Search NASA⌕ Search

SEARCH · Search NASA

Results for “Regulatory Framework Modernization”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Risk Analysis of Various Design Architectures for High Safety-significant Safety-related Digital Instrumentation and Control Systems of Nuclear Power Plants during Accident Scenarios

This report documents the plus-up activities performed by Idaho National Laboratory (INL) during Fiscal Year (FY) 2022 for the U.S. Department of Energy (DOE) Light Water Reactor Sustainability (LWRS) Program, Risk Informed Systems Analysis (RISA) Pathway, digital instrumentation and control (DI&C) risk assessment project. In FY 2019, the RISA Pathway initiated a project to develop a risk assessment strategy for delivering a strong technical basis to support effective, licensable, and secure DI&C technologies for digital upgrades/designs. An integrated risk assessment technology for the DI&C systems was proposed for this strategy, which aims to (1) provide a best-estimate, risk-informed capability to quantitatively and accurately estimate the safety margin obtained from plant modernization, especially for the high safety-significant safety-related (HSSSR) DI&C systems, (2) support and supplement existing advanced risk-informed DI&C design guides by providing quantitative risk information and evidence, (3) offer a capability of design architecture evaluation of various DI&C systems to support system design decisions and diversity and redundancy applications, (4) assure the long-term safety and reliability of HSSSR DI&C systems, and (5) reduce uncertainty in costs and support integration of DI&C systems in the plant. To achieve these technical goals and deal with the expensive licensing justifications from regulatory insights, the LWRS-developed framework instructs nuclear vendors and utilities on how to effectively lower the costs associated with digital compliance and speed industry advances by: (1) defining an integrated risk-informed analysis process for DI&C upgrade, including hazard analysis, reliability analysis, and consequence analysis, (2) applying systematic and risk-informed tools to address common cause failures (CCFs) and quantify corresponding failure probabilities for DI&C technologies, particularly software CCFs, (3) evaluating the impact of digital failures at the component level, system level, and plant level, and (4) providing insights and suggestions on designs to manage the risks, thus to support the development, licensing, and deployment of advanced DI&C technologies on nuclear power plant (NPPs). Adding diversity within system or components is the main means to eliminate and mitigate CCFs, but diversity also increases plant complexity and errors and may not address all sources of systematic failures. How to optimize the diversity and redundancy applications for the safety-critical DI&C systems remains a challenge. To deal with the technical issues in addressing potential software CCFs in HSSSR DI&C systems of NPPs and supporting relevant design optimization, the framework provides: ? An integrated best-estimate, risk-informed capability to address new technical digital issues quantitatively, accurately, and efficiently in plan modernization progress, such as software CCFs in HSSSR DI&C systems of NPPs ? A common and a modularized platform for DI&C designers, software developers, cybersecurity analysts, and plant engineers to efficiently predict and prevent risk in the early design stage of DI&C systems ? Technical bases and risk-informed insights to assist U.S. Nuclear Regulatory Commission (NRC) and industry to address and fulfill the risk-informed alternatives for evaluation of CCFs in HSSSR DI&C systems of NPPs ? An integrated risk-informed tool that offers a capability of design architecture evaluation of various DI&C systems to support system design decisions in diversity and redundancy applications. The plus-up research and development efforts of this project in FY 2022 are focused on methodology improvement of software CCF modeling and estimation, prevention analysis, importance analysis and risk analysis of various design architectures of HSSSR DI&C systems. This work greatly enhances the capability of the LWRS-developed framework for the risk assessment and design optimization of safety-critical DI&C systems. It should be noted that all the analyses are performed for the demonstration of the LWRS-developed framework, not for the evaluation of relevant systems. Results are obtained based on very limited design information and testing data.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Velo: A Knowledge Management Framework for Modeling and Simulation

Modern scientific enterprises are inherently knowledge-intensive. Scientific studies in domains such as geosciences, climate, and biology require the acquisition and manipulation of large amounts of experimental and field data to create inputs for large-scale computational simulations. The results of these simulations are then analyzed, leading to refinements of inputs and models and additional simulations. The results of this process must be managed and archived to provide justifications for regulatory decisions and publications that are based on the models. In this paper we introduce our Velo framework that is designed as a reusable, domain independent knowledge management infrastructure for modeling and simulation. Velo leverages, integrates and extends open source collaborative and content management technologies to create a scalable and flexible core platform that can be tailored to specific scientific domains. We describe the architecture of Velo for managing and associating the various types of data that are used and created in modeling and simulation projects, as well as the framework for integrating domain-specific tools. To demonstrate realizations of Velo, we describe examples from two deployed sites for carbon sequestration and climate modeling. These provide concrete example of the inherent extensibility and utility of our approach.

99 GENERAL AND MISCELLANEOUS↗

A safety and licensing roadmap to identify the research and development gaps of commercial molten salt reactors

Molten salt reactors (MSRs) both inherently and through good design possess highly desirable safety attributes. Successful commercial deployment of MSRs is heavily dependent on establishing their safety characteristics in a well-coordinated licensing requirements program. The approach outlined is based on adapting the MSR licensing process to the current LWR–based NRC process that exists today, which has been the traditional approach used by new technologies such as the Pebble Bed Reactor licensing application, the Clinch River Breeder Reactor licensing application, and more recently the NuScale licensing application. NRC has recognized some of the unique passively safe aspects of advanced non-LWR reactors and has introduced an advanced reactor strategic plan which will address policy issues that need to be addressed to accommodate advanced reactor concepts within the existing regulatory framework. Examples of some of these policy issues are the use of functional containment, the use of mechanistic source terms, and more reliance on performance-based and risk-informed regulatory processes, such as the Licensing Modernization Project, which emphasizes the use of risk-informed processes to select licensing basis events, safety categorization of SSC, and well-defined defense-in-depth systems. Applying performance-based, risk-informed regulatory processes is, consequently, vital to substantially decreasing the cost, time, and uncertainty of commercial MSR reactor licensing while providing for the health and safety of the public and protecting the environment. This document is intended to provide a roadmap for the MSR licensing and safety activities necessary to provide a success path to commercialization.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

SAS4A/SASSYS-1 Commercial Grade Dedication Example Report for a Generic Sodium Pool-Type Fast Reactor Application

In the U.S., a key component of the commercialization of advanced reactors is completion of a license application, which must ultimately be approved by the Nuclear Regulatory Commission (NRC). The approval of the license application by the NRC is contingent on satisfactory demonstration of the design basis and the response of the advanced reactor design to transient and accident scenarios using accepted codes and methods. This report describes the qualification and dedication requirements that the advanced reactor safety analysis system software SAS4A/SASSYS-1 are expected to need to fulfill to be used for sodium-cooled pool-type fast reactor licensing. The qualification and dedication requirements are identified through performance critical characteristics and evaluation model acceptance criteria representative of the advanced reactor design considered for licensing. This document captures, additionally, the verification process developed to demonstrate that the software fulfills the qualification and dedication requirements for a generic sodium-cooled pool-type fast reactor as part of the commercial grade dedication process. Like most software that has primarily existed in the research and development space, the most significant challenge facing SAS4A/SASSYS-1 for use in a licensing framework is the availability of a documentation basis describing the code pedigree. SAS4A/SASSYS-1 has been used for licensing of the fast flux test facility (FFTF) and the JOYO sodium-cooled fast reactor in Japan, as well as the design of the CRBR Plant. However, the historical verification and validation (V&V) activities supporting SAS4A/SASSYS-1 development do not align with modern software quality assurance (SQA) and V&V requirements. Two approaches to use of SAS4A/SASSYS-1 in a commercial licensing framework have been identified: commercial-grade dedication (CGD) and software qualification. The methods and requirements prescribed in the ASME NQA-1-2008/2009 Standard and Regulatory Guide 1.203 on the evaluation model development and assessment process (EMDAP) have been used as guidance to define the CGD and qualification processes, respectively. A qualification and dedication requirements matrix has been developed which utilizes fundamental software verification. In this process, software verification is defined as a software quality process aimed at defining software requirement specifications, developing software design documentation, and performing and documenting acceptance testing of the code against requirements. A key element of software qualification and dedication includes determination of software acceptance with respect to critical characteristics relevant to the functional requirements of the software. To assist with identification of cross-cutting transient phenomena and functional requirements, domestic SFR vendor designs have been reviewed to identify a reference SFR design. For this report, the reference design is defined as a pool-type reactor with metal alloy fuel, a liquid-metal intermediate heat transport system, and passive decay heat rejection systems. Given this reference, a series of high-level cross-cutting phenomena was identified for a general class of single-fault undercooling or reactivity insertion transients that scopes the design basis space, with the goal of assisting with prioritization of documentation development efforts for key transient models in SAS: 1) Reactivity feedback response prior to scram; 2) System-wide thermal inertia; 3) Transition in natural circulation flow regime in heat removal systems; 4) Decay heat generation; 5) Steady-state fuel characterization; 5) Clad/fuel behavior at elevated temperatures; 6) Point kinetics and decay heat; 7) Pump coastdown behavior; 8) Core flow redistribution in loss of forced convection; 9) Pool stratification. As a demonstration of CGD of SAS4A/SASSYS-1 for a sodium pool reactor, a software qualification and dedication gap analysis as it relates to code documentation has been performed. This effort leverages the framework established as part of the SAS4A/SASSYS-1 SQA Program. This CGD demonstration provides a framework that vendors can build upon to demonstrate the applicability of the SAS4A/SASSYS-1 software for licensing a sodium-cooled pool-type fast reactor.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

EARLY-STAGE DESIGN AND EVALUATION FOR NUCLEAR POWER PLANT CONTROL ROOM UPGRADES

As control rooms are modernized with new digital systems at nuclear power plants, it is necessary to evaluate operator performance with these systems as part of a verification and validation process. While there is regulatory and industry guidance for some modernization activities, there are no well defined standard processes or predefined metrics available for assessing what is satisfactory operator interaction with new systems, especially during the early design stages. This paper proposes a framework defining the design process and metrics for evaluating human system interfaces as part of control room modernization. The process and metrics are generalizable to other applications and serve as a guiding template for utilities undertaking their own control room modernization activities.

99 GENERAL AND MISCELLANEOUS↗

ACCELERATED DEPLOYMENT OF NOVEL MATERIALS BASED ON RELIABILITY INTEGRITY MANAGEMENT USING CUMULATIVE DAMAGE MODELING

There is currently no widely agreed, detailed general method for licensing a novel plant incorporating novel materials (or materials being deployed in novel environments); in many such situations, there are no directly applicable engineering code cases for decision-makers (including regulators) to rely on. This paper discusses a framework for solving this problem that is based on the Reliability and Integrity Management (RIM) approach delineated in ASME BPVC Section XI Division 2. NRC Regulatory Guide 1.246, Rev. 0, endorses, with conditions, the subject portion of the 2019 ASME Code. The proposed framework is meant to support development of a licensing case by addressing certain remaining technical challenges. The framework discussed here is compatible with the Licensing Modernization Project, but applying it in a specific case will call for advances in the state of practice, if not the state of the art. The RIM approach calls for applicants to (a) allocate reliability targets to plant structures, systems, and components (SSCs), (b) show that they are able to relate the currently observed physical condition of each SSC in the program to its failure probability well enough to determine whether the target reliability allocations are being satisfied, allowing for uncertainty related to the novelty of the materials/designs/operating environments, and (c) be able to demonstrate that the proposed program of surveillances will reliably detect unacceptable degradation of an SSC before SSC failure occurs. A modeling approach potentially applicable to item (b), based on cumulative damage modeling rather than failure rates, is briefly illustrated.

22 - GENERAL STUDIES OF NUCLEAR REACTORS↗

Development of a Theoretical Monitoring System Design for a HLW Repository Based on the 'MoDeRn Monitoring Workflow' (A Case Study) - 12044

In this paper, a generic German disposal concept in rock salt is used as an example to discuss the design of a repository monitoring system. The approach used is based on a generic structured approach to monitoring - the MoDeRn Monitoring Workflow - which is being developed and tested as part of an on-going European Commission Seventh Framework project. As a first step in the study, the requirements on the monitoring program were identified through consideration of the national context, including regulatory guidelines, host rock properties and waste to be disposed of. These are stated as general monitoring objectives. An analysis of the German safety concept for safe confinement of the radioactive waste allows these general objectives to be converted into specific sub-objectives, and for the sub-objectives to be related to specific monitoring processes and parameters. The safety concept identified the key safety components, each of them having specific associated safety functions. The safety functions can be related to the list of features, events and processes (FEPs) that contains all processes related to the future repository evolution. By screening the FEP list, all processes that potentially can affect the safety functions have been identified. In a next step the parameters that would be affected by the individual processes were determined, leading to a preliminary list of parameters to be monitored. By evaluating available techniques and monitoring equipment, this preliminary list was investigated with respect to its technical feasibility at the intended locations. Prior to final system selection, potential impacts of the monitoring system on safety or other measurements are evaluated. To avoid potential pathways for fluids that may compromise the integrity of a barrier, considerations on the application of wireless data transmission systems and techniques for autonomous, long-term power supply were given. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Assessment of coated cladding impact on large-break LOCA with TRACE-DAKOTA

Since 2011, the U.S. Department of Energy has launched new research and development (R&D) programs for developing new accident tolerant fuels (ATFs). These new fuel concepts are expected to bring several advancements in terms of plant safety. However, development, licensing, as well as deployment of ATF require a substantial investment among fuel vendors, operating utilities, and regulatory authorities. For ATF to be economically feasible, credited safety benefits may be necessary to provide an economic incentive for transition of nuclear power plants from Zr/UO2-based fuel technologies to ATFs. As a result, it is essential to evaluate the economic viability of ATF by conducting a comprehensive safety benefits study informed by R&D and demonstration studies. In the present work, based on the best estimate plus uncertainty methodology, sensitivity analysis and uncertainty quantification for key safety quantities under LB-LOCA are performed for the Peach Bottom boiling water reactor (BWR) with GE14 nuclear fuel design adopting the ATF concepts. A coupled TRACE-DAKOTA analysis framework is adopted to perform the uncertainty quantification. Based on the computational results and obtained statistics, the coping time increase, fuel performance improvement as well as the most dominating phenomena during the accident for Cr-coated cladding are investigated in detail. Overall, the results obtained are useful for subsequent plant PRA study and support a move to more modernized performance-based regulatory requirements to realize plant economic benefits.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Combining biotechnology with sustainability: feasibility of bioenergy sorghum in generating high-value bioproducts

Biofuels generated through fermentation of plant-derived lignocellulosic biomass are currently not competitive with fossil fuels. Here, a framework is described for the engineering of valuable coproducts to improve the economic feasibility of biofuel production. To accomplish this goal, the desirable traits of the bioenergy crop Sorghum bicolor are harnessed via modern engineering approaches. A robust analysis is provided to highlight the scientific basis, costs, regulatory challenges, and lucrative nature of coproduct development. Sustainable biofuel production could also have far-reaching societal impacts, especially in the context of our rapidly changing global climate. This perspective suggests that the path to profitable biofuel production is attainable and encourages consideration of similar approaches by the biotechnology industry.

09 BIOMASS FUELS↗

Repository performance confirmation.

Repository performance confirmation links the technical bases of repository science and societal acceptance. This paper explores the myriad aspects of what has been labeled performance confirmation in U.S. programs, which involves monitoring as a collection of distinct activities combining technical and social significance in radioactive waste management. This paper is divided into four parts: (1) A distinction is drawn between performance confirmation monitoring and other testing and monitoring objectives; (2) A case study illustrates confirmation activities integrated within a long-term testing and monitoring strategy for Yucca Mountain; (3) A case study reviews compliance monitoring developed and implemented for the Waste Isolation Pilot Plant; and (4) An approach for developing, evaluating and implementing the next generation of performance confirmation monitoring is presented. International interest in repository monitoring is exhibited by the European Commission Seventh Framework Programme 'Monitoring Developments for Safe Repository Operation and Staged Closure' (MoDeRn) Project. The MoDeRn partners are considering the role of monitoring in a phased approach to the geological disposal of radioactive waste. As repository plans advance in different countries, the need to consider monitoring strategies within a controlled framework has become more apparent. The MoDeRn project pulls together technical and societal experts to assimilate a common understanding of a process that could be followed to develop a monitoring program. A fundamental consideration is the differentiation of confirmation monitoring from the many other testing and monitoring activities. Recently, the license application for Yucca Mountain provided a case study including a technical process for meeting regulatory requirements to confirm repository performance as well as considerations related to the preservation of retrievability. The performance confirmation plan developed as part of the Yucca Mountain license application identified a broad suite of monitoring activities. A revision of the plan was expected to winnow the number of activities down to a manageable size. As a result, an objective process for the next stage of performance confirmation planning was developed as an integral part of an overarching long-term testing and monitoring strategy. The Waste Isolation Pilot Plant compliance monitoring program at once reflects its importance to stakeholders while demonstrating adequate understanding of relevant monitoring parameters. The compliance criteria were stated by regulation and are currently monitored as part of the regulatory rule for disposal. At the outset, the screening practice and parameter selection were not predicated on a direct or indirect correlation to system performance metrics, as was the case for Yucca Mountain. Later on, correlation to performance was established, and the Waste Isolation Pilot Plant continues to monitor ten parameters originally identified in the compliance certification documentation. The monitoring program has proven to be effective for the technical intentions and societal or public assurance. The experience with performance confirmation in the license application process for Yucca Mountain helped identify an objective, quantitative methodology for this purpose. Revision of the existing plan would be based on findings of the total system performance assessment. Identification and prioritization of confirmation activities would then derive from performance metrics associated with performance assessment. Given the understanding of repository performance confirmation, as reviewed in this paper, it is evident that the performance confirmation program for the Yucca Mountain project could be readily re-engaged if licensing activities resumed.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Virtual Power Plants: Pilots, Challenges, and Innovations Shaping Future Development

Virtual Power Plants (VPPs) aggregate distributed energy resources (DERs) to provide grid services traditionally delivered by centralized power plants. This article reviews the current state of VPP deployment, highlighting business models, compensation mechanisms, and global pilot projects. While VPPs offer benefits such as grid flexibility, resilience, and cost savings, challenges remain in communication infrastructure, regulatory frameworks, market access, and customer engagement. To address these, we propose a scalable, privacy-preserving hierarchical VPP architecture that coordinates with distribution utilities and preserves customer data. We also present the Integrated T&D Control Room of the Future as a key test bed for validating and accelerating VPP adoption. These innovations can help transition VPPs from pilot programs to integral components of a modern, reliable power grid.

24 POWER TRANSMISSION AND DISTRIBUTION↗

The Importance of Experience Based Decommissioning Planning - 16242

Decommissioning of a nuclear facility is an extensive and multidisciplinary task which involves the management and technical actions associated with ceasing operation and thereafter the step by step transfer of the facility from an operating plant to an object under decommissioning. The decommissioning phase includes dismantling of systems and components, decontamination and clearance, demolition of buildings, remediation of any contaminated ground and finally a survey of the site. Several of these activities generate radioactive or potentially radioactive waste which has to be managed properly prior to clearance or disposal. What makes decommissioning of nuclear installations unique is to a large extent the radioactive waste management. No other industries have that complex regulatory frameworks for waste management. If a decommissioning project in the nuclear industry does not consider the waste aspects to the extent required, there is a large risk of failure causing a reduced trust by the regulators and other stakeholders as well as cost and schedule overruns. This paper will give an overview of important aspects and findings gathered during decades of planning and conducting decommissioning and nuclear facility modernization projects. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development of a Fleet-Level Human Factors Engineering Program to Support the Digital Modernization of Multiple Turbine Control Systems

A number of years ago, Duke Energy and the United States (U.S.) Department of Energy (DOE) entered into a collaboration to support Duke’s digital upgrade activities for the main control rooms at three of their commercial nuclear power stations. The collaboration specifically focused on the human factors engineering (HFE) aspects of Duke’s plans to upgrade the legacy turbine control systems (TCS) at their Brunswick, Robinson, and Harris plants. This TSC upgrade involved installing a common digital control system (DCS), or distributed instrumentation and control (I&C) system platform, which multiple digital plant control systems can be integrated onto as the control rooms are modernized over time. Given the breadth and depth of the scope of this upgrade, DOE researchers at Idaho National Laboratory (INL) with expertise in human factors collaborated with Duke throughout the entire HFE life cycle to help ensure the upgrade was performed in a manner consistent with regulatory human factors review criteria, such as the U.S. Nuclear Regulatory Commission’s (NRC) Human Factors Engineering Program Review Model (NUREG 0711, 2012). This paper describes the HFE researchers performed through the early and middle phases of these TCS upgrades. Specific HFE activities include: 1) the development of a human factors program management plan, 2) performing an operational experience review, 3) evaluating the design human system interface while it was still in the early stages of development, and 4) developing a framework to help map these HFE activities to NUREG-0711 to help understand and catalog the value of different types and phases of human performance data collection. These four HFE activities are described in more detail below.

99 GENERAL AND MISCELLANEOUS↗

Advanced Seismic Probabilistic Risk Assessment Methodology: Development of Beta 1.0 MASTODON Toolset

Design of nuclear power plant (NPP) facilities to resist natural hazards has been a part of the regulatory process from the beginning of the NPP industry in the United States, but has evolved substantially over time. The original set of approaches and methods was entirely deterministic in nature and focused on a traditional engineering margins-based approach. However, over time probabilistic and risk-informed approaches were also developed and implemented in US Nuclear Regulatory Commission guidance and regulation. A defense-in-depth framework has also been incorporated into US regulatory guidance over time. As a result, today, the US regulatory framework incorporates deterministic and probabilistic approaches for a range of different applications and for a range of natural hazard considerations. Although the US regulatory framework has continued to evolve over time, the tools, methods and data available to the US nuclear industry to meet the changing requirements have not kept pace. Notably, there is room for improvement in the tools and methods available for external event probabilistic risk assessment (PRA), which is the principal assessment approach used in risk-informed regulations and risk-informed decision-making applied to natural hazard assessment and design. Development of a new set of tools and methods that incorporate current knowledge, modern best practice, and state-of-the-art computational resources would lead to more reliable assessment of facility risk and risk insights (e.g., the plant elements and accident sequences that are most risk-significant), with less uncertainty and reduced conservatisms. Development of the next generation tools and methods for external events PRA is ongoing under the Risk Informed Safety Margins Characterization (RISMC) technical pathway. The RISMC toolkit development centers on integration of the tools and methods under a common framework, MOOSE. These tools and methods make use of existing and newly developed tools and methods, coupled with the experience and data gained in the past decades, to define and analyze more realistic risk assessment models. Specific focus in this report is on the capability to model seismic risk using advanced SPRA methods. Over the last year, significant capability has been added to Mastodon to simulate 3-D wave passage effects through nonlinear soil. Verification has demonstrated the capability of Mastodon to model wave passage effects in 1-D, 2-D, and 3-D. Methods have been developed to incorporate probabilistic floor response capabilities. Additional capability will be added to Mastodon over the next year to implement a robust gapping and sliding element for cyclic shaking, web-based verification and user manuals, stochastic finite elements, and frequency independent damping. Verification of added capabilities has occured in parallel with code writing activities.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Smart Inverters, Dumb Risk: Taking Control of IBR Security in the Digital Age

This presentation addresses the security challenges posed by Inverter-Based Resources (IBRs) in the modern energy landscape. The presentation highlights the vulnerabilities and risks associated with IBRs, including the potential for cyber-attacks, the impact of insecure defaults, and the systemic risks posed by supply chain dependencies. Key topics covered include: 1) The increasing digital transformation in energy systems and the associated security risks. 2) Specific vulnerabilities in IBRs, including weak passwords, hardcoded credentials, and insecure web application interfaces. 3) The implications of persistent connectivity and the strategic risks posed by foreign-manufactured components. 4) The role of regulatory frameworks, such as NERC CIP, in addressing these challenges and the limitations of current oversight. 5) Practical solutions for mitigating risks, including secure design practices, vendor risk assessments, and the importance of strong passwords and role-based access control. The presentation underscores the necessity of a comprehensive, system-of-systems approach to securing IBRs, emphasizing the need for collaboration across various stakeholders, including operators, developers, and regulators, to ensure the resilience and security of the energy grid.

24 - POWER TRANSMISSION AND DISTRIBUTION↗

Velo: Riding the Knowledge Management Wave for Simulation and Modeling

Modern scientific enterprises are inherently knowledge-intensive. In general, scientific studies in domains such as geosciences, climate, and biology require the acquisition and manipulation of large amounts of experimental and field data in order to create inputs for large-scale computational simulations. The results of these simulations must then be analyzed, leading to refinements of inputs and models and further simulations. Further, these results must be managed and archived to provide justifications for publications and regulatory decisions that are based on these models. In this paper we describe our Velo framework that is designed as a reusable, domain independent knowledge management infrastructure for modeling and simulation. Velo leverages, integrates, and extends open source collaborative and content management technologies to create a scalable and flexible core platform that can be tailored to specific scientific domains. In this paper we describe the architecture of Velo for managing and associating the various types of data that are used and created in modeling and simulation projects, as well as the framework for integrating domain-specific tools. To demonstrate a realization of Velo, we describe the Geologic Sequestration Software Suite (GS3) that has been developed to support geologic sequestration modeling. This provides a concrete example of the inherent extensibility and utility of our approach.

99 GENERAL AND MISCELLANEOUS↗

Workshop Summary for Maintaining Innovation and Security in Biotechnology: Lessons Learned from Nuclear, Chemical, and Informational Technologies

In the fast-paced field of biotechnology where innovation has such far-reaching impacts on human health and the environment, dealing with the implications of possible illicit activities, accidents or unintended research consequences with potential detrimental societal impacts tends to remain in the background. While controls may be inevitable for the biotech industry, workshop attendees agreed that the way in which controls are implemented will play a major role in the agility and innovation of the biotechnology industry. There is little desire to slow down the pace of the gains while dealing with the security issues that arise. As was seen from the brief examinations of the Nuclear, Chemical, and Information Technology sectors explored in this workshop, establishing a regulatory regime needs to be a partnership between the public, corporate interests, scientists, and the government. Regulation is often written to combat perceived risk rather than actual risk—the public’s perceptions (occasionally even fictional portrayals) can spur regulatory efforts. This leads to the need for a thorough and continuing assessment of the risks posed by modern biotechnology. Inadequate or minimal risk assessment might expedite development in the short term but has potential negative long-term security and economic consequences. Industry and the technical community also often have a large role in setting regulatory policy, especially when well-crafted incentives are incorporated into the regulations. Such incentives might actually lead to enhanced innovation while poorly designed incentives can actually reduce safety and security. Any regulations should be as agile and flexible as the technology they regulate and when applied to biotechnologies they will need a new framework for thinking and implementing. The new framework should consider biotechnology as a technology and not simply a science since it is an extremely complex and adaptive system. This suggests the need to invest in social and political systems, rather than exclusively in technology, as a part of maintaining not only robust, but agile regulation. Modeling and simulations to illustrate how the biotech ecosystem might respond to new policies may be a promising approach to crafting regulations.

59 BASIC BIOLOGICAL SCIENCES↗

Securing Grid Communications Infrastructure: Addressing Gaps Beyond NERC CIP Facility Perimeters

The North American electric grid relies on a complex communications infrastructure that extends beyond facility perimeters traditionally covered by NERC Critical Infrastructure Protection (CIP) standards. While CIP requirements have significantly strengthened cybersecurity within Electronic Security Perimeters, many operational communications—such as those between control centers, substations, and third-party networks—fall outside current regulatory scope. As grid modernization introduces new technologies and connectivity models, these external pathways present evolving security challenges. This brief explores the nature of these challenges, including emerging attack vectors and supply chain considerations, and highlights how ongoing grid transformation increases exposure to sophisticated threats. It outlines practical strategies and policy options to complement existing standards, such as expanding secure communications practices, enhancing supply chain transparency, and fostering collaboration among federal, state, and industry stakeholders. Near-term actions like encryption, authentication, and contractual safeguards can help reduce risk while longer-term frameworks are developed to ensure resilient and secure grid operations.

24 - POWER TRANSMISSION AND DISTRIBUTION↗