Search NASASearch

SEARCH · Search NASA

Results for “Project Implementation Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Long-term Moisture Adsorption in Packaged Plutonium Oxide

In 2018, the Department of Energy National Nuclear Security Administration (DOE-NNSA) began implementing dilute and dispose to remove 34 metric tons (MT) of surplus weapons grade plutonium from the US stockpile. Under this plan, surplus plutonium material is converted into plutonium oxide (PuO 2 ) before being stored in metal containers and sent to the DOE Waste Isolation Pilot Plant (WIPP). The dilute and dispose project was implemented as a more cost-effective method for abiding by the Plutonium Management and Disposition Agreement (PMDA) between the USA and Russia, as compared to producing mixed oxide fuel (MOX). The PMDA was originally signed in 2000 and amended in 2010.2 The disassembly of pits and conversion to PuO 2 as part of dilute and dispose is carried out through the Advanced Recovery and Integrated Extraction System (ARIES) developed at Los Alamos National Laboratory (LANL). The dilute portion of dilute and dispose is carried out at Savannah River Site (SRS). With this program in place, it is necessary to ensure the safe, long-term storage of the PuO 2 generated during this process until final disposal at WIPP is accomplished.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W

DEVELOPMENT OF AN INTEGRATED SECURITY AND SAFETY MONITORING SYSTEM FOR SPENT NUCLEAR FUEL AND HIGH-LEVEL WASTE TRANSPORTATION

This paper provides an overview of the progress to date, and discussion of the path forward, related to designing, fabricating, and testing an integrated security and safety monitoring system (ISSMS) for railcars used to transport spent nuclear fuel (SNF) and high-level radioactive waste (HLW) in the United States. The system will comply with the US Department of Energy’s (DOE) Order 460.2B “Departmental Materials Transportation Management” and the Association of American Railroads’ (AAR) standard S-2043 “Performance Specification for Trains Used to Carry High-level Radioactive Material” [1] developed specifically for railcars used to transport high-level radioactive material (HLRM). DOE is in the process of developing and testing an ISSMS that will satisfy both DOE requirements and AAR standards. DOE has already developed railcar designs for transportation of HLRM. In 2024, DOE’s Atlas railcar project completed the design, fabrication and testing of three railcar types: transportation cask-carrying, buffer, and security escort, resulting in AAR conditional approval to operate on freight rail networks in North America. DOE decided to combine the required security and safety systems into one system, and this combined system is the subject of the current effort. DOE is developing and proposes to implement the ISSMS for these railcars as part of the build out of the railcar fleet. DOE began planning for development of the ISSMS in February 2020. The project is divided into seven phases starting with conceptual design and continuing through production design, as shown in Figure 1. An earlier version of the system was tested as part of the Atlas railcar consist demonstration test run in 2023. This paper describes the design features and system testing using the Atlas project railcars, and laboratory testing completed to date. The paper will also describe the activities planned to support the DOE project to ship the High Burn-Up Research Cask (HBRC) in 2027.

Schultze, Michael [ORNL] (ORCID:0000000283205671)

Airport Ground Support Equipment Analysis

Ground support equipment (GSE) plays a critical role in providing services to aircraft at arrival and departure gates, ensuring smooth and efficient airport operations. As the airline industry seeks to reduce costs and expand energy options, electric GSE (eGSE) is emerging as a promising solution. This project examines the integration of eGSE into airport operations, addressing key considerations such as vehicle deployment, charging infrastructure, and grid impacts. We developed a flexible, bottom-up modeling framework to evaluate energy demands and infrastructure requirements across more than 300 U.S. airports, providing actionable insights to support electrification planning and implementation. The study focuses on eight major types of GSE with commercially available electric counterparts: aircraft tractors, ground power units, baggage tractors, belt loaders, cargo loaders, catering trucks, lavatory trucks, and water trucks. Project results include annual charging load profiles, total energy consumption, and the charger and fleet requirements for each airport.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI

Financial Analysis of the Smallmouth Bass Flows implemented at the Glen Canyon Dam during Water Year 2024

The Glen Canyon Dam (GCD) is a Colorado River Storage Project (CRSP) power resource that is a component of the Salt Lake City Area Integrated Projects (SLCA/IP). The 2016 record of decision (ROD) for the GCD long-term experimental and management plan (LTEMP) final Environmental Impact Statement (EIS) specifies criteria for GCD monthly water releases, daily and hourly operating limits, and experimental releases. This report presents a financial analysis of the Smallmouth bass (Micropterus dolomieu) (SMB) flows implemented at GCD during Water Year (WY) 2024. These bypass flows were introduced by the U.S. Bureau of Reclamation (USBR) as an emergency response to the growing threat posed by invasive SMB in the Colorado River ecosystem downstream of the dam. SMB are a non-native predatory species that pose a significant threat to native fish populations, including the endangered humpback chub (Gila cypha). The thermal regime below GCD, typically cold due to hypolimnetic releases from Lake Powell, has historically served as a thermal barrier limiting SMB establishment. However, persistently low reservoir levels in recent years have reduced stratification in Lake Powell, allowing warmer water to be released downstream. This has enabled SMB to spawn successfully below the dam, prompting urgent ecological concerns. To mitigate the risk of SMB proliferation, the USBR implemented a series of bypass flows in WY 2024. Drawn from a lower elevation than the penstocks, the bypass structures released cooler water downstream. These short-duration bypass flows aimed to keep temperatures cool enough to prevent SMB from spawning, thereby reducing the ecological threat posed by this invasive species. Although motivated by ecological objectives, these bypass flows came with financial tradeoffs. Releasing water through the bypass structures instead of the turbines at GCD reduced hydropower generation, resulting in a significantly lower financial position for Western Area Power Administration (WAPA), which is responsible for marketing the electricity produced by the GCD Powerplant. This report analyzes the financial impact of the SMB flows implemented from July to November 2024. These experimental releases led to an estimated financial cost of approximately $18.9 million, primarily driven by the substantial volume of water diverted through the bypass structures. This study applies an integrated set of tools to estimate WAPA financial impacts by simulating GCD under two types of cases; namely, (1) a “With Experiment” case that mimics the water operations that actually occurred, including the SMB bypass flows, and (2) a “Without Experiment” case that simulates operations under the assumption that the SMB flows did not occur. Both cases comply with LTEMP hourly and daily operating criteria, and the monthly water release volumes are assumed to be identical under both cases. The Colorado River Storage Project Python-based model (CRiSPPy) model was the main modeling tool used to simulate the dispatch of the GCD hydropower plant and associated water releases from Lake Powell. In the modeling process, the research team used extensive data sets and historical information on SLCA/IP power plant characteristics, hydrologic conditions, and WAPA’s power purchases and sales prices.

13 HYDRO ENERGY

Detection and Association of Operational Events using DAS and Seismometers (FY 2025 Mid-Year Report)

This mid-year report summarizes ongoing work to identify anomalous vibration signals indicative of potential containment breaches. This work includes compiling continuous seismic datasets and testing and refining underground detection and geolocation techniques. In the first two quarters of FY25, we have completed two project work plan tasks: (1) creating a database of continuous waveforms and ground truth event data from multiple modalities and (2) refining and implementing a detection and association algorithm to create a catalog of anomalous underground activities. This report contains a summary of the seismic database including the continuous seismic data collected by a dense array of surface seismic stations above Pleasant Gap Mine, and continuous seismic data collected using subsurface distributed acoustic sensing (DAS) in the subsurface at Sanford Underground Research Facility (SURF) and the ground truth information gathered from both sites. This report also includes results from refining and applying a dynamic power spectral density detector to both continuous seismic datasets. Finally, the report provides an initial catalog of subsurface operational events from both sensing modalities.

58 GEOSCIENCES

Automated Ride Hailing - Status, Projections, and Critical Safety Review

Automated ride-hailing services, commonly known as 'robo-taxis' are beginning to proliferate and scale. Currently they are available in four major US cities with another 10 cities planning their implementation in the near future. In the US, automated ride-hailing services are dominated by a single provider, with announcements from several competitors of service offerings by end of calendar year 2025. Internationally, only three companies are currently in commercial operations, with many more planned. The scaling of robo-taxi services appears to be the leading application of automated vehicles (AVs), and provides evidence of their anticipated safety in comparison to conventional vehicles. This presentation will provide an overview of the status of deployments of fully operational AVs in ride-hailing services, projections of the number of trips, vehicles, and vehicle miles traveled for the immediate future, and a critical review of the safety data that has been reported, both in the US as well as internationally.

29 ENERGY PLANNING, POLICY, AND ECONOMY

EMPOWERED Distributed Energy Resources Permit Accelerator Pilot

This report summarizes the EMPOWERED Distributed Energy Resources (DER) Permit Accelerator Pilot project. Its primary objective was to streamline the design, installation, permitting, and inspections of targeted Distributed Energy Resource (DER) solutions. Streamlining these processes is critical to strengthening and accelerating the adoption of DER solutions nationwide. Moreover, streamlined processes help expedite the clean energy transition and expand energy resilience by improving understanding and capability among key stakeholders like property owners, code officials, and the general workforce. The project team accomplished this by developing and deploying a set of design and permitting guides for simple DER solutions, which they rolled out via a permitting pilot program. The project team developed nine permitting and inspection guides for simple DER solutions, as follows: 1. Single-Family and Duplex: Electric Vehicle Service Equipment (EVSE), and Storage, Solar + Storage (each in two code cycles) 2. Multi-family and Office: EVSE, Storage, Solar + Storage (each in two code cycles) 3. A permitting process guide to support the implementation of the permitting guides. The guides cover key code requirements via plan review and field inspection checklists for code officials and building owners to follow to streamline the permitting and inspections process for DER solutions. Following the development of the initial set of guides, the project team formed two cohorts, each made up of four jurisdictions, to participate in the Permit Accelerator Pilot. Each cohort received training and technical assistance to support them in incorporating the guides into use. The project successfully engaged jurisdictions in two disparate US regions: Chelsea, Somerville, Natick, and Norwood in metro Boston; and Pima County, Town of Gilbert, Flagstaff, and Sedona in Arizona. Feedback gathered from the project was valuable in refining the guides to better address jurisdictional needs. After the pilot period, the project team developed final versions of the guides based on extensive feedback from the cohorts and from external technical peer review. Feedback included needs and barriers related to implementation, as well as detailed technical improvements from external peer review. The final guides were presented in a series of webinars with a national reach, with 192 attendees from 35 states in the live session of the final webinar, and the final guides are posted online and available for use nationwide. Key findings: • The most receptive jurisdictions were those adjacent to other jurisdictions that had already adopted similar initiatives. The least receptive jurisdictions were those in the midst of adopting new code cycles. • The most common barrier to jurisdictional adoption of new guidelines were internal administrative and process delays, more so than technical barriers. • The main technical barrier to adoption proved to be the concern of fire hazard risks posed by energy storage systems. There is some apprehension in the code enforcement community about the safety of the batteries. Education coordinated with fire and safety services will help alleviate concerns and increase confidence in the acceptance of innovative technologies. • Opportunities to further leverage and advance the guides and related resources include outreach, education, and jurisdictional support; updates to the resources to align with code cycle changes and local requirements; and advancements supporting emerging technologies.

14 SOLAR ENERGY

Scalable Truck Charging Demand Simulation for Cost-Optimized Infrastructure Planning

This project developed a scalable, high-resolution model to simulate medium- and heavy-duty (MHD) electric truck charging demand and assess its impact on grid infrastructure. Using generative modeling, simulation, and cost optimization, the project delivered an end-to-end software pipeline and a library of 96 real-world scenarios for the Dallas–Houston megaregion. We demonstrated a modular architecture for transportation and grid modeling, implemented cost-optimized infrastructure planning methods, and quantified grid capital, operational, and environmental costs across a wide range of truck electrification scenarios. The results have been adopted by major utility stakeholders and contributed to regional planning efforts.

24 POWER TRANSMISSION AND DISTRIBUTION

E2C Cohorts: Implementation Funding Projects - Impact Summary [Slides]

From August 2024 to October 2025, 11 Clean Cities and Communities coalitions supported projects to advance transportation goals by gathering input from local stakeholders, and using the resulting insights to develop new plans and programs for local partners. This effort leveraged information and best practices shared during the 2024 E2C Cohort on Integrating Community Priorities into Electric Vehicle Plans and Projects. These coalitions supported partners across the country to develop plans for electric vehicle integration through one-on-one technical assistance and tailored local engagement. This deck summarizes the individual projects completed by coalitions, and the overall reach and impact of all of this program.

29 ENERGY PLANNING, POLICY, AND ECONOMY

IrrigationViz: A Geospatial Visualization Application to Facilitate Irrigation Modernization

Irrigation water delivery infrastructure, such as canals and pipelines, are essential to agriculture in the Western U.S., yet many of these systems are reaching the end of their useful lives. Reinvestment can achieve a wide variety of benefits, from water conservation to energy savings or renewable energy generation. Modernization requires significant planning, design, and implementation funding which can be a challenge for many irrigation districts. Here, this paper introduces IrrigationViz, a web-based mapping application designed to help irrigation districts visualize and generate high-level cost and benefit estimates for infrastructure modernization projects. These estimates can help water managers identify projects that benefit from additional engineering resources and ultimately obtain funding. IrrigationViz includes map interactions, graphs, and visualization components to facilitate planning and communication to stakeholders and funders. IrrigationViz combines user-provided information about a water-delivery system with public datasets and basic engineering formulas to generate estimates of the benefits of reinvestment. Estimates include the amount of water seepage in earthen canals, potential hydropower generation associated with replacing a canal with a pressurized pipe, and pipe size recommendations. We found that hydropower generation estimates compared favorably with real world projects, but seepage loss estimates showed high variability relative to on-the-ground measurements

99 - GENERAL AND MISCELLANEOUS

Energy Baseline Assessment and Project Considerations for the Wai'anae Moku Community Energy Plan

This report was prepared as a supplement to the Waianae moku community's energy plan and includes results of two activities conducted by the National Laboratory of the Rockies in support of the planning process: (1) an energy baseline assessment and (2) considerations and resources for possible energy projects prioritized by the community in its energy plan. Results of the energy assessment describe the energy landscape in the state of Hawaii, on the island of Oahu, and in the Waianae moku at the time the plan was developed, with the intention of supporting informed community participation in the planning process. Considerations and resources align with each of the energy project ideas identified in the community's energy plan, and are intended to describe the current context and activities related to each, along with possible next steps toward implementation, and additional resources. The report concludes with takeaways for the community to consider as they pursue their energy goals.

29 ENERGY PLANNING, POLICY, AND ECONOMY

2024 Geothermal Rising Conference Poster

As part of a U.S. DOE Geothermal Technologies Office funding opportunity, Geysers Power Company, LLC, an indirect subsidiary of Calpine Corporation, partnered with Sandia National Labs, EGI at the University of Utah, and Texas A&M University to demonstrate increased drilling performance at The Geysers Geothermal Field. The performance target in the drilling demonstrations is at least a 25% improvement in rates of penetration with increased time on bottom for each bit. The planned drilling demonstrations are being conducted as part of an existing drilling campaign intended to enhance reservoir utilization. A major goal of the project is to assess the effectiveness of implementing mechanical specific energy (MSE) and drilling dysfunction diagnosis and remediation in these challenging environments, as well as alternate bit technologies. The first demonstration well has been completed, with a total of 15 PDC bit runs in the 17.5”, 12.25” and 8.5” sections. Initial analysis shows ROP gains in all three hole sections, especially in the 17.5” and 12.25” sections, compared with conventional roller cone bit runs in the demonstration well and offset wells. However in the 8.5” hole, wear and damage to the PDC bits resulted in relatively short bit runs. Analysis is underway to take advantage of the positive results and remediate the challenges.

15 GEOTHERMAL ENERGY

Advanced Conductor Testing – 1431 kcmil Prysmian ACSS with E3X

Advanced conductors represent a significant evolution in transmission line technology. These conductors utilize innovative materials, such as composite cores, ultra-high-strength steel, and heat-dissipating coatings, to offer improved performance compared to traditional Aluminum Conductor Steel Reinforced (ACSR) designs. However, the deployment of these technologies has so far been limited. As each conductor comes with nuances in test setup and specifications, a standard test is not readily available to apply to all advanced conductors. Idaho National Laboratory’s (INL) Advanced Conductor Testing project, sponsored by the Department of Energy (DOE) Office of Cybersecurity, Energy Security, and Emergency Response (CESER) and Office of Electricity (OE), focuses on developing and implementing testing protocols and plans for advanced conductor technologies to assess and demonstrate physical performance under varying operational conditions, including extreme environmental stressors such as wildfires. This report contains the fire testing results of a 1431 kcmil Prysmian ACSS with E3X conductor.

24 - POWER TRANSMISSION AND DISTRIBUTION

A cost–benefit framework to evaluate capacity upgrade options in overhead line transmission planning

This paper presents the methodology behind the new Reconductoring Economic and Financial Analysis (REFA) tool, an open-access software, used by transmission utilities to evaluate transmission capacity enhancement options. The proposed methodology is intended to be used in a new planning stage, after the capacity expansion and prior to the individual transmission project engineering, allowing capacity upgrade options (reconductoring, rebuild or voltage upgrade), and respective conductor selection, to be compared under the same economic basis. Furthermore, the REFA tool implements a methodology to rank project options and conductor types based on economic criteria, considering an approximation of the ampacity and sag constraints. Results, using 5 real transmission lines in the US, show that least-cost combinations of project and conductor types can be very diverse, which emphasizes the need for the proposed methodology and tool.

Advanced conductors

HERO CarbonSAFE Phase 2 Project in the Columbia River Basalt Group

The Hermiston, Oregon Basalt CarbonSAFE Phase II project (HERO CarbonSAFE) seeks to accelerate the deployment of commercial carbon dioxide (CO2) storage projects in basaltic rocks. Basalt CO2 storage has several advantages to conventional saline storage reservoirs including 1. The potential for rapid mineralization of CO2, 2. Associated decreases in pressure and CO2 migration risks, 3. Reduced long-term monitoring requirements with respect to plume tracking, 4. Widespread geographic distribution and, 5. Large storage potential due to thickness, porosity, and CO2 interactions with basalt. And for locations such as the Pacific Northwest, Hawaii, Iceland, India and Japan, basalts may offer the only economically feasible option for local CO2 storage. However, there are limited field-scale assessments of CO2 storage in basalt, and current carbon capture utilization and storage (CCUS) permitting and regulatory frameworks were developed for conventional saline reservoirs. HERO CarbonSAFE is designed to address research gaps and uncertainties associated with basalt storage. Specifically, the project will assess the feasibility of CO2 injection in the deep layered basalts, long-term storage (mineralization), practical approaches for large-scale implementation (50+ million metric tons of CO2 over 30 years), lithology-specific risks, and the technoeconomic potential for CO2 storage in basalts. The HERO CarbonSAFE project will assess feasibility of developing a commercial-scale (50+ million metric tons of CO2) geological storage complex within the Columbia River Basalt Group (CRBG), a layered continental flood basalt complex that underlies Calpine’s natural gas-fired Hermiston Power Project (HPP) in Hermiston, OR (Figure 1). Under this 2-year CarbonSAFE Phase II project, the HERO team will conduct a data acquisition campaign that includes drilling a stratigraphic well to a total depth of ~1,500 m into the thick layered basalts proximal to HPP. A comprehensive well logging and hydrologic testing program will be augmented with new core collected from flow zones and sealing units, and comprehensive laboratory testing to help refine the kinetic rates of mineralization. The newly acquired information will be integrated with existing data from regional wells to correlate basalt injection zone properties to develop storage hub/commercial-scale models. Using these models, the project team will evaluate injection scenarios to define the technical and economic potential for storing a minimum of 50 million metric tons of CO2 over a 30-year period, along with a robust sensitivity analysis on key parameters governing reservoir viability for sustainable injection over a commercial project lifetime. Specific technical objectives of HERO are: (1) assessing the reservoir response of a series of stacked layered reservoir flowtop sequences occurring in this area of the CRBG to commercial-scale injection volumes; (2) extending prior efforts by the project team to characterize the deep layered basalts encountered in regional studies, to leverage prior investments by U.S. Department of Energy’s (DOE) Carbon Storage program; (3) leveraging DOE’s mineralization characterization efforts to advance model parametrization for commercial scale injection of CO2 in basalts; (4) conducting risk assessments associated with scaling up to commercial storage hub injection goals, while validating DOE’s National Risk Assessment Partnership (NRAP) tools, to identify potential constraints that would prevent the CRBG from serving as a commercial-scale storage complex; (5) developing mitigation plans to address identified risks; (6) developing a commercial-scale injection and monitoring, verification and accounting (MVA) strategy; (7) utilizing computational models to define and minimize, if possible, the Area of Review (AoR) under Class VI regulations; and (8) developing a robust CO2 management strategy for CRBG that also considers a regional source/sink approach that is responsive to stakeholder needs and industrial demand. Specific institutional objectives are: (1) identifying and developing plans to mitigate the nontechnical challenges associated with the build-out of a commercial-scale storage complex within the CRBG with integrated CO2 sources; (2) implementing the community outreach plan; (3) conducting regulatory research, including a survey of issues related to pore space ownership, MVA and long-term assurance of mineralization-based storage, to support an eventual application for a UIC Class VI permit; (4) advancing the project’s plan for CO2 liability management; and (5) continuing to refine and update the project’s economic model. The final objective is the preparation of a comprehensive Site Characterization Plan that draws upon the technical and institutional feasibility assessments to prepare the project for future commercialization efforts.

58 GEOSCIENCES

EV Charging Infrastructure Energization An Overview of Approaches for Simplifying and Accelerating Timelines to Processing EV Charging Load Service Requests

The United States has seen significant growth in electric vehicle (EV) adoption, leading to increased demand for EV charging infrastructure. Over the past decade, EV charging infrastructure site developers, site hosts, and electric distribution utilities have navigated the process to integrate chargers onto the electric grid. Site developers and site hosts have raised the alarm that the integration process for high-powered EV charging projects does not meet the needs of the EV market for timeliness or cost. High-powered charging stations typically require a load service request or an agreement with the local utility to connect to the grid. The process of energizing a new high-powered charging site can be complex and time-consuming, often taking up to 2 years. This timeline is the result of current utility energization processes having been designed for construction projects that take longer to build (i.e., buildings). The specific challenges stem from various factors, including compartmentalization in application processes, the integration of EV charging process approvals with other distributed energy resources (DERs), and the need to ensure grid reliability. The energization process needs to evolve to meet the growing demand for high-powered EV charging. This white paper compiles information gathered through various conversations with key stakeholders, including utilities, utility regulators, EV charging operators, site developers, and authorities having jurisdiction (AHJ) as well as through an extensive literature review. This document identifies the challenges and provides potential solutions to streamline the process of connecting EV charging infrastructure to the power grid in the United States, serving as a starting point for future conversations around these solutions. The solutions noted in this white paper require collaborative efforts among utilities, regulators, and EV charging infrastructure developers to streamline the grid connection process for EV charging infrastructure. They are broadly organized into four areas: 1. Increase data access and transparency: Develop automated load service request tools, integrate hosting capacity and load service request analyses, incorporate EV adoption forecasts, and provide transparency on the processing queue. 2. Improve energization processes and timing: Create fast-track options based on prescreening criteria, provide flexibility or phased approvals in the load service request/interconnection process, build internal knowledge within utilities about EV charging technologies, and provide standardized workforce training. 3. Promote economic efficiency: Right size distribution components to accurately reflect the load requirements of EV charging infrastructure, make proactive investments in grid infrastructure based on EV adoption forecasts and growth projections, and consider energy equity and environmental justice factors such as equitable access to EV charging when planning infrastructure. 4. Improve grid reliability and resilience: Use load management/power control systems (PCS) at EV charging stations, adopt and implement harmonized standards for communication protocols and information models between the EV charging and grid control infrastructure, and address cybersecurity considerations by implementing robust security measures and standards for EV charging infrastructure—with particular emphasis on clarifying the security requirements for the interface to the grid. The objective of the solutions proposed in this white paper is to accelerate the timeline and decrease costs associated with connecting EV charging infrastructure to the grid. Electric utilities, utility regulators, EV charging infrastructure developers, and site hosts will first need to understand which solutions are available in their service territory, and if warranted, which combination of solutions would support their specific needs. Through the successful implementations of solutions at scale detailed here, industry will demonstrate a new and innovative ecosystem where timely deployment and energization of EV charging infrastructure with greater grid resiliency and reliability is a reality.

24 POWER TRANSMISSION AND DISTRIBUTION

Techno-Economic Analysis of Photovoltaics and Battery Storage for Maine [Slides]

Maine GEO was interested in a small-scale pilot using REopt to expand on previous resilience efforts and better understand the most useful information to gather from facilities to maximize the efficacy of the analysis. The pilot began with identification of three pilot facilities from the existing Maine Community Resilience Partnership (MCRP) cohort, selection of the facilities prioritizing: social vulnerability, community led planning work and commitment to ongoing work. The technical assistance focused on working with identified facilities to help scope the project and identify their goals and then provide technical specifications on optimal energy generation and storage strategies for each community. At the conclusion of the project, participating facilities received a REopt analysis report, including optimal generation and storage strategies to address identified goals and next steps and considerations for implementation.

24 POWER TRANSMISSION AND DISTRIBUTION

Resilience Project Implementation Memo for the Town of Stowe, Vermont

This Resilience Project Implementation Process Memo was developed with and for the Town of Stowe Electric Department (SED) under the DOE C2C Expert Match Program. It is intended to outline the steps of a process, albeit nonlinear and iterative, to plan, design, and implement community resilience hubs.

29 ENERGY PLANNING, POLICY, AND ECONOMY