Meta-Analysis of Advanced Nuclear Reactor Cost Estimations

Supporting Data can be downloaded at: https://gain.inl.gov/content/uploads/4/2024/06/INL-RPT-24-77048-R1.xlsx Nuclear energy is a critical cornerstone of the current United States clean energy supply and may play a larger role in the future in support of a transition to a net-zero economy. The current fleet of nuclear reactors predominantly consists of large light-water reactors (LWRs), while many of the reactor designs under consideration are smaller and/or different technologies. Because these new designs have not yet been built, there is a high degree of uncertainty associated with their cost. This complicates energy-planning efforts because cost projections are not always standardized, consistent, and centralized in an easily accessible location. To help support energy planning in the US, this report provides advanced nuclear cost ranges using a transparent methodology along with other relevant information that can be used to help support decision making and energy planning. The purpose of this work was to conduct a methodical process for cost evaluation using only public information that was vetted with the end-goal to provide reference cost projections for nuclear energy. To provide a solid basis for these values, the approach and assumptions are explicitly laid out throughout the report allowing any user of the data to challenge or reconsider them. Because future US nuclear-reactor costs are still unknown due to little recent observed data, the report opted to compile a comprehensive list of bottom-up estimates and evaluate averages/trends within the data to identify reference ranges. This was deemed preferable to opining on the robustness or validity of one cost estimation versus another. To that end, the work evaluated thousands of lines of cost subaccounts from several bottom-up cost estimates. A wide variety of different reactor types captured in the data are of various sizes and technologies. Some of these reactors will be representative of advanced reactors under development while others will not. Thus, the results here are dependent on the data that are available and the accuracy of the estimates that are used. Each bottom-up estimate was reviewed to determine whether it was complete. Incomplete data sets were corrected to ensure an adequate basis of cross-comparison. The report is not without limitations and should be interpreted as an initial step to develop cost ranges for nuclear technology. Ultimately, future work can build upon the methodology with refined cost estimates to reduce uncertainty. US-based overnight capital cost (OCC) estimates were compiled from extensive data sets into ranges for both large and small reactor sizes for 2030. To project the cost declines over time, learning rates were sampled from literature sources. No SMRs were previously built; hence, learning rates based on bottom-up approaches (e.g., by quantifying the impact stemming from fabrication of different components, modular work, site construction, commissioning) were prioritized. For larger reactors, actual learning rates from deployments were used to project future costs (adjusted to account for standardization or lack thereof between designs). Other costs included are fixed and variable operations and maintenance costs. The final variables were capacity factors and ramp rates to support energy planning.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Carbon Management Projects (CONNECT) Database and Explorer

Overview The Carbon Management Projects (CONNECT) Toolkit is an online exploratory visualization tool developed by the U.S. Department of Energy's (DOE) Office of Fossil Energy and Carbon Management (FECM) with support from other federal agencies such as the U.S. Environmental Protection Agency (EPA) and the U.S. Department of Transportation (DOT). It provides a single point of access to authoritative information on federal agency investment in a portfolio of research, development, and demonstration (RD&D) projects that have been publicly announced to advance technologies for point source carbon capture, carbon dioxide removal, transport, storage, and conversion, collectively referred to as carbon management. The RD&D programs covered in this tool are authorized by annual congressional appropriations ("Base Program") and the 2021 Infrastructure Investment and Jobs Act (IIJA). The tool also incorporates public information on other federal initiatives, such as the Regional Clean Hydrogen Hubs, and public information released by other government agencies, such as the Environmental Protection Agency's (EPA) and Primacy States’ Underground Injection Control Class VI permits and EPA’s facility level greenhouse gas (GHG) emissions. Developed in a geographic information system, the tool organizes carbon management projects into five groups based on the primary technology that a project aims to advance, each visually represented as a digital layer ("carbon management project layer"). Only federally funded projects are included, which can be awarded projects that are completed or ongoing, or projects that have been selected but are currently under negotiation. Project information can be viewed in the map or in the attribute table below it when turned on. In the map view, each project is displayed at either its host site (for field work), where available, or its performer site (project lead's location, further explained in the table below). Host sites and performer sites are represented in distinct icons. Several reference layers offer additional public information on infrastructural and natural resource environment for carbon management. These reference layers, combined with multiple geographical basemaps, enable users to visualize the carbon management project layers in context. Carbon management project information will be updated monthly based on feedback and information availability. Carbon management project layers Point Source Carbon Capture (PSC) This layer contains DOE-funded projects focused on capturing carbon dioxide (CO2) from power plants or industrial facilities. Carbon Dioxide Removal (CDR) This layer contains DOE-funded projects focused on capturing CO2 from the atmosphere, including direct air capture (DAC) and DAC hubs, direct ocean capture, enhanced mineralization, and biomass carbon removal and storage. For projects with multiple host sites, each of the sites are displayed individually with the project cost and cost sharing information representing the total for the entire project. Carbon Transport This layer contains DOE- and DOT-funded projects focused on CO2 transport. The Transport Research and Development sublayer contains projects that do not involve physical infrastructure; the Proposed Transport Corridor sublayer contains projects for which either a route for the transport infrastructure has been proposed or a general area for the transport infrastructure has been identified. Carbon Storage This layer contains DOE-funded key projects focused on CO2 storage. For projects with multiple field-work sites, each of the sites are displayed individually on the map with the project cost and cost sharing information representing the overall total for the entire project. Carbon Conversion This layer contains DOE-funded projects focused on converting CO2 into economically valuable products. Reference layers The following layers provide additional information in the geographic proximity of carbon management projects. Users should reference the original sources for more details (weblinks provided below and in pop-up windows on the map). Regional Clean Hydrogen Hub and Facility These layers illustrate the approximate areas of the Regional Clean Hydrogen Hubs announced by DOE's Office of Clean Energy Demonstrations (OCED) and the approximate locations of individual facilities that constitute the hubs (see "Where are the H2Hubs located?" on the webpage linked above). EPA Facility Level GHG Emissions (direct emitter) This layer shows direct CO2 emissions from stationary sources in 2022, using data extracted from EPA's Facility Level Information on GreenHouse gases Tool (FLIGHT). Captured and injected CO2 are not deducted from direct emitters’ total emissions. Contact EPA for additional details. Underground Injection Control Class VI permit/permit application This layer shows the locations of CO2 injection wells that are granted or in the process of applying for an Underground Injection Control Class VI permit by EPA or a Primacy State (currently Louisiana, North Dakota, and Wyoming). The URLs for the permits or permit applications are provided in the pop-up windows associated with the well locations. Contact EPA for additional details. Carbon Storage Resource This layer contains information on prospective CO2 storage resources in saline formations and oil and gas reservoirs provided by the National Carbon Sequestration Database and Geographic Information System (NATCARB) spatial database. Contact NETL for additional details. Existing CO2 pipeline This layer shows active CO2 pipelines based on information digitized from the map issued by the Pipeline and Hazardous Materials Safety Administration (PHMSA). Contact PHMSA for additional details.

Carbon Conversion↗

A life cycle cost economics model for projects with uniformly varying operating costs

A mathematical model is developed for calculating the life cycle costs for a project where the operating costs increase or decrease in a linear manner with time. The life cycle cost is shown to be a function of the investment costs, initial operating costs, operating cost gradient, project life time, interest rate for capital and salvage value. The results show that the life cycle cost for a project can be grossly underestimated (or overestimated) if the operating costs increase (or decrease) uniformly over time rather than being constant as is often assumed in project economic evaluations. The following range of variables is examined: (1) project life from 2 to 30 years; (2) interest rate from 0 to 15 percent per year; and (3) operating cost gradient from 5 to 90 percent of the initial operating costs. A numerical example plus tables and graphs is given to help calculate project life cycle costs over a wide range of variables.

Remer, D. S.↗

A cost assessment of reliability requirements for shuttle-recoverable experiments

The relaunching of unsuccessful experiments or satellites will become a real option with the advent of the space shuttle. An examination was made of the cost effectiveness of relaxing reliability requirements for experiment hardware by allowing more than one flight of an experiment in the event of its failure. Any desired overall reliability or probability of mission success can be acquired by launching an experiment with less reliability two or more times if necessary. Although this procedure leads to uncertainty in total cost projections, because the number of flights is not known in advance, a considerable cost reduction can sometimes be achieved. In cases where reflight costs are low relative to the experiment's cost, three flights with overall reliability 0.9 can be made for less than half the cost of one flight with a reliability of 0.9. An example typical of shuttle payload cost projections is cited where three low reliability flights would cost less than $50 million and a single high reliability flight would cost over $100 million. The ratio of reflight cost to experiment cost is varied and its effect on the range in total cost is observed. An optimum design reliability selection criterion to minimize expected cost is proposed, and a simple graphical method of determining this reliability is demonstrated.

Campbell, J. W.↗

An Analysis of Rocket Propulsion Testing Costs

The primary mission at NASA Stennis Space Center (SSC) is rocket propulsion testing. Such testing is commonly characterized as one of two types: production testing for certification and acceptance of engine hardware, and developmental testing for prototype evaluation or research and development (R&D) purposes. For programmatic reasons there is a continuing need to assess and evaluate the test costs for the various types of test campaigns that involve liquid rocket propellant test articles. Presently, in fact, there is a critical need to provide guidance on what represents a best value for testing and provide some key economic insights for decision-makers within NASA and the test customers outside the Agency. Hence, selected rocket propulsion test databases and references have been evaluated and analyzed with the intent to discover correlations of technical information and test costs that could help produce more reliable and accurate cost projections in the future. The process of searching, collecting, and validating propulsion test cost information presented some unique obstacles which then led to a set of recommendations for improvement in order to facilitate future cost information gathering and analysis. In summary, this historical account and evaluation of rocket propulsion test cost information will enhance understanding of the various kinds of project cost information; identify certain trends of interest to the aerospace testing community.

Ramirez, Carmen↗

MSFC Optical Metrology: A National Resource

A national need exists for Large Diameter Optical Metrology Services. These services include the manufacture, testing, and assurance of precision and control necessary to assure the success of large optical projects. "Best Practices" are often relied on for manufacture and quality controls while optical projects are increasingly more demanding and complex. Marshall Space Flight Center (MSFC) has acquired unique optical measurement, testing and metrology capabilities through active participation in a wide variety of NASA optical programs. An overview of existing optical facilities and metrology capabilities is given with emphasis on use by other optical projects. Cost avoidance and project success is stressed through use of existing MSFC facilities and capabilities for measurement and metrology controls. Current issues in large diameter optical metrology are briefly reviewed. The need for a consistent and long duration Large Diameter Optical Metrology Service Group is presented with emphasis on the establishment of a National Large Diameter Optical Standards Laboratory. Proposals are made to develop MSFC optical standards and metrology capabilities as the primary national standards resource, providing access to MSFC Optical Core Competencies for manufacturers and researchers. Plans are presented for the development of a national lending library of precision optical standards with emphasis on cost avoidance while improving measurement assurance.

Burdine, Robert↗

NASA Aerosciences Perspective on Proposed De-Scope of Ares I-X Development Flight Instrumentation

This position paper is written as a result of a number of emails and a presentation that have recently been circulated concerning the potential reduction of Development Flight Instrumentation (DFI) to be included on the Ares I-X flight test vehicle. A reduction in instrumentation has been proposed presumably to reduce project costs and relieve project schedule pressures. This proposal has generated a significant amount of discussion on both sides of the issue, primarily from those within the project. The intention here is to provide a perspective on this issue from outside the mainline project.

Schuster, David M.↗

MARVEL Technical Overview: Breakdown of cost and scope growth through 90% Final Design

This report presents a breakdown of cost and scope growth for the Microreactor Applications Research Validation and Evaluation (MARVEL) project through the design phase, and includes observations, lessons learned, and the results from an independent project assessment. It presents the status and history of the project. Technology maturity is considered in high-level, qualitative comparison to other microreactor design efforts. Its purpose is to record MARVEL’s evolution and lessons learned from the planning and design phases through completion of 90% final design. Analyses included a detailed review of project cost, schedule, and periodic project reports and management documents. The Primary Coolant Apparatus Test (PCAT) is specifically highlighted. It was concluded that MARVEL would have benefited from more extensive planning early in the project to better define cost and schedule to provide more certainty in the total project cost and delivery date. Modest cost and schedule improvements may have been possible, but compared qualitatively, MARVEL’s total cost and schedule performance are consistent with that of other efforts currently underway. Better planning would have provided more certainty, improved risk mitigations, and potentially eliminated delays due to funding shortfalls. A recommended path forward is presented that addresses recommendations in the independent project assessment.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Strategies for Tailoring Reliability Test Standards

The paper suggests a simple strategy for the tailoring of the ground testing of unmanned spacecraft including considerations of project costs and risks. It is simply stated in five steps: (1) access the specific project's requirements and constraints, (2) use the existing comprehensive quality assurance programs as a guide, (3) prioritize the risks, (4) prioritize the tests, and (5) tailor the test program as appropriate. This approach addresses the specific project needs without unduly compromising the wealth of accumulated flight experience. Tailoring falls into three categories: tailoring of test levels, tailoring of test configurations, and tailoring of test techniques. Three examples are included to illustrate these types of tailoring activities. This paper on stratagies for tailoring spacecraft standards both advocates for and cautions against tailoring depending on the situation. Applied sensibly and carefully, tailoring can improve the test effectiveness and relax constraints on certain project resources. On the other hand, tailoring a product assurance program usually incurres some element of risk and may increase project costs.

tailoring↗

Application of ERTS-1 data to the protection and management of New Jersey's coastal environment

The author has identified the following significant results. Rates of erosion and accretion of the shoreline are being calculated for two test areas along the New Jersey coast. Measurements are made on aerial photographs taken over the last 20 years and processed by computer. The rates are presented in graphic form on an ERTS-1 base map at a scale of 1:125,000. These rates are being used to determine the effectiveness of various shore protection structures at preventing sand removal and encouraging sand accumulation. Information on maintenance and construction expenditures is being used to obtain a cost effectiveness ratio for various shore protection devices. The relationship of erosion rates, property value, and project cost are all criteria for selection of site type and extent of a shore protection structure. Compilation and evaluation of historical data will identify past decision making patterns. The effectiveness of these decisions with respect to erosion rates, property value, and project cost, can be used as an added criteria for future allocation of money and the selection of site and type of structure to be built.

Yunghans, R. S.↗

Labor Estimation and Trending in an Operations Environment

Accurate cost estimation for future work is important for ensuring that organizations have the personnel and resources needed to complete a task successfully. Operations support in particular provides additional challenges for estimating cost. Unlike manufacturing-based work, it may be difficult to derive a "cost per product," and projects that appear to be similar may have drastically different underlying assumptions. In addition, for critical operations, a certain level of adaptability to changing circumstances is expected. Responding to contingencies or anomalies requires additional support and troubleshooting, and could result in increases to project cost. Labor estimation is one of the most important inputs for estimating the cost of an operations-based project, especially in a pre-established facility. Various methods are needed to develop reliable estimates. These methods include a bottom-up summarization of known or expected work items, and a top-down estimate generated by trending and scaling actual labor from past analogous operations support.

Laing, Jason↗

Sensitivities of projected 1980 photovoltaic system costs to major system cost drivers

The sensitivity of projected 1990 photovoltaic (PV) system costs to major system cost drivers was examined. It includes: (1) module costs and module efficiencies; (2) area related balance of system (BOS) costs; (3) inverter costs and efficiencies; and (4) module marketing and distribution markups and system integration fees. Recent PV system cost experiences and the high costs of electricity from the systems are reviewed. The 1990 system costs are projected for five classes of PV systems, including four ground mounted 5-MWp systems and one residential 5-kWp system. System cost projections are derived by first projecting costs and efficiencies for all subsystems and components. Sensitivity analyses reveal that reductions in module cost and engineering and system integration fees seem to have the greatest potential for contributing to system cost reduction. Although module cost is clearly the prime candidate for fruitful PV research and development activities, engineering and system integration fees seem to be more amenable to reduction through appropriate choice of system size and market strategy. Increases in inverter and module efficiency yield significant benefits, especially for systems with high area related costs.

Zimmerman, L. W.↗

Concentrator enhanced solar arrays design study

The analysis and preliminary design of a 25 kW concentrator enhanced lightweight flexible solar array are presented. The study was organized into five major tasks: (1) assessment and specification of design requirements; (2) mechanical design; (3) electric design; (4) concentrator design; and (5) cost projection. The tasks were conducted in an iterative manner so as to best derive a baseline design selection. The objectives of the study are discussed and comparative configurations and mass data on the SEP (Solar Electric Propulsion) array design, concentrator design options and configuration/mass data on the selected concentrator enhanced solar array baseline design are presented. Design requirements supporting design analysis and detailed baseline design data are discussed. The results of the cost projection analysis and new technology are also discussed.

Lott, D. R.↗

Silicon web process development

Silicon dendritic web, a single crystal ribbon shaped during growth by crystallographic forces and surface tension (rather than dies), is a highly promising base material for efficient low cost solar cells. The form of the product smooth, flexible strips 100 to 200 microns thick, conserves expensive silicon and facilitates automation of crystal growth and the subsequent manufacturing of solar cells. These characteristics, coupled with the highest demonstrated ribbon solar cell efficiency-15.5%-make silicon web a leading candidate to achieve, or better, the 1986 Low Cost Solar Array (LSA) Project cost objective of 50 cents per peak watt of photovoltaic output power. The main objective of the Web Program, technology development to significantly increase web output rate, and to show the feasibility for simultaneous melt replenishment and growth, have largely been accomplished. Recently, web output rates of 23.6 sq cm/min, nearly three times the 8 sq cm/min maximum rate of a year ago, were achieved. Webs 4 cm wide or greater were grown on a number of occassions.

Duncan, C. S.↗

Military markets for solar thermal electric power systems

The Department of Defense maintains an inventory of over 1,800 MW of engine-generators 15 KW and larger, with an estimated procurement rate of over 140 MW/year. Nearly the entire requirement could be met by advanced heat engines of the types being developed as point-focussing, distributed receiver power plants. A conceptual system consisting of a heat engine which efficiently burns liquid fossil or synthetic fuels, with a 'solarization kit' for conversion to hybrid solar operation could meet existing DOD requirements for new systems which are quieter, lighter, and multi-fueled. An estimated 24 percent (33 MW/year) or more could operationally benefit from the solar option. Baseline cost projections indicate levelized energy cost goals of 210 to 120 mills/KWh (15 to 1000 KW systems). Fuel cost escalation is the major factor affecting the value of the solar option. A baseline calculation for fuel at $0.59/gal in spring, 1979, escalating at 8 percent above general inflation indicates a value of $2700/KWe for a solarization kit.

Hauger, J. S.↗

Project Antares: A low cost modular launch vehicle for the future

The single stage to orbit launch vehicle Antares is based upon the revolutionary concept of modularity, enabling the Antares to efficiently launch communications satellites, as well as heavy payloads, into Earth's orbit and beyond. The basic unit of the modular system, a single Antares vehicle, is aimed at launching approximately 10,000 kg into low Earth orbit (LEO). When coupled with a Centaur upper stage it is capable of placing 3500 kg into geostationary orbit. The Antares incorporates a reusable engine, the Dual Mixture Ratio Engine (DMRE), as its propulsive device. This enables Antares to compete and excel in the satellite launch market by dramatically reducing launch costs. Antares' projected launch costs are $1340 per kg to LEO which offers a tremendous savings over launch vehicles available today. Inherent in the design is the capability to attach several of these vehicles together to provide heavy lift capability. Any number of these vehicles, up to seven, can be attached depending on the payload and mission requirements. With a seven vehicle configuration Antares's modular concept provides a heavy lift capability of approximately 70,000 kg to LEO. This expandability allows for a wider range of payload options such as large Earth satellites, Space Station Freedom support, and interplanetary spacecraft, and also offers a significant cost savings over a mixed fleet based on different launch vehicles.

Aarnio, Steve↗

Low Cost Rapid Response Spacecraft, (LCRRS): A Research Project in Low Cost Spacecraft Design and Fabrication in a Rapid Prototyping Environment

The Low Cost Rapid Response Spacecraft (LCRRS) is an ongoing research development project at NASA Ames Research Center (ARC), Moffett Field, California. The prototype spacecraft, called Cost Optimized Test for Spacecraft Avionics and Technologies (COTSAT) is the first of what could potentially be a series of rapidly produced low-cost satellites. COTSAT has a target launch date of March 2009 on a SpaceX Falcon 9 launch vehicle. The LCRRS research system design incorporates use of COTS (Commercial Off The Shelf), MOTS (Modified Off The Shelf), and GOTS (Government Off The Shelf) hardware for a remote sensing satellite. The design concept was baselined to support a 0.5 meter Ritchey-Chretien telescope payload. This telescope and camera system is expected to achieve 1.5 meter/pixel resolution. The COTSAT team is investigating the possibility of building a fully functional spacecraft for $500,000 parts and $2,000,000 labor. Cost is dramatically reduced by using a sealed container, housing the bus and payload subsystems. Some electrical and RF designs were improved/upgraded from GeneSat-1 heritage systems. The project began in January 2007 and has yielded two functional test platforms. It is expected that a flight-qualified unit will be finished in December 2008. Flight quality controls are in place on the parts and materials used in this development with the aim of using them to finish a proto-flight satellite. For LEO missions the team is targeting a mission class requiring a minimum of six months lifetime or more. The system architecture incorporates several design features required by high reliability missions. This allows for a true skunk works environment to rapidly progress toward a flight design. Engineering and fabrication is primarily done in-house at NASA Ames with flight certifications on materials. The team currently employs seven Full Time Equivalent employees. The success of COTSATs small team in this effort can be attributed to highly cross trained engineering team. The engineers on the team are capable of functioning in two to three engineering disciplines which allows highly efficient interdisciplinary engineering collaboration. NASA Ames is actively proposing mission concepts to use the COTSAT platform to accomplish science. If the COTSAT team validates this approach, it will allow the possibility for remote sensing missions to produce a high science yield for minimal cost and reduced schedule. Another aim of this approach is to yield an accelerated pathway from a Phase A study to mission launch. Leaders in the aerospace industry have shown interest in this methodology. Several visits and tours have been given in the lab. Although the concept of low-cost development is initially met with skepticism from some within the prohibitive aerospace industry, the project's efforts have been highly praised for the accomplishments met within a limited time and budget. Overall the development has progressed tremendously well and the team is answering critical questions for current and future low-cost small satellite developments. COTSAT subsystems are not limited to a specific weight class and could be adapted to produce smaller platforms and to fit various launch vehicles.

Spremo, Stevan↗

A life cycle cost economics model for automation projects with uniformly varying operating costs

The described mathematical model calculates life-cycle costs for projects with operating costs increasing or decreasing linearly with time. The cost factors involved in the life-cycle cost are considered, and the errors resulting from the assumption of constant rather than uniformly varying operating costs are examined. Parameters in the study range from 2 to 30 years, for project life; 0 to 15% per year, for interest rate; and 5 to 90% of the initial operating cost, for the operating cost gradient. A numerical example is presented.

Remer, D. S.↗