Search NASA⌕ Search

SEARCH · Search NASA

Results for “RFQ”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Charge per Micro-Pulse Calculation for Ideal Lujan and WNR beams

A complete redesign of the LANSCE front-end is currently under development for the Los Alamos Modernization Project (LAMP). This includes the replacement of the traditional Cockroft-Walton injection system to the newer radiofrequency quadrupole (RFQ) standard. LANSCE accelerates both H- and H+ beams and therefore requires an unconventional application for RFQ systems. A new facility could consider using an independent RFQ for each beam species. However, with the tight space of the LANSCE injector facility, it would prove difficult to instrument. Our initial studies have shown that a single RFQ could be used. The negatively- and positively-charged direct current (DC) beams are shaped, bunched, and accelerated out of phase to each other, with very little interaction. This would work for all possible H+ beam gates and most H- Beam gates. However, a challenge arises with the Weapons Neutron Research (WNR) beam structure that requires the acceleration of bunched beams at higher charge density per pulse. The Long Bunch Enable Gate (LBEG) used for the Lujan center is the best example of a standard injector beam gate. The beam gate, or Macro-Pulse (MP), is 625-us long, separated by at least 8.3 ms. A chopper is used to dice the MP into 1750 mini-Pulses (mP), which are 290-ns wide. After chopping, the MP contains 100,000 micro-Pulses (uP), which are generated by the linac acceleration structure modulated at 201.25 MHz; that is, the micro-Pulses are separated 5 ns apart from each other. The H+ beam structure will be very similar once a chopper is added to its transport. However, the Multi-Pulse Enable Gate (MPEG) used for WNR is significantly different in structure. In this case, the mP is chopped to be only 35-ns wide. This width is then rotated into a single 201.25 MHz RF bucket using the Low Frequency Buncher (LFB). This is proving difficult for the RFQ design in the LAMP upgrade. We began investigating the amount of current sent to WNR for two reasons. Firstly, we wanted to find a solution to avoid using the Low Frequency Buncher to simplify the LAMP RFQ design. It is simple to inject and accelerate a 35 mA DC beam in the LAMP RFQ (this is done in numerous accelerator facilities). However, injecting a short bunch with a larger current (once compressed to 5 ns to meet the RFQ frequency) may be difficult. Second, we have a technique called PSR2WNR in which we do not employ the Low Frequency Buncher, but rather accumulate 5 LBEG uP (5 ns) in the PSR and deliver the accumulated beam to WNR every 1.8 us. As a result, we could provide to WNR with five accumulated LBEG uPs every shot. The goal here is to create a rapid kicker with a frequency response of 555 kHz. DARHT-II and other accelerator facilities have constructed kickers of this type for other uses, and our engineers consider this technology as feasible.

43 PARTICLE ACCELERATORS↗

Design and fabrication of a four-rod radio frequency quadrupole with a variable aperture

Radiofrequency quadrupole (RFQ) linear accelerators with variable aperture cell parameters offer an effective means of accelerating high-intensity ion beams exceeding 100 mA and have been implemented in various RFQ designs. However, in a four-rod RFQ, the use of dielectric perturbation methods to measure the voltage distribution behind the rod electrodes is not applicable when implementing variable aperture geometries, because changes in the rod shape influence the electric field at the location of the perturbation element. Therefore, it was necessary to design the rod profile for each cell such that the electric field distribution behind the rods remains unaffected by changes in the aperture. In this study, we present a method to adjust the voltage distribution by modifying the geometry of the rod electrodes according to each cell's aperture parameters. This design approach enables the integration of variable aperture cells into a four-rod RFQ linac, significantly enhancing the achievable beam current. To ensure uniform capacitance and maintain a constant rod-electrode voltage despite variations in the average aperture radius, we developed a systematic method for shaping the rod electrodes. This method was refined using two-dimensional (2D) and three-dimensional (3D) electromagnetic field simulations to optimize the electrode cross-sectional profiles. The fabricated rod electrodes were then installed in a four-rod RFQ, and the electric field distribution was measured using the perturbation method and tuned by adjusting the base plates. As a result, the measured variation of ±1.1 % confirms that this design methodology can produce a sufficiently uniform voltage distribution for high-current beam acceleration. These results demonstrate the practical feasibility of a variable-aperture four-rod RFQ linac.

43 PARTICLE ACCELERATORS↗

Neutron generator based on intense lithium beam driver

We are proposing a compact neutron generator based on a Li beam driver. The proposed neutron generator comprises a laser ion source, a radio-frequency quadrupole linear accelerator (RFQ linac), a drift tube linac, and a target containing protons. In the generator, the lithium ion is used as a projectile instead of protons to utilize the kinematic focusing technique. The technique enables us to enhance the neutron flux without increasing the beam energy, which is important to develop a clean compact neutron generator. Moreover, the combination of a laser ion source and a RFQ linac with the direct plasma injection scheme will provide several tens of mA of a fully ionized lithium beam, which is much higher than that of conventional heavy ion sources comparable with proton drivers. Neutrons are generated by the nuclear reaction of the lithium ions and protons in the beam target. In this paper, we reported the current status of the development. For RFQ, we designed the RFQ rods to accelerate 40 mA of 7Li3+. We fabricated and installed the rods into a cavity, and, as a first test, accelerated 10 mA of C6+ successfully.

Ikeda, Shunsuke (ORCID:0000000339800577)↗

Installation and commissioning of the ion source systems for the new spallation neutron source 2.5 MeV injector

The U.S. Spallation Neutron Source (SNS) is a state-of-the-art neutron scattering facility delivering the world’s most intense pulsed neutron beams to a wide array of instruments, which are used to conduct investigations in many fields of engineering, physics, chemistry, material science, and biology. Neutrons are produced by spallation of liquid Hg by the bombardment of short (∼1 µs), intense (∼35 A) pulses of protons delivered at 60 Hz by an accumulator ring which is fed by a high-intensity, 1 GeV, H− LINAC (linear accelerator). This facility has operated nearly continuously since 2006 but has recently undergone a 4-month maintenance period, which featured a complete replacement of the 2.5 MeV injector feeding the LINAC. The new injector was developed at ORNL in an off-line beam test facility and consists of an ion source, low energy beam transport, and a Radio Frequency Quadrupole (RFQ). This report first describes the installed configuration of the new injector detailing the ion source system. The first beam current, RFQ transmission, emittance, and energy measurements from the injector installed on the SNS are reported. These data not only show a significant performance improvement for our existing facility but will also make accessible the higher beam current requirements for future SNS upgrade projects: the proton power upgrade and second target station.

Welton, R. F.↗

Recent performance of the SNS H - ion source with a record long run

The Spallation Neutron Source (SNS) accelerator system includes a 65 keV H - injector, a 2.5 MeV radio frequency quadrupole (RFQ), a 1 GeV linac chain (DTL-CCL-SCL) and an accumulator ring. The H - injector consists of an RF-driven, Cs-enhanced, multi-cusp H - ion source and a compact, two-lens electrostatic low energy beam transport (LEBT). In 2018, a new RFQ was installed in place of the original RFQ along with upgraded ion source support infrastructure. This paper presents the operational performance and some highlights of beam studies with the SNS ion source since the new RFQ was put into operation. SNS routinely operates at 1.4 MW average beam power for three run cycles per year. During the most recently finished run, FY20B, we operated a single source for the entire run spanning ~4 months with a >99.5% availability. A single dose of cesiation was conducted during the ion source startup which yielded ≥54 mA current for the entire run with just few minor adjustments of parameters.

Han, Baoxi↗

LAMP Technical Readiness Evaluation Report

An internal preliminary evaluation of Critical Technology Elements (CTEs) for the LANSCE Modernization Project (LAMP) was completed in 2023. This included determining corresponding Technical Readiness Levels (TRLs) for all subsystems using the criteria of DOE G 413.3-4A, Technical Readiness Assessment Guide. This revised report includes a summary of the recent design modifications required to meet the project Key Performance Requirements (KPPs), some of which may reduce technical risk to the project. These recent design modifications include: • Further optimization of the low-energy and medium-energy beam transport regions (LEBT and MEBT, respectively), including relocation of various functional elements (ie choppers, kickers, and bunchers). • An additional H - ion source to separate ion-source function based on beam delivery requirements. • A high-repetition-rate pulsed kicker magnet to select/merge the two H ion beams into a common low-energy beam transport. • Modification and further optimization to a more conventional RFQ design. Performance of the RFQ has been optimized to deliver the required three types of beams while meeting the project KPPs. • The addition of a second chopper in the medium-energy beam transport (MEBT) line to reduce the required pulser voltages. The scope of the evaluation was limited to the project Work Breakdown Structure (WBS) elements as defined for the RFQ Injector and Drift Tube Linac (DTL) systems only. Integration of Instrumentation and Controls (I&C) and Safety Systems was not considered, although specific technologies as related to the RFQ and DTL systems were included. Other elements of the project such as Shielding, System Design, Technical Management, and additional facility integration needed to enable off-line testing and pre-installation commissioning were also not evaluated. Each technical subsystem element was evaluated for technical readiness, however, not all were found to meet the criteria for a CTE. Three subsystem elements were determined to meet the CTE criteria. Their associated TRLs are summarized in the table below. These subsystem elements of the project have the lowest technical readiness due to either being new, novel or modified, requiring additional R&D before being capable of meeting the project Key Performance Parameters (KPPs) and subsystem requirements, or present technology exists but has not yet been demonstrated in a relevant environment. All other subsystems were determined to have a TRL of 8, indicating that actual operating systems exist having similar performance requirements as needed for LAMP. Details of the technical readiness evaluation for each subsystem is given in the following sections of this report.

43 PARTICLE ACCELERATORS↗

Nozzle geometry optimization for high-current aluminum ion beam acceleration via direct plasma injection scheme

We report the generation of a record aluminum ion beam current exceeding 58 mA at the Al 11+ charge state, accelerated to an energy of 5.5 MeV using the direct plasma injection scheme, which integrates a laser ion source (LIS) with a radio frequency quadrupole (RFQ) accelerator. The effect of nozzle geometry on beam extraction was systematically investigated using 8 and 12 mm tapered designs and an 18 mm cylindrical configuration. The 18 mm nozzle achieved the highest Al 11+ beam current, while the 12 mm aperture provided a favorable balance between beam intensity and current density. Beam extraction simulations confirmed effective RFQ matching across multiple charge states, and solenoidal field tuning further enhanced plasma collimation. This work not only establishes a new benchmark for high-current ion beam generation but also provides a fundamental understanding of plasma–beam interface dynamics crucial for the next generation of high-intensity particle accelerators, particularly those employing LIS-RFQ systems.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Extraction of ion beam from laser ion source for direct plasma injection scheme

Laser ion sources are expected to be used in various applications of heavy ion beam technology. The plasma direct injection scheme (DPIS) is a method in which ion beams extracted from a laser ion source are directly injected into a radio frequency quadrupole (RFQ) linear accelerator. In this study, a new shape of the plasma electrode with a concave surface for the DPIS was proposed to inject a converging beam to a cavity of RFQ accelerator. This approach allows the use of a large-diameter extraction electrode, which is not limited by the aperture of the RFQ electrode rods. The DPIS, using the concave surface electrode, was employed to accelerate C 6+ ion beams. The results indicated that both the beam current and the number of ions increased nearly twice with the proposed electrode shape compared to values obtained with the conventional electrode. This enhancement corresponded to the increased extraction area of the beam.

43 PARTICLE ACCELERATORS↗

Measurements at peak operational beam current in the SNS beam test facility

Work at the SNS beam test facility has focused on high dimensional and high dynamic range measurements of the medium energy (2.5 Mev) beam distribution. This is motivated by the need to understand and predict beam losses down to one-part-per-million. The initial demonstration of full-and-direct 6D phase space measurement was done at a current of 40 mA transported through the RFQ. Since that demonstration, more detailed studies have been performed at lower transported currents (in the range 30 mA and below). This is due to a hardware change - recent runs utilize the original SNS RFQ, which after a decade of service in the SNS achieves transmission significantly below design (50-60%, vs >80%). A short run in 2023 with a newly-commissioned RFQ enables maximum transmission. Preliminary results from beam distribution measurements during this run are discussed.

Ruisard, Kiersten↗

Energy and transverse acceptance calculation of the 750 keV RFQTS with Parmteqm

Using the code Parmteq and a model of the 750 keV test stand RFQ produced by Kress, labeled ‘as11c’, I calculate the effect on RFQ beam transmission in the following cases: 1. Varying input energy spread, 2. Transverse mismatch of the input beam, 3. Varying input emittance of matched beam, and 4. Injection offset of beam centroid. For this model, the RFQ transmission is 96.3%, input energy 35 keV, and beam current 35 mA.

43 PARTICLE ACCELERATORS↗

Performance of the Fermilab Linac Injector

The Fermilab Linac injection line consists of a 35 keV magnetron-type H- ion source, two-solenoid Low Energy Beam Transport (LEBT), 201 MHz 4-rod 750 keV Radio Frequency Quadrupole (RFQ), and a Medium Energy Transport (MEBT) containing 4 quadrupoles and a bunching cavity. The injector delivers 25 mA, 48 s pulses to drift-tube Linac at a repetition rate of 15Hz. The transmission efficiency has been lower than expected since commissioning. Recent beam current measurements suggest that the beam is primarily lost upstream of the RFQ exit. Numerical simulations indicate that ions passing through the non-linear field region of the solenoids could produce a beam with an increased emittance resulting in up to 50 % of the LEBT beam current failing to meet the RFQ acceptance. An aperture restriction was installed upstream of the first solenoid to remove these ions. This report describes the results of measurements and simulations as well as the LEBT tuning.

Jones, Daniel C.↗

Record of Decision: MEBT Energy Change

The LAMP Conceptual Design (LCD), as described in the LAMP Conceptual Design Report incorporates a radiofrequency quadrupole (RFQ) with an output beam energy of 3.0-MeV; the medium energy beam transport line (MEBT) transports beam from the end of the RFQ into the first LAMP drift tube linac (DTL) tank. The MEBT contains components, such as rebunchers and beam choppers, designed for the specific output energy of the RFQ, and the DTL tank is designed to accept this beam energy.

43 PARTICLE ACCELERATORS↗

Record of Decision: LEBT Energy Change

The LAMP Conceptual Design (LCD), as described in the LAMP Conceptual Design Report incorporates multiple 100-keV low-energy beam transport (LEBT) lines between the ion sources and the radiofrequency quadrupole (RFQ). The LEBT lines transport H + and H - beams from their respective ion sources to the RFQ entrance, and provide the required manipulations (focusing, steering, chopping, etc.) to the ion beams to prepare them for injection into the RFQ and further acceleration.

43 PARTICLE ACCELERATORS↗

Performance of the Fermilab Linac Injector

The Fermilab Linac injection line consists of a 35 keV magnetron-type H- ion source, two-solenoid Low Energy Beam Transport (LEBT), 201 MHz 4-rod 750 keV Radio Frequency Quadrupole (RFQ), and a Medium Energy Transport (MEBT) containing 4 quadrupoles and a bunching cavity. The injector delivers 25 mA, 48 s pulses to drift-tube Linac at a repetition rate of 15Hz. The transmission efficiency has been lower than expected since commissioning. Recent beam current measurements suggest that the beam is primarily lost upstream of the RFQ exit. Numerical simulations indicate that ions passing through the non-linear field region of the solenoids could produce a beam with an increased emittance resulting in up to 50 % of the LEBT beam current failing to meet the RFQ acceptance. An aperture restriction was installed upstream of the first solenoid to remove these ions. This report describes the results of measurements and simulations as well as the LEBT tuning.

Jones, Daniel C.↗

Performance of the Fermilab Linac Injector

The Fermilab Linac injection line consists of a 35 keV magnetron-type H\textsuperscript{-} ion source, two-solenoid Low Energy Beam Transport (LEBT), 201 MHz 4-rod 750 keV Radio Frequency Quadrupole (RFQ), and a Medium Energy Transport (MEBT) containing 4 quadrupoles and a bunching cavity. The injector delivers 25 mA, 48 µs pulses to the drift-tube Linac at a repetition rate of 15Hz. The transmission efficiency of the injector has been lower than expected since commissioning. Recent beam current measurements suggest that the beam is primarily lost upstream of the RFQ exit. Numerical simulations indicate that ions passing through the non-linear field region of the solenoids could produce a beam with an increased emittance resulting in up to 50\% of the LEBT beam current failing to meet the RFQ acceptance. An aperture restriction was installed upstream of the first solenoid to remove these ions. This report describes the results of measurements and simulations as well as the LEBT tuning.

43 PARTICLE ACCELERATORS↗

On-line installation of the Superallowed Transition Beta-Neutrino Decay Ion Coincidence Trap

The Cabibbo-Kobayashi-Maskawa quark mixing matrix currently does not satisfy unitarity at the 2σ-level. This could be the result of an inaccurate value of one or both of its largest matrix elements V us and V ud . In the case of V ud , the most precise measurement is obtained from the f t -value measurements of superallowed beta-transitions between 0 + states. The accuracy of this determination can, in turn, be tested by extracting V ud in other transitions including superallowed transitions between mirror nuclei. The Superallowed Transition Beta-Neutrino Decay Ion Coincidence Trap (St. Benedict) is currently under construction at the Nuclear Science Laboratory of the University of Notre Dame to perform such a determination, with the goal of shedding more light on this tension with unitarity. St. Benedict will take a radioactive ion beam produced by TwinSol , thermalize it in a large volume gas catcher, then transport it in two separate differentially-pumped volumes using a radio-frequency (RF) carpet and a radio-frequency quadrupole (RFQ) ion guide before injecting it in an RFQ trap to create cool ion bunches for injection in the measurement Paul trap. In this paper, we detail the installation of the beam preparation components of St. Benedict, and present the results of the first RIBs successfully stopped and extracted from its gas catcher.

Brodeur, M.↗

First on-line commissioning experiments at the St. Benedict facility

Nuclear beta decays provide an excellent probe of fundamental symmetries due to their mediation by the weak interaction. In particular, precise measurements of these decays provide constraints on the unitarity of the Cabbibo-Kobayashi-Maskawa (CKM) quark-mixing matrix. While superallowed pure Fermi decays currently set the most precise limits, the alternative suite of superallowed mixed mirror decays has been ill-studied. These nuclei can provide an important consistency check of calculation and measurement methods employed for the pure Fermi decays, more critically needed now in the wake of a 2.4σ deviation from unitarity of the CKM matrix. In order to remedy the gap in data for mirror decays, the Superallowed Transition Beta-Neutrino Decay Ion Coincidence Trap (St. Benedict) facility is being commissioned at the University of Notre Dame’s Nuclear Science Laboratory (NSL). In this paper, we present first results of the commissioning of the St. Benedict facility on-line at the TwinSol radioactive beam facility. The results of initial commissioning experiments involving the St. Benedict gas catcher, RF carpet, RFQ ion guide and RFQ cooler-buncher will be presented.

beta decay↗

LAMP Technical Readiness Evaluation Report (Rev. 1)

An internal preliminary evaluation of Critical Technology Elements (CTEs) for the LANSCE Modernization Project (LAMP) was completed. Corresponding Technical Readiness Levels (TRLs) were also determined for all subsystems using the criteria of DOE G 413.3-4A, Technical Readiness Assessment Guide. The scope of the evaluation was limited to the project Work Breakdown Structure (WBS) elements as defined for the RFQ Injector and Drift Tube Linac (DTL) systems only. Integration of Instrumentation and Controls (I&C) and Safety Systems was not considered, although specific technologies as related to the RFQ and DTL systems were included. Other elements of the project such as Shielding, System Design, Technical Management, and additional facility integration needed to enable off-line testing and pre-installation commissioning were also not evaluated. Each technical subsystem element was evaluated for technical readiness, however, not all were found to meet the criteria for a CTE. Only two subsystem elements were determined to meet the CTE criteria. Their associated TRLs are summarized in the table below. These subsystem elements of the project have the lowest technical readiness due to either being new, novel or modified, requiring additional R&D before being capable of meeting the project Key Performance Parameters (KPPs) and subsystem requirements, or present technology exists but has not yet been demonstrated in a relevant environment. All other subsystems were determined to have a TRL of 8, indicating that actual operating systems exist having similar performance requirements as needed for LAMP. Details of the technical readiness evaluation for each subsystem is given in the following sections of this report.

43 PARTICLE ACCELERATORS↗