Search NASA⌕ Search

SEARCH · Search NASA

Results for “Programmable Logic Controller”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Test Capability Enhancements to the NASA Langley 8-Foot High Temperature Tunnel

The NASA Langley 8-Foot High Temperature Tunnel produces true enthalpy environments simulating flight from Mach 4 to Mach 7, primarily for airbreathing propulsion and aerothermal/thermo-structural testing. Flow conditions are achieved through a methane-air heater and nozzles producing aerodynamic Mach numbers of 4, 5 or 7 and have exit diameters of 8 feet or 4.5 feet. The 12-ft long free-jet test section, housed inside a 26-ft vacuum sphere, accommodates large test articles. Recently, the facility underwent significant upgrades to support hydrocarbon fueled scramjet engine testing and to expand flight simulation capability. The upgrades were required to meet engine system development and flight clearance verification requirements originally defined by the joint NASA-Air Force X-43C Hypersonic Flight Demonstrator Project and now the Air Force X-51A Program. Enhancements to the 8-Ft. HTT were made in four areas: 1) hydrocarbon fuel delivery; 2) flight simulation capability; 3) controls and communication; and 4) data acquisition/processing. The upgrades include the addition of systems to supply ethylene and liquid JP-7 to test articles; a Mach 5 nozzle with dynamic pressure simulation capability up to 3200 psf, the addition of a real-time model angle-of-attack system; a new programmable logic controller sub-system to improve process controls and communication with model controls; the addition of MIL-STD-1553B and high speed data acquisition systems and a classified data processing environment. These additions represent a significant increase to the already unique test capability and flexibility of the facility, and complement the existing array of test support hardware such as a model injection system, radiant heaters, six-component force measurement system, and optical flow field visualization hardware. The new systems support complex test programs that require sophisticated test sequences and precise management of process fluids. Furthermore, the new systems, such as the real-time angle of attack system and the new programmable logic controller enhance the test efficiency of the facility. The motivation for the upgrades and the expanded capabilities is described here.

Harvin, S. F.↗

Implementation of Adaptive Digital Controllers on Programmable Logic Devices

Much has been made of the capabilities of FPGA's (Field Programmable Gate Arrays) in the hardware implementation of fast digital signal processing (DSP) functions. Such capability also makes and FPGA a suitable platform for the digital implementation of closed loop controllers. There are myriad advantages to utilizing an FPGA for discrete-time control functions which include the capability for reconfiguration when SRAM- based FPGA's are employed, fast parallel implementation of multiple control loops and implementations that can meet space level radiation tolerance in a compact form-factor. Other researchers have presented the notion that a second order digital filter with proportional-integral-derivative (PID) control functionality can be implemented in an FPGA. At Marshall Space Flight Center, the Control Electronics Group has been studying adaptive discrete-time control of motor driven actuator systems using digital signal processor (DSF) devices. Our goal is to create a fully digital, flight ready controller design that utilizes an FPGA for implementation of signal conditioning for control feedback signals, generation of commands to the controlled system, and hardware insertion of adaptive control algorithm approaches. While small form factor, commercial DSP devices are now available with event capture, data conversion, pulse width modulated outputs and communication peripherals, these devices are not currently available in designs and packages which meet space level radiation requirements. Meeting our goals requires alternative compact implementation of such functionality to withstand the harsh environment encountered on spacecraft. Radiation tolerant FPGA's are a feasible option for reaching these goals.

Gwaltney, David A.↗

Hardware and Software Engineering

The Launch Control System (LCS) is a part of the system used to launch the Space Launch System (SLS). It monitors and control of both vehicle and ground systems for SLS. My internship this spring was focused both on the hardware and software aspects of the command and control system. During my internship I worked in two groups, the Record and Playback Subsystem (RPS) and Kennedy Ground Control Subsystems (KGCS). During my time on RPS, I worked on automating the updating of displays and engineering reports. While on KGCS I worked on creating a power distribution diagram of the Control System Development Lab (CDL) and a new trainer for new interns or employees to gain an understanding of Programmable Logic Controllers (PLCs).

Hardware↗

Calibration of the analog beam-signal hardware for the credited engineered beam power limit system at the Proton Power Upgrade Project at the Spallation Neutron Source

A programmable signal processor-based credited safety control that calculates pulsed beam power based on beam kinetic energy and charge was designed as part of the Proton Power Upgrade (PPU) project at the Spallation Neutron Source (SNS). The system must reliably shut off the beam if the average power exceeds 2.145 MW averaging over 60 seconds. System calibration requires pedigree in measurements, calibration setup, and calculations. This paper discusses the calibration of the analog beam signal components up to and including the Analog Digital Convertors (ADCs) for implementation into the Safety Programmable Logic Controllers (PLCs) and Field Programmable Gate Arrays (FPGAs).

Bobrek, Miljko↗

Development of Algorithms for Control of Humidity in Plant Growth Chambers

Algorithms were developed to control humidity in plant growth chambers used for research on bioregenerative life support at Kennedy Space Center. The algorithms used the computed water vapor pressure (based on measured air temperature and relative humidity) as the process variable, with time-proportioned outputs to operate the humidifier and de-humidifier. Algorithms were based upon proportional-integral-differential (PID) and Fuzzy Logic schemes and were implemented using I/O Control software (OPTO-22) to define and download the control logic to an autonomous programmable logic controller (PLC, ultimate ethernet brain and assorted input-output modules, OPTO-22), which performed the monitoring and control logic processing, as well the physical control of the devices that effected the targeted environment in the chamber. During limited testing, the PLC's successfully implemented the intended control schemes and attained a control resolution for humidity of less than 1%. The algorithms have potential to be used not only with autonomous PLC's but could also be implemented within network-based supervisory control programs. This report documents unique control features that were implemented within the OPTO-22 framework and makes recommendations regarding future uses of the hardware and software for biological research by NASA.

Costello, Thomas A.↗

Designing Crane Controls with Applied Mechanical and Electrical Safety Features

The use of overhead traveling bridge cranes in many varied applications is common practice. In particular, the use of cranes in the nuclear, military, commercial, aerospace, and other industries can involve safety critical situations. Considerations for Human Injury or Casualty, Loss of Assets, Endangering the Environment, or Economic Reduction must be addressed. Traditionally, in order to achieve additional safety in these applications, mechanical systems have been augmented with a variety of devices. These devices assure that a mechanical component failure shall reduce the risk of a catastrophic loss of the correct and/or safe load carrying capability. ASME NOG-1-1998, (Rules for Construction of Overhead and Gantry Cranes, Top Running Bridge, and Multiple Girder), provides design standards for cranes in safety critical areas. Over and above the minimum safety requirements of todays design standards, users struggle with obtaining a higher degree of reliability through more precise functional specifications while attempting to provide "smart" safety systems. Electrical control systems also may be equipped with protective devices similar to the mechanical design features. Demands for improvement of the cranes "control system" is often recognized, but difficult to quantify for this traditionally "mechanically" oriented market. Finite details for each operation must be examined and understood. As an example, load drift (or small motions) at close tolerances can be unacceptable (and considered critical). To meet these high functional demands encoders and other devices are independently added to control systems to provide motion and velocity feedback to the control drive. This paper will examine the implementation of Programmable Electronic Systems (PES). PES is a term this paper will use to describe any control system utilizing any programmable electronic device such as Programmable Logic Controllers (PLC), or an Adjustable Frequency Drive (AID) 'smart' programmable motion controller. Therefore the use of the term Programmable Electronic Systems (PES) is an encompassing description for a large spectrum of programmable electronic control devices.

Lytle, Bradford P.↗

Strengthening Cybersecurity for Industrial Control Systems: Innovations in Protecting PLC-Based Infrastructure

In this paper, we propose two new approaches aimed at enhancing the security of industrial control systems (ICS) that utilize programmable logic controllers (PLCs) for the control of critical processes. The first approach involves the addition of a unique digital watermark to the PWM control that adjusts the motor speed to control the critical process. This enables efficient detection and identification of any unauthorized modifications to the sensor signals responsible for controlling the plant. The second approach focuses on monitoring the input current (i.e power) drawn by the PLC during the execution of critical process control tasks. Malicious intrusions to change the PLC parameters and/or unauthorized firmware updates can be rapidly detected. Both approaches demonstrate a substantial improvement in the security of ICS, effectively safeguarding against potential cyber-attacks. Experimental results from a laboratory scale water tank level controlled via PLC showcases rapid intrusion detection capabilities.

Huang, Peng-Hao↗

Automated Cyber Security Testing Platform for Industrial Control Systems

Nuclear Power Plants (NPPs) are a complex system of coupled physics controlled by a network of Programmable Logic Controllers (PLCs). These PLCs communicate process data across the network to coordinate control actions with each other and inform the operators of process variables and control decisions. Networking the PLCs allows more effective process control and provides the operator more information which results in more efficient plant operation. This interconnectivity creates new security issues, as operators have more access to the plant controls, so will bad actors. As plant networks become more digitized and encompass more sophisticated controllers, the network surface exposed to cyber interference grows. Understanding the dynamics of these coupled systems of physics, control logic, and network communications is critical to their protection. The research into the cybersecurity of the Operational Technologies of NPPs is developing and requires a platform that can allow high fidelity physics simulations to interact with digital networks of controllers. This will require three main components: a network simulation environment, a physics simulator, and virtual PLCs (vPLC) that represent typical industry hardware. A platform that incorporates these three components to provide the most accurate representation of actual NPP networks and controllers is developed in this paper.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

A System for Managing Replenishment of a Nutrient Solution Using an Electrical Conductivity Controller

Control of nutrient solution parameters is very important for the growth and development of plants grown hydroponically. Protocols involving different nutrient solution replenishment times (e.g. one-week, two-week, or two-day replenishment) provide manual periodic control of the nutrient solution's electrical conductivity (EC). Since plants take-up nutrients as they grow, manual control has a drawback in that EC is not held constant between replenishments. In an effort to correct this problem the Center for Food and Environmental Systems for Human Exploration of Space at Tuskegee University has developed a system for managing and controlling levels of EC over a plant's entire growing cycle. A prototype system is being tested on sweetpotato production using the nutrient film technique (NFT), and it is being compared to a system in which sweetpotatoes are grown using NFT with manual control. NASA has played an important role in the development of environmental control systems. They have become a forerunner in growing plants hydroponically with some control systems through the use of networked data acquisition and control using environmental growth chambers. Data acquisition systems which involve the use of real-time, calibration, set points, user panel, and graphical representation programming provide a good method of controlling nutrient solution parameters such as EC and pH [Bledsoe, 19931]. In NASA's Biomass Production Chamber (BPC) at Kennedy Space Center, control is provided by a programmable logic controller (PLC). This is an industrial controller which combines ladder computer logic which has the ability to handle various levels of electrical power. The controller controls temperature, light and other parameters that affect the plant's environment, in the BPC, the Nutrient Delivery System (NIX), a sub-system of the PLC, controls nutrient solution parameters such as EC, pH, and solution levels. When the nutrient EC measurement goes outside a preset range (120-130 mS/m) a set amount of a stock solution of nutrients is automatically added by a metering pump to bring the EC back into operating range [Fortson, 1992]. This paper describes a system developed at Tuskegee University for controlling the EC of a nutrient solution used for growing sweetpotatoes with an EC controller and a computer with LabView data acquisition and instrumentation software. It also describes the preliminary data obtained from the growth of sweetpotatoes using this prototype control system.

Davis, D.↗

Fuel Flexible Gas Turbine Combustor Flametube Facility Upgraded

In fiscal year 2003, test cell 23 of the Research Combustion Laboratory (RCL 23) at the NASA Glenn Research Center was upgraded with the addition of gaseous hydrogen as a working propellant and the addition of a 450-psig air-supply system. Test flexibility was further enhanced by upgrades to the facility control systems. RCL 23 can now test with gaseous hydrogen flow rates up to 0.05 lbm/sec and jet fuel flow rates up to 0.62 lbm/sec. Research airflow rates up to 3 lbm/sec are possible with the 450-psig supply system over a range of inlet temperatures. Nonvitiated, heated air is supplied from a shell and tube heat exchanger. The maximum nonvitiated facility air temperature is 1100 F at 1.5 lbm/sec. Research-section exhaust temperatures are limited to 3200 F because of material and cooling capacity limits. A variety of support systems are available depending on the research hardware configuration. Test section ignition can be provided via either a hydrogen air torch system or an electronic spark system. Emissions measurements are obtained with either pneumatically or electromechanically actuated gas sample probes, and the electromechanical system allows for radial measurements at a user-specified axial location for measurement of emissions profiles. Gas analysis data can be obtained for a variety of species, including carbon monoxide (CO), carbon dioxide (CO2), nitrogen oxides (NO and NOx), oxygen (O2), unburnt hydrocarbons, and unburnt hydrogen. Facility control is accomplished with a programmable logic control system. Facility operations have been upgraded to a system based on graphical user interface control screens. A data system is available for real-time acquisition and monitoring of both measurements in engineering units and performance calculations. The upgrades have made RCL 23 a highly flexible facility for research into low emissions gas turbine combustor concepts, and the flame tube configuration inherently allows for a variety of fuel nozzle configurations to be tested in a cost-effective manner. RCL 23 is poised to be a leading facility for developing modern low-emission fuel nozzles for use with jet fuel and alternative fuels.

Little, James E.↗

Software and Human-Machine Interface Development for Environmental Controls Subsystem Support

The Space Launch System (SLS) is the next premier launch vehicle for NASA. It is the next stage of manned space exploration from American soil, and will be the platform in which we push further beyond Earth orbit. In preparation of the SLS maiden voyage on Exploration Mission 1 (EM-1), the existing ground support architecture at Kennedy Space Center required significant overhaul and updating. A comprehensive upgrade of controls systems was necessary, including programmable logic controller software, as well as Launch Control Center (LCC) firing room and local launch pad displays for technician use. Environmental control acts as an integral component in these systems, being the foremost system for conditioning the pad and extremely sensitive launch vehicle until T-0. The Environmental Controls Subsystem (ECS) required testing and modification to meet the requirements of the designed system, as well as the human factors requirements of NASA software for Validation and Verification (V&V). This term saw significant strides in the progress and functionality of the human-machine interfaces used at the launch pad, and improved integration with the controller code.

Dobson, Matthew↗

Primary Pump Motor Area - Transfer Fan Replacement PLC Design

My poster is about a project that I have worked on in my time at ATR as an intern. The Heating and Ventilation Control Panel (HVB-1) controls thirty-five heating and ventilation fans within the Advanced Test Reactor. This control panel needs replacement, as many of the components inside the existing panel are becoming old and degrading. In preparation for this replacement effort, concepts and component identification for the new control panel needed to be developed. Instead of replacing the new panel with replacement mechanical components, a Programmable Logic Controller (PLC) is proposed as a solution. Although multiple fans are associated with this panel, my poster focuses on the replacement design for the Primary Pump Motor Area Transfer Fan. This will provide an example of how the entire cabinet may be upgraded.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

NASA Glenn's Single-Stage Axial Compressor Facility Upgraded

NASA Glenn Research Center's Single-Stage Axial Compressor Facility was upgraded in fiscal year 2003 to expand and improve its research capabilities for testing high-speed fans and compressors. The old 3000-hp drive motor and gearbox were removed and replaced with a refurbished 7000-hp drive motor and gearbox, with a maximum output speed of 21,240 rpm. The higher horsepower rating permits testing of fans and compressors with higher pressure ratio or higher flow. A new inline torquemeter was installed to provide an alternate measurement of fan and compressor efficiency, along with the standard pressure and temperature measurements. A refurbished compressor bearing housing was also installed with bidirectional rotation capability, so that a variety of existing hardware could be tested. Four new lubrication modules with backup capability were installed for the motor, gearbox, torquemeter, and compressor bearing housing, so that in case the primary pump fails, the backup will prevent damage to the rotating hardware. The combustion air supply line for the facility inlet air system was activated to provide dry air for repeatable inlet conditions. New flow conditioning hardware was installed in the facility inlet plenum tank, which greatly reduced the inlet turbulence. The new inlet can also be easily modified to accommodate 20- or 22-in.-diameter fans and compressors, so a variety of existing hardware from other facilities (such as Glenn's 9- by 15-Foot Low-Speed Wind Tunnel) can be tested in the Single-Stage Axial Compressor Facility. An exhaust line was also installed to provide bleed capability to remove the inlet boundary layer. To improve the operation and control of the facility, a new programmable logic controller (PLC) was installed to upgrade from hardwired relay logic to software logic. The PLC also enabled the usage of human-machine interface software to allow for easier operation of the facility and easier reconfiguration of the facility controls when necessary. Finally, a new health-monitoring system was installed to measure shaft speed, shaft movement, and machine vibration on all of the rotating equipment. The system also provides automatic alarms and shutdown of the equipment when required. An integrated systems test for checkout of the facility was completed on June 17, 2003. Research testing resumed on June 30 with data obtained in support of the Ultra-Efficient Engine Technology Project's Compressor Casing Treatment Project.

Brokopp, Richard A.↗

Modernization of B-2 Data, Video, and Control Systems Infrastructure

The National Aeronautics and Space Administration (NASA) Glenn Research Center (GRC) Plum Brook Station (PBS) Spacecraft Propulsion Research Facility, commonly referred to as B-2, is NASA s third largest thermal-vacuum facility with propellant systems capability. B-2 has completed a modernization effort of its facility legacy data, video and control systems infrastructure to accommodate modern integrated testing and Information Technology (IT) Security requirements. Integrated systems tests have been conducted to demonstrate the new data, video and control systems functionality and capability. Discrete analog signal conditioners have been replaced by new programmable, signal processing hardware that is integrated with the data system. This integration supports automated calibration and verification of the analog subsystem. Modern measurement systems analysis (MSA) tools are being developed to help verify system health and measurement integrity. Legacy hard wired digital data systems have been replaced by distributed Fibre Channel (FC) network connected digitizers where high speed sampling rates have increased to 256,000 samples per second. Several analog video cameras have been replaced by digital image and storage systems. Hard-wired analog control systems have been replaced by Programmable Logic Controllers (PLC), fiber optic networks (FON) infrastructure and human machine interface (HMI) operator screens. New modern IT Security procedures and schemes have been employed to control data access and process control flows. Due to the nature of testing possible at B-2, flexibility and configurability of systems has been central to the architecture during modernization.

Cmar, Mark D.↗

Modernization of B-2 Data, Video, and Control Systems Infrastructure

The National Aeronautics and Space Administration (NASA) Glenn Research Center (GRC) Plum Brook Station (PBS) Spacecraft Propulsion Research Facility, commonly referred to as B-2, is NASA's third largest thermal-vacuum facility with propellant systems capability. B-2 has completed a modernization effort of its facility legacy data, video and control systems infrastructure to accommodate modern integrated testing and Information Technology (IT) Security requirements. Integrated systems tests have been conducted to demonstrate the new data, video and control systems functionality and capability. Discrete analog signal conditioners have been replaced by new programmable, signal processing hardware that is integrated with the data system. This integration supports automated calibration and verification of the analog subsystem. Modern measurement systems analysis (MSA) tools are being developed to help verify system health and measurement integrity. Legacy hard wired digital data systems have been replaced by distributed Fibre Channel (FC) network connected digitizers where high speed sampling rates have increased to 256,000 samples per second. Several analog video cameras have been replaced by digital image and storage systems. Hard-wired analog control systems have been replaced by Programmable Logic Controllers (PLC), fiber optic networks (FON) infrastructure and human machine interface (HMI) operator screens. New modern IT Security procedures and schemes have been employed to control data access and process control flows. Due to the nature of testing possible at B-2, flexibility and configurability of systems has been central to the architecture during modernization.

Cmar, Mark D.↗

CELSS Breadboard Project at the Kennedy Space Center

The CELSS Breadboard Project is described, noting that it was initiated to study aspects of a CELSS for long-term space missions. Topics for extensive investigation included air and water regeneration, engineering control, and food production. The many options available for growing food crops in commercial plant growth chambers were investigated and the best of this information was translated to the Biomass Production Chamber (BPC). The chamber contains 20 sq m of crop growing area under 96 400 W HPS lamps; sixteen 0.25 sq m plant growth trays used on each of four growing shelves for a total of 64 trays; and one 256-L nutrient solution reservoir with the appropriate continuous-flow, thin-film plumbing for each shelf. A heating, ventilating, and air-conditioning system maintains atmospheric conditions and serves to distribute oxygen and carbon dioxide and maintain pressure at 12 mm of water. The control and monitoring subsystem, which uses a programmable logic controller, manages the BPC subsystems.

Prince, R. P.↗

Integrated System for Health Management and Autonomous Control (ISHM-AC): Development and Application

Autonomous control systems represent a technological barrier from manual and automated operated control systems in an industry wide application. An increase in energy-efficient storage, transfer and use of cryogens and cryogenic propellants on Earth and in space has been observed in space related industries between NASA, government and commercial programs. An increase in efficiency of cryogenic systems demands an increase in the capabilities of the control and monitoring system that manages them. As new technologies are developed for cryogenic systems, complexity and capability increases. The increase in complexities are a natural drive to develop better and more capable health monitoring and control system management. Current research and development efforts lead the Cryogenics Test Laboratory at the Kennedy Space Center to improve its automated control and health monitoring system from a Programmable Logic Control (PLC) based-only system to a fully Integrated System for Health Management (ISHM) - Autonomous Control (AC) capable of performing autonomous operations on a cryogenic propellant transfer system. This ISHM-AC system has been developed and tested by controlling a complete simulated propellant transfer operation. The capabilities and test results of this fully integrated autonomous system for cryogenics propellant transfer operation will be presented in this paper.

Toro, Jaime A.↗

Integrated System for Health Management and Autonomous Control (ISHM-AC) for Cryogenic Operations on the Simulated Propellant Loading System

Autonomous control systems represent a technological barrier from manual and automated operated control systems in an industry wide application. An increase in energy-efficient storage, transfer and use of cryogens and cryogenic propellants on Earth and in space has been observed in space related industries between NASA, government and commercial programs. An increase in efficiency of cryogenic systems demands an increase in the capabilities of the control and monitoring system that manages them. As new technologies are developed for cryogenic systems, complexity and capability increases. The increase in complexities are a natural drive to develop better and more capable health monitoring and control system management. Current research and development efforts lead the Cryogenics Test Laboratory at the Kennedy Space Center to improve its automated control and health monitoring system from a Programmable Logic Control (PLC) based-only system to a fully Integrated System for Health Management (ISHM) - Autonomous Control (AC) capable of performing autonomous operations on a cryogenic propellant transfer system. This ISHM-AC system has been developed and tested by controlling a complete simulated propellant transfer operation. The capabilities and test results of this fully integrated autonomous system for cryogenics propellant transfer operation will be presented in this paper.

Toro Medina, Jaime A.↗