Search NASA⌕ Search

SEARCH · Search NASA

Results for “RISK ASSESSMENT”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Updated Filter Leak Frequencies for Use in Risk Assessments

Quantitative risk assessment (QRA) is highly dependent on data, leading to more robust models as new and updated data is acquired. The Hydrogen Plus Other Alternative Fuels Risk Assessment (HyRAM+) QRA capabilities include calculations of individual risk from leaks in a gaseous hydrogen facility due to the potential effects of jet fires and explosions. Leak frequencies are acquired through statistical analysis of published data from a variety of sources and industries. The filter leak frequencies in previous versions of the HyRAM+ software are substantially greater than the leak frequencies of other components, leading to QRA results for gaseous hydrogen in which filters consistently dominate the overall risk. Data that were previously used to derive the filter leak frequencies were reevaluated for applicability and additional data points were added to update the filter leak frequencies. The new frequencies are more comparable to leak frequencies for other components.

08 HYDROGEN↗

Macromolecular Expression and Function: A New Paradigm for NASA Risk Assessment

Predicting risks in humans of either acute effects such as bone loss or muscle wasting, or late effects such as cancer, is challenging. To an approximation, this is because uncertainties of exposure to stress factors or toxic agents and the uniformity of processing subsequent damage at the cellular level within a complex set of biological variables degrade the confidence of predicting pathologic outcome. A cellular biodosimeter that simultaneously reports 1) the type of damage due to that exposure, 2) the quantity of damage incurred by that exposure, and 3) the dataset used to assess risk of developing pathologic outcome caused by that exposure would therefore be useful for predicting ultimate risks faced by an individual, such as an astronaut. It is suggested that such a biodosimeter can be based upon analyses of gene-expression and protein expression whereby large datasets of cellular response to damage are obtained and analyzed for expression-profiles correlated with established end points and molecular markers predictive for risks being assessed. The usefulness of multiparametric cellular biodosimeters could be realized by quantitatively profiling these datasets using techniques of bioinformatics. Such an approach contributes to the foundation of molecular epidemiology as a new scientific discipline, and represents a new paradigm of risk assessment.

Richmond, Robert↗

Schedule Risk Assessment

Schedule Risk Assessment needs to determine the probability of finishing on or before a given point in time. Task in a schedule should reflect the "most likely" duration for each task. IN reality, each task is different and has a varying degree of probability of finishing within or after the duration specified. Schedule risk assessment attempt to quantify these probabilities by assigning values to each task. Bridges the gap between CPM scheduling and the project's need to know the likelihood of "when".

Smith, Greg↗

Architecture for Integrated Medical Model Dynamic Probabilistic Risk Assessment

Probabilistic Risk Assessment (PRA) is a modeling tool used to predict potential outcomes of a complex system based on a statistical understanding of many initiating events. Utilizing a Monte Carlo method, thousands of instances of the model are considered and outcomes are collected. PRA is considered static, utilizing probabilities alone to calculate outcomes. Dynamic Probabilistic Risk Assessment (dPRA) is an advanced concept where modeling predicts the outcomes of a complex system based not only on the probabilities of many initiating events, but also on a progression of dependencies brought about by progressing down a time line. Events are placed in a single time line, adding each event to a queue, as managed by a planner. Progression down the time line is guided by rules, as managed by a scheduler. The recently developed Integrated Medical Model (IMM) summarizes astronaut health as governed by the probabilities of medical events and mitigation strategies. Managing the software architecture process provides a systematic means of creating, documenting, and communicating a software design early in the development process. The software architecture process begins with establishing requirements and the design is then derived from the requirements.

Probability Theory↗

Decision Support Tool for Risk Assessment & Maneuver Planning in Collision Avoidance

As the quantity of orbital debris continues to grow, so too does the rate of conjunction messages that suggest possible collisions between high value payloads and debris. The abundance of these conjunction messages, and eventual misses, has led to a culture of ignored alerts, and an increase in satellite operation costs as a result of the frequent need to plan resources for maneuver planning and execution. The loss of “trust” in conjunction alerts is due to the poorly characterized evolution in probability of collision (Pc) as time approaches the time of closest approach (TCA) between two objects, as well as the interpretation of Pc in the context of maneuver planning. To address these problems, and in collaboration with the NASA Conjunction Assessment Risk Analysis (CARA) program, the Industrial Sciences Group has developed a novel Maneuver Decision Support System (MDSS) to assist satellite operations in conjunction assessment and Maneuver planning. It provides a meaningful and intuitive Urgency metric for actionable maneuver decisions, based on the physical dynamics of conjunctions. It is based on a forecast of the evolution of Pc over time and represents an advance over current methods that are in use for satellite conjunction monitoring and planning. The result is to give satellite operators a validated decision support systems to plan for maneuver execution or mitigation or monitoring up to 3 days before TCA.

Decision Support Tool↗

Trial Implementation of a Multihazard Risk Assessment Framework for High-Impact Low-Frequency Power Grid Events

The Pacific Northwest National Laboratory developed a risk framework for modeling high-impact, low-frequency power grid events to support risk-informed decisions. In this research article, we briefly recap the framework and demonstrate its implementation for seismic and geomagnetic hazards using a benchmark reliability test system. We describe integration of a collection of models implemented to perform hazard analysis, fragility evaluation, consequence estimation and post-event restoration. We demonstrate the value of the framework as a multi-hazard power grid risk assessment and management tool. The research will benefit transmission planners and emergency planners by improving their ability to maintain a resilient grid infrastructure against impacts from major events.

power grid, risk assessment, seismic hazard, dynam↗

Peak Pc Prediction in Conjunction Analysis: Conjunction Assessment Risk Analysis

Satellite conjunction risk typically evaluated through the probability of collision (Pc). Considers both conjunction geometry and uncertainties in both state estimates. Conjunction events initially discovered through Joint Space Operations Center (JSpOC) screenings, usually seven days before Time of Closest Approach (TCA). However, JSpOC continues to track objects and issue conjunction updates. Changes in state estimate and reduced propagation time cause Pc to change as event develops. These changes a combination of potentially predictable development and unpredictable changes in state estimate covariance. Operationally useful datum: the peak Pc. If it can reasonably be inferred that the peak Pc value has passed, then risk assessment can be conducted against this peak value. If this value is below remediation level, then event intensity can be relaxed. Can the peak Pc location be reasonably predicted?

Operations↗

Silent Aircraft Initiative Concept Risk Assessment

A risk assessment of the Silent Aircraft Initiative's SAX-40 concept design for extremely low noise has been performed. A NASA team developed a list of 27 risk items, and evaluated the level of risk for each item in terms of the likelihood that the risk would occur and the consequences of the occurrence. The following risk items were identified as high risk, meaning that the combination of likelihood and consequence put them into the top one-fourth of the risk matrix: structures and weight prediction; boundary-layer ingestion (BLI) and inlet design; variable-area exhaust and thrust vectoring; displaced-threshold and continuous descent approach (CDA) operational concepts; cost; human factors; and overall noise performance. Several advanced-technology baseline concepts were created to serve as a basis for comparison to the SAX-40 concept. These comparisons indicate that the SAX-40 would have significantly greater research, development, test, and engineering (RDT&E) and production costs than a conventional aircraft with similar technology levels. Therefore, the cost of obtaining the extremely low noise capability that has been estimated for the SAX-40 is significant. The SAX-40 concept design proved successful in focusing attention toward low noise technologies and in raising public awareness of the issue.

Nickol, Craig L.↗

Schedule Risk Assessment

Schedule Risk Assessment (SRA) determines the probability of finishing on or before a given point in time. This viewgraph presentation introduces the prerequisites, probability distribution curves, special conditions, calculations, and results analysis for SRA.

Smith, Grego↗

Risk-Assessment Computer Program

RISK D/C is prototype computer program assisting in attempts to do program risk modeling for Space Exploration Initiative (SEI) architectures proposed in Synthesis Group Report. Risk assessment performed with respect to risk events, probabilities, and severities of potential results. Enables ranking, with respect to effectiveness, of risk-mitigation strategies proposed for exploration program architecture. Allows for fact that risk assessment in early phases of planning subjective. Although specific to SEI in present form, also used as software framework for development of risk-assessment programs for other specific uses. Developed for Macintosh(TM) series computer. Requires HyperCard(TM) 2.0 or later, as well as 2 Mb of random-access memory and System 6.0.8 or later.

Dias, William C.↗

Application of Risk Assessment Tools in the Continuous Risk Management (CRM) Process

Marshall Space Flight Center (MSFC) of the National Aeronautics and Space Administration (NASA) is currently implementing the Continuous Risk Management (CRM) Program developed by the Carnegie Mellon University and recommended by NASA as the Risk Management (RM) implementation approach. The four most frequently used risk assessment tools in the center are: (a) Failure Modes and Effects Analysis (FMEA), Hazard Analysis (HA), Fault Tree Analysis (FTA), and Probabilistic Risk Analysis (PRA). There are some guidelines for selecting the type of risk assessment tools during the project formulation phase of a project, but there is not enough guidance as to how to apply these tools in the Continuous Risk Management process (CRM). But the ways the safety and risk assessment tools are used make a significant difference in the effectiveness in the risk management function. Decisions regarding, what events are to be included in the analysis, to what level of details should the analysis be continued, make significant difference in the effectiveness of risk management program. Tools of risk analysis also depends on the phase of a project e.g. at the initial phase of a project, when not much data are available on hardware, standard FMEA cannot be applied; instead a functional FMEA may be appropriate. This study attempted to provide some directives to alleviate the difficulty in applying FTA, PRA, and FMEA in the CRM process. Hazard Analysis was not included in the scope of the study due to the short duration of the summer research project.

Paul S. Ray↗

Reliability and Probabilistic Risk Assessment - How They Play Together

PRA methodology is one of the probabilistic analysis methods that NASA brought from the nuclear industry to assess the risk of LOM, LOV and LOC for launch vehicles. PRA is a system scenario based risk assessment that uses a combination of fault trees, event trees, event sequence diagrams, and probability and statistical data to analyze the risk of a system, a process, or an activity. It is a process designed to answer three basic questions: What can go wrong? How likely is it? What is the severity of the degradation? Since 1986, NASA, along with industry partners, has conducted a number of PRA studies to predict the overall launch vehicles risks. Planning Research Corporation conducted the first of these studies in 1988. In 1995, Science Applications International Corporation (SAIC) conducted a comprehensive PRA study. In July 1996, NASA conducted a two-year study (October 1996 - September 1998) to develop a model that provided the overall Space Shuttle risk and estimates of risk changes due to proposed Space Shuttle upgrades. After the Columbia accident, NASA conducted a PRA on the Shuttle External Tank (ET) foam. This study was the most focused and extensive risk assessment that NASA has conducted in recent years. It used a dynamic, physics-based, integrated system analysis approach to understand the integrated system risk due to ET foam loss in flight. Most recently, a PRA for Ares I launch vehicle has been performed in support of the Constellation program. Reliability, on the other hand, addresses the loss of functions. In a broader sense, reliability engineering is a discipline that involves the application of engineering principles to the design and processing of products, both hardware and software, for meeting product reliability requirements or goals. It is a very broad design-support discipline. It has important interfaces with many other engineering disciplines. Reliability as a figure of merit (i.e. the metric) is the probability that an item will perform its intended function(s) for a specified mission profile. In general, the reliability metric can be calculated through the analyses using reliability demonstration and reliability prediction methodologies. Reliability analysis is very critical for understanding component failure mechanisms and in identifying reliability critical design and process drivers. The following sections discuss the PRA process and reliability engineering in detail and provide an application where reliability analysis and PRA were jointly used in a complementary manner to support a Space Shuttle flight risk assessment.

Safie, Fayssal M.↗

Aggregate Exposure Pathways in Support of Risk Assessment

Over time, risk assessment has shifted from establishing relationships between exposure to a single chemical and a resulting adverse health outcome, to evaluation of multiple chemicals and disease outcomes simultaneously. As a result, there is an increasing need to better understand the complex mechanisms that influence risk of chemical and non-chemical stressors, beginning at their source and ending at a biological endpoint relevant to human or ecosystem health risk assessment. Just as the Adverse Outcome Pathway (AOP) framework has emerged as a means of providing insight into mechanism-based toxicity, the exposure science community has seen the recent introduction of the Aggregate Exposure Pathway (AEP) framework. AEPs aid in making exposure data applicable to the FAIR (i.e., findable, accessible, interoperable, and reusable) principle, especially by (1) organizing continuous flow of disjointed exposure information;(2) identifying data gaps, to focus resources on acquiring the most relevant data; (3) optimizing use and repurposing of existing exposure data; and (4) facilitating interoperability among predictive models. Herein, we discuss integration of the AOP and AEP frameworks and how such integration can improve confidence in both traditional and cumulative risk assessment approaches.

63 RADIATION, THERMAL, AND OTHER ENVIRON. POLLUTAN↗