Search NASA⌕ Search

SEARCH · Search NASA

Results for “QUALITY ASSURANCE”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Use of Receiver Operating Curve Analysis and Machine Learning With an Independent Dose Calculation System Reduces the Number of Physical Dose Measurements Required for Patient-Specific Quality Assurance

Our purpose was to assess the use of machine learning methods and Mobius 3D (M3D) dose calculation software to reduce the number of physical ion chamber (IC) dose measurements required for patient-specific quality assurance during corona virus disease 2019.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Continuous Integration, In-Code Documentation, and Automation for Nuclear Quality Assurance Conformance

The Multiphysics Object Oriented Simulation Environment (MOOSE) is an open-source, finite element framework for solving highly coupled sets of nonlinear equations. The development of the framework and applications occurs concurrently using an agile, continuous-integration software package. Included in the framework is an in-code, extensible documentation system. Using these two tools in union with the repository management tools GitHub and GitLab, a software quality plan was created and followed such that MOOSE and a MOOSE-based application (BISON) have been shown to meet the American Society of Mechanical Engineers’ Nuclear Quality Assurance-1 standard. The approach relies heavily on automation for both testing and documentation. The resulting effort demonstrates that a rigorous software quality plan may be implemented that incurs a minimal impact on day-to-day development of the software, satisfying the stringent guidelines necessary to operate the software in a safety function within a nuclear facility.

97 MATHEMATICS AND COMPUTING↗

WIPP Safety Significant Confinement Ventilation System (SSCVS) Quality Assurance Program - 20237

Construction and major equipment fabrication are underway for a new ventilation exhaust system at the Waste Isolation Pilot Plant (WIPP). The new system will provide continuous HEPA filtration of the exhaust from the WIPP underground while meeting the ventilation demands for expanded waste emplacement and mining operations over the next 40 years. The SSCVS project has proceeded with the awarding of CD-3A for Long Lead Procurements followed by CD-2/3 approval for the construction of the facilities. The SSCVS project team made the decision to increase the quality oversight throughout the complete project per the Project Quality Assurance Plan (PQAP) such that it can ensure the final products meet applicable NQA-1 requirements and general quality requirements, and that the project will proceed to operations without significant delays due to post installation quality concerns. The PQAP was established prior to approval of the project at the CD-2/3 milestone. The SSCVS project has 2 major long lead procurements which commenced with the awarding of CD-3A. These procurements include the HEPA filter housing assemblies and the Exhaust Fans. There are 22 HEPA filter assemblies for the SSCVS, which are designated Safety Significant for pressure boundary confinement, per the approved PDSA. The exhaust fans also have Safety Significant components to maintain the pressure confinement boundary. NWP made the decision to install resident Quality Inspectors at the fabrication facilities to ensure the documentation for each fabricated unit meets all the QA requirements as defined in the respective contract documents. For the construction of the SSCVS Salt Reduction Building (SRB) and New Filter Building (NFB), dedicated, on-site quality inspectors have been utilized to ensure that all work being performed will comply with quality requirements and the Special Inspections as defined in IBC-2015. At each stage of inspection, hold points are placed into the work packages to ensure NWP QA personnel are present to inspect and verify the installations are in accordance with the design specifications, codes and standards. With this level of oversight, NWP anticipates that the level of quality related issues, as seen on multiple other DOE complex site projects, will be avoided and that the commissioning, start-up and hot operations will progress in a timely fashion, as all documentation will be in place and approved prior to initiation of these activities. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Quality Assurance methodology for the ATLAS Inner Tracker strip sensor production

The production of the strip sensors for the ATLAS Inner Tracker (ITk) will start in 2020. Nearly 22,000 large area sensors will be produced over a period of about five years by Hamamatsu Photonics K.K. (HPK). The institutes involved in the sensor development and production are committed to deliver and maintain the highest quality sensors for the experiment. A Quality Assurance (QA) strategy has been prepared to be carried out during the whole production period. Once the process has been characterized as providing the required pre-irradiation specifications and the proper radiation hardness, the onus is on the manufacturer to rigidly stick to that qualified process. Still, sample testing with specific device-element structures and irradiation of devices should be implemented by the ITk sensor collaboration. A detailed irradiation and testing plan has been prepared by the ATLAS-ITk Collaboration, together with a newly designed test chip with specific structures to monitor different key technological and device parameters during the whole production. The tests and irradiations will be carried out on a sample basis. In order to have a practical methodology, samples from alternating batches will be sent for irradiations with protons, neutrons and gammas, and then tested in order to check that the characteristics remain within specifications. Here we present the detailed plan and the design and test methods for the structures in the test chip.

47 OTHER INSTRUMENTATION↗

Can Radiation Therapy Quality Assurance Improve Nasopharyngeal Cancer Outcomes in Low- and Middle-Income Countries: Reporting the First Phase of a Prospective International Atomic Energy Agency Study

Most new nasopharyngeal cancer cases occur in low-income and middle-income countries, and these patients experience poorer overall survival than that of new nasopharyngeal cancer cases in high-income countries. The goal of this research project is to determine whether the introduction of a radiation therapy quality assurance program can ultimately improve outcomes for nasopharyngeal cancer patients in lower-income and middle-income countries. This study reports the results of the first phase of the International Atomic Energy Agency Coordinated Research Project (325-E3-TM-47712).

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Correlation approach for quality assurance of additive manufactured parts based on optical metrology

Surface topography and surface finish are two significant factors for evaluating the quality of products in additive manufacturing (AM). AM parts are fabricated layer by layer, which is quite different from traditional formative or subtractive methods. Despite rapid progress in additive manufacturing and associated optical metrology for quality control and in-situ monitoring, limited research has been conducted to investigate the reliability of 3D surface measurement data. The surface topologies scanned by multiple optical systems demonstrated significant differences due to varying sampling mechanisms, resolutions, system noises, etc. The 3D datasets should be trustworthy in order to extract parameters for quality assurance or feedback control from 3D surface measurements. In this paper, we set up new standards to evaluate the reliability of 3D surface measurement data and analyze the variation in the topographical profile. In this study, two non-contact optical methods based on Focus Variation Microscopy (FVM) and Structured Light System (SLS) were adopted to measure the surface topography of the target components. The two optical metrology systems generated two entirely different point cloud datasets. Statistical methods were applied to test the difference between the data obtained from the two systems. By using a data analytics approach for comparison, it was found that the surface roughness estimated from the point cloud data sets of FVM and SLS has no significant difference, though the point cloud data sets were completely different. This paper provides standard validation approach to evaluate the plausibility of metrology data from in-situ real-time surface analysis for process planning of AM.

36 MATERIALS SCIENCE↗

Production Agency Quality Assurance Management Execution Strategy [Thesis]

There are multiple federal directives that Los Alamos National Laboratory (LANL) must follow for the proper implementation of quality assurance, strategic planning, and execution of manufacturing and surveillance operations. Recent assessments identified that manufacturing in all processing areas is dynamic due to influencing scope changes, design modifications, funding adjustments, and staff attrition. In response, this project was started to develop a comprehensive PAQ execution strategy to support the success of LANL’s manufacturing mission. This project’s method for developing an updated architecture was to create an integrated, flexible, reliable, and agile strategic process. The execution plan has five deliverables: 1) an integrated schedule view of PAQ work scope, 2) a resource management plan that aligns with the required scope, 3) a metrics monitoring dashboard, 4) a project management plan for sustaining NAP 401.1A implementation, and 5) a risk management plan. The research design is a mixed-method approach focused on data collection for each deliverable. The methodology entails qualitative and quantitative research, metrics monitoring, data analysis, and the creation of a dashboard. The qualitative methods used include literature reviews and interviews. The quantitative methods include resource, financial, schedule and survey data analysis. Preliminary and final results were peer reviewed by subject matter experts both within the ALDWP organization and deployed support.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Developing a Nuclear Quality Assurance Compliant Design Methodology for Neutronic Analysis of Xe-100 Design

The primary objective of this work is to develop a design methodology compliant with nuclear quality assurance standards for the Xe-100 neutronic design verification studies. To achieve this, a Monte Carlo model of the Xe-100 reactor was constructed using the exclusion principle, transformation technique, and universe-based level specification following Idaho National Laboratory (INL) NQA level-1 compliant standards and an NQA-1 compliant version of MCNP6. The model encompasses the entire reactor core structures, including the upper plenum, core region, and lower plenum sections, along with all sub-components. The active core section was represented using the spectral regions, each comprising a particular fuel composition and temperature averaged over the considered zone, calculated by X-energy using Very Superior Old Programs (VSOP). Additionally, a component-wise temperature map was implemented into the model, not only for the core region but also for the structural components. Temperature-dependent cross-section libraries, along with thermal scattering law libraries, generated using INL NQA-1 compliant version of NJOY21, were utilized for each isotope in the burnt fuel and the structural materials. Furthermore, the volume of each modeled component was estimated using a stochastic approach with the ray tracing method in MCNP and criticality calculations were performed.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Quality Assurance Project Plan for the Salish Sea Model – Continuing Development of New Capabilities and Applications: European Green Crab (EGC) Larval Transport, Coupling to VELMA and Atlantis, Performance Improvements and Diagnostic Applications

This quality assurance project plan (QAPP) is for proposed FY24-FY27 efforts to (a) develop/expand a predictive European Green Crab (EGC) larval dispersal model for the Salish Sea, (b) add linkage between VELMA (Visualizing Ecosystem Land Management Assessments) watershed model and Atlantis model (ecosystem dynamics and food web) through SSM, and (c) continue SSM capability development through the addition of metals, harmful algal blooms (HABs), and FVCOM-LTRANS (Lagrangian Larval Transport) modules.

54 ENVIRONMENTAL SCIENCES↗

The ERSDT Software Quality Assurance Plan Practices and Development Environment Setup for RASCAL 5

This document includes the information pertaining to the practices of the Emergency Response Software Development Team (ERSDT) for the RASCAL software project. The content includes information regarding: 1) Software Quality Assurance. 2) Project Management. 3) Configuration Management. 4) Development Standards. 5) Third-Party Software. 6) Verification and Validation. The information contained in this report is considered living documentation. The information contained in this report was assembled from multiple documents and content management systems.

97 MATHEMATICS AND COMPUTING↗

Pre-production results from ATLAS ITk Strip Sensors Quality Assurance Testchip

The production of strip sensors within the framework of the ATLAS Inner Tracker (ITk) development is a process which requires continuous evaluation during the full production period (about 4 years). Such an evaluation is divided into two different parts: Quality Control (QC), which focuses on the final product (the actual sensors) and tries to identify possible defects once the fabrication is completed, and Quality Assurance (QA), which aims to prevent deviations in the manufacturing process and uses specifically-designed test structures. The initial sensor pre-production consists of 5% (1041 sensors) of the total number of sensors expected during production. As part of pre-production, the collaboration has measured key parameters from miniature strip sensors (minis), monitor diodes (MD8), and the ATLAS Testchip, before and after irradiation. In this contribution we focus on the analysis of the results of the MD8 and the Testchip. All parameters have been obtained from the test structures (MD8, bias resistors, interdigitated structures, field oxide capacitors, coupling capacitors, punch-through protection structures and cross-bridge resistors) measured at the different test sites (KEK/Tsukuba, Birmingham, Toronto, Ljubljana, Valencia, Carleton, Prague, CNM-Barcelona). The results are compared to predefined pre- and post-irradiation specifications for each tested parameter.

47 OTHER INSTRUMENTATION↗

SAM Software Quality Assurance Plan Implementation and NQA-1 Assessment

The System Analysis Module (SAM) is an advanced and modern system analysis tool being developed at Argonne National Laboratory under the U.S. DOE Office of Nuclear Energy’s Nuclear Energy Advanced Modeling and Simulation (NEAMS) program. As a modern-day software, SAM development included efforts to follow best practices in software development. These best practices include version control using git, independent reviews of development activities, and detailed descriptions of developments and bug fixes using the GitLab issue and merge request system. In Fiscal Year 2023 (FY23), the SAM development team set out to formalize a Software Quality Assurance (SQA) program that allowed industry partners to credit the informal steps being taken by the SAM development team to ensure the quality of the software. As part of formalizing an SQA program, a SQA Plan (SQAP) was developed, implemented, and assessed. The SAM SQAP targets compliance with NQA-1-2008/2009 Addenda. The SQAP builds on the MOOSE SQAP and the Argonne SSQAPP while accounting for the needs of the multi-organization SAM development team. Modifications to the SAM repository structure, including a new testing system, updated test cases, and the development of an internal website, facilitate the implementation of the SAM SQAP. The initial assessment of the SAM SQAP indicated that the SAM SQAP was adequately and effectively implemented and additional work was required to improve the compliance of the SAM SQAP with NQA-1 2008/2009 Addenda. Several improvements to the SQAP have already been drafted to address these assessments and future work is planned to further improve the SAM SQAP in support of end-user needs.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Nuclear Quality Assurance Certification of the MCNP-ORIGEN Activation Automation tool

The MCNP-ORIGEN Activation Automation (MOAA) tool couples MCNP and ORIGEN-S, allowing to support ATR and TREAT experiments by predicting their composition and activity before their irradiation takes place. MOAA is developed and maintained by the Irradiation Experiment Neutronics Analysis group (C-150) at INL. This poster presents the motivation behind the development of MOAA, its main workflow, as well as the software quality assurance (SQA) efforts required by LWP-13620, "Managing Information Technology Assets."

07 ISOTOPE AND RADIATION SOURCES↗

Establishing the Quality Assurance programme for the strip sensor production of the ATLAS tracker upgrade including irradiation with neutrons, photons and protons to HL-LHC fluences

The successful pre-production delivery of strip sensors for the new Inner Tracker (ITk) for the upgraded ATLAS detector at the High Luminosity LHC (HL-LHC) at CERN was completed and based on their performance full production has commenced. The overall delivery period is anticipated to last 4 years to complete the approximately 22000 sensors required for the ITk. For Quality Assurance (QA), a number of test structures designed by the collaboration, along with a large area diode and miniature version of the main sensor, are produced in every wafer by the foundry Hamamatsu Photonics K.K (HPK). As well as Quality Control (QC) checks on every main sensor, samples of the QA pieces from each delivery batch are tested both before and after irradiation with results after exposure to neutrons, gammas or protons to fluences and doses corresponding to those anticipated after operation at the HL-LHC to roughly 1.5 times the ultimate integrated luminosity of 4000 fb -1 . In this paper the procedures are presented and the studies carried out to establish that the seven ITk QA Strip Sensor irradiation and test sites meet all the requirements to support this very extensive programme throughout the strip sensor production phase for the ITk project.

47 OTHER INSTRUMENTATION↗

Quality Assurance Plan for Federal Guidance Report 16

Federal Guidance Report No. 16 will provide risk coefficients for use in projecting the probability of cancer morbidity or mortality from exposure to environmental radionuclides. The derivation of nuclide-specific risk coefficients involves multiple steps, with each step relying on the accuracy of the previous step as well as the numerical data utilized within each step. Thus, to ensure the quality of the derived risk coefficients, it is necessary to evaluate and confirm the quality and proper implementation of input data at each step of the derivation. The Oak Ridge National Laboratory (ORNL) dosimetry research team currently has two largely independent software codes for deriving radiation dose estimates, dose coefficients, and cancer risk coefficients for internally deposited radionuclides: DCAL and QCAL. The agreement of derived values based on alternate codes is an important step in quality assurance (QA) of the risk coefficients produced in this project. DCAL is an integration of the dosimetric software and numerical databases developed at ORNL over the past 25 years for the EPA’s Office of Radiation and Indoor Air (ORIA). QCAL was developed in 2015 to serve as a substitute for DCAL while DCAL was undergoing revision and to provide QA for the updated version of DCAL. The complex methodology employed in the derivation of cancer risk coefficients presents a challenge for QA, and as such, this report describes the QA steps used by the ORNL dosimetry team in this process as implemented in DCAL and QCAL for Federal Guidance Report No. 16.

61 RADIATION PROTECTION AND DOSIMETRY↗

Fiscal Year 2024 Software Quality Assurance Activities for the ARC Software

The continued goal of the ARC SQA project in the Advanced Reactor Technologies program of DOE is to resolve the QA gaps for the ARC software that limit, or prevent, commercialization of the software for industry users. This project started in earnest in fiscal year 2023 which saw the entire code system moved from a SVN repository to a GitLab repository and an associated software quality assurance plan (SQAP) developed and ratified. Most of the QA gaps in the ARC software were identified in collaboration with industry partners and work begin in fiscal year 2023 and continued in 2024. The primary documentation that is missing includes user manuals, user guides, software verification reports, and code coverage assessments. The SUMMAR manual was completed this fiscal year and work was started on creating manuals for SE2ANL, SE2RCT, and DASSH. Software verification work was carried out for DIF3D and REBUS in a previous program and the current fiscal year saw the completion of software verification reports for GAMSOR, GAMSRC, VARPOW, EvaluateFlux, and SUMMAR. The goal for the next fiscal year is to complete the PERSENT software verification work and begin planning the software verification work for DASSH, SE2ANL, and SE2RCT. The code coverage reports for DIF3D and MC2-3 were completed in the previous fiscal year and the goal is to generate code coverage reports for REBUS, GAMSOR, PERSENT, and DASSH in the coming fiscal year. A considerable amount of effort was spent in the current fiscal year working on the continuous integration capability for automated regression testing in GitLab. The first version of the testing was created in the previous fiscal year and applied to DIF3D and its utility programs. That testing was extended this year to cover GAMSOR, REBUS, and PERSENT. To accomplish this, the first version of the new testing methodology had to be updated to make a single output checking methodology viable for all of the ARC software. This will result in a single document to detail the automated regression testing methodology and minor documents to detail the tolerance settings that have been applied to the output for each ARC code. The previous methodology put into place with SVN would have required a separate document for each ARC code to detail the output checking methodology and the tolerance settings for the output from each code. Because some of our industry partners are providing funds to add new capabilities to the ARC software to meet their needs, all of which must be reviewed and approved by the SQA program funded by this project, a summary of that development work is detailed in this report. Overall progress on resolving the QA gaps has been good this year with the most impactful improvement for our industry partners in capability being the creation of a threaded version of DIF3D-VARIANT that allows the DIF3D, REBUS, and GAMSOR run times to be reduced by a factor of 4-6. The most impactful QA gap that was resolved was the software verification of GAMSRC and VARPOW.

97 MATHEMATICS AND COMPUTING↗