Search NASA⌕ Search

SEARCH · Search NASA

Results for “Project Readiness”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

RDPP: Accelerating Diversity in DOE Climate Science and Resilience Research (Final Report)

The scope of the project was set out to accelerate the inclusion of diversity into the Department of Energy (DOE) Earth and Environmental Systems Sciences Division (EESSD) relevant climate science and resilience research to inclusively advance solutions. The Project Objectives were to usher in equitable use-inspired climate-related research with underrepresented Minorities of which this project helped fund 7 HU graduate students work with the DOE (three of which will graduate in Spring 2025). The two key aims underpinning that core goal were AIM1: developing partnerships (18 organized engaged, see partners list) and AIM2: Developing capabilities (3 visits to DOE facilities, 5 DOE partners visits to HU, increased visiting faculty participation in BNL-DOE lab, secured 5 grants together totaling 1.2 million in funds for HU). The project objectives were highly successful as they were designed to ambitiously pull together DOE lab researchers with the long-standing and successful transdisciplinary climate science research programs of the PI and local DC groups. The major outcomes of this RDPP program will be in the new fundamentally inclusive partnerships with DOE and HU tasked to understand the urban-rural impacts due to climate change in the US, Eastern South Atlantic (ESA) Region, related to energy issues driven by heat stress and the water cycle. Overall, this project contributes to the DOE and science community vision for catalyze connections for project-ready underrepresented minorities (URMs) at a prominent HBCU to DOE projects supported by the Biological and Environmental research (BER) Program; particularly, the Earth and Environmental Systems Sciences Division (EESSD).

54 ENVIRONMENTAL SCIENCES↗

GeoRePORT (Geothermal Resource Portfolio Optimization & Reporting Technique)

The Geothermal Resource Portfolio Optimization and Reporting Technique (GeoRePORT) Protocol provides a system for reporting resource grade and project readiness level. It is particularly useful for describing early-stage exploration projects. GeoRePORT can assist in evaluating project risk and return, identifying gaps in reported data, evaluating research and design impacts, and gathering insights on successes and failures. It helps users objectively and quantitatively compare project potential in geological, technical, and socioeconomic areas.

Young, Katherine↗

In Situ Summarization with VTK-m

Summarization and compression at current and future scales requires a framework for developing and benchmarking algorithms. We present a framework created by integrating existing, production-ready projects and provide timings of two particular algorithms that serve as exemplars for summarization: a wavelet-based data reduction filter and a generator for creating image-like databases of extracted features (isocontours in this case). Both support browser-based, post-hoc, interactive visualization of the summary for decision-making. A study of their weak-scaling on a distributed multi-GPU system is included in this article.

97 MATHEMATICS AND COMPUTING↗

GeoRePORT Protocol Volume III: Technical Assessment Tool

Technical Project Readiness Level is an assessment of the development of a geothermal area as a power generation facility. Five separate progression levels ranging from 'unrecognizable' to 'demonstrated' are designated, with criteria specific to technical development that must be completed to move up the scale.

15 GEOTHERMAL ENERGY↗

Cal Poly Space Project G-279

The Cal Poly Space Project is an effort on the part of several highly motivated students to deploy a space canister which will examine the effects of microgravity on electroplating and immiscible metals. The experiments will be controlled and monitored by a specialized triple redundancy system developed to defer the possible electronic errors due to uncontrollable factors such as photons from the Sun. With the finalization of the payload design and the near completion of the data control system, the integration phase of the project is anticipated to be completed and the project ready for launching by early 1987. It is hoped that the experiments will lead to new insights in space research and also prove profitable to industry.

Farley, David R.↗

GeoRePORT Case Study Examples: Reporting Using the Geothermal Resource Portfolio Optimization and Reporting Technique (GeoRePORT)

The GeoRePORT System is based on the concept that a geothermal system can be described both in terms of the quality of the geothermal resource as it relates to the potential to extract heat (Resource Grade) and the progress of research and development over the lifetime of the project (Project Readiness Level). Case study examples using the GeoRePORT tool are shared and discussed.

15 GEOTHERMAL ENERGY↗

AI-Ready Data Pilot Project Report

The proliferation of artificial intelligence in scientific research has created an urgent need to define "AI-ready data" for researchers and, more importantly, provide resources to help them produce AI-ready data. At Pacific Northwest National Laboratory, we conducted a pilot study with three data scientists evaluating three CSV datasets from different scientific domains, followed by semi-structured interviews capturing assessment practices. Our findings reveal that AI-readiness evaluation is intuition-based, with practitioners asking "How fast can I go from raw data to my machine learning pipeline?" Data scientists consistently prioritized workflow efficiency, human interpretability, and quality stewardship signals. From these insights, we developed a practical evaluation framework comprising data requirements, metadata standards, and validation tests that provides actionable criteria for producing and curating AI-ready datasets, addressing the gap between theoretical understanding and practical implementation.

97 MATHEMATICS AND COMPUTING↗

GODEEEP-hydro: Historical and projected power system ready hydropower data for the United States

Hydropower is a critical electricity resource in the United States which, in addition to low-cost electricity generation, provides valuable ancillary grid services, and supports the integration of nondispatchable weather-dependent resources (e.g., wind and solar). Despite its value to the grid, there are very few comprehensive datasets available from which to study both historical and future impacts of climate, weather driven energy droughts, and integration of other weather driven generation. In this paper, we present a hydropower generation dataset covering 1,452 hydroelectric plants in the contiguous U.S. The dataset contains monthly and weekly hydropower generation estimates for both historical (1982–2019) and future (2020–2099) periods which includes 4 future climate scenarios. In addition, this dataset provides weekly and monthly constraints such as minimum and maximum power which are particularly useful in power system models which are used to study grid reliability, transmission planning and capacity expansion.

13 HYDRO ENERGY↗

Grid Ready: Strategies for Interconnecting Large-Scale PV in New York City

This Grid Ready Solar project is intended to help create transparency for building owners and developers, so they can better understand and more quickly navigate the interconnection process for large-scale photovoltaic (PV) projects on Con Edison's electrical grid in New York City. Phase 1 of the project provided high-level technical screens of grid interconnection requirements in an attempt to streamline the interconnection of large-scale solar PV systems to the New York City grid. In Phase 2 of the Grid Ready project, the focus of this report, Sustainable CUNY worked with NREL to evaluate a range of solutions for improving the economics of large-scale (over 200 kW) PV within the five boroughs of New York City that are in Con Edison's service territory, as identified on the NY Solar Map.

14 SOLAR ENERGY↗

Management of the Cs/Sr Capsule Project at the Hanford Site. Technology Readiness Assessment Report

The Federal Project Director (FPD) for the U.S. Department of Energy (DOE), Richland Operations Office (RL) Waste Management and D&D Division (WMD) requested a Technology Readiness Assessment (TRA) for the Management of the Cesium/Strontium Capsule Storage Project (MCSCP) at the Waste Encapsulation and Storage Facility (WESF) on the Hanford Site in Washington State. The MCSCP CD-1 TRA was performed by a team selected in collaboration between the Office of Environmental Management (EM) Chief Engineer (EM-3.3) and RL, WMD FPD. The TRA Team included subject matter and technical experts having experience in cask storage, process engineering, and system design who were independent of the MCSCP, and the team was led by the Director of Operations and Processes from the EM Chief Engineer's Office (EM-3.32). Movement of the Cs/Sr capsules to dry storage, based on information from the conceptual design, involves (1) capsule packaging, (2) capsule transfer, and (3) capsule storage. The project has developed a conceptual process, described in 30059-R-02, "NAC Conceptual Design Report for the Management of the Cesium and Strontium Capsules Project", which identifies the five major activities in the process to complete the transfer from storage pool to pad-mounted cask storage. The process, shown schematically in Figure 1, is comprised of the following process steps: (1) loading capsules into the UCS; (2) UCS processing; (3) UCS insertion into the TSC Basket; (4) cask transport from WESF to CSA and (5) extended storage at the CSA.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Estimation of General Area Dose Rates During Closure Weld Operations on the DOE Standard Canister Pacific Basin Nuclear Conference 2024

The Department of Energy (DOE) Spent Nuclear Fuel (SNF) Road Ready Demonstration Project is an effort to package DOE-managed SNF for road-ready dry storage. A key operation in this demonstration is performing the closure weld on the DOE Standard Canister after it has been loaded with the SNF. Planning the closure weld operations is ongoing and must consider what parts of the operations (if any) can be done manually and what parts must be done remotely. A key parameter to inform the evolving planning of these operations is the dose rate in the vicinity of the canister and the dose hazard posed to the closure weld operators and collocated workers. This study developed a Monte Carlo N-Particle (MCNP) model of the closure weld operation, which was used to estimate general area dose rates as well as dose rates to the welding location, weld operators, and collocated workers. These estimates provide some insight into the potential radiation exposure hazard for workers during the operations and are a factor to be considered in the ongoing development of designs, technology, processes, and administrative controls for packaging DOE-managed SNF for road-ready dry storage.

11 - NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

EPOXI and Stardust NExT: The Management Challenges of Two Comet Flybys in Three Months

The EPOXI and Stardust NExT missions were missions of opportunity utilizing the Deep Impact and Stardust spacecraft, respectively. These new missions took advantage of the cost savings of utilizing spacecraft that were already flying for new science investigations. Both were retargeted to fly by an additional comet. EPOXI visited Hartley 2, significantly smaller than the other Jupiter family comets visited previously. Stardust NExT flew by Tempel 1, providing a second look at the comet previously studied by Deep Impact in 2005. Both projects were part of NASA's Discovery Program. In order to further save costs, the projects were combined into a single project office at JPL. This provided some efficiencies due to the similarity of the missions, but having the flybys space only three months apart posed challenges for the project management team to ensure each project was ready for its critical event and ensuring each received the proper support from the management team. The project office relied on an integrated calendar for tracking and scheduling meetings, reviews, and other key events. The project management team also coordinated their availability for both projects to maintain involvement with each team to ensure effective risk identification and management.

NExT (New Exploration of Tempel 1)↗

Optimizing Alabama’s CO 2 Storage in Shelby County (Project OASIS): Task 6.0 Deliverable – CarbonSAFE Phase III Readiness

The OASIS CarbonSAFE Phase II Project OASIS (Optimizing Alabama’s CO 2 Storage in Shelby County) is a geologic and reservoir characterization study designed to evaluate deep saline formations for potential long-term carbon dioxide (CO 2 ) storage in central Alabama near the National Carbon Capture Center (NCCC) and Alabama Power’s Plant Gaston. The project centers on understanding the potential of the Cambro-Ordovician Knox Group and underlying strata such as the Conasauga and Rome Formations for geologic storage of CO 2 . These formations were investigated as part of SECARB-USA (DE-FE0031830) and Project OASIS through the drilling of two stratigraphic test wells to obtain electronic well logs, core, and sidewall core plugs. These data provide direct measurements of porosity, permeability, and lithologic variability critical for reservoir characterization. Complementing the well program, a limited 2D seismic survey was conducted to help select the site for Westover #2 as part of SECARB-USA (DE-FE0031830), and a more regional Seismic Exchange (SEI) seismic survey was licensed and interpreted to define structural and stratigraphic frameworks in a new Static Earth Model (SEM), map reservoir continuity, and to identify potential sealing intervals. Integrated with geologic and reservoir modeling, these datasets form the basis for evaluating storage capacity, injectivity, and containment. While this document endeavors to provide readers with a high-level overview of Project OASIS activities and its suitability for subsequent CarbonSAFE Phases, such as a Phase III effort. Other project deliverables and milestones will provide more details on individual subjects.

20 FOSSIL-FUELED POWER PLANTS↗

Bering Strait Energy Planning Network

Kawerak will work with partners as a clearinghouse for energy information, provide training for remote and onsite technical assistance to communities on energy projects, work with communities to update their portions of the regional energy plan and contribute results to state energy planners, and host an annual regional energy summit to share information and provide training while networking with other regions to collaborate on energy issues and projects. These projects will look to leverage current and future DOE and other funding opportunities and to capture the Norton Sound Economic Development Corporation funding for shovel ready energy projects.

99 GENERAL AND MISCELLANEOUS↗

Photovoltaic system criteria documents. Volume 1: Guidelines for evaluating the management and operations planning of photovoltaic applications

Guidelines are provided to the Field Centers for organization, scheduling, project and cost control, and performance in the areas of project management and operations planning for Photovoltaics Test and Applications. These guidelines may be used in organizing a T and A Project Team for system design/test, site construction and operation, and as the basis for evaluating T and A proposals. The attributes are described for project management and operations planning to be used by the Field Centers. Specifically, all project management and operational issues affecting costs, schedules and performance of photovoltaic systems are addressed. Photovoltaic tests and applications include residential, intermediate load center, central station, and stand-alone systems. The sub-categories of system maturity considered are: Initial System Evaluation Experiments (ISEE); System Readiness Experiments (SRE); and Commercial Readiness Demonstration Projects (CRDP).

Koenig, John C.↗

Nuclear Direct Air Capture with Carbon Storage (NuDACCS) (Final Technical Report)

This final report, which is for DOE Award Number DE-FE0032160 (Direct Air Capture Combined with dedicated Long-Term Carbon Storage, Coupled to Existing Low-Carbon Energy), covers the Nuclear Direct Air Capture with Carbon Storage (NuDACCS) project period of performance from 03/31/2022 to 12/27/2024. Battelle Memorial Institute (Battelle) partnered with Aircapture LLC (Aircapture), Southern Company (Southern), Carbonvert, the University of Alabama, and Sargent & Lundy (S&L) to develop a front end engineering design (FEED) study for a direct air capture (DAC) system co-located with Southern Company's Joseph M. Farley Nuclear Plant (Plant Farley) in Columbia, Alabama. The DAC system was designed to capture at least 5,000 net tonnes of carbon dioxide (CO2) per year from ambient air in a form suitable for long duration carbon storage (e.g., geologic storage). To complement and support the FEED study, additional analyses were completed, including a Technology Maturation Plan (TMP); Workforce Readiness Plan; Project Cost Estimate; Business Case Analysis (BCA); Life Cycle Analysis (LCA); Environmental Health and Safety (EH&S) Assessment; and Environmental Justice (EJ) Analysis and Economic Revitalization and Job Creation Outcomes Analysis.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗