Search NASA⌕ Search

SEARCH · Search NASA

Results for “Project Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Overview of the DOE nuclear fuels storage and transportation planning project - 15444

The US Department of Energy (DOE) Office of Nuclear Energy is conducting planning activities within the Nuclear Fuels Storage and Transportation Planning Project (NFST) to lay the groundwork for implementing interim storage, including associated transportation, per the Administration's Strategy for the Management and Disposal of Used Nuclear Fuel and High-Level Radioactive Waste, and to develop a foundation for a new nuclear waste management organization. The purpose of the NFST is to make progress on this important national issue within existing legislative and budgetary authorizations. The objective of the NFST is to develop and begin implementation of an integrated plan to (1) implement interim storage; (2) improve the overall integration of storage as a planned part of the waste management system; (3) prepare for the large-scale transportation of spent nuclear fuel and high-level radioactive waste, with an initial focus on removing SNF from the shutdown reactor sites; and (4) develop foundational information, resources, and capabilities needed to support the aforementioned objectives and future implementation decisions and actions. An over-arching goal is to develop options for decision-makers on the design of an integrated waste management system. The planning activities are divided into four major topical areas: (1) Consent-Based Siting, (2) Storage, (3) Transportation, and (4) Strategic Crosscuts. This paper provides an overview of the NFST and its activities. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

ESGF project plan for ramping down development activities and transition the project and data to a new team

This document summarizes the current software development activities carried by the ESGF team with planned delivery dates before the transition of the project to a new team. The work we started on the publishing, search and retrieval, and the backend for indexing and data management that can be deployed using Kubernetes are planned to be delivered within the next three months; however, this assumes that the current team members will continue to work on the project. The activities are listed in Table 1 by priority and in case we lose team members, development of lower priority tasks can be paused and passed to the new team with its current status. Team members can be re-assigned based on their availability and transition work needed. Table 2 below describe activities necessary to help project transition to the new team. Deadlines for these activities are before October 1 st of 2022 or the completion of a successful transition. Support during the transition period assumes that we will have 3 key ESGF members and the ESGF PI supported at the 50% level or less for the duration of the transition. The level of support is an estimate, and it depends on several factors that cannot be decided at this time. The total cost of the proposed work and support activities for fiscal year 2021 is $1,270K with $230K carry over to fiscal year 2022. The cost for the support work listed in Table 2 is the sum of the two rows “HW support” and “project support, maintenance, and transition efforts”, colored blue, in Table1 which adds up to $720K. This cost is included in the $1,270K cost in table 1.

97 MATHEMATICS AND COMPUTING↗

Nuclear fuels storage and transportation planning project strategic crosscutting activities - 15180

The United States Department of Energy's Office of Nuclear Energy (DOE-NE) is conducting planning activities within the Nuclear Fuels Storage and Transportation Planning Project (NFST) to lay the groundwork for implementing interim storage, including associated transportation, per the Administration's Strategy for the Management and Disposal of Used Nuclear Fuel and High-Level Radioactive Waste (Strategy), and to develop a foundation for a new nuclear waste management organization. The NFST is organized into the following four major elements: 1) Consent-Based Siting, 2) Storage, 3) Transportation, and 4) Strategic Crosscuts. This paper discusses those activities underway in the NFST Strategic Crosscuts element. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Reuse Permit I-160-02Quality Assurance Project Plan (QAPP) for Required Environmental and Process MonitoringIdaho National Laboratory Materials and Fuels Complex Industrial Waste Ditch and Pond

The purpose of this quality assurance project plan (QAPP) is to describe the technical requirements and quality assurance (QA) activities of the environmental data collection/analyses operations to be performed under Reuse Permit I-160-02, Modification 1 (hereafter ‘permit’). It describes the scope of monitoring, the organization and persons involved, the data quality objectives, the monitoring procedures, and the specific quality control (QC) measures to be employed. All QAPP activities are implemented to determine whether the results of the sampling and monitoring performed are the right type, quantity, and quality to satisfy the requirements of the permit, Section 5.

99 GENERAL AND MISCELLANEOUS↗

Quality Assurance Project Plan for the Salish Sea Model – Continuing Development of New Capabilities and Applications: European Green Crab (EGC) Larval Transport, Coupling to VELMA and Atlantis, Performance Improvements and Diagnostic Applications

This quality assurance project plan (QAPP) is for proposed FY24-FY27 efforts to (a) develop/expand a predictive European Green Crab (EGC) larval dispersal model for the Salish Sea, (b) add linkage between VELMA (Visualizing Ecosystem Land Management Assessments) watershed model and Atlantis model (ecosystem dynamics and food web) through SSM, and (c) continue SSM capability development through the addition of metals, harmful algal blooms (HABs), and FVCOM-LTRANS (Lagrangian Larval Transport) modules.

54 ENVIRONMENTAL SCIENCES↗

Production Pathways and Separation Procedures for High-Diagnostic-Value Activation Species, Fission Products, and Actinides Required for Preparation of Realistic Synthetic Post-Detonation Nuclear Debris: Status Report and FY16 Project Plan

The objective of this project is to provide a comprehensive study on the production routes and chemical separation requirements for activation products, fission products, and actinides required for the creation of realistic post-detonation surrogate debris. Isotopes that have been prioritized by debris diagnosticians will be examined for their ability to be produced at existing irradiation sources, production rates, and availability of target materials, and chemical separation procedures required to rapidly remove the products from the bulk target matrix for subsequent addition into synthetic debris samples. The characteristics and implications of the irradiation facilities on the isotopes of interest will be addressed in addition to a summary of the isotopes that are already regularly produced. This is a planning document only.

38 RADIATION CHEMISTRY, RADIOCHEMISTRY, AND NUCLEA↗

Summary of Industry Task Orders Completed by the U.S. Department of Energy, Office of Nuclear Energy's Nuclear Fuel Storage and Transportation Planning Project

The Administration released its Strategy for the Management and Disposal of Used Nuclear Fuel and High- Level Radioactive Waste in January 2013. The Strategy includes a phased, adaptive, and consent-based approach to siting, and implementing a comprehensive management and disposal system. These plans include activities to establish one or more ISFs using consent-based siting and to prepare for large-scale transport of spent nuclear fuel (SNF). Nuclear Fuels Storage and Transportation Planning Project (NFST) completed the following three Task Orders, using industry Advisory and Assistance Contracts related interim storage and transportation. These design concepts provide important information to the waste management systems analysis regarding throughput capacities, operational considerations, and cost estimates. - Generic Design Alternatives for Dry Storage of Used Nuclear Fuel- Chicago Bridge and Iron (CBandI) developed and documented generic design alternatives for receipt and storage of SNF and greater-than-class-C (GTCC) waste contained in dual-purpose canisters. - Generic Design for Small Size Standard Transportation, Aging, and Disposal Canister System- EnergySolutions developed a generic design of a small capacity (4 PWR/9 BWR) Standard Transportation, Aging, and Disposal (STAD) canister. - Operational Requirements for Standardized Dry Fuel Canister Systems- EnergySolutions developed solutions to address operational impacts of using a standardized canister at utility sites with a smaller capacity than conventional, dual-purpose canisters (DPC). (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Reuse Permit I-161-02 Quality Assurance Project Plan (QAPP) for Required Environmental and Process Monitoring. Idaho National Laboratory Advanced Test Reactor (ATR) Complex Cold Waste Ponds

The Department of Environmental Quality (DEQ) issued Reuse Permit No. I-161-02 (hereafter permit) for the Idaho National Laboratory (INL) Advanced Test Reactor (ATR) Complex Cold Waste Ponds (CWP) on November 20, 2014. Permit Section 3 compliance activity (CA), CA-161-02, requires the permittee to prepare and implement a Quality Assurance Project Plan (QAPP) within 6 months of permit issuance. This QAPP is prepared in accordance with CA-161-02 using a template provided by DEQ.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Reuse Permit I-161-02 Quality Assurance Project Plan (QAPP) for Required Environmental and Process Monitoring Idaho National Laboratory Advanced Test Reactor (ATR) Complex Cold Waste Ponds

The Department of Environmental Quality (DEQ) issued Reuse Permit No. I-161-02 (hereafter permit) for the Idaho National Laboratory (INL) Advanced Test Reactor (ATR) Complex Cold Waste Ponds (CWP) on November 20, 2014, with minor Modification 1 effective March 7, 2017. Permit Section 3 compliance activity (CA), CA-161-02, requires the permittee to prepare and implement a Quality Assurance Project Plan (QAPP) within 6 months of permit issuance. This QAPP is prepared in accordance with CA-161-02 using a template provided by DEQ.

99 GENERAL AND MISCELLANEOUS↗

Vitrified hillforts as anthropogenic analogues for nuclear waste glasses - project planning and initiation

Nuclear waste must be deposited in such a manner that it does not cause significant impact on the environment or human health. In some cases, the integrity of the repositories will need to sustain for tens to hundreds of thousands of years. In order to ensure such containment, nuclear waste is frequently converted into a very durable glass. It is fundamentally difficult, however, to assure the validity of such containment based on short-term tests alone. To date, some anthropogenic and natural volcanic glasses have been investigated for this purpose. However, glasses produced by ancient cultures for the purpose of joining rocks in stonewalls have not yet been utilized in spite of the fact that they might offer significant insight into the long-term durability of glasses in natural environments. Therefore, a project is being initiated with the scope of obtaining samples and characterizing their environment, as well as to investigate them using a suite of advanced materials characterization techniques. It will be analysed how the hillfort glasses may have been prepared, and to what extent they have altered under in-situ conditions. The ultimate goals are to obtain a better understanding of the alteration behaviour of nuclear waste glasses and its compositional dependence, and thus to improve and validate models for nuclear waste glass corrosion. The paper deals with project planning and initiation, and also presents some early findings on fusion of amphibolite and on the process for joining the granite stones in the hillfort walls.

ageing↗

Idaho National Laboratory Ten-Year Site Plan Project Description Document: Descriptions of the capital projects delineated in the Idaho National Laboratory 2013 - 2022 Ten-Year Site Plan as of June 2011

This document describes the currently active and proposed infrastructure projects listed in Appendix B of the Idaho National Laboratory 2013-2022 Ten Year Site Plan (DOE/ID-11449). It was produced in accordance with Contract Data Requirements List I.06. The projects delineated in this document support infrastructure needs at INL's Research and Education Campus, Materials and Fuels Complex, Advanced Test Reactor Complex and the greater site-wide area. The projects provide critical infrastructure needed to meet current and future INL operational and research needs. Execution of these projects will restore, rebuild, and revitalize INL's physical infrastructure; enhance program execution, and make a significant contribution toward reducing complex-wide deferred maintenance.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

An Overview of Project Planning for Hot-Isostatic Pressure Treatment of High-Level Waste Calcine for the Idaho Cleanup Project - 12289

The Calcine Disposition Project is responsible for retrieval, treatment by hot-isostatic pressure, packaging, and disposal of highly radioactive calcine stored at the Idaho Nuclear Technology and Engineering Center at the Idaho National Laboratory Site in southeast Idaho. In the 2009 Amended Record of Decision: Idaho High-Level Waste and Facilities Disposition Final Environmental Impact Statement the Department of Energy documented the selection of hot-isostatic pressure as the technology to treat the calcine. The Record of Decision specifies that the treatment results in a volume-reduced, monolithic waste form suitable for transport outside of Idaho by a target date of December 31, 2035. That target date is specified in the 1995 Idaho Settlement Agreement to treat and prepare the calcine for transport out of Idaho in exchange for allowing storage of Navy spent nuclear fuel at the INL Site. The project is completing the design of the calcine-treatment process and facility to comply with Record of Decision, Settlement Agreement, Idaho Department of Environmental Quality, and Department of Energy requirements. A systems engineering approach is being used to define the project mission and requirements, manage risks, and establish the safety basis for decision making in compliance with DOE O 413.3B, 'Program and Project Management for the Acquisition of Capital Assets'. The approach draws heavily on 'design-for-quality' tools to systematically add quality, predict design reliability, and manage variation in the earliest possible stages of design when it is most efficient. Use of these tools provides a standardized basis for interfacing systems to interact across system boundaries and promotes system integration on a facility-wide basis. A mass and energy model was developed to assist in the design of process equipment, determine material-flow parameters, and estimate process emissions. Data generated from failure modes and effects analysis and reliability, availability, maintainability, and inspectability analysis were incorporated into a time and motion model to validate and verify the capability to complete treatment of the calcine within the required schedule. The Calcine Disposition Project systems engineering approach, including use of industry-proven design-for-quality tools and quantitative assessment techniques, has strengthened the project's design capability to meet its intended mission in a safe, cost-effective, and timely manner. Use of these tools has been particularly helpful to the project in early design planning to manage variation; improve requirements and high-consequence risk management; and more effectively apply alternative, interface, failure mode, RAMI, and time and motion analyses at the earliest possible stages of design when their application is most efficient and cost effective. The project is using these tools to design and develop HIP treatment of highly radioactive calcine to produce a volume-reduced, monolithic waste form with immobilization of hazardous and radioactive constituents. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Final Report for the Soboba Strategic Tribal Energy Planning Project

In 2011 the Tribe was awarded funds from the Department of Energy to formulate the Soboba Strategic Tribal Energy Plan. This will be a guiding document used throughout the planning of projects focused on energy reduction on the Reservation.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Idaho National Laboratory Ten-Year Site Plan Project / Activity Description Document

This document describes the currently active and proposed infrastructure projects and activities listed in Appendix B of the Idaho National Laboratory 2015 2023 Ten-Year Site Plan (DOE/ID-11488) with project statuses as of August 2013. This document was produced in accordance with Contract Data Requirements List I.06.

99 GENERAL AND MISCELLANEOUS↗

Feedback from International Decommissioning Planning Projects - 20269

Decommissioning of Nuclear Power Plants is an increasing reality in many countries with nuclear power. Already many years before final shutdown, planning of the decommissioning work is usually started in order to understand for example the costs, waste volume capacity and licensing work needed. In many countries it is required to have a final decommissioning plan before any decommissioning work is allowed to start. Westinghouse has been involved in international decommissioning planning for more than 30 years, where the first 20 years was mostly funding and preliminary plans due to that decommissioning was many years away. However, as many more plants are now moving into decommissioning, the focus has shifted to final decommissioning plans with budgets instead of funding plans, strategic decisions instead of choices, waste volume specifications instead of estimates and a defined approach instead of what ifs. Westinghouse has developed a methodology based on the planning and execution of many decommissioning projects in Europe, America and Asia. That international experience and understanding helps the customers to adopt a systematic planning process where strategy development is done with the end state in mind, where the goals are clearly outlined and the starting point described. The process and steps to reach the desired end state need to be clearly defined and all options/alternatives evaluated from a cost/benefit point of view. This is followed by a thorough and quantitative risk analysis in order to give solid recommendations and credible conclusions. One important feedback has been that real decommissioning experience from reference projects is invaluable for an efficient and timely progress in order not to spend unnecessary time and effort on understanding the barriers and links between different activities in decommissioning. Skilled project managers or engineers can drive the project forward, but without decommissioning experience previously gained, valuable lessons learned are not used and the same mistakes can be made again. Many utilities have invested in knowledge transfer from other decommissioning projects through site visits, exchange programs and supplier meetings, which is a valuable asset and way of implementing lessons learned from performed decommissioning projects into the planning process. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Recertification Project Plan (Rev. 5)

The Waste Isolation Pilot Plant (WIPP) Recertification Project was established to meet the WIPP Land Withdrawal Act (LWA) (Public Law 102-579, as amended by Public Law 104-201) (102nd U.S. Congress, 1992) requirement to demonstrate continued compliance with U.S. Environmental Protection Agency (EPA) disposal regulations. This plan sets the overall direction for a complex and interdependent set of tasks that is repeated at five-year intervals and culminates in EPA certification that the WIPP facility demonstrates continued compliance with Title 40 Code of Federal Regulations (CFR) Part 191, "Environmental Radiation Protection Standards for the Management and Disposal of Spent Nuclear Fuel, High-Level and Transuranic Radioactive Wastes," pursuant to LWA sections 8(d)(1) and 8(f).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Advanced Seismic Probabilistic Risk Assessment Demonstration Project Plan

Idaho National Laboratories (INL) has an ongoing research and development (R&D) project to remove excess conservatism from seismic probabilistic risk assessments (SPRA) calculations. These risk calculations should focus on providing best estimate results, and associated insights, for evaluation and decision-making. This report presents a plan for improving our current traditional SPRA process using a seismic event recorded at a nuclear power plant site, with known outcomes, to improve the decision making process. SPRAs are intended to provide best estimates of the various combinations of structural and equipment failures that can lead to a seismic induced core damage event. However, in general this approach has been conservative, and potentially masks other important events (for instance, it was not the seismic motions that caused the Fukushima core melt events, but the tsunami ingress into the facility).

58 GEOSCIENCES↗