Search NASA⌕ Search

SEARCH · Search NASA

Results for “Projection”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Advanced Instrumentation, Information and Control (II&C) Research and Development Facility Buildout and Project Execution of LWRS II&C Pilot Projects 1 and 3

The U.S. Department of Energy (DOE) is sponsoring research, development, and deployment on light water reactor sustainability (LWRS), in which the Idaho National Laboratory (INL) is working closely with nuclear utilities to develop technologies and solutions to help ensure the safe operational life extension of current reactors. As technologies are introduced that change the operation of the plant, the LWRS pilot projects can help identify their best-advanced uses and help demonstrate the safety of these technologies. In early testing of operator performance given these emerging technologies will ensure the safety and usability of systems prior to large-scale deployment and costly verification and validation at the plant. The aim of these collaborations, demonstrations, and approaches are intended to lessen the inertia that sustains the current status quo of today's II&C systems technology, and to motivate transformational change and a shift in strategy to a long-term approach to II&C modernization that is more sustainable. Research being conducted under Pilot Project 1 regards understanding the conditions and behaviors that can be modified, either through process improvements and/or technology deployment, to improve the overall safety and efficiency of outage control at nuclear facilities. The key component of the research in this pilot project is accessing the delivery of information that will allow researchers to simulate the control room, outage control center (OCC) information, and plant status data. The simulation also allows researchers to identify areas of opportunity where plant operating status and outage activities can be analyzed to increase overall plant efficiency. For Pilot Project 3 the desire is to demonstrate the ability of technology deployment and the subsequent impact on maximizing the 'Collective Situational Awareness' of the various stakeholders in a commercial nuclear power plant. Specifically, the desire is to show positive results in plant status control, information management, knowledge management, and 'Real-Time-Truth' as it relates to the current plant conditions. The following report includes two attachments; each attachment represents Pilot Project 1 and 3. The two attachments also provide a report on two distinct milestones that were completed and are described below: M3L11IN06030307 - Complete initiation of two pilot projects. Complete initiation of pilot projects on real-time configuration management and control to overcome limitations with existing permanent instrumentation and real-time awareness of plant configurations; two candidate projects that consider low-cost wireless technology for in situ configuration monitoring and candidate technologies and an information architecture for outage management and control will be initiated with utilities. M3L11IN06030309 - Complete data collection, R&D plans, and agreements needed to conduct the two pilot projects. Complete data collection conducted at pilot project utilities to support real-time configuration management and outage control center pilot studies conducted; R&D plan for pilot projects produced and needed agreements established to support R&D activities.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Assessment of online public opinions on large infrastructure projects: A case study of the Three Gorges Project in China

Public opinion becomes increasingly salient in the ex post evaluation stage of large infrastructure projects which have significant impacts to the environment and the society. However, traditional survey methods are inefficient in collection and assessment of the public opinion due to its large quantity and diversity. Recently, Social media platforms provide a rich data source for monitoring and assessing the public opinion on controversial infrastructure projects. This paper proposes an assessment framework to transform unstructured online public opinions on large infrastructure projects into sentimental and topical indicators for enhancing practices of ex post evaluation and public participation. The framework uses web crawlers to collect online comments related to a large infrastructure project and employs two natural language processing technologies, including sentiment analysis and topic modeling, with spatio-temporal analysis, to transform these comments into indicators for assessing online public opinion on the project. Based on the framework, we investigate the online public opinion of the Three Gorges Project on China's largest microblogging site, namely, Weibo. Assessment results present spatial-temporal distributions of post intensity and sentiment polarity, reveals major topics with different sentiments and summarizes managerial implications, for ex post evaluation of the world's largest hydropower project. The proposed assessment framework is expected to be widely applied as a methodological strategy to assess public opinion in the ex post evaluation stage of large infrastructure projects. - Highlights: • We developed a framework to assess online public opinion on large infrastructure projects with environmental impacts. • Indicators were built to assess post intensity, sentiment polarity and major topics of the public opinion. • We took the Three Gorges Project (TGP) as an example to demonstrate the effectiveness proposed framework. • We revealed spatial-temporal patterns of post intensity and sentiment polarity on the TGP. • We drew implications for a more in-depth understanding of the public opinion on large infrastructure projects.

54 ENVIRONMENTAL SCIENCES↗

Designing a Successful Transportation Project: Lessons Learned from the Clean Cities American Recovery and Reinvestment Act Projects

The largest source of funding for alternative fuel vehicle and infrastructure projects in the U.S. Department of Energy's Clean Cities program's history came from the American Recovery and Reinvestment Act (Recovery Act). In 2009, the 25 cost-share projects totaled nearly $300 million in federal government investment. This effort included the involvement of 50 Clean Cities coalitions and their nearly 700 stakeholder partners who provided an additional $500 million in matching funds to support projects in their local communities. In total, those 25 projects established 1,380 alternative fueling stations and put more than 9,000 alternative fuel and advanced technology vehicles on the road. Together, these projects displaced 154 million gasoline gallon equivalents (GGE) of petroleum and averted 254,000 tons of greenhouse gas (GHG) emissions, while supporting U.S. energy independence and contributing to regional economic development. During post-project interviews, project leaders consistently cited a number of key components - ranging from technical and logistical factors, to administrative capabilities - for accomplishing an effective and impactful project. This report summarizes the high-level project design and administrative considerations for conducting a successful transportation project.

30 DIRECT ENERGY CONVERSION↗

Improving the SWAT forest module for enhancing water resource projections: A case study in the St. Croix River basin

Abstract Insufficiently calibrated forest parameters of the Soil & Water Assessment Tool (SWAT) may introduce uncertainties to water resource projections in forested watersheds. In this study, we improved SWAT forest parameterization and phosphorus cycling representations to better simulate forest ecosystems in the St. Croix River basin, and we further examined how those improvements affected model projections of streamflow, sediment, and nitrogen export under future climate conditions. Simulations with improved forest parameters substantially reduced model estimates of water, sediment, and nitrogen fluxes relative to those based on default parameters. Differences between improved and default projections can be attributed to the enhanced representation of forest water consumption, nutrient uptake, and protection of soil from erosion. Better representation of forest ecosystems in SWAT contributes to constraining uncertainties in water resource projections. Results of this study highlight the importance of improving SWAT forest ecosystem representations in projecting delivery of water, sediment, and nutrients from land to rivers in response to climate change, particularly for watersheds with large areas of forests. Improved forest parameters and the phosphorus weathering algorithms developed in this study are expected to help enhance future applications of SWAT to investigate hydrological and biogeochemical consequences of climate change.

Yang, Qichun↗

U.S. Department of Energy Fuels & Lubricants Project on Lubricant Technology - Innovation, Discovery, Design, and Engineering (Final Report)

In 2016, the Vehicle Technologies Office (VTO) of the Department of Energy (DOE) issued a solicitation for the AOP Lab Call research in FY2017 on a number of topics related to vehicles. Topic 6A of the Lab Call focused on research related to advanced lubricants: '...(in) support of the lubricants program goal to, by 2020, demonstrate novel formulations for powertrain and driveline lubricants, compatible with new and legacy vehicles, to achieve at least a 4 percent real-world fuel economy improvement.' Argonne National Laboratory (ANL) in collaboration with Oak Ridge National Laboratory (ORNL) and Pacific Northwest National Laboratory (PNNL) was awarded a 3-year multilab project on 'Lubricant Technology - Innovation, Discovery, Design, and Engineering.' Research on the project began in FY2017 at the three laboratories with industry participation; however, in FY2018, the project was terminated due to budgetary constraints. The following is the final report for the project and highlights progress made during the first year of research. The report is divided into sections that highlight the following: goals, objectives, milestones and deliverables; project highlights; outreach - publications, conferences, and reports; milestones accomplished; research progress.

30 DIRECT ENERGY CONVERSION↗

The Scenario Model Intercomparison Project (ScenarioMIP) for CMIP6

Projections of future climate change play a fundamental role in improving understanding of the climate system as well as characterizing societal risks and response options. The Scenario Model Intercomparison Project (ScenarioMIP) is the primary activity within Phase 6 of the Coupled Model Intercomparison Project (CMIP6) that will provide multi-model climate projections based on alternative scenarios of future emissions and land use changes produced with integrated assessment models. Here, we describe ScenarioMIP's objectives, experimental design, and its relation to other activities within CMIP6. The ScenarioMIP design is one component of a larger scenario process that aims to facilitate a wide range of integrated studies across the climate science, integrated assessment modeling, and impacts, adaptation, and vulnerability communities, and will form an important part of the evidence base in the forthcoming Intergovernmental Panel on Climate Change (IPCC) assessments. Furthermore, it will provide the basis for investigating a number of targeted science and policy questions that are especially relevant to scenario-based analysis, including the role of specific forcings such as land use and aerosols, the effect of a peak and decline in forcing, the consequences of scenarios that limit warming to below 2°C, the relative contributions to uncertainty from scenarios, climate models, and internal variability, and long-term climate system outcomes beyond the 21st century. In order to serve this wide range of scientific communities and address these questions, a design has been identified consisting of eight alternative 21st century scenarios plus one large initial condition ensemble and a set of long-term extensions, divided into two tiers defined by relative priority. Some of these scenarios will also provide a basis for variants planned to be run in other CMIP6-Endorsed MIPs to investigate questions related to specific forcings. Harmonized, spatially explicit emissions and land use scenarios generated with integrated assessment models will be provided to participating climate modeling groups by late 2016, with the climate model simulations run within the 2017–2018 time frame, and output from the climate model projections made available and analyses performed over the 2018–2020 period.

54 ENVIRONMENTAL SCIENCES↗

Designing a Successful Transportation Project: Lessons Learned from the Clean Cities American Recovery and Reinvestment Act Projects

The largest source of funding for alternative fuel vehicle and infrastructure projects in the U.S. Department of Energy's Clean Cities program's history came from the American Recovery and Reinvestment Act (Recovery Act). In 2009, the 25 cost-share projects totaled nearly $300 million in federal government investment. This effort included the involvement of 50 Clean Cities coalitions and their nearly 700 stakeholder partners who provided an additional $500 million in matching funds to support projects in their local communities. In total, those 25 projects established 1,380 alternative fueling stations and put more than 9,000 alternative fuel and advanced technology vehicles on the road. Together, these projects displaced 154 million gasoline gallon equivalents (GGE) of petroleum and averted 254,000 tons of greenhouse gas (GHG) emissions, while supporting U.S. energy independence and contributing to regional economic development. During post-project interviews, project leaders consistently cited a number of key components - ranging from technical and logistical factors, to administrative capabilities - for accomplishing an effective and impactful project. This report summarizes the high-level project design and administrative considerations for conducting a successful transportation project.

arra, doe, recovery act,clean cities, alternative ↗

A Practical Application of Integrated Systems Engineering and Project Management on a Complex EPC Project - 17207

This paper introduces how an integrated set of Systems Engineering (SE) and Project Management (PM) processes were applied in a practical way, to address the challenges on a complex, highly technical, Engineering Procurement Construction project within the nuclear field. This approach was inspired by: - the principles contained in a Community of Practice on Lean in Program Management jointly established in May 2012 by MIT, PMI and INCOSE; - an opportunity to apply international standard ISO/IEC 15288:2008(E) Systems and software engineering - System life cycle processes on a real-life situation; - and the belief that there is great value in applying Systems Engineering and Project Management in an integrated manner on a project. The project offering this opportunity was the Detail Engineering, Procurement, Construction and Cold Commissioning (EPC) of the Silo Direct-encapsulation Plant (SDP). This project was undertaken by the Joint Venture (JV) formed by Areva, Mace and Atkins (a.m.a. Nuclear Ltd). Unfortunately, early termination of the project, at a stage when only a part of the processes and tools were being implemented, did not allow this integrated approach to be demonstrated in full. However, the benefits achieved in the early stages in aligning and forming an integrated project execution team, showed potential for great benefits. This paper covers an introductory analysis of the situation, the successes and benefits achieved from implementing an integrated SE - PM approach up to the stage when the project was terminated, and possible path forward had the project continued. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

WE-EF-207-04: An Inter-Projection Sensor Fusion (IPSF) Approach to Estimate Missing Projection Signal in Synchronized Moving Grid (SMOG) System

Purpose: A synchronized moving grid (SMOG) has been proposed to reduce scatter and lag artifacts in cone beam computed tomography (CBCT). However, information is missing in each projection because certain areas are blocked by the grid. A previous solution to this issue is acquiring 2 complimentary projections at each position, which increases scanning time. This study reports our first Result using an inter-projection sensor fusion (IPSF) method to estimate missing projection in our prototype SMOG-based CBCT system. Methods: An in-house SMOG assembling with a 1:1 grid of 3 mm gap has been installed in a CBCT benchtop. The grid moves back and forth in a 3-mm amplitude and up-to 20-Hz frequency. A control program in LabView synchronizes the grid motion with the platform rotation and x-ray firing so that the grid patterns for any two neighboring projections are complimentary. A Catphan was scanned with 360 projections. After scatter correction, the IPSF algorithm was applied to estimate missing signal for each projection using the information from the 2 neighboring projections. Feldkamp-Davis-Kress (FDK) algorithm was applied to reconstruct CBCT images. The CBCTs were compared to those reconstructed using normal projections without applying the SMOG system. Results: The SMOG-IPSF method may reduce image dose by half due to the blocked radiation by the grid. The method almost completely removed scatter related artifacts, such as the cupping artifacts. The evaluation of line pair patterns in the CatPhan suggested that the spatial resolution degradation was minimal. Conclusion: The SMOG-IPSF is promising in reducing scatter artifacts and improving image quality while reducing radiation dose.

60 APPLIED LIFE SCIENCES↗

High-resolution dynamically downscaled projections of precipitation in the mid and late 21st century over North America

This study performs high-spatial-resolution (12 km) Weather Research and Forecasting (WRF) simulations over a very large domain (7200 km × 6180 km, covering much of North America) to explore changes in mean and extreme precipitation in the mid and late 21st century under Representative Concentration Pathways 4.5 (RCP 4.5) and 8.5 (RCP 8.5). We evaluate WRF model performance for a historical simulation and future projections, applying the Community Climate System Model version 4 (CCSM4) as initial and boundary conditions with and without a bias correction. WRF simulations using boundary and initial conditions from both versions of CCSM4 show smaller biases versus evaluation data sets than does CCSM4 over western North America. WRF simulations also improve spatial details of precipitation over much of North America. However, driving the WRF with the bias-corrected CCSM4 does not always reduce the bias. WRF-projected changes in precipitation include decreasing intensity over the southwestern United States, increasing intensity over the eastern United States and most of Canada, and an increase in the number of days with heavy precipitation over much of North America. Projected precipitation changes are more evident in the late 21st century than the mid 21st century, and they are more evident under RCP 8.5 than under RCP 4.5 in the late 21st century. Uncertainties in the projected changes in precipitation due to different warming scenarios are non-negligible. Differences in summer precipitation changes between WRF and CCSM4 are significant over most of the United States.

54 ENVIRONMENTAL SCIENCES↗

Comparisons of Montane Snow Water Equivalent Projections: Calculating Total Snow Mass in Regions with Projection Agreement and Divergence in the Western United States

Montane snowpack is a vital source of water in the western United States. Here, we use a large-ensemble approach to evaluate the agreement across 124 snow water equivalent (SWE) projections with statistically downscaled forcing between end-of-century (2076–95) and early twenty-first century (2106–35) periods. Comparisons were performed on dates corresponding with the end of winter (15 April) and midspring snowmelt (15 May) in five western U.S. domains. Using 1) the percent change to end-of-century SWE across different ensembles of snow projections and 2) the shift between early twenty-first century and end-of-century SWE distributions for each snow projection, we identified relationships between projections that were consistent across each domain. In low to midelevations, end-of-century SWE decreases were 48% and larger on 15 April. These regions had projected changes to SWE that were both high confidence and in relative agreement across projections. Despite this, the majority of 15 April SWE volume existed in higher elevations where the magnitude and direction (positive or negative) of SWE changes were most uncertain. The results of this study show that large-ensemble approaches can be used to measure coherence between snow projections and identify 1) the highest confidence changes to future snow water resources and 2) the locations and periods where and when improvements to snow projections would most benefit estimates of future snow water resources.

Climate models↗

El Paso County Geothermal Project at Fort Bliss. Final Project Report

The El Paso County Geothermal Project at Fort Bliss was an effort to determine the scale and scope of geothermal resources previously identified on Fort Bliss’ McGregor Range in southern Otero County, New Mexico. The project was funded with a $5,000,000 grant to El Paso County from the U.S. Department of Energy (DOE) as part of the American Recovery and Reinvestment Act of 2009 and a $4,812,500 match provided by private sector partners. The project was administered through the DOE Golden Field Office to awardee El Paso County. The primary subcontractor to El Paso County and project Principal Investigator - Ruby Mountain Inc. (RMI) of Salt Lake City, Utah - assembled the project team consisting of Evergreen Clean Energy Management (ECEM) of Provo, Utah, and the Energy & Geoscience Institute at the University of Utah (EGI) in Salt Lake City, UT to complete the final phases of the project. The project formally began in May of 2010 and consisted of two preliminary phases of data collection and evaluation which culminated in the identification of a drilling site for a Resource Confirmation Well on McGregor Range. Well RMI 56-5 was drilled May and June 2013 to a depth of 3,030 ft. below ground level. A string of slotted 7 inch casing was set in 8.75 inch hole on bottom fill at 3,017 ft. to complete the well. The well was drilled using a technique called flooded reverse circulation, which is most common in mineral exploration. This technique produced an exceptionally large and complete cuttings record. An exciting development at the conclusion of drilling was the suspected discovery of a formation that has proven to be of exceptionally high permeability in three desalinization wells six miles to the south. Following drilling and preliminary testing and analysis, the project team has determined that the McGregor Range thermal anomaly is large and can probably support development in the tens of megawatts.

15 GEOTHERMAL ENERGY↗

An Overview of Project Planning for Hot-Isostatic Pressure Treatment of High-Level Waste Calcine for the Idaho Cleanup Project - 12289

The Calcine Disposition Project is responsible for retrieval, treatment by hot-isostatic pressure, packaging, and disposal of highly radioactive calcine stored at the Idaho Nuclear Technology and Engineering Center at the Idaho National Laboratory Site in southeast Idaho. In the 2009 Amended Record of Decision: Idaho High-Level Waste and Facilities Disposition Final Environmental Impact Statement the Department of Energy documented the selection of hot-isostatic pressure as the technology to treat the calcine. The Record of Decision specifies that the treatment results in a volume-reduced, monolithic waste form suitable for transport outside of Idaho by a target date of December 31, 2035. That target date is specified in the 1995 Idaho Settlement Agreement to treat and prepare the calcine for transport out of Idaho in exchange for allowing storage of Navy spent nuclear fuel at the INL Site. The project is completing the design of the calcine-treatment process and facility to comply with Record of Decision, Settlement Agreement, Idaho Department of Environmental Quality, and Department of Energy requirements. A systems engineering approach is being used to define the project mission and requirements, manage risks, and establish the safety basis for decision making in compliance with DOE O 413.3B, 'Program and Project Management for the Acquisition of Capital Assets'. The approach draws heavily on 'design-for-quality' tools to systematically add quality, predict design reliability, and manage variation in the earliest possible stages of design when it is most efficient. Use of these tools provides a standardized basis for interfacing systems to interact across system boundaries and promotes system integration on a facility-wide basis. A mass and energy model was developed to assist in the design of process equipment, determine material-flow parameters, and estimate process emissions. Data generated from failure modes and effects analysis and reliability, availability, maintainability, and inspectability analysis were incorporated into a time and motion model to validate and verify the capability to complete treatment of the calcine within the required schedule. The Calcine Disposition Project systems engineering approach, including use of industry-proven design-for-quality tools and quantitative assessment techniques, has strengthened the project's design capability to meet its intended mission in a safe, cost-effective, and timely manner. Use of these tools has been particularly helpful to the project in early design planning to manage variation; improve requirements and high-consequence risk management; and more effectively apply alternative, interface, failure mode, RAMI, and time and motion analyses at the earliest possible stages of design when their application is most efficient and cost effective. The project is using these tools to design and develop HIP treatment of highly radioactive calcine to produce a volume-reduced, monolithic waste form with immobilization of hazardous and radioactive constituents. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Machine learning model to project the impact of COVID-19 on U.S. motor gasoline demand

Owing to the global lockdowns that resulted from the COVID-19 pandemic, fuel demand plummeted and the price of oil futures went negative in April 2020. Robust fuel demand projections are crucial to economic and energy planning and policy discussions. Here we incorporate pandemic projections and people's resulting travel and trip activities and fuel usage in a machine-learning-based model to project the US medium-term gasoline demand and study the impact of government intervention. We found that under the reference infection scenario, the US gasoline demand grows slowly after a quick rebound in May, and is unlikely to fully recover prior to October 2020. Under the reference and pessimistic scenario, continual lockdown (no reopening) could worsen the motor gasoline demand temporarily, but it helps the demand recover to a normal level quicker. Under the optimistic infection scenario, gasoline demand will recover close to the non-pandemic level by October 2020. The COVID 19 pandemic and consequent lockdown has had a substantial impact on mobility and therefore fuel demand and it is not clear when demand will recover. Ou et al. use a machine learning model that integrates health recovery scenarios to project the near-term future of gasoline demand.

COVID-19 pandemic↗

3D Modeling of Safety-Related Upgrade Pilot Project

Constellation Energy and the United States Department of Energy (DOE) have established a public/private partnership to implement a pilot digital upgrade to replace legacy analog, safety-related reactor protection and emergency safety feature actuation systems (RPS/ESFAS) with modern digital systems. This effort is occurring at Constellation’s Limerick Generating Station. This project is being performed in accordance with industry processes that have been adapted to better support digital upgrades. These processes include IP-ENG-001, Standard Design Process, NISP-EN-04, Standard Digital Engineering Process and Electric Power Research Institute Report 3002011816, Digital Engineering Guide. The Light Water Reactor Sustainability (LWRS) Program at the Idaho National Laboratory (INL) has been supporting this effort. Latest INL HFE efforts in support of this project have focused on definition and implementation of the Human Factors Engineering (HFE) Program in support of Constellation design and related licensing efforts. This paper will present the development of the HFE 3D modeling execution of the Main Control Room safety upgrades. New equipment and modifications are planned for upgrading the new safety systems. 3D modeling allows for visualization of the new equipment and modifications to be shared with engineering and design teams for evaluation and review. Anthropometric considerations such as sight lines and functional reach can be evaluated directly using the 3D model. This effort has helped to provide visualizations for additional review with operations personnel and project stakeholders.

3D Modeling↗

ORNL Trusted Corridors Project: Watts Bar Dam Inland Waterway Project

Radiation has existed everywhere in the environment since the Earth's formation - in rocks, soil, water, and plants. The mining and processing of naturally occurring radioactive materials for use in medicine, power generation, consumer products, and industry inevitably generate emissions and waste. Radiological measuring devices have been used by industry for years to measure for radiation in undesired locations or simply identify radioactive materials. Since the terrorist attacks on the United States on 9-11-01 these radiation measuring devices have proliferated in many places in our nation's commerce system. DOE, TVA, the Army Corps and ORNL collaborated to test the usefulness of these devices in our nation's waterway system on this project. The purpose of the Watts Bar Dam ORNL Trusted Corridors project was to investigate the security, safety and enforcement needs of local, state and federal government entities for state-of-the-art sensor monitoring in regards to illegal cargo including utilization of the existing infrastructure. TVA's inland waterways lock system is a recognized and accepted infrastructure by the commercial carrier industry. Safety Monitoring activities included tow boat operators, commercial barges and vessels, recreational watercraft and their cargo, identification of unsafe vessels and carriers, and, monitoring of domestic and foreign commercial vessels and cargo identification. Safety Enforcement activities included cargo safety, tracking, identification of hazardous materials, waterway safety regulations, and hazardous materials regulations. Homeland Security and Law Enforcement Applications included Radiological Dispersive Devices (RDD) identification, identification of unsafe or illicit transport of hazardous materials including chemicals and radiological materials, and screening for shipments of illicit drugs. In the Fall of 2005 the SensorNet funding for the project expired. After several unsuccessful attempts to find a Federal sponsor to continue with the project, the Watts Bar Dam Project was canceled and the Exploranium radiation monitors were removed from the doors of Watts Bar Dam in early 2006. The DHS Domestic Nuclear Detection Office decided to proceed with a Pilot building on the ORNL work performed at the TN and SC weigh stations in the highway sector of the Trusted Corridors project and eventually expanded it to other southern states under the name of Southeastern Corridor Pilot Project (SETCP). Many of the Phase I goals were achieved however real-world test data of private watercraft and barges was never obtained.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Sustainable Solar Education Project - Final Project Report

This project supported the sustainable growth of the distributed solar market by providing information and training to state and municipal officials to help ensure that distributed solar electricity remains consumer friendly and benefits low- and moderate-income households. Our project’s official name was “Training for State Officials to Make Solar More Inclusive, Affordable, and Consumer Friendly,” but we publicly referred to it as “the Sustainable Solar Education Project.” The project started March 1, 2016 and ran through July 2018. The first year of the project centered around research, development, and production of a series of guides for state and municipal officials on topics related to solar consumer protection and equitability. The final year and a half was focused on providing in-person training on project issues and disseminating project resources to reach our target audience.

14 SOLAR ENERGY↗

2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review—Biodiesel Cellulosic Ethanol Research Project (Hendry County Sustainable Biofuels Center)

The presentation provides an overview of the Biodiesel Cellulosic Ethanol Research Project (Hendry County Sustainable Biofuels Center). It summarizes the project history, timeline, budget, partners, objectives, goals, future plans and in closer detail reviews the used approaches and technical accomplishments. The main project goals were (1) developing strategies and tools that assist in the creation of economically and environmentally sustainable bioenergy industries within ecologically-sensitive regions such as South Florida and, in particular, the greater Everglades, (2) using these bioenergy strategies and tools in evolving the existing agricultural, urban, and ecological sectors towards more sustainable structures and practices and (3) using bioenergy as a focal point in the larger effort to mitigate climate change and sea level rise, realities with particularly catastrophic consequences for South Florida. The project started on Oct 1, 2010 and ended on Feb 28, 2013. It yearly average budget was $369,770, with the Dept. of Energy annual cost share of $317,167. The main project partners were Hendry County, University of Florida - Institute of Food and Agricultural Sciences, Intelligentsia International, Inc., Edison State College and University of South Florida. Used approaches, main accomplishments and results in the categories of (1) technical research, (2) education and (3) business development are presented in detail. The project uniqueness is mainly related to the use of system approaches and integrating several systems analyses. Relevance of the project applicable to sustainability of bioenergy, food production, & restoration is explained, critical success factors are challenges are outlined and future work drafted. Finally, the main publications and presentations catalogue list is presented.

09 BIOMASS FUELS↗