Queued Up: Characteristics of Power Plants Seeking Transmission Interconnection As of the End of 2021 [Slides]

Proposed large-scale electric generation and storage projects must apply for interconnection to the bulk power system via interconnection queues. While most projects that apply for interconnection are not subsequently built, data from these queues nonetheless provide a general indicator for mid-term trends in developer interest. Berkeley Lab compiled and analyzed data from all seven ISOs/RTOs in concert with 35 non-ISO utilities, representing an estimated 85% of all U.S. electricity load. We include all "active" projects in these generation interconnection queues through the end of 2021, as well as data on "operational" and "withdrawn" projects where those data are available. We find that the amount of new electric capacity in these queues is growing dramatically, with over 1,400 gigawatts (GW) of total generation and storage capacity now seeking connection to the grid (over 90% of which is for zero-carbon resources like solar, wind, and battery storage). Solar (676 GW) and battery storage (~420 GW) are – by far – the fastest growing resources in the queues; combined they accounted for nearly 85% of new capacity entering the queues in 2021. Substantial wind (247 GW) capacity is also seeking interconnection, 31% of which is for offshore projects (77 GW). In total, about 930 GW of zero-carbon generating capacity is currently seeking transmission access, as is 74 GW of natural gas capacity. Hybrids now comprise a large – and increasing – share of proposed projects, particularly in CAISO and the non-ISO West. 286 GW of solar hybrids (primarily solar+battery) and 19 GW of wind hybrids are currently active in the queues; nearly half of battery storage in the queues is paired with generation. However, much of this proposed capacity will be withdrawn from the queues and not built. Among a subset of queues for which data are available, only 23% of the projects seeking connection from 2000 to 2016 have subsequently been built. Completion percentages appear to be declining and are even lower for wind and solar than other resources. Additionally, wait times are on the rise: for the regions with available data, the typical duration from connection request to commercial operation increased from ~2.1 years for projects built in 2000-2010 to ~3.7 years for those built in 2011-2021.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Queued Up: Characteristics of Power Plants Seeking Transmission Interconnection As of the End of 2022 [Slides]

Proposed large-scale electric generation and storage projects must apply for interconnection to the bulk power system via interconnection queues. While most projects that apply for interconnection are not subsequently built, data from these queues nonetheless provide a general indicator for mid-term trends in developer interest. Berkeley Lab compiled and analyzed data from all seven ISOs/RTOs in concert with 35 non-ISO utilities, representing an estimated 85% of all U.S. electricity load. We include all "active" projects in these generation interconnection queues through the end of 2022, as well as data on "operational" and "withdrawn" projects where those data are available. We find that the amount of new electric capacity in these queues is growing dramatically, with over 2,000 gigawatts (GW) of total generation and storage capacity now seeking connection to the grid (over 95% of which is for zero-carbon resources like solar, wind, and battery storage). Solar (947 GW) and battery storage (~680 GW) are – by far – the fastest growing resources in the queues; combined they accounted for over 80% of new capacity entering the queues in 2022. Substantial wind (300 GW) capacity is also seeking interconnection, 38% of which is for offshore projects (113 GW). In total, about 1,250 GW of zero-carbon generating capacity is currently seeking transmission access, as is 82 GW of natural gas capacity. Hybrids projects (co-locating multiple generation and/or storage types) comprise a large – and increasing – share of proposed projects, particularly in CAISO and the non-ISO West. 457 GW of solar hybrids (primarily solar+battery) and 24 GW of wind hybrids are currently active in the queues; over half of battery storage in the queues is paired with generation. However, much of this proposed capacity will be withdrawn from the queues and not built. Among a subset of queues for which data are available, only 21% of the projects (and 14% of capacity) seeking connection from 2000 to 2017 have been built as of the end of 2022. Additionally, interconnection wait times are on the rise: The typical duration from connection request to commercial operation increased from <2 years for projects built in 2000-2007 to nearly 4 years for those built in 2018-2022 (with a median of 5 years for projects built in 2022).

24 POWER TRANSMISSION AND DISTRIBUTION↗

Queued Up: Characteristics of Power Plants Seeking Transmission Interconnection As of the End of 2020

Proposed large-scale electric generation and storage projects must apply for interconnection to the bulk power system via interconnection queues. While many projects that apply for interconnection are not subsequently built, data from these queues nonetheless provide a general indicator for mid-term trends in developer interest. Berkeley Lab compiled and analyzed data from all seven ISOs/RTOs in concert with 35 non-ISO utilities, representing an estimated 85% of all U.S. electricity load. We include all "active" projects in these generation interconnection queues through the end of 2020, as well as data on "completed" and "withdrawn" projects for five of the ISOs (CAISO, ISO-NE, MISO, NYISO, PJM). We find that the total capacity active in the queues is growing year-over-year, with over 750 GW of generation and an estimated 200 GW of storage capacity as of the end of 2020. Solar (462 GW) accounts for a large – and growing – share of generator capacity in the queues. Substantial wind (209 GW) capacity is also in development, 29% of which is for offshore projects (61 GW). In total, about 680 GW of zero-carbon capacity is currently seeking transmission access, as is 74 GW of natural gas capacity. Hybrids now comprise a large – and increasing – share of proposed projects, particularly in CAISO and the non-ISO West. 159 GW of solar hybrids (primarily solar+battery) and 13 GW of wind hybrids are currently active in the queues. However, much of this proposed capacity will not ultimately be built. Among a subset of queues for which data are available, only 24% of the projects seeking connection from 2000 to 2015 have subsequently been built. Completion percentages appear to be declining, and are even lower for wind and solar than other resources. Additionally, wait times are on the rise: in four ISOs, the typical duration from connection request to commercial operation increased from ~1.9 years for projects built in 2000-2009 to ~3.5 years for those built in 2010-2020. There are growing calls for queue reform to reduce cost, lead times, and speculation.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Hybrid Power Plants: Status of Operating and Proposed Plants, 2023 Edition [Slides]

Improving battery technology and the growth of variable renewable generation are driving a surge of interest in “hybrid” power plants that combine, for example, wind or solar generating capacity with co-located batteries. While most of the current interest involves pairing photovoltaic (PV) plants with batteries, other types of hybrid or co-located plants with wide-ranging configurations have been part of the U.S. electricity mix for decades. This annually updated briefing tracks and maps existing hybrid or co-located plants across the United States while also synthesizing data from power purchase agreements (PPAs) and generation interconnection queues to shed light on near- and long-term development pipelines. The scope includes “co-located hybrids” that pair two or more resources (e.g., multiple types of generation and/or generation with storage) that are operated largely independently behind a single point of interconnection, and “full hybrids” that also feature coordinated operations of the co-located resources. The focus is on plants with one megawatt (MW) or more of capacity; smaller (often behind-the-meter) projects are also increasingly common, but are not included in this data synthesis. Key findings from the latest briefing include: -At the end of 2022, there were 374 hybrid plants (>1 MW) operating across the United States (+25% compared to the end of 2021), totaling nearly 41 GW of generating capacity (+15%) and 5.4 GW/15.2 GWh of energy storage (+69%/+88%). PV+storage plants are by far the most common, dominating in terms of plant number (213), storage capacity (4.0 GW/12.5 GWh), storage:generator capacity ratio (49%), and storage duration (3.1 hours). But there are nearly twenty other hybrid plant configurations as well, including several different fossil hybrid categories (each dominated by the fossil component) as well as wind+storage, wind+PV, wind+PV+storage, geothermal+PV, and others. -Last year was another strong year for PV+storage hybrids in particular: 59 of the 62 hybrids added in 2022 were PV+storage. As of the end of 2022, there was roughly as much storage capacity operating within PV+storage hybrid plants as in standalone storage plants (~4 GW each). In storage energy terms, however, PV+storage edged out standalone storage by ~2 GWh (12.5 GWh vs. 10.4 GWh, respectively). -Interconnection queue data show continued strong developer interest in hybridization. At the close of 2022, there were 51% more hybrid plants—representing 59% more generating capacity—in interconnection queues across the United States than there were at the end of 2021. Solar dominates these proposed plants as well: at the close of 2022, there were 457 GW of solar capacity proposed as a hybrid (representing ~48% of all solar capacity in the queues), most typically pairing PV with battery storage. At the same time, there were 24 GW of wind capacity proposed as a hybrid (representing ~8% of all wind capacity in the queues), again most-often pairing wind with storage. Meanwhile, more than half of all storage in the queues is estimated to be part of a hybrid plant. While many of the plants proposed in the queues will not ultimately reach commercial operations, the depth of interest in hybrid plants—especially PV+storage—is notable, particularly in certain regions. For example, in CAISO, 97% of all solar capacity and 45% of all wind capacity in the queues is proposed as a hybrid. -The report also surveys power purchase agreement (PPA) price data from a sample of operating and proposed PV+storage plants. Though PV+storage PPA prices have fallen over time, “levelized storage adders” have recently increased somewhat to ~$\$ $7000/MW-month, ~$\$ $60/MWh-stored (assuming one full cycle per day), or ~$\$ $15/MWh-PV. Some of the recent price increase could simply reflect a trend towards higher battery:PV capacity ratios over time, which increases costs, all else being equal. The well-publicized impact of inflationary and supply chain pressures on battery prices is no doubt a contributor as well.

25 ENERGY STORAGE↗

Hybrid Power Plants: Status of Operating and Proposed Plants, 2022 Edition [Slides]

Falling battery prices and the growth of variable renewable generation are driving a surge of interest in “hybrid” power plants that combine, for example, wind or solar generating capacity with co-located batteries. While most of the current interest involves pairing photovoltaic (PV) plants with batteries, other types of hybrid or co-located plants with wide-ranging configurations have been part of the U.S. electricity mix for decades. This annually updated briefing tracks and maps existing hybrid or co-located plants across the United States while also synthesizing data mined from power purchase agreements (PPAs) and generation interconnection queues to shed light on near- and long-term development pipelines. The scope includes co-located hybrid plants that pair two or more generators and/or that pair generation with storage at a single point of interconnection, and full hybrids that feature co-location and co-control. The focus is on plants with one megawatt (MW) or more of capacity; smaller (often behind-the-meter) projects are also increasingly common, but are not included in this data synthesis. Key findings from the latest briefing include: -At the end of 2021, there were nearly 300 hybrid plants (>1 MW) operating across the United States, totaling nearly 36 gigawatts (GW) of generating capacity and 3.2 GW/8.1 GWh of energy storage. PV+storage plants are by far the most common, dominating in terms of plant number (140), storage capacity (2.2 GW/7.0 GWh), storage:generator ratio (53%), and storage duration (3.2 hours). But there are nearly twenty other hybrid plant configurations as well, including several different fossil hybrid categories (each dominated by the fossil component) as well as wind+storage, wind+PV, wind+PV+storage, geothermal+PV, and others. -Last year was a breakout year for PV+storage hybrids in particular: 67 of the 74 hybrids added in 2021 were PV+storage. By the end of 2021, there were more GW of battery capacity installed in PV+storage hybrids (2.2 GW) than as standalone storage plants (1.8 GW). The difference is even starker in energy terms, with PV+storage plants hosting twice as much battery capacity as standalone storage plants (7 GWh vs. 3.5 GWh, respectively). Much of the battery capacity added in hybrid form in 2021 was a battery retrofit to a pre-existing PV plant. -Data on plants under development from the interconnection queues of all seven ISOs/RTOs plus 35 individual utilities suggest that these hybridization trends are likely to continue. At the close of 2021, there were more than 670 GW of solar plants in the nation’s queues; 285 GW (~42%) of this capacity was proposed as a hybrid, most typically pairing PV with battery storage (PV+storage represented nearly 90% of all hybrid capacity in the queues). For wind, 247 GW of capacity sat in the queues, with 19 GW (~8%) proposed as a hybrid, again most-often pairing wind with storage (wind+storage represented ~4% of all hybrid capacity in the queues). Meanwhile, nearly half of all storage in the queues is estimated to be part of a hybrid plant. While many of these proposed plants will not ultimately reach commercial operations, the depth of interest in hybrid plants—especially PV+storage—is notable.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Tandem Predictions for HPC Jobs

At the core of the predictive analytics applied to High Performance Computing (HPC), the most prominent tasks are the prediction of job runtimes and the prediction of job queue times, both of which have the potential for informing HPC users during their every-day decision making. Accurate runtime predictions can help users better choose so-called wallclock times at job submission, decreasing the odds of their jobs waiting in queues longer than necessary. The accurate and timely queue time predictions offered for the available partitions can inform the favorable selection of partitions for running jobs. This potential is well understood as we see in the abundance of research studies that propose solutions for these tasks, including the work published in the last several years. These tasks are seemingly receptive to the Machine Learning (ML) solutions, considering that there is no shortage of training data where HPC centers over time run millions and millions of jobs. However, we study the existing research literature, as well as look for examples in the toolchains supported on the exemplar HPC facilities, and, surprisingly, do not find any practical solutions that are ready to be adopted. We interpret this as a manifestation of the shortage of UX/UI efforts that support HPC analytics and also as a sign that the research has not come to the consensus on solving these tasks. In this study, we aim to shed new light on the long-running task of job queue time prediction by exploring the utility of runtime predictions in improving prediction accuracy and, actually, predicting these two metrics together, in tandem. In other words, we show how runtime predictions become valuable input in the queue time modeling. We challenge the existing approaches to feature engineering for the queue time prediction and describe promising results we obtained for a large dataset of HPC jobs from a supercomputer at the National Renewable Energy Laboratory.

HPC↗

Tandem Predictions for HPC Jobs: Preprint

At the core of the predictive analytics applied to High Performance Computing (HPC), the most prominent tasks are the prediction of job runtimes and the prediction of job queue times, both of which have the potential for informing HPC users during their every-day decision making. Accurate runtime predictions can help users better choose so-called wallclock times at job submission, decreasing the odds of their jobs waiting in queues longer than necessary. The accurate and timely queue time predictions offered for the available partitions can inform the favorable selection of partitions for running jobs. This potential is well understood as we see in the abundance of research studies that propose solutions for these tasks, including the work published in the last several years. These tasks are seemingly receptive to the Machine Learning (ML) solutions, considering that there is no shortage of training data where HPC centers over time run millions and millions of jobs. However, we study the existing research literature, as well as look for examples in the toolchains supported on the exemplar HPC facilities, and, surprisingly, do not find any practical solutions that are ready to be adopted. We interpret this as a manifestation of the shortage of UX/UI efforts that support HPC analytics and also as a sign that the research has not come to the consensus on solving these tasks. In this study, we aim to shed new light on the long-running task of job queue time prediction by exploring the utility of runtime predictions in improving prediction accuracy and, actually, predicting these two metrics together, in tandem. In other words, we show how runtime predictions become valuable input in the queue time modeling. We challenge the existing approaches to feature engineering for the queue time prediction and describe promising results we obtained for a large dataset of HPC jobs from a supercomputer at the National Renewable Energy Laboratory.

97 MATHEMATICS AND COMPUTING↗

Queued Up: 2025 Edition – Characteristics of Power Plants Seeking Transmission Interconnection As of the End of 2024 [Slides]

Electric transmission system operators (ISOs, RTOs, or utilities) require proposed power plants seeking to connect to the transmission grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. The lists of projects in this process are known as “interconnection queues”. In collaboration with interconnection.fyi, Berkeley Lab compiled, aggregated, and cleaned interconnection queue data from >50 transmission grid operators (7 ISO/RTOs and 49 non-ISO balancing areas), which collectively represent ~97% of currently installed U.S. electric generating capacity. The dataset includes requests submitted to queues through the end of 2024, and only includes requests seeking to connect to the transmission grid (not distribution-connected or behind-the-meter projects). The files below include both a PDF report and an Excel data file. The PDF report analyzes interconnection data and metrics through the end of 2024. The Excel data file includes (a) the full project-level interconnection queue dataset through 2024, (b) a codebook (data dictionary) describing each data field, and (c) 35 additional tabs featuring tables summarizing a range of interconnection metrics. Key highlights from the Queued Up: 2025 Edition (featuring data through 2024) include: • As of the end of 2024, there were ~10,300 projects actively seeking grid interconnection in the U.S., representing 1,400 GW of generation and approximately 890 GW of storage. • Historic withdrawal rates alongside relatively fewer new requests resulted in a 12% decrease in total active queue volume compared to the prior year. • Active natural gas capacity (136 GW, +72% year-over-year) increased in 2024, while solar (956 GW, -12%), storage (890 GW, -13%), and wind (271 GW, -26%) capacity decreased. • 408 GW of capacity already has a draft or executed interconnection agreement (IA) but has not yet reached commercial operations. • The time projects spend in queues before reaching COD is increasing. For the regions with available data, the median duration from IR to COD has doubled from <2 years for projects built in 2000-2007 to over 4 years for those built in 2018-2024. • Ultimately, most of this proposed capacity will not be built. Only 13% of capacity that submitted interconnection requests from 2000-2019 had reached commercial operations by the end of 2024; 77% of that capacity had been withdrawn and 10% was still active. • FERC Order 2023 and various other reforms are being implemented. These are important measures to reduce interconnection bottlenecks and enhance grid system reliability, but it is too early to measure and assess their full impact. • New additions for the 2025 edition include: (a) additional detail on data processing and gaps; (b) updates on interconnection reforms; (c) new analysis on interconnection agreements, and more.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Buffered freepointer management memory system

A system and method of buffered freepointer management to handle burst traffic to fixed size structures in an external memory system. A circular queue stores implicitly linked free memory locations, along with an explicitly linked list in memory. The queue is updated at the head with newly released locations, and new locations from memory are added at the tail. When a freed location in the queue is reused, external memory need not be updated. When the queue is full, the system attempts to release some of the freepointers such as by dropping them if they are already linked, updating the linked list in memory only if those dropped are not already linked. Latency can be further reduced by loading new locations from memory when the queue is nearly empty, rather than waiting for empty condition, and by writing unlinked locations to memory when the queue is nearly full.

Jacob, Philip↗

DIVA/DeviceEditor (DIVA) v6.0.0

The DIVA software interfaces a process in which researchers design their DNA with a web-based graphical user interface (DeviceEditor), submit their designs to a central queue, and a few weeks later receive their sequence-verified clonal constructs. Each researcher independently designs the DNA to be constructed with a web-based BioCAD tool, and presses a button to submit their designs to a central queue. Researchers have web-based access to their DNA design queues, and can track the progress of their submitted designs as they progress from "evaluation", to "waiting for reagents", to "in progress", to "complete". Researchers access their completed constructs through the central DNA repository. Along the way, all DNA construction success/failure rates are captured in a central database. Once a design has been submitted to the queue, a small number of dedicated staff evaluate the design for feasibility and provide feedback to the responsible researcher if the design is either unreasonable (e.g., encompasses a combinatorial library of a billion constructs) or small design changes could significantly facilitate the downstream implementation process. The dedicated staff then use DNA assembly design automation software to optimize the DNA construction process for the design, leveraging existing parts from the DNA repository where possible and ordering synthetic DNA where necessary. Once all requisite process inputs are available, the design progresses from "waiting for reagents" to "in progress" in the design queue. Human-readable and machine-parseable DNA construction protocols output by the DNA assembly design automation software are then executed by the dedicated staff exploiting lab automation devices wherever possible. Since the all employed DNA construction methods are sequence-agnostic, standardized (utilize the same enzymatic master mixes and reaction conditions), completely independent DNA construction tasks can be aggregated into the same multi-well plates and pursued in parallel. The resulting sets of cloned constructs can then be screened by high-throughput next-gen sequencing platforms for sequence correctness. A combination of long read-length (e.g., PacBio) and paired-end read platforms (e.g., Illumina) would be exploited depending the particular task at hand (e.g., PacBio might be sufficient to screen a set of pooled constructs with significant gene divergence). Post sequence verification, designs for which at least one correct clone was identified will progress to a "complete" status, while designs for which no correct clones were identified will progress to a "failure" status. Depending on the failure mode (e.g., no transformants), and how many prior attempts/variations of assembly protocol have been already made for a given design, subsequent attempts may be made or the design can progress to a "permanent failure" state. All success and failure rate information will be captured during the process, including at which stage a given clonal construction procedure failed (e.g., no PCR product) and what the exact failure was (e.g. assembly piece 2 missing). This success/failure rate data can be leveraged to refine the DNA assembly design process.

Plahar, Hector↗

Age class based arbitration

A system, includes a plurality of sub-queues. Each sub-queue is assigned to an age class of a sequence of age classes. A set of age thresholds divides the sub-queues. A queue manager places a received transaction into a sub-queue based on a comparison of an age of the received transaction to the set of age thresholds.

97 MATHEMATICS AND COMPUTING↗

Evaluating the impacts of Variable Message Signs on Airport Curbside Performance Using Microsimulation

Curbs play a vital role in facilitating vehicle access and egress for individuals at airports. Inefficiently allocating this resource hinders airport accessibility and productivity, resulting in congestion, longer travel times, and increased pollution. As airport demand fluctuates throughout the day and grows over time, airports face intensified curbside pressure. Yet, curb management research is significantly less robust at airports than in urban areas. Given the unbalanced nature of airport demand—riders tend to arrive simultaneously at specific entrances at certain hours—Variable Message Sign (VMS) arises as a cost-effective technology to divert vehicles from congested to underutilized curbs. Still, VMS implementation faces a significant challenge. Historically, airports have managed VMS heuristically and by intuition rather than an evidence-based approach. This research investigates the impacts of implementing VMS on curb performance at airports. By considering different driver compliance rates (DCR), we aim to determine when the sign should be turned on and off to diverge traffic to avoid undesired externalities while enhancing curb performance. Using a validated agent-based microsimulation model, VISSIM, we analyzed the Seattle-Tacoma (SeaTac) Airport as a case study. We modeled sixteen VMS management scenarios and a baseline where the message sign is not displayed, diverging vehicles between the departures and arrivals access levels at four different moments (early morning, morning, afternoon, and late night). We quantified the effects of VMS using seven metrics, including curb productivity index (CPI), curb accessibility (CA), queue length, queue duration, delay, vehicle counts, and emissions. The results of each scenario were compared against the baseline using absolute and relative changes and Repeated Measures ANOVA. Overall, VMS improved curb performance and traffic conditions at the airport, reducing emissions by 14.8% to 8.9%. Moreover, significant reductions in queue length (1,150 ft to 100 ft) and duration (15 to 144 minutes) were observed in the sending link under all VMS policies. However, impacts on the receiving link varied based on congestion, with significant increases in queue duration (9.8 to 24 min) when congested but no substantial changes in free flow. Notably, diverging vehicles to congested links resulted in non-significant results, and activating late and deactivating late VMS affected curb productivity (-5.8% to -61.4%), curb accessibility (-16.5% to -25.8%), cumulative counts (-33.4% to -59.4%), and vehicle delay (95.98% to 594.3%). Activating VMS before congestion begins in the sending link and deactivating before a queue forms in the receiving link yield the most significant improvements: 8.1% to 10.1% in CPI, 9.4% to9.6% in CA, -29.3% to -77.9% in total delay, -11.6% to -13.9% in total emissions, and 101% to 103% in cumulative counts. As the analysis was made with a wide range of time periods, access levels, driver compliance rates, and scenarios, we believe our findings can provide valuable insights into how airports should manage VMS. Our work introduces a novel approach to the scientific airport literature, as some of our metrics were previously unexplored. Additionally, we propose a methodology that other airports can adopt to maximize their curb performance.

Gutierrez, Jorge D.↗

Modeling and Control Using Stochastic Distribution Control Theory for Intersection Traffic Flow

In this work, we investigated stochastic distribution control theory-based traffic signal optimization to achieve a smooth and uniform flow of vehicles through signalized intersections. In this context, the static and linear dynamic stochastic distribution models were developed to express the relationship between the signal timing and the traffic queue length together with its probability density function. Two stochastic distribution control algorithms were designed to control the signal timing at intersections such that the probability density function of the traffic queue of each intersection road segment is made as narrow and as small as possible. Also, a recursive input-output traffic queue estimation model was proposed, which is data-driven and dynamic in nature, to calculate real-time traffic queue length using traffic signal timings and loop-detector data. The control algorithms were evaluated for a one-signal corridor, two-signal corridor, and 2 x 2 network of signalized intersections. MATLAB simulation examples are provided to demonstrate the use of the proposed algorithms and comparison to the existing widely-used semi-actuated control has been made. Desired results were obtained.

97 MATHEMATICS AND COMPUTING↗

Synthetic residential load models for smart city energy management simulations

The ability to control tens of thousands of residential electricity customers in a coordinated manner has the potential to enact system-wide electric load changes, such as reduce congestion and peak demand, among other benefits. To quantify the potential benefits of demand-side management and other power system simulation studies (e.g. home energy management, large-scale residential demand response), synthetic load datasets that accurately characterize the system load are required. This study designs a combined top-down and bottom-up approach for modelling individual residential customers and their individual electric assets, each possessing their own characteristics, using time-varying queueing models. The aggregation of all customer loads created by the queueing models represents a known city-sized load curve to be used in simulation studies. The three presented residential queueing load models use only publicly available data. An open-source Python tool to allow researchers to generate residential load data for their studies is also provided. The simulation results presented consider the ComEd region (utility company from Chicago, IL) and demonstrate the characteristics of the three proposed residential queueing load models, the impact of the choice of model parameters, and scalability performance of the Python tool.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Hybrid Power Plants: Status of Installed and Proposed Projects [Slides]

As battery prices fall and wind and solar generation rises, power plant developers are increasingly combining wind and solar projects with on-site batteries, creating “hybrid” power plants. But hybrid or co-located plants have been part of the U.S. electricity mix for decades, with widely ranging configurations that extend beyond pairing a generator with a battery. This new summary tracks and maps existing hybrid and co-located plants across the United States while also synthesizing data from generation interconnection queues to illustrate developer interest in the next wave of plants. The scope is inclusive of co-located hybrid plants that pair two or more generators and/or that pair generation with storage at a single point of interconnection, and also full hybrids that feature co-location and co-control. The focus is on larger, 1 MW+ systems: smaller (often behind-the-meter) projects are also increasingly common, but are not included in the data synthesis. Based in part on EIA Form 860 data, there were at least 125 co-located hybrid plants (>1 MW) already operating across the United States at the end of 2019, totaling over 14 GW of aggregate capacity. Some of the most common configurations include wind+storage (13 projects, 1,290 MW wind, 184 MW storage), PV+storage (40 projects, 882 MW PV, 169 MW storage), and fossil+storage (10 projects, 2,414 MW fossil, 91 MW storage). Data from interconnection queues demonstrates the considerable commercial interest that exists in hybrid power plants, especially solar co-located with storage. By the end of 2019, there were at least 367 GW of solar plants in the nation’s queues; 102 GW (~28%) of this capacity was proposed as a hybrid, most typically pairing PV with battery storage. For wind, 225 GW of capacity sat in the queues, with 11 GW (~5%) proposed as a hybrid, again most-often pairing wind with storage. The proposed solar+storage plants are located throughout the United States, but with California and the non-ISO West being the most prominent areas of commercial interest. Proposed wind+storage and standalone storage plants also center to a degree on these regions of the country.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Generator Interconnection Costs to the Transmission System in non-ISO Balancing Authorities [Slides]

Electric transmission system operators—including Independent System Operators (ISOs), Regional Transmission Organizations (RTOs), and utilities—require proposed power plants to undergo a series of interconnection studies before connecting to the grid. These studies assess what transmission upgrades or new infrastructure may be necessary and assign the associated costs to the project. Lawrence Berkeley National Laboratory has compiled, aggregated, and cleaned interconnection cost data, originally for ISOs/RTOs, and now for five non-ISO Balancing Authorities: PacifiCorp, Bonneville Power Authority, Duke Energy Progress, Duke Energy Carolinas and Duke Energy Florida. Insufficient transparency in interconnection cost data may contribute to rapidly expanding interconnection queues, with active queue capacities tripling between 2020 and 2024 in the studied BAs. Most projects withdraw after receiving high interconnection cost estimates. Interconnection costs have increased since the early 2000s, with average costs for "complete" projects reaching $194/kW between 2018 and 2024. Active queue projects and withdrawn projects incur substantially higher costs, primarily due to rising network upgrade costs. Recent interconnection costs in non-ISO balancing authorities are higher than in ISO regions, potentially due to a greater willingness to pay among developers. Utility-scale solar, wind, and storage projects have interconnection costs that exceed those for natural gas. However, when focusing on projects that do not withdraw from the queue, the interconnection costs for these technologies are more similar to natural gas projects. Other key findings include: (1) Larger generation projects benefit from lower proportional interconnection costs, (2) capacity transmission service (NRIS) often requires additional network investments, and (3) projects with high network upgrade costs are often clustered geographically. The dataset includes results from 2,104 interconnection studies conducted between 2000 and 2024, covering projects that are operational, withdrawn, or still progressing through the study process. The Excel file contains (a) the complete project-level interconnection cost dataset, and (b) seven additional tabs summarizing cost metrics across dimensions such as time, market structure, cost category (point of interconnection vs. broader network upgrades), fuel type, service type (ERIS vs. NRIS), generator size, and geography.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Network resiliency through memory health monitoring and proactive management

A method for managing a network queue memory includes receiving sensor information about the network queue memory, predicting a memory failure in the network queue memory based on the sensor information, and outputting a notification through a plurality of nodes forming a network and using the network queue memory, the notification configuring communications between the nodes.

Andrade Costa, Carlos H.↗

Job Scheduler-Driven Power Gateway for High Performance Computing

Power gateways in the form of a microgrid can incorporate multiple distributed energy resources (DER) in either grid forming or grid following mode and support high performance computing (HPC) power profiles including the large load-follow requirements observed in multi-user HPC systems. The microgrid’s flexibility to operate in either grid forming or grid following mode and to actively switch between these modes enables baseline power from multiple non-baseline DER while maintaining high power quality metrics for the HPC system. But this enormous flexibility in demand response and time of use shifting is generally programmed independently of any integration with an HPC job scheduler which can better inform the load shaping by the microgrid. While there are many existing approaches where the HPC job scheduler takes in information from the grid to make queue scheduling decisions, this work takes the opposite view and explores a scheduler where the jobs in the queue can directly impact the settings of the grid. Several HPC scheduler strategies are tested where the jobs in the queue directly impact the settings of a microgrid designed for HPC operation which is driving a datacenter with three classes of HPC architectures. The scheduler operation is shown using a microgrid with 64 kW of solar capacity and 320 kWh of battery over a period of 21 days operating with significant low-follow swings, a throttled grid, cloudy conditions, switching between grid following and grid forming modes, and a wide range of battery states-of-charge all while maintaining high quality power metrics. The scheduler provides a mechanism for the job queue to directly impact a power gateway like a microgrid and to improve HPC power outcomes such as maximizing renewable energy usage

microgrid↗