Search NASA⌕ Search

SEARCH · Search NASA

Results for “REPORTING REQUIREMENTS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

National Institute of Standards and Technology Requirements (Analysis Report)

EPOC uses the Deep Dive process to discuss and analyze current and planned science, research, or education activities and the anticipated data output of a particular use case, site, or project to help inform the strategic planning of a campus or regional networking environment. This includes understanding future needs related to network operations, network capacity upgrades, and other technological service investments. A Deep Dive comprehensively surveys major research stakeholders’ plans and processes in order to investigate data management requirements over the next 5–10 years. In October of 2022, staff members from the Engagement and Performance Operations Center (EPOC) met with researchers and staff from the National Institute of Standards and Technology (NIST) for the purpose of a Deep Dive into scientific and research drivers. The goal of this activity was to help characterize the requirements for a number of campus use cases, and to enable cyberinfrastructure support staff to better understand the needs of the researchers within the community. Material for this event included the written documentation from each of the profiled research areas, documentation about the current state of technology support, and a write-up of the discussion that took place via e-mail and video conferencing. The case studies highlighted the ongoing challenges and opportunities that NIST has in supporting a cross-section of established and emerging research use cases. Each case study mentioned unique challenges which were summarized into common needs.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

New York-Presbyterian and Columbia University Irving Medical Center Requirements (Analysis Report)

EPOC uses the Deep Dive process to discuss and analyze current and planned science, research, or education activities and the anticipated data output of a particular use case, site, or project to help inform the strategic planning of a campus or regional networking environment. This includes understanding future needs related to network operations, network capacity upgrades, and other technological service investments. A Deep Dive comprehensively surveys major research stakeholders’ plans and processes in order to investigate data management requirements over the next 5–10 years. Between February and June 2024, staff members from the Engagement and Performance Operations Center (EPOC) met with researchers and staff from New York-Presbyterian (NYP), Columbia University Irving Medical Center (CUIMC), and NYSERNet for the purpose of a Deep Dive into scientific and research drivers. The goal of this activity was to help characterize the requirements for a number of campus use cases, and to enable cyberinfrastructure support staff to better understand the needs of the researchers within the community. Material for this event included the written documentation from each of the profiled research areas, documentation about the current state of technology support, and a write-up of the discussion that took place via e-mail and video conferencing. The case studies highlighted the ongoing challenges and opportunities that NYP and CUIMC have in supporting a cross-section of established and emerging research use cases. Each case study mentioned unique challenges which were summarized into common needs.

97 MATHEMATICS AND COMPUTING↗

Salk Institute for Biological Studies Requirements (Analysis Report)

EPOC uses the Deep Dive process to discuss and analyze current and planned science, research, or education activities and the anticipated data output of a particular use case, site, or project to help inform the strategic planning of a campus or regional networking environment. This includes understanding future needs related to network operations, network capacity upgrades, and other technological service investments. A Deep Dive comprehensively surveys major research stakeholders’ plans and processes in order to investigate data management requirements over the next 5–10 years. Between February and March 2024, staff members from the Engagement and Performance Operations Center (EPOC) met with researchers and staff from the Salk Institute for Biological Studies (Salk) for the purpose of a Deep Dive into scientific and research drivers. The goal of this activity was to help characterize the requirements for a number of campus use cases, and to enable cyberinfrastructure support staff better to understand the needs of the researchers within the community. Material for this event included the written documentation from each of the profiled research areas, documentation about the current state of technology support, and a write-up of the discussion that took place via e-mail and video conferencing. The case studies highlighted the ongoing challenges and opportunities that Salk Institute for Biological Studies have in supporting a cross-section of established and emerging research use cases. Each case study mentioned unique challenges which were summarized into common needs.

59 BASIC BIOLOGICAL SCIENCES↗

R&D GREET Battery Carbon Footprint Calculator

The Battery Carbon Footprint (CF) Calculator was developed to help U.S. battery manufacturers meet the carbon footprint reporting requirements of the EU Battery Regulation (EU) 2023/1542. The calculator incorporates several major battery carbon footprint frameworks, including the Joint Research Centre's Rules for the Calculation of the Carbon Footprint of Electric Vehicle Batteries (CFB-EV), RECHARGE's Product Environmental Footprint Category Rules for High Specific Energy Rechargeable Batteries for Mobile Applications (PEFCR), the Catena-X Product Carbon Footprint Rulebook (CX-PCF Rules), Battery Pass's Battery Carbon Footprint: Rules for Calculating the Carbon Footprint of the "Distribution" and "End-of-Life and Recycling" Life Cycle Stages, the Global Battery Alliance's Greenhouse Gas Rulebook: Generic Rules, Version 2.1, and the Ministry of Economy, Trade and Industry's draft Carbon Footprint Calculation Method for Automotive Batteries. The tool pairs these frameworks with foreground data from Argonne's R&D GREET models and integrates user-supplied background data covering battery manufacturing and supply chain activities. By bringing multiple international methodologies together in a single platform, the calculator enables manufacturers to evaluate product carbon footprints, improve data consistency, and prepare for evolving regulatory compliance and global market reporting requirements.

Zhang, Jingyi↗

Refinement of Salt Dissolution Inhibitor Requirements (Interim Report)

At Savannah River Site, High-Level Waste is stored in below-grade carbon steel tanks. This waste in part consists of sludge, salt cake, and/or supernate. Preparation of this waste for future processing involves dissolution of the salt cake layer. The salt dissolution process can create conditions that leave the carbon steel tanks susceptible to localized corrosion. The salt to be dissolved contains high concentrations of nitrate, that once released, create an environment that may be conducive to pitting corrosion or stress corrosion cracking (SCC) of carbon steel. The salt dissolution process also liberates interstitial liquid trapped between the salt crystals. This liquid is initially high in nitrite and hydroxide concentration. High pH and greater ratios of nitrite to nitrate act as inhibitors to minimize corrosion of carbon steel in high nitrate environments. However, as dissolution proceeds, the concentration of nitrate increases while the hydroxide and nitrite concentration of the interstitial liquid depletes and becomes insufficient to prevent the onset of corrosion attack. While tank blending and the addition of inhibitors are used to ensure adequate concentrations of hydroxide and nitrite during normal operation, this is not desirable during salt dissolution as it can reduce process efficiency and increase the amount of waste that needs processed.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Refinement of Salt Dissolution Inhibitor Requirements (Final Report)

At Savannah River Site (SRS), High-Level Waste is stored in below-grade carbon steel tanks. This waste in part consists of sludge, salt cake, and/or supernate. Preparation of this waste for future processing involves dissolution of the salt cake layer. The salt dissolution process can create conditions that leave the carbon steel tanks susceptible to localized corrosion. The salt to be dissolved contains high concentrations of nitrate, that once released, create an environment that may be conducive to pitting corrosion and/or stress corrosion cracking (SCC) of carbon steel. The salt dissolution process also liberates interstitial liquid trapped between the salt crystals. This liquid is initially high in nitrite and hydroxide concentration. High pH and greater ratios of nitrite to nitrate act as inhibitors to minimize corrosion of carbon steel in high nitrate environments. However, as dissolution proceeds, the concentration of nitrate will increase, while the hydroxide and nitrite concentration of the interstitial liquid will deplete and become insufficient to prevent the onset of corrosion attack. Tank blending and addition of inhibitors are used to ensure adequate concentrations of hydroxide and nitrite. However, this is not desirable during salt dissolution as it can reduce process efficiency and increase the amount of waste that needs processing. It has been proposed that these corrosion control limits be revisited to evaluate the corrosion susceptibility of carbon steel in environments that more closely resemble current operating conditions at SRS. An experimental matrix was designed to evaluate the use of the pitting factor for supernate chemistries characteristic to SRS, particularly during the salt dissolution process. Two electrochemical methods were identified to determine the susceptibility of A537 and A285 low-carbon steels to pitting corrosion with this chemistry envelope at temperatures up to 75 °C. The predominant electrochemical test method was Cyclic Potentiodynamic Polarization (CPP) studies. Through CPP, the pitting factor was used, based on Hanford Site corrosion studies, to accurately identify pitting susceptibility within the compositional range studied with some conservatism. Additionally, sulfate was determined to have no statistically significant influence, at concentrations up to 0.6 M, on pitting behavior in more concentrated solutions where other aggressive species govern pitting susceptibility. Where CPP was inconclusive, Modified ASTM G192 was successfully used to evaluate pitting susceptibility conditions and allowed for a pass/fail result to be determined. In all cases, the pitting factor was determined to be applicable to the simulants tested, with this metric accurately predicting incidences in which pitting occurred. Based upon the findings in this work, a pitting factor of 1.2 is being proposed to build in a safety factor and remain consistent with the Hanford Site approach. Additionally, a minimum pH limit of 12 is proposed to ensure carbon steel passivity and localized corrosion the primary degradation mechanism. Susceptibility to SCC was evaluated using a reduced matrix of tests at 75 °C. No failures due SCC were observed at open circuit. In addition, tests polarized anodically by 200 mV only resulted in failures for trials with pitting factors less than 0.86. However, a test with a passing condition based upon the pitting factor metric (pitting factor = 1.40) did exhibit a failure with an applied potential of +300 mV vs. OCP. This result is contrary to the prediction based upon the pitting factor, however, a polarization of 300 mV, or even 200 mV, from open circuit is substantial. The relationship between these testing parameters and service environment/conditions and the desired level of conservatism in the metric should be further evaluated in the determination of the significance of this result. While the pitting factor accurately predicted susceptibility to SCC at temperatures up to 75 °C and with positive overpotentials up to 200 mV, the relatively small sample matrix and failure of a passing pitting factor with a 300 mV polarization resulted in an inconclusive determination of whether the pitting factor may be used for predicting susceptibility to SCC at temperatures between 50 °C and 75 °C. As such, additional testing is recommended to evaluate the validity of the pitting factor for SCC susceptibility prediction at temperatures between 50 °C and 75 °C.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Life-Cycle Baseline Customization for the Formerly Utilized Sites Remedial Action Program - 20304

One of the responsibilities of the federal government is to estimate sound and defensible life-cycle baseline costs for use in federal budget estimates and to meet federal financial reporting requirements. To accomplish this, the US Department of Energy (DOE) Office of Legacy Management (LM) and the US Army Corps of Engineers (USACE) have partnered together to ensure that the liabilities documented in each Formerly Utilized Sites Remedial Action Program (FUSRAP) site's life-cycle baseline are specifically tailored. FUSRAP was created in the mid-1970's to clean up radiological contamination resulting from the early development of nuclear weapons. DOE was responsible for FUSRAP until October 1997, when Congress transferred the administration and execution of FUSRAP site cleanups to USACE. By 1997, DOE had completed the cleanup of 25 of the 46 sites that were active within the program and had begun cleanup at 13 additional sites. USACE was assigned responsibility for the cleanup of the 21 remaining FUSRAP sites, and at 8 additional sites that had since been referred for cleanup. The LM mission for the FUSRAP sites is to perform long-term surveillance and maintenance (LTS and M). Currently, LM provides long-term stewardship for 34 completed FUSRAP sites. Another 20 sites are under active remediation by USACE. Within the last 5 years, USACE has completed the cleanup at five FUSRAP sites and the LTS and M responsibility has been transferred to LM. By 2029, USACE will compete remediation at eight additional sites and LTS and M for those sites will transfer to LM. Because responsibilities for the FUSRAP sites transfer between USACE and LM upon completion of remedial actions, both agencies maintain life-cycle baselines for different stages of the project and both must have a strong understanding of the needs and requirements for each site. This understanding ensures that the life-cycle baselines form a complete and accurate picture of what is required for the site and for the FUSRAP program. LM focuses on several things when customizing the life-cycle baseline estimates for the FUSRAP sites, including (1) Understanding the unique requirements for each site. By reviewing site-specific documents prepared by USACE, such as Feasibility Studies and Records of Decision, and partnering with USACE to gain additional insight about site conditions and requirements for stewardship, as well as potential risks, LM can better develop the life-cycle baselines. (2) Developing site-specific labor breakdowns. This ensures the required labor mix is baselined for specific activities by comparing the labor mix required to perform activities at (a) other LM-managed FUSRAP sites and (b) non-FUSRAP LM sites and (c) by USACE at active FUSRAP sites. (3) Taking a tiered approach to life-cycle baseline planning. Estimates for sites transferring to LM in the near term (5 years) are more definitive than for sites transferring in the out-year period. Remedial actions at the near-term sites are at or near completion, providing LM a strong understanding of the LTS and M requirements and remaining liabilities. This in turn allows for site-specific customization of the baseline. (4) Using a robust risk management approach to ensure that liabilities specific to each site are identified, evaluated by probability and severity, and documented in relation to the impact to cost or schedule. To ensure the most accuracy within all the baselines, the FUSRAP life-cycle baselines are updated as needed to support program, project, and contract management needs. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Automated Data Review of Analytical Laboratory Results at Los Alamos National Laboratory - 20299

Newport News Nuclear BWXT-Los Alamos, LLC (N3B) collects samples in support of the U.S. Department of Energy's (DOE) Office of Environmental Management (EM) Los Alamos Legacy Cleanup Contract (LLCC). N3B receives and reviews over 1.6 million sample data points annually in support of various ongoing environmental monitoring and remediation projects of the LLCC. N3B must demonstrate and document that reported external analytical laboratory data produced for the LLCC are of sufficient quality to fulfill their intended purpose and to support defensible decision making as described in EPA QA/G4 Guidance for the Data Quality Objectives Process 1994. In 2018, N3B assumed management of the LLCC along with the Environmental Information Management (EIM) database that contains all historical and current environmental data associated with the LLCC. The entire EIM database is shared between N3B, Triad National Security, LLC (Triad), and New Mexico Environment Department (NMED). These three parties jointly manage the database, its configuration, and changes / updates. All environmental data that are entered into EIM are updated and available, on a daily basis, in the linked public database Intellus New Mexico (Intellus). The quality and defensibility of the environmental data generated from sampling activities is a key component of an effective remediation process. Providing quality data is accomplished through a data assessment process that includes examination, verification, and validation. Examination is the assessment of completeness of the deliverables, identification of any reporting errors, and determining the usability of the data based on the laboratory's evaluation of its data as described in the case narrative received with the data. Verification consists of an evaluation of the Electronic Data Deliverables (EDD) data report to determine the extent to which the external analytical laboratories met method and contract-specific quality control and reporting requirements. Validation consists of determining the data quality and the extent to which the external analytical laboratories accurately and completely reported all sample and quality control results and satisfied all contract requirements. EIM contains an automatic Data Validation Module which performs automated data review (DVM ADR). DVM ADR is a tool to assist in the validation process. When DVM ADR is used in conjunction with manual examination of sample data packages, the combination of the two will meet and exceed the requirements of verification. N3B recognized an opportunity for process improvement, focusing on DVM ADR configuration and enhancements in EIM. Testing EIM's configuration provided proof of the DVM ADR's capabilities and flexibility to accurately perform routine data checks based on analytical methods and regulatory requirements. In addition, the DVM ADR module was improved through enhancements for all analytes, particularly upgrades for radiochemistry data. Extensive testing of the DVM ADR module occurred using EDDs from actual laboratory analyses on the EIM testing site. During this process, N3B manipulated EDD information to verify that the actual outcomes matched the expected outcomes. The results of this testing were shared with the database architects, and configuration improvements were identified to address these results. During this process, N3B identified that the radiochemical DVM ADR capabilities were underutilized, and so enhanced the DVM ADR functionality with respect to radioanalytical assessment. N3B environmental data uploads to Intellus on a daily basis from EIM, once the analytical data undergoes examination and verification. As such, it is important to have a high level of confidence in the quality and defensibility of the data. The process of manual examination, along with the DVM ADR, in conjunction with full validation of a percentage the data specified through the Data Quality Objectives greatly increases efficiency of data review and confidence level of the quality of the data, and gives the project managers, governmental offices, and the public expedited access to high-quality data. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Federal Metering Guidance

The Federal Metering Guidance documents the metering provisions in EO 13834, Efficient Federal Operations and other metering related statutory requirements. This document provides the meter-related reporting requirements for Federal agencies, specifies a method to verify the existence of currently installed building-level meters, provides guidelines on prioritizing the implementation of advanced energy and water meters, sets the schedule for agencies to update their five-year metering plans, provides the minimum requirements that agencies must meet when updating their five-year metering plans along with recommend elements for an effective plan.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

National Ignition Facility. Facility and Infrastructure Systems Maintenance Plan

Ensuring the reliability of the NIF, including its support systems, laser systems, target diagnostic systems, and utilities, is essential to the availability of the NIF in its support of NNSA missions. NIF is a key capability in the DOE Stockpile Stewardship Program and supports high energy physics experiments for nuclear weapons, energy, and astrophysics applications. High system reliability provides opportunities for shots and scientific discoveries with opportunities to enhance and upgrade capabilities. This Maintenance Plan (MP) identifies the policies and procedures used to perform and support asset management of the NIF Facility and Infrastructure Systems (FInS), NIF Lasers & Alignment (LASE), NIF Target Experimental Operations (TOPS), NIF Target Area Science and Engineering (TASE), and NIF&PS Control Systems (NCS). The FInS systems include the facility, HVAC, contamination control, beampath, and Line Replaceable Units (LRUs) as well as utilities which create the beampath environments, such as vacuum, argon, or clean dry air. The LASE systems are Programmatic systems which include laser diagnostics, alignment, power conditioning, pulsed power, and input laser systems. The TOPS and TASE systems are also Programmatic systems which include target and diagnostic delivery systems and positioners, many different insertable and fixed target diagnostics, and cryogenic and target gas fill systems. Finally, the NCS systems include both software and hardware for industrial and shot operation control systems. Policies governing administrative and operational practices related to maintenance of FInS, LASE, TOPS, TASE, and NCS systems are described in this plan. In addition, the plan provides processes and procedures for managing, tracking, and documenting the work. This document, the NIF Operations Management Plan, NIF-5020544 (Ref. 1), and NIF Shot Operations Plan, NIF-5018506 (Ref. 2), together satisfy the requirements of the Conduct of Operations. Duties, responsibilities, and reporting requirements of the various positions associated with FInS, LASE, and TOPS maintenance are detailed in this plan. The FInS systems include both Real Property systems with asset management requirements specified in DOE Order 430.1C (Ref. 3) and Programmatic systems. In addition, for FInS, there is a list of the System Level Maintenance Plans (SLMPs) in NIF-1007419198 (Ref. 4) which provide the system descriptions and maintenance plan and schedule. In addition, the list includes the Reliability Centered Maintenance (RCM) and Experience Centered Maintenance (ECM) evaluations that have been performed for applicable FInS systems as well as reliability criticality per Section 3.5. The -AM version of the NIF Maintenance Plan focuses on the reliability program for FInS, LASE, TOPS, TASE, and NCS within the context of the overall NIF Reliability, Availability, and Maintainability (RAM) program and incorporates changes since the -AL version from August 2011 and has been updated to be fully consistent with the updates to Ref. 1. It also includes asset management considerations, updates to the Work Order (WO) process within the NIF Computerized Maintenance Management System (CMMS) which is EAM infor® System Maintenance and Reliability Tracking (SMaRT) (Ref. 5), and updates to metrics and key performance indicators (KPIs).

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

FY 2021 Idaho National Laboratory Site Sustainability Plan

The mission of the Department of Energy (DOE) is to ensure America’s security and prosperity by addressing its energy, environmental, and nuclear challenges through transformative science and technology solutions. This FY 2021 Idaho National Laboratory Site Sustainability Plan (SSP) was developed to enable and sustain Idaho National Laboratory’s (INL’s) mission to discover, demonstrate, and secure innovative nuclear solutions, clean energy options, and critical infrastructure. The SSP was developed according to the narrative requirements from the “FY 2021 DOE Site Sustainability Plan Guidance” document issued in August 2020. The SSP contains strategies and activities that will lead to continual energy, water, and waste reductions that move INL toward meeting DOE sustainability goals and requirements. The SSP summarizes energy and available fuel use reporting requirements and references criteria for instituting sustainable design. SSP requirements are integrated into each INL contractor’s Integrated Safety Management System and Environmental Management System (EMS). Finally, the Sustainability Program directives, based on this SSP, are integrated into the INL Annual Laboratory Plan Fiscal Year 2020 (INL/LTD-20-59747), and operations and acquisition systems.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

FY 2022 Idaho National Laboratory Site Sustainability Plan

The mission of the Department of Energy (DOE) is to ensure America’s security and prosperity by addressing its energy, environmental and nuclear challenges through transformative science and technology solutions. This FY 2022 Idaho National Laboratory Site Sustainability Plan (SSP) was developed to enable and sustain Idaho National Laboratory’s (INL’s) mission to discover, demonstrate, and secure innovative nuclear solutions, clean energy options, and critical infrastructure. DOE Order 436.1, “Departmental Sustainability,” provides requirements and assigns responsibilities for managing sustainability within DOE to ensure that DOE missions are carried out in a sustainable manner, to institute wholesale cultural change to factor sustainability into all DOE decisions, and to ensure DOE achieves sustainability goals. DOE Order 436.1 also requires DOE sites to commit appropriate personnel resources, establish a financing plan that prioritizes the use of life-cycle cost effective private-sector financing, optimize the application of appropriations and budgeted funds, and establish specific performance measures and deliverables designed to achieve the listed requirements. The SSP was developed according to the narrative requirements from the “FY 2022 DOE Site Sustainability Plan Guidance” document issued in September 2021. The SSP contains strategies and activities that will lead to continual energy, water, and waste reductions that move the INL site toward meeting DOE sustainability goals and requirements. The SSP summarizes energy and available fuel use reporting requirements and references criteria for instituting sustainable design. SSP requirements are integrated into each INL site contractor’s Integrated Safety Management System and Environmental Management System (EMS). Finally, the Sustainability Program directives, based on this SSP, are integrated into INL/LTD-21-62463, Annual Laboratory Plan 2021, and operations and acquisition systems.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

FY 2023 Idaho National Laboratory Site Sustainability Plan

The mission of the Department of Energy (DOE) is to ensure America’s security and prosperity by addressing its energy, environmental and nuclear challenges through transformative science and technology solutions. This FY 2022 Idaho National Laboratory Site Sustainability Plan (SSP) was developed to enable and sustain Idaho National Laboratory’s (INL’s) mission to discover, demonstrate, and secure innovative nuclear solutions, clean energy options, and critical infrastructure. DOE Order 436.1, “Departmental Sustainability,” provides requirements and assigns responsibilities for managing sustainability within DOE to ensure that DOE missions are carried out in a sustainable manner, to institute wholesale cultural change to factor sustainability into all DOE decisions, and to ensure DOE achieves sustainability goals. DOE Order 436.1 also requires DOE sites to commit appropriate personnel resources, establish a financing plan that prioritizes the use of life-cycle cost effective private-sector financing, optimize the application of appropriations and budgeted funds, and establish specific performance measures and deliverables designed to achieve the listed requirements. The SSP was developed according to the narrative requirements from the “FY 2022 DOE Site Sustainability Plan Guidance” document issued in September 2021. The SSP contains strategies and activities that will lead to continual energy, water, and waste reductions that move the INL site toward meeting DOE sustainability goals and requirements. The SSP summarizes energy and available fuel use reporting requirements and references criteria for instituting sustainable design. SSP requirements are integrated into each INL site contractor’s Integrated Safety Management System and Environmental Management System (EMS). Finally, the Sustainability Program directives, based on this SSP, are integrated into INL/LTD-21-62463, Annual Laboratory Plan 2021, and operations and acquisition systems.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

CONNECT Neutronics Initial Report

This report represents the first status update from the Creation of Next-generation Nuclear Energy Computational Technology (CONNECT) effort within the Nuclear Energy Advanced Modeling and Simulation (NEAMS) Program and is intended to satisfy the reporting requirements of the following milestones: • M3MS-24OR0101321: Assess needs, requirements and opportunities for high-fidelity neutronics and transport as used in DOE-NE program. • M3MS-24AN0101301: Generate a community report on the needs, requirements, and opportunities for high-fidelity neutronics and transport as used in DOE-NE programs and industry. • M3MS-24OR0202433: Implement and assess numerical strategies leveraging Monte Carlo neutron transport on GPUs for production analysis. In particular, Sections 1, 2, and 3 detail the assessment of the current state of practice and the landscape of the broader advanced computing world to meet the objectives of M3MS-24OR0101321 and M3MS-24AN0101301, while Sections 4 and 5 describe new work during FY24 to extend current GPU Monte Carlo capabilities in areas relevant to active NEAMS development to satisfy M3MS-24OR0202433. Section 6 offers some thoughts about the potential future impact of Monte Carlo neutronics on NEAMS and the nuclear industry.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Oak Ridge National Laboratory FY 2023 Site Sustainability Plan With FY 2022 Performance Data

At the close of each fiscal year, the US Department of Energy (DOE) Sustainability Performance Division (SPD) issues guidance documents and technical resource aids/tools necessary for DOE sites and national laboratories to complete sustainability reporting requirements. SPD is part of the DOE Office of Asset Management. As required by DOE Order 436.1, Departmental Sustainability, “each site will develop and commit to an annual Site Sustainability Plan (SSP) that identifies its respective contribution toward meeting the DOE’s sustainability goals.” SPD collects and compiles information reported by each site to develop an agency-wide Sustainability Report and Implementation Plan, which is used to report DOE sustainability progress to the federal government as required by all major federal agencies. DOE launched a formal Sustainability Office and annual SSP process in 2011. Each year, Oak Ridge National Laboratory (ORNL), in concert with the Office of Science (SC), provides the resources essential to fulfill its commitment to deliver a complete and accurate SSP report and quality performance data for entry into the DOE Sustainability Dashboard as managed by SPD. The performance data entered by each DOE site are then combined to disclose the progress of each DOE Program Office and are further combined to show comprehensive progress for the agency. The Office of Asset Management provides assistance to program offices in sustaining their missions, freeing up resources by reducing waste, avoiding excess expenditure on utilities, maximizing productivity, and improving the efficiency of facilities and processes. By focusing on mission needs, programs and associated DOE sites can help the agency meet its sustainability goals, as outlined in federal statutory and regulatory requirements. In FY 2022, the SSP guidance was updated to capture requirements from Executive Order (EO) 14008, Tackling the Climate Crisis at Home and Abroad, the Energy Act of 2020 (EAct 20), actions outlined in DOE’s Climate Adaptation & Resilience Plan and Sustainability Plan, and EO 14057, Catalyzing Clean Energy Industries and Jobs Through Federal Sustainability. Updates in SSP guidance help to minimize and streamline reporting while simultaneously addressing updated federal requirements. Per DOE, each SSP report should provide an overview of the site’s planned actions, as well as an overview of efforts and accomplishments during the reporting period. SPD collects and compiles information reported by each site to develop DOE’s Annual Sustainability Report, Climate Adaptation & Resilience Plan, and Annual Energy Management Report to Congress. The agency goal has been to lower the reporting burden for sites and increase and improve the consistency of information available to decision makers, allowing them to better identify projects and potential for increased efficiency, as well as to reduce waste, lower emissions, and enhance operational resilience. Sites may elect to produce a more polished publication for their leadership and stakeholders, but this step is no longer required. The ORNL SSP narrative report (this document) and the reporting of DOE SPD Sustainability Dashboard performance data is a collaborative effort of approximately 30 subject matter experts (SMEs) from ORNL facility management and research divisions. Annually, these associates come together to provide a report that can be used by DOE to demonstrate continued agency progress in energy efficiency and sustainable federal operations.

99 GENERAL AND MISCELLANEOUS↗

Retro-Commissioning Sensor Suitcase for Energy Efficiency (CRADA Final Report)

The Sensor Suitcase project aimed to enable cost-effective, data-driven retro-commissioning (RCx) in small commercial buildings through a self-installable toolkit consisting of portable sensors and diagnostic software. Results showed that the Sensor Suitcase could identify common operational faults leading to 5–15% energy savings opportunities, with automated reports requiring minimal user interpretation. The project adhered closely to its Statement of Work (SOW) but evolved the reporting interface and sensor logging duration based on field feedback. The development and validation of diagnostics are documented in PNNL technical reports and internal analysis summaries.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Oak Ridge National Laboratory 2025 Site Sustainability Plan With FY 2024 Performance Data

At the close of each fiscal year, the US Department of Energy (DOE) Sustainability Performance Office (SPO) issues instruction documents and technical resource aids/tools necessary for DOE sites and national laboratories to complete sustainability reporting requirements. SPO is part of the DOE Office of Asset Management. As required by DOE Order 436.1A, Departmental Sustainability, each site develops and commits to an annual site sustainability plan (SSP) that identifies its respective contribution toward meeting DOE’s sustainability goals. SPO collects and compiles information reported by each site to develop an agency-wide sustainability report and implementation plan, which are used to report DOE sustainability progress to the federal government as required by all major federal agencies.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

2022 Annual Site Environment Report, Princeton Plasma Physics Laboratory

This report provides the U.S. Department of Energy (DOE) and the public with information on the level of radioactive and non-radioactive pollutants (if any) that are added to the environment as a result of Princeton Plasma Physics Laboratory’s (PPPL) operations. This report fulfills the annual public reporting requirements of DOE Order 231.1B. The results of PPPL’s 2022 environmental surveillance and monitoring program are presented and discussed. The report also summarizes environmental initiatives, assessments, and community involvement programs that were undertaken in 2022. PPPL’s on-site operations started to be restored in 2022, following curtailments in 2020 and 2021 for the global coronavirus (COVID-19) pandemic. PPPL has engaged in fusion energy research since 1951 and at its current locations since 1958. The Laboratory’s mission is to develop the scientific knowledge and advanced engineering to enable fusion to power the U.S. and the world, and to develop the understanding of plasmas from the nano- to the astrophysical scale. PPPL’s primary experiment, the National Spherical Torus Experiment-Upgrade (NSTX-U) is a collaboration among national laboratories, universities, and national and international research institutions and is a major element in the US Fusion Energy Sciences Program. Its design tests the physics principles of spherical torus (ST) plasmas, playing an important role in the development of smaller, more economical fusion reactors. Due to previous operational issues, NSTX-U did not operate in 2022. PPPL is engaged in a project to replace key NSTX-U components and systems to enable the operation of this international magnetic fusion user facility. In 2022, PPPL’s radiological environmental monitoring program measured tritium in the air at onsite sampling stations. Using highly sensitive air monitors, PPPL is capable of detecting small changes in the ambient levels of tritium. The operation of monitors located on D-site is used to demonstrate compliance with the National Emission Standard for Hazardous Air Pollutants (NESHAPs) regulations. Also included in PPPL’s radiological environmental monitoring program, are water monitoring – ground, surface, and waste waters. PPPL’s radiological monitoring program characterized the background levels of tritium in the environment and those data are presented in this report. Ground water monitoring continued under New Jersey Department of Environmental Protection’s (NJDEP) Site Remediation Program regulations. PPPL monitored for non-radiological contaminants, mainly volatile organic compounds (components of common degreasing solvents). In 2022, PPPL complied with permit limits for surface water and sanitary wastewater discharges. PPPL was honored with an award for EPEAT-certified electronics purchasing from the Global Electronics Council.

54 ENVIRONMENTAL SCIENCES↗