Search NASA⌕ Search

SEARCH · Search NASA

Results for “Project Closeout”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

ALICE-USA Barrel Tracking Upgrade (Project Final Report)

The ALICE-USA Barrel Tracking Upgrade (BTU) project began in 2015 to participate in a major upgrade of the Time Projection Chamber (TPC) and the Inner Tracking System (ITS) of the ALICE Experiment at CERN in Geneva, Switzerland. This upgrade increased the maximum readout rate of the ALICE detector to accommodate the increased heavy ion interaction rates following Long Shutdown 2 of the Large Hadron Collider, and greatly improved the vertexing performance of the detector. The original scope was completed and reviewed in November 2019. The BTU project document BTU.19.v1 "ALICE Barrel Tracking Upgrade Project Closeout / Transition to Operations (2019)" from November 2019 describes the status in detail and is attached as Appendix 1 below. At that point, all delivery milestones had been met on time, all Key Performance Parameters (KPPs) of the project had been satisfied, and the project was under budget. Several subsequent No Cost Extensions (NCEs) supported integration and pre-commissioning of the BTU project deliverables at CERN, as well as study and assessment of performance with Pb-Pb collisions at 50 kHz. The BTU project was successfully completed on 30 September 2024.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

USACE FUSRAP Records Management Challenges in the Digital Age - 20242

In late 2016, the U.S. Army Corps of Engineers (USACE) implemented a Headquarters-supported nationwide records management initiative managed by the USACE-New England District to address the digitization and organization of Formerly Utilized Sites Remedial Action Program (FUSRAP) project files. This initiative will prepare USACE FUSRAP for moving toward a fully electronic system of records management. Additionally, the records management initiative streamlines the process and prepares the Administrative Record (AR) and Permanent Record (PR) file for transfer from USACE to the U.S. Department of Energy (DOE)-Office of Legacy Management (LM) following project closeout. Over the past couple of years, USACE and DOE-LM have been working to finalize a joint guidance document to assist in the FUSRAP records transition process. However, there remain key records management topics that require further discussion and development. Specifically, these topics include the implementation, process, and procedure for the capture of social media records and compliance with Section 508 of the Rehabilitation Act of 1973 (29 USC 794d), as amended. Due to advances in technology and the ease of communication it provides, USACE is using social media more often to interface with the public than 5, 10 or 15 years ago. The identification and capture of these records are challenging because it requires each USACE district or producer of a record to track what has been released through social media so that it can be captured as part of the AR or PR. USACE is currently evaluating processes and procedures for social media records capture. This paper explores how social media is being used by USACE across FUSRAP projects and best practices for the capture of social media records. Public accessibility to the project AR is required under the Comprehensive Environmental Response, Compensation, and Liability Act, which USACE FUSRAP must follow. As USACE FUSRAP ARs are converted to a digital format, greater accessibility to the files can be provided through web sites or other electronic media. However, Section 508 of the Rehabilitation Act must be considered when releasing electronic files to the public. Under Section 508, government agencies must ensure that information is made available to the public in a format that provides equal access to persons with disabilities. This paper discusses the electronic records requirements under Section 508 and addresses broad implementation of compliance across large digital records sets. Records management challenges are presented in the context of the FUSRAP records management program; however, these records management considerations and best practices are applicable across all Federal agency records management programs. Examples presented will further aid in understanding electronic records requirements that may be included on new USACE FUSRAP contracts as well as upcoming National Archives Records Administration requirements that will move us toward an electronic government. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Building America Industrialized Housing Partnership (BAIHP II)

This report summarizes the work conducted by the Building America Industrialized Housing Partnership (BAIHP - www.baihp.org) during the final budget period (BP5) of our contract, January 1, 2010 to November 30, 2010. Highlights from the four previous budget periods are included for context. BAIHP is led by the Florida Solar Energy Center (FSEC) of the University of Central Florida. With over 50 Industry Partners including factory and site builders, work in BP5 was performed in six tasks areas: Building America System Research Management, Documentation and Technical Support; System Performance Evaluations; Prototype House Evaluations; Initial Community Scale Evaluations; Project Closeout, Final Review of BA Communities; and Other Research Activities.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Final Technical Report

The project, Capital Investment to Fund Equipment Purchases and Facility Modifications to Create a Sustainable Future for EnergyXchange served to replace landfill gas energy with alternative energy resources, primarily solar and wood waste. This is the final project closeout report.

09 BIOMASS FUELS↗

FIELD IMPLEMENTATION PLAN FOR A WILLISTON BASIN BRINE EXTRACTION AND STORAGE TEST

The Energy & Environmental Research Center (EERC) successfully completed all technical work of Phase I, including development of a field implementation plan (FIP) for a brine extraction and storage test (BEST) in the North Dakota portion of the Williston Basin. This implementation plan was commissioned by the U.S. Department of Energy (DOE) National Energy Technology Laboratory (NETL) as a proxy for managing formation pressure plumes and measuring/monitoring the movement of differential pressure and CO2 plumes in the subsurface for future saline CO2 storage projects. BEST comprises the demonstration and validation of active reservoir management (ARM) strategies and extracted brine treatment technologies. Two prospective commercial brine injection sites were evaluated for BEST to satisfy DOE’s goals. Ultimately, an active saltwater disposal (SWD) site, Johnsons Corner, was selected because it possesses an ideal combination of key factors making it uniquely suited to host BEST. This site is located in western North Dakota and operated by Nuverra Environmental Solutions (Nuverra), a national leader in brine handling, treatment, and injection. An integrated management approach was used to incorporate local and regional geologic characterization activities with geologic and simulation models, inform a monitoring, verification, and accounting (MVA) plan, and to conduct a risk assessment. This approach was used to design a FIP for an ARM schema and an extracted brine treatment technology test bed facility. The FIP leverages an existing pressure plume generated by two commercial SWD wells. These wells, in conjunction with a new brine extraction well, will be used to conduct the ARM schema. Results of these tests will be quantified based on their impact on the performance of the existing SWD wells and the surrounding reservoir system. Extracted brine will be injected into an underlying deep saline formation through a new injection well. The locations of proposed extraction and injection wells were selected during the Phase I efforts. These wells will be permitted as North Dakota Administrative Code Underground Injection Control Class II wells and will yield additional characterization data which will further refine the FIP in Phase II. An array of surface and downhole monitoring techniques will validate ARM performance against predictive simulation results. Infrastructure will be constructed to manage extracted fluids at the surface and provide brine to a treatment test bed facility. Treatment of extracted brine can provide a means of reducing extracted brine disposal volumes, an alternate source of water, and/or salable products for beneficial use. A test bed facility will be constructed to provide a means of demonstrating these technologies on a wide range of brine concentrations. Screening criteria based on a techno-economic and life cycle assessment were developed to select high-salinity brine treatment technologies for extended duration treatment (30–60 days) in Phase II. A detailed cost assessment determined total implementation costs for BEST of $19,901,065 million (DOE share $15,680,505). These costs are inclusive of all necessary equipment, infrastructure construction, operations and project closeout costs required to implement BEST. An ideal combination of key factors makes the Johnsons Corner site uniquely suited to be the BEST demonstration.

10 SYNTHETIC FUELS↗

Environmental Cost Analysis System (ECAS) Status and Compliance Requirements for EM Consolidated Business Center Contracts - 13204

The Department of Energy (DOE) Office of Environmental Management (EM) has developed a web-accessible database to collect actual cost data from completed EM projects to support cost estimating and analysis. This Environmental Cost Analysis System (ECAS) database was initially deployed in early 2009 containing the cost and parametric data from 77 decommissioning, restoration, and waste management projects completed under the Rocky Flats Closure Project. In subsequent years we have added many more projects to ECAS and now have a total of 280 projects from 8 major DOE sites. This data is now accessible to DOE users through a web-based reporting tool that allows users to tailor report outputs to meet their specific needs. We are using it as a principal resource supporting the EM Consolidated Business Center (EMCBC) and the EM Applied Cost Engineering (ACE) team cost estimating and analysis efforts across the country. The database has received Government Accountability Office review as supporting its recommended improvements in DOE's cost estimating process, as well as review from the DOE Office of Acquisition and Project Management (APM). Moving forward, the EMCBC has developed a Special Contract Requirement clause or 'H-Clause' to be included in all current and future EMCBC procurements identifying the process that contractors will follow to provide DOE their historical project data in a format compatible with ECAS. Changes to DOE O 413.3B implementation are also in progress to capture historical costs as part of the Critical Decision project closeout process. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Closeout of the Melton Valley Completion Project at the Oak Ridge National Laboratory

The U.S. Department of Energy DOE Order 413.3A (Program and Project Management for the Acquisition of Capital Assets) identifies major milestones in a project life cycle that require approval upon achievement, including Critical Decision-4 (CD-4), the project completion milestone. A CD-4 document is required for all DOE projects in accordance with DOE Order 413.3A, Program and Project Management for Acquisition of Capital Assets. A conditional CD-4 report was prepared for the Melton Valley Completion Project (MVCP) in order to document the completion of the remedial action in the Melton Valley watershed. Approval of the MVCP CD-4 was 'conditional' pending final resolution of a small quantity of unexpected pyrophoric material, with no current disposition pathway, remaining in one of the waste trenches that were to be remediated as part of the completion project. This paper will provide an overview of the MVCP remediation work and the process successfully used to demonstrate closeout of a major CERCLA project in accordance with DOE requirements. In summary: The MV ROD was planned to be completed in 12 years; however, under the ACP the remedial activities were completed 6 years ahead of schedule (September 2006). Highlights of the remedial actions include: - Completion of remedial action activities at 219 release sites identified in the MV ROD. - Construction of 58 hectares of multilayer caps for SWSA 4, SWSA 5, SWSA 6, Pits 2, 3 and 4 and Trenches 5, 6, and 7; - Complete excavation, retrieval and over-pack of 204 casks, 8 boxes, and 530 m{sup 3} of loose waste from the TRU waste retrieval project; - Complete demolition and disposition of approx. 557 m{sup 2} of various buildings such as HRE ancillary facilities, NHF, Liquid LLW pumping stations, 7841 Scrap Yard, misc. storage buildings, and well P and A; - Removal of LLW sludges and stabilization of T-1, T-2, and HFIR tanks; - In situ grouting/stabilization of approx. 12 km of inactive waste pipelines; - Excavation and disposition of approx. 38,000 m{sup 3} of soil from HFIR impoundments, HRE cryogenic pond, IHP and contaminated soil from miscellaneous leak sites; - Completion of in-situ grouting of LLLW matrix at Trenches 5 and 7. The CD-4 document to demonstrate attainment of the project completion milestone was prepared to document close-out activities. Approval of the MVCP CD-4 was obtained but deemed 'conditional' pending final resolution of a small quantity of unexpected pyrophoric material, with no current disposition pathway, remaining in Trench 13 of the 22 Trench Area in SWSA 5N. DOE is currently evaluating options for the final disposition of this material and has committed to resolution of the issue by the end of Fiscal Year 2008. At that time, all aspects of the Melton Valley Completion Project will be complete. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

High-Burnup Spent Fuel Data Project Sibling Pin Test Campaign Closeout Summary

The Used Fuel Disposition Campaign (UFDC) was established within the United States (U.S.) Department of Energy (DOE) Office of Nuclear Energy (NE) to conduct research and development (R&D) activities associated with storage, transportation, and disposal of used or spent nuclear fuel (UNF or SNF) and high-level radioactive waste.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Development of Solid Isotope Harvesting Methods in Preparation for FRIB (Closeout Report)

This project developed the techniques necessary to isolate hydrolysable radiometals from irradiated accelerator components. It was a collaborative project headed by Dr. Jennifer Shusterman at Hunter College in coordination with Dr. Nick Scielzo at Lawrence Livermore National Laboratory and Dr. Gregory Severin at Michigan State University. To develop the methods for harvesting hydrolysable radiometals, both non-radioactive and radioactive experiments were conducted. Non-radioactive tests involved dissolving common accelerator materials (tungsten, copper, aluminum, and gold), adding trace amounts of Zr 4+ and Y 3+ , and then separating the added ions out again using a variety of column-based approaches. These methods were then tested on surrogate materials that were created by irradiating tungsten, copper, aluminum and gold foils with a low-purity 88 Zr beam at the National Superconducting Cyclotron Laboratory. The implanted 88 Zr (and co-implanted and daughter-product 88 Y) were recovered, validating the developed methods. MSU’s role in the project was to develop the chemistry for recovering Zr and Y from tungsten; build the target station for irradiating the foils; conduct the irradiations with the collaborators; to validate the tungsten methodology using the irradiated foils; and to disseminate the results.

07 ISOTOPE AND RADIATION SOURCES↗

New Industry Partnerships: Solar Energy Technologies Office Support for Early Projects in the Energy Systems Integration Facility: An Agreement Closeout Summary Report

The U.S. Department of Energy (DOE) Office of Energy Efficiency and Renewable Energy (EERE) Solar Energy Technologies Office (SETO)-funded New Industry Partnerships (NIPs) agreement established multiple new cooperative research projects with industry partners. Each project demonstrated the use of the National Renewable Energy Laboratory's Energy Systems Integration Facility (ESIF) as a national asset for research and development, testing, and validation of new technologies to support high penetrations of solar energy on the electric grid. The agreement was launched in 2013 and represented the SETO portion of the DOE EERE-wide Integrated Network Testbed for Energy Grid Research and Technology Experimentation (INTEGRATE) program. The focus of INTEGRATE was on multi-energy system testing and on testing the interactions of energy systems with information technology, communications, and telecommunications (ICT) systems. The NIPs agreement was a bit different from traditional research projects because it was specifically structured to enable partnerships for ESIF testing and as such required at least a 1:1 funds-in cost share from industry partners. In the end, the project engaged six different industry partnerships and resulted in testing a large number of innovative technologies. These included tiny inverters; power-to-gas technologies; and advanced simulation, analysis, and power-hardware-in-the-loop testing techniques. The agreement also provided significant impact for both research and industrial communities. This summary report provides a brief, high-level overview of these projects and their highlights along with lists of citations and other impacts. Readers are referred to the corresponding project reports for more in-depth information.

14 SOLAR ENERGY↗

Development of a high-density gas-jet target for nuclear astrophysics and reaction studies with rare isotope beams. Final Report

The purpose of this project was to develop a high-density gas jet target that will enable a new program of transfer reaction studies with rare isotope beams and targets of hydrogen and helium that is not currently possible and will have an important impact on our understanding of stellar explosions and of the evolution of nuclear shell structure away from stability. This is the final closeout report for the project.

43 PARTICLE ACCELERATORS↗

Fixing Amdahl's Law within the Limits of Accelerated Systems: FALLACY

Closeout report for FALLACY project. The performance of Data Model Convergence Initiative (DMC) applications on parallel machines is far below the limit set by Amdahl’s law. Whether the machine is based on many-core, GPUs, FPGAs, or a heterogeneous combination, usually the most significant bottleneck is accessing data from the memory system. Aligning with DMC’s HW/architecture thrust, this project developed a set of memory-centric tools called ‘MemGaze’ that inform the HW/SW stack about an application’s memory behavior, including data access latency and diagnosing poor data layout and data composition. Our approach uses architectural modeling and analysis of workload data accesses.

97 MATHEMATICS AND COMPUTING↗

National Computational Infrastructure for Lattice Gauge Theory SciDAC-2 Closeout Report

As part of this project work, researchers from Vanderbilt University, Fermi National Laboratory and Illinois Institute of technology developed a real-time cluster fault-tolerant cluster monitoring framework. This framework is open source and is available for download upon request. This work has also been used at Fermi Laboratory, Vanderbilt University and Mississippi State University across projects other than LQCD. The goal for the scientific workflow project is to investigate and develop domain-specific workflow tools for LQCD to help effectively orchestrate, in parallel, computational campaigns consisting of many loosely-coupled batch processing jobs. Major requirements for an LQCD workflow system include: a system to manage input metadata, e.g. physics parameters such as masses, a system to manage and permit the reuse of templates describing workflows, a system to capture data provenance information, a systems to manage produced data, a means of monitoring workflow progress and status, a means of resuming or extending a stopped workflow, fault tolerance features to enhance the reliability of running workflows. Requirements for an LQCD workflow system are available in documentation.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

FutureGen 2.0 Oxy-combustion Large Scale Test – Final Report

The primary objectives of the FutureGen 2.0 CO 2 Oxy-Combustion Large Scale Test Project were to site, permit, design, construct, and commission, an oxy-combustion boiler, gas quality control system, air separation unit, and CO 2 compression and purification unit, together with the necessary supporting and interconnection utilities. The project was to demonstrate at commercial scale (168MWe gross) the capability to cleanly produce electricity through coal combustion at a retrofitted, existing coal-fired power plant; thereby, resulting in near-zeroemissions of all commonly regulated air emissions, as well as 90% CO 2 capture in steady-state operations. The project was to be fully integrated in terms of project management, capacity, capabilities, technical scope, cost, and schedule with the companion FutureGen 2.0 CO 2 Pipeline and Storage Project, a separate but complementary project whose objective was to safely transport, permanently store and monitor the CO 2 captured by the Oxy-combustion Power Plant Project. The FutureGen 2.0 Oxy-Combustion Large Scale Test Project successfully achieved all technical objectives inclusive of front-end-engineering and design, and advanced design required to accurately estimate and contract for the construction, commissioning, and start-up of a commercial-scale "ready to build" power plant using oxy-combustion technology, including full integration with the companion CO 2 Pipeline and Storage project. Ultimately the project did not proceed to construction due to insufficient time to complete necessary EPC contract negotiations and commercial financing prior to expiration of federal co-funding, which triggered a DOE decision to closeout its participation in the project. Through the work that was completed, valuable technical, commercial, and programmatic lessons were learned. This project has significantly advanced the development of near-zero emission technology and will be helpful to plotting the course of, and successfully executing future large demonstration projects. This Final Scientific and Technical Report describes the technology and engineering basis of the project, inclusive of process systems, performance, effluents and emissions, and controls. Further, the project cost estimate, schedule, and permitting requirements are presented, along with a project risk and opportunity assessment. Lessons-learned related to these elements are summarized in this report. Companion reports Oxy-combustion further document the accomplishments and learnings of the project, including: A.01 Project Management Report which describes what was done to coordinate the various participants, and to track their performance with regard to schedule and budget B.02 Lessons Learned - Technology Integration, Value Improvements, and Program Management, which describes the innovations and conclusions that we arrived upon during the development of the project, and makes recommendations for improvement of future projects of a similar nature . B.03 Project Economics, which details the capital and operation costs and their basis, and also illustrates the cost of power produced by the plant with certain sensitivities. B.04 Power Plant, Pipeline, and Injection Site Interfaces, which details the interfaces between the two FutureGen projects B.05 Contractual Mechanisms for Design, Construction, and Operation, which describes the major EPC, and Operations Contracts required to execute the project.

54 ENVIRONMENTAL SCIENCES↗

National Computational Infrastructure for LatticeGauge Theory SciDAC-2 Closeout Report

As part of the reliability project work, researchers from Vanderbilt University, Fermi National Laboratory and Illinois Institute of technology developed a real-time cluster fault-tolerant cluster monitoring framework. The goal for the scientific workflow project is to investigate and develop domain-specific workflow tools for LQCD to help effectively orchestrate, in parallel, computational campaigns consisting of many loosely-coupled batch processing jobs.

97 MATHEMATICS AND COMPUTING↗

Sustaining and Extending the Open Science Grid: Science Innovation on a PetaScale Nationwide Facility (DE-FC02-06ER41436) SciDAC-2 Closeout Report

Under this SciDAC-2 grant the project’s goal w a s t o stimulate new discoveries by providing scientists with effective and dependable access to an unprecedented national distributed computational facility: the Open Science Grid (OSG). We proposed to achieve this through the work of the Open Science Grid Consortium: a unique hands-on multi-disciplinary collaboration of scientists, software developers and providers of computing resources. Together the stakeholders in this consortium sustain and use a shared distributed computing environment that transforms simulation and experimental science in the US. The OSG consortium is an open collaboration that actively engages new research communities. We operate an open facility that brings together a broad spectrum of compute, storage, and networking resources and interfaces to other cyberinfrastructures, including the US XSEDE (previously TeraGrid), the European Grids for ESciencE (EGEE), as well as campus and regional grids. We leverage middleware provided by computer science groups, facility IT support organizations, and computing programs of application communities for the benefit of consortium members and the US national CI.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗