Search NASA⌕ Search

SEARCH · Search NASA

Results for “RF Window”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Multipacting Analysis of Warm Linac RF Vacuum Windows

Multipacting in accelerating structures is a complex phenomenon with which there is much to be understood. While multipacting research efforts have primarily been focused on superconducting radio frequency (SRF) systems, normal conducting accelerating structures that have a higher thermal capacity and a greater vacuum pressure tolerance could benefit from additional investigation. This research details multipacting simulation methods and the results of 3-D electromagnetic simulations of RF vacuum windows used on normal conducting linac (NCL) cavities. Possible techniques for reducing and eliminating multipacting activities in these structures are discussed.

Toby, George↗

PIC Simulations of One-side Multipactor on Dielectric

Breakdown of dielectric RF windows is an important issue for particle accelerators and high-power RF sources. One of the generally considered reasons for the RF windows failure is the multipactor on dielectric surface. The multipactor may be responsible for excessive heating of dielectric and discharge of charges that accumulated in ceramic due to secondary emission. In this study the comprehensive self-consistent PIC simulations with space charge effect were performed in order to better understand the dynamic of one-side multipactor development and floating potential on dielectric induced by the emission. The important correlations between the multipactor parameters at saturation and the secondary emission properties of dielectric and the applied RF field parameters were found and are reported in the paper.

43 PARTICLE ACCELERATORS↗

Resonant dynamics of one-side multipactor on dielectric

Breakdown of dielectric radio frequency (RF) windows is an important issue for particle accelerators and high-power RF sources. One of the common reasons for RF window failure is the multipactor on a dielectric surface. The multipactor may be responsible for excessive heating of the dielectric and discharge of charges that accumulated in the ceramic due to secondary emission. In this study, comprehensive self-consistent particle-in-cell simulations with space charge effect were performed. This was to better understand the dynamic of one-side multipactor development and floating potential on the dielectric induced by the emission. The important correlations between the multipactor parameters at saturation, the secondary emission properties of dielectric, and the applied RF field parameters have been found, which led to the conclusion that the dynamics of one-side multipactor on dielectric is a resonant phenomenon.

43 PARTICLE ACCELERATORS↗

NCRF gun status and test plan

Summary of this presentation are: (1) NCRF injector has achieved >7MV/m average gradients; (2) RGA trace shows little water in cathode cell; (3) NCRF injector has produced electron beams; (4) Dark current can be reduced with solenoid magnetic field; (5) An RF window failed at RF power above 800kW; (6) Beam tests will be performed with both RLWG (each exposed to 500kW of RF power); and (7) Beam tests will use CsK{sub 2}Sb photocathodes fabricated using low-temperature alkali sources.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

RF-driven ion source with a back-streaming electron dump

A novel ion source is described having an improved lifetime. The ion source, in one embodiment, is a proton source, including an external RF antenna mounted to an RF window. To prevent backstreaming electrons formed in the beam column from striking the RF window, a back streaming electron dump is provided, which in one embodiment is formed of a cylindrical tube, open at one end to the ion source chamber and capped at its other end by a metal plug. The plug, maintained at the same electrical potential as the source, captures these backstreaming electrons, and thus prevents localized heating of the window, which due to said heating, might otherwise cause window damage.

47 OTHER INSTRUMENTATION↗

Studies and optimization of Pohang Light Source-II superconducting radio frequency system at stable top-up operation with beam current of 400 mA

After three years of upgrading work, the Pohang Light Source-II (PLS-II) is now successfully operating. The final quantitative goal of PLS-II is a top-up user-service operation with beam current of 400 mA to be completed by the end of 2014. During the beam store test up to 400 mA in the storage ring (SR), it was observed that the vacuum pressure around the radio frequency (RF) window of the superconducting cavity rapidly increases over the interlock level limiting the availability of the maximum beam current storing. Although available beam current is enhanced by setting a higher RF accelerating voltage, it is better to keep the RF accelerating voltage as low as possible in the long time top-up operation. We investigated the cause of the window vacuum pressure increment by studying the changes in the electric field distribution at the superconducting cavity and waveguide according to the beam current. In our simulation, an equivalent physical modeling was developed using a finite-difference time-domain code. The simulation revealed that the electric field amplitude at the RF window is exponentially increased as the beam current increases, thus this high electric field amplitude causes a RF breakdown at the RF window, which comes with the rapid increase of window vacuum pressure. The RF accelerating voltage of PLS-II RF system was set to 4.95 MV, which was estimated using the maximum available beam current that works as a function of RF voltage, and the top-up operation test with the beam current of 400 mA was successfully carried out.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Low RF loss conductive ceramic for high power input coupler windows for SRF cavities

High power RF couplers connect transmission lines to cavities, providing power used to accelerate particle beam • Coupler also provides vacuum barrier for beam vacuum via RF windows • RF windows experience breakdown at much lower voltages than comparable insulators in DC fields • For large voltages, electron emission from “triple junction” and multipacting lead to window failure due to arching and/or thermal runaway.

43 PARTICLE ACCELERATORS↗

Overview of the First Five Refurbished CEBAF Cryomodules

The Thomas Jefferson National Accelerator Facility is currently engaged in a cryomodule refurbishment project known as the C50 project. The goal of this project is robust 6 GeV, 5 pass operation of the Continuous Electron Beam Accelerator Facility (CEBAF). The scope of the project includes removing, refurbishing and replacing ten CEBAF cryomodules at a rate of three per year. Refurbishment includes reprocessing of SRF cavities to eliminate field emission and increase the nominal gradient from the original 5 MV/m to 12.5 MV/m. New "dogleg" couplers between the cavity and helium vessel flanges will intercept secondary electrons that produce arcing at the 2 K ceramic window in the fundamental Power Coupler (FPC). Modifications of the external Q (Qext) of the FPC will allow higher gradient operations. Other changes include new ceramic RF windows for the air to vacuum interface of the FPC and improvements to the mechanical tuner. Any damaged or worn components will be replaced as well. Currently, five refurbished cryomodules have been installed in CEBAF and are currently operational. This paper will summarize the test results and current operational experience.

Drury, Michael↗

Design studies of the output system of a 95 GHz, 100 kW, CW gyrotron

This paper presents the design studies of the output system of a 95 GHz, 100 kW, CW gyrotron for ECRH7ECRIS applications. During this course, the design studies of an advanced dimpled-wall quasi optical launcher, non-linear taper and RF window will be carried out. (author)

43 PARTICLE ACCELERATORS↗

Design and development of a 6 MW peak, 24 kW average power S-band klystron

A 6 MW peak, 24 kW average power S-band Klystron is under development at CEERI, Pilani under an MoU between BARC and CEERI. The design of the klystron has been completed. The electron gun has been designed using TRAK and MAGIC codes. RF cavities have been designed using HFSS and CST Microwave Studio while the complete beam wave interaction simulation has been done using MAGIC code. The thermal design of collector and RF window has been done using ANSYS code. A Gun Collector Test Module (GCTM) was developed before making actual klystron to validate gun perveance and thermal design of collector. A high voltage solid state pulsed modulator has been installed for performance valuation of the tube. The paper will cover the design aspects of the tube and experimental test results of GCTM and klystron. (author)

43 PARTICLE ACCELERATORS↗

Summary Report for the C50 Cryomodule Project

The Thomas Jefferson National Accelerator Facility has recently completed the C50 cryomodule refurbishment project. The goal of this project was to enable robust 6 GeV, 5 pass operation of the Continuous Electron Beam Accelerator Facility (CEBAF). The scope of the project included removal, refurbishment and reinstallation of ten CEBAF cryomodules at a rate of three per year. The refurbishment process included reprocessing of SRF cavities to eliminate field emission and to increase the nominal gradient from the original 5 MV/m to 12.5 MV/m. New 'dogleg' couplers were installed between the cavity and helium vessel flanges to intercept secondary electrons that produce arcing in the fundamental Power Coupler (FPC). Other changes included new ceramic RF windows for the air to vacuum interface of the FPC and improvements to the mechanical tuner. Damaged or worn components were replaced as well. All ten of the refurbished cryomodules are now installed in CEBAF and are currently operational. This paper will summarize the performance of the cryomodules.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Microwave induced plasma discharge in multi-cell superconducting radio-frequency cavity

A R&D effort for in situ cleaning of 1.5 GHz Superconducting Radio Frequency (SRF) cavities at room temperature using the plasma processing technique has been initiated at Jefferson Lab. This is a step toward the cleaning of cryomodules installed in the Continuous Electron Beam Accelerator Facility (CEBAF). For this purpose, we have developed an understanding of plasma discharge in a 5-cell CEBAF-type SRF cavity having configurations similar to those in the main accelerator. The focus of this study involves the detailed investigations of developing a plasma discharge inside the cavity volume and avoids the breakdown condition in the vicinity of the ceramic RF window. A plasma discharge of the gas mixture Ar–O{sub 2} (90%:10%) can be established inside the cavity volume by the excitation of a resonant 4π/5 TM{sub 010}-mode driven by a klystron. The absence of any external magnetic field for generating the plasma is suitable for cleaning cavities installed in a complex cryomodule assembly. The procedures developed in these experimental investigations can be applied to any complex cavity structure. Details of these experimental measurements and the observations are discussed in the paper.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Study on spatial distribution of plasma parameters in a magnetized inductively coupled plasma

Spatial distributions of various plasma parameters such as plasma density, electron temperature, and radical density in an inductively coupled plasma (ICP) and a magnetized inductively coupled plasma (M-ICP) were investigated and compared. Electron temperature in between the rf window and the substrate holder of M-ICP was higher than that of ICP, whereas the one just above the substrate holder of M-ICP was similar to that of ICP when a weak (<8 G) magnetic field was employed. As a result, radical densities in M-ICP were higher than those in ICP and the etch rate of oxide in M-ICP was faster than that in ICP without severe electron charging in 90 nm high aspect ratio contact hole etch.

36 MATERIALS SCIENCE↗

Status of the Perpendicular Biased 2nd Harmonic Cavity for the Fermilab Booster

This is a status report on the 2nd harmonic cavity for the Fermilab Booster as part of the Proton Improvement Plan (PIP) for increasing beam transmission efficiency, and thus reducing losses. A set of tuner rings has been procured and is undergoing quality control tests. The Y567 tube for driving the cavity has been successfully tested at both injection and extraction frequencies. A cooling scheme for the tuner and cavity has been developed after a thorough thermal analysis of the system. RF windows have been procured and substantial progress has been made on the mechanical designs of the cavity and the bias solenoid. Finally, the goal is to have a prototype cavity ready for testing by the end of 2017.

42 ENGINEERING↗

Electron Activity (Secondary Electron & Field Emission ) Suppression by Magnetic Field Placed on the Surface of Metals And Dielectric [Slides]

Secondary electron emission happens when the surface is exposed to an oscillating electromagnetic field. It has extremely dangerous effect when resonance condition of this oscillating field and higher SEY conditions are met. The dependence of the secondary electron on primary electron energy is shown in the figure. This multiplication effect on the number of electrons in oscillating electromagnetic field is called multipacting. The problem with multipacting exist in many scientific fields like LHC, ISS, ITER involving particle accelerator, space science and fusion research. In high intensity proton rings this multiplies electron get trapped inside the potential created by proton beam called electron cloud. In High power microwave sources, rf couplers and rf window to couple the power also hugely affected by multipacting.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

High power coupler development for EIC

The synchrotron radiation loss in EIC Electron Storage Ring is as high as up to 10 MW. This energy loss will be compensated by 17 2K 591 MHz single-cell SRF cavities with a combined total of 34 high power fundamental power couplers. Each power coupler will operate 92% of revolution time CW and ~8% of revolution time with 400 kW forward power due to the beam abort gap. To satisfy the EIC needs, we developed two 500 kW standing-wave FPC designs at BNL based on either a BeO and an Al 2 O 3 RF window. This paper will briefly summarize test results of the BeO window FPC , and describe the design development of the Al 2 O 3 window based FPC.

43 PARTICLE ACCELERATORS↗

SRF R&D

Temperature mapping -- Process development -- Large grain niobium -- RF windows -- High-current -- Structures -- SRF photo-injectors

Source record↗