Search NASA⌕ Search

SEARCH · Search NASA

Results for “Regulatory documents”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Space Propulsion Hazards Analysis Manual (SPHAM), volume 1

The Space Propulsion Hazards Analysis Manual (SPHAM) is a compilation of methods and data directed at hazards analysis and safety for space propulsion and associated vehicles, but broadly applicable to other environments and systems. Methods are described of compiling relevant regulatory documentation, deriving design requirements and specifications, modeling accident scenarios in formal risk assessments, and correlation real-time data to risk probability modeling. Also, SPHAM provides methods for predicting post-accident blast, fragmentation, thermal, and environmental damage. Included in the appendices are an exhaustive bibliography, hazardous properties information on selected space propulsion commodities, and system descriptions of various launch vehicles, upper stages, and spacecrafts.

Becker, Dorothy L.↗

Hypergolic Propellant Safety Course

Under the sponsorship of the NASA Safety Training Center at the Johnson Space Center, a hypergolic propellant safety course has been developed. This is a 2-day course on guidelines for hypergolic propellant system design, materials selection, operations, storage, and transportation. Recognizing that numerous fuels and oxidizers can be hypergolic, this course is specific to the hydrazine family of fuels and nitrogen tetroxide and its variants. The objectives of the course are to enable the student to identify and evaluate the hazards of hypergolic propellants, and to understand the methods for controlling those hazards and responding to emergencies. The course covers properties and hazards of the hydrazines and oxidizers; design and operations in hypergolic facilities; materials selection for use in hypergol systems; storage vessels, piping, and component considerations; hypergol detection; fire fighting practices; operating and transportation principles and procedures; and emergency practices and considerations. A hazards analysis methodology is presented. Numerous references are provided and the applicability of certain regulatory documents is discussed. A brief overview of other propellants, including hydrogen peroxide, is given at the end of the course.

Rathgeber, Kurt A.↗

Part IV: Remedial Action

This part of the book focuses on the remedial action where the remedy is selected and approved with associated regulatory documentation, detailed designs are prepared, and construction and/or implementation of the remedy is completed. The application may include remediation of environmental media (e.g., subsurface sediments or surface water sources), waste processing, and/or deactivation and decommissioning of historical facilities. Once a preferred remedy is implemented, the final steps include long-term stewardship and site closure (discussed in Part V). Refer to Section 3.2 of Chapter 1, Remediation Strategy for Complex Waste Sites, for context on how these steps fit into the broader remediation process.

Johnson, Christian D.↗

US Hydropower & Environmental Mitigations: A 1998-2023 inventory of mitigation measures inside licensing documents

Federal Energy Regulatory Commission (FERC) license documents mandate environmental mitigation requirements to reduce potential environmental damage caused by non-federal hydropower facilities. This StoryMap showcases a dataset that leveraged Natural Language Processing (NLP) to inventory environmental mitigations from 465 FERC licenses that were issued from 1998-2023 (Ruggles et al, 2025). Users can explore trends in mitigation requirements over time and space with interactive maps and are presented with a demonstration use case.

Ruggles, Thomas A. [Oak Ridge National Laboratory ↗

Complete Documentation of Applicable Regulations and Regulatory Authority for Transportation

This report fulfills the M4 milestone M4MR-20PN0303023, “Complete Documentation of Applicable Regulations and Regulatory Authority for Transportation. Microreactors are very small nuclear reactors with a power output of 20MWe or less and are designed to be factory-built, modular in nature, and highly portable. The objective of this report is to identify and document applicable regulations, the appropriate regulatory authority, and the associated framework for microreactor transport. Sections 2 and 3 of this report summarize U.S. Department of Transportation (DOT) and NRC regulations related to the transportation of Class 7 (radioactive) materials. These sections concentrate on the transport of fissile material packages and Type B packages, which would be most applicable to the transport of a microreactor before and after irradiation. Section 4 summarizes DOE hazardous and radioactive material transportation regulations. Section 5 summarizes U.S. Coast Guard regulations related to the transport of radioactive material. Section 6 discusses state requirements for the permitting of oversize and/or overweight truck shipments. Section 7 presents detailed schedules of requirements for transporting fissile material packages and Type B packages based on NRC and DOT regulations. The schedules are presented in a two-column format, the right column is the regulatory requirement and the left column is the citation of the regulation in which the requirement is found.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Estimated capital costs of fish exclusion technologies for hydropower facilities

Hydropower is a reliable source of renewable energy, and its future expansion is likely to be in the form of either smaller new stream development (NSD) projects or powering existing non-powered dams. Thresholds for entrainment risk to fish and the requirements for fish exclusion at hydropower facilities often differ depending on the species involved, the characteristics of the facility, and the goals of stakeholders, but little quantitative information is present within the literature regarding the specific costs of fish exclusion measures. Cost data associated with protection, mitigation, and enhancement (PM&E) measures related to positive barrier screening were identified using keyword searches of an existing environmental mitigation cost data set and manual extraction from regulatory licensing documents available in the Federal Energy Regulatory Commission (FERC) eLibrary. This approach yielded a total of 50 p.m.&E mitigation measures with estimated capital construction costs pertaining to positive barrier screens and represented <10% of the 171 total FERC project dockets available in the data set. These data were highly skewed toward conventional relicensing projects, as <7% were associated with NSD projects. Results indicate highly variable costs are associated with fish screening, with flow-normalized costs one to two orders of magnitude higher for screening with the highest exclusion capability (≤0.09 in. spacing) compared with coarser screening (1–2 in.). These data provide an initial baseline for estimating exclusion costs for hydropower development and may help developers consider options for more fish-friendly generation technologies, though gaps remain relating to a lack of data, particularly for NSD projects.

13 HYDRO ENERGY↗

Cost of Fish Exclusion and Passage Technologies for Hydropower

Hydropower represents a reliable source of renewable energy and accounts for approximately 7% of the total electrical generation in the United States. Future expansion of hydropower is likely to be in the form of either smaller new stream development projects or powering existing non-powered dams. For these new projects to be successful, careful analysis of risks, costs, and uncertainty to offset reduced power production as well as ensuring the protection and safe passage of migratory fish to gain public support, will be required. Exclusion and passage are two common approaches to protect fish from entrainment and impingement at hydropower facilities. The thresholds for entrainment risk and requirements for exclusion and passage often differ depending on the species involved, the characteristics of the facility, and the goals of stakeholders. While the costs associated with environmental mitigations represent a large proportion of the total costs required for the licensing of hydropower facilities, little quantitative information is present within the literature regarding the specific costs of fish exclusion and passage. Working with FOA awardee Natel Energy, scientists at Oak Ridge National Laboratory were tasked with assessing the capital construction costs for downstream fish exclusion and passage infrastructure. This report used keyword searches of an existing environmental mitigation cost data set and manual extraction of additional cost data associated with protection, mitigation, and enhancement (PM&E) measures related to positive barrier screening and passage from regulatory licensing documents available in the Federal Energy Regulatory Commission (FERC) eLibrary. This approach yielded a total of 50 PM&E mitigation measures with estimated capital construction costs pertaining to positive barrier screens, 142 pertaining to passage studies, and 26 pertaining to passage-related studies. PM&E measures associated with positive barrier screens represented <10% of the 171 total FERC project dockets available in the data set. These data were highly skewed toward conventional relicensing projects, as <7% were associated with new stream development (NSD) projects. Results from these data indicate highly variable costs associated with fish screening, with flow-normalized costs one to two orders of magnitude higher for screening with the highest exclusion capability (≤0.09 in. spacing) compared with coarser screening (1 to 2 in.). Furthermore, estimated capital costs of passage infrastructure were positively related to the scale of the project based on installed capacity for some, but not all, types of passage. These data provide an initial baseline for estimating exclusion and passage costs for hydropower development and may help developers consider options for more fish-friendly generation technologies, though gaps remain relating to a lack of data, particularly for NSD projects. More data may still be available within the FERC eLibrary, but significant effort will be required to manually identify and extract the data for future analyses.

13 HYDRO ENERGY↗

Scaling open-weight large language models for hydropower regulatory information extraction: A systematic analysis

Information extraction from regulatory and technical documents using large language models (LLMs) involves practical trade-offs between extraction quality and computational cost. We evaluate eight open-weight LLMs spanning 0.6B–70B parameters on hydropower licensing documents and report deployment-oriented evidence under a unified extraction schema and evaluation protocol. Across the model set, we observe clear scale-dependent trends in both baseline extraction quality and the effectiveness of reflective reasoning (self-checking) under our fixed-prompt, no-augmentation setting. Mid-scale models often provide a favorable balance of accuracy and efficiency, whereas the smallest models show limited or inconsistent gains from the reasoning variants tested. Larger models achieve the highest overall F1 scores but incur substantially greater compute and infrastructure requirements. We further find that reliability failure modes can distort conventional metrics in this domain: in particular, high recall can coincide with systematic extraction errors when models fabricate values for fields that are absent from the source text, underscoring the importance of conservative null handling and evidence-grounded evaluation. Overall, our study provides a reproducible resource–performance comparison for open-weight LLM-based extraction in hydropower regulatory documentation and offers practical guidance for model selection under different deployment constraints.

Evaluation protocol↗

Moving from scientific research to consenting guidance for MRE environmental risk

Potential environmental effects from tidal and wave devices are of concern to regulators, advisors, and other stakeholders in many nations. Monitoring results from early deployments and the first commercial arrays, coupled with targeted research studies, are providing a growing base of knowledge of how components of tidal turbines and wave energy converters might interact with marine animals and habitats. Efforts are underway to organize and direct these findings towards facilitating consenting that allays concerns and allows the marine renewable energy (MRE) industry to move forward. The OES-Environmental international initiative has developed scientific evidence bases for several key interactions from MRE devices, organized around stressors (portions of MRE systems that may cause injury or stress to the marine ecosystem), and receptors (the animals, habitats, and ecosystem processes that may be affected). This paper summarizes the evidence bases for four stressors (underwater noise, electromagnetic fields, habitat change, and changes in oceanographic systems) and presents the process of moving from the scientific knowledge into guidance documents to support the regulatory process. The guidance documents will serve as a broad guide that can be used internationally to look at stressor-receptor interactions of interest within a regulatory context. The evidence bases and guidance documents aim to assist MRE developers, regulators, and advisors with project scoping, consenting, and licensing processes.

Copping, Andrea E.↗

Human System Integration: Regulatory Analysis

This document was intended as an input to the Access 5 Policy Integrated Product team. Using a Human System Integration (HIS) perspective, a regulatory analyses of the FARS (specifically Part 91), the Airman s Information Manual (AIM) and the FAA Controllers Handbook (7110.65) was conducted as part of a front-end approach needed to derive HSI requirements for Unmanned Aircraft Systems (UAS) operations in the National Airspace System above FL430. The review of the above aviation reference materials yielded eighty-four functions determined to be necessary or highly desirable for flight within the Air Traffic Management System. They include categories for Flight, Communications, Navigation, Surveillance, and Hazard Avoidance.

Source record↗

A Deep Learning Based Framework to Identify Undocumented Orphaned Oil and Gas Wells from Historical Maps: A Case Study for California and Oklahoma

Undocumented Orphaned Wells (UOWs) are wells without an operator that have limited or no documentation with regulatory authorities. An estimated 310,000 to 800,000 UOWs exist in the United States (US), whose locations are largely unknown. These wells can potentially leak methane and other volatile organic compounds to the atmosphere, and contaminate groundwater. In this study, we developed a novel framework utilizing a state-of-the-art computer vision neural network model to identify the precise locations of potential UOWs. The U-Net model is trained to detect oil and gas well symbols in georeferenced historical topographic maps, and potential UOWs are identified as symbols that are further than 100 m from any documented well. A custom tool was developed to rapidly validate the potential UOW locations. We applied this framework to four counties in California and Oklahoma, leading to the discovery of 1301 potential UOWs across >40,000 km 2 . We confirmed the presence of 29 UOWs from satellite images and 15 UOWs from magnetic surveys in the field with a spatial accuracy on the order of 10 m. This framework can be scaled to identify potential UOWs across the US since the historical maps are available for the entire nation.

54 ENVIRONMENTAL SCIENCES↗

The dynamic nature of risk in DOE facilities in the surveillance and maintenance program–with observations for risk communications

Here, we explore three case studies of facilities at two US Department of Energy (DOE) former nuclear weapons research and production sites—the Oak Ridge National Laboratory and the Hanford site—whose risk profiles have changed during their long-term management under the DOE's surveillance and maintenance (S&M) program. These case studies provide examples of the challenges faced in communicating to external stakeholders, such as federal and state regulators, local communities surrounding the site, as well as the general public, the circumstances surrounding unexpected events or the emergence/discovery of new risk-important information at historically high-risk sites. We identify common topics of importance from these case studies and suggest a taxonomy for risk communicators to use in informing the dialogues with individuals and organizations that may not be technically oriented or fully informed on the subject matter. The taxonomy is based on technical insights from the quintessential definition of risk known as the Kaplan–Garrick “risk triplet” as well as insights from regulatory guidance documents on risk communication with external stakeholders originally developed for the commercial nuclear power industry.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Offshore Wind Electrical Safety Standards Harmonization (Workshop Proceedings)

Offshore wind (OSW) development activity is accelerating in the United States, with over 10 gigawatts (GW) of capacity likely to be installed on the Atlantic coast before 2030. In addition, states have committed to procure over 29 GW of offshore wind. Experienced European offshore wind energy developers are beginning to make large investments into offshore wind projects in American waters, and some U.S. developers have submitted key design documents for regulatory review. European offshore wind developers possess extensive experience in other geographic markets, which greatly increases confidence that the U.S. offshore wind industry will be successful. Nonetheless, existing U.S. electrical standards and European electrical standards are significantly different. If not addressed, these differences could potentially impact worker safety.

17 WIND ENERGY↗

Engaging the Regulatory Community to Aid Environmental Consenting/Permitting Processes for Marine Renewable Energy

Regulators involved in consenting/permitting marine renewable energy (MRE) have faced multiple challenges due to relatively new, unfamiliar technologies and uncertainty surrounding potential environmental impacts. This has resulted in slow progress for the MRE industry, including long consenting timeframes and extensive and expensive monitoring requirements, which increase financial risk for investors. OES-Environmental has surveyed regulators internationally to understand their key knowledge gaps and perspectives to support the development of the MRE industry. From the results of these surveys a data transferability process and a risk retirement pathway have been developed to assess consenting and monitoring requirements in proportion to risk. A tool for discovering existing data sets by using an online matrix has been developed, along with training materials, regulatory guidance documents, and a strategic outreach plan to engage regulators and advisers. his engagement and the application of these products should lead to a better understanding of the environmental effects of marine energy, and more efficient consenting processes.

16 TIDAL AND WAVE POWER↗

Environmental health trends

Trends in environmental health listed include: specific health concerns, sources of organic dusts causing pneumonitis, toxic substances lists, criteria documents, and regulatory developments.

Proctor, G.↗

NASA Hydrogen Peroxide Propellant Hazards Technical Manual

The Fire, Explosion, Compatibility and Safety Hazards of Hydrogen Peroxide NASA technical manual was developed at the NASA Johnson Space Center White Sands Test Facility. NASA Technical Memorandum TM-2004-213151 covers topics concerning high concentration hydrogen peroxide including fire and explosion hazards, material and fluid reactivity, materials selection information, personnel and environmental hazards, physical and chemical properties, analytical spectroscopy, specifications, analytical methods, and material compatibility data. A summary of hydrogen peroxide-related accidents, incidents, dose calls, mishaps and lessons learned is included. The manual draws from art extensive literature base and includes recent applicable regulatory compliance documentation. The manual may be obtained by United States government agencies from NASA Johnson Space Center and used as a reference source for hazards and safe handling of hydrogen peroxide.

Baker, David L.↗

Panel Session 26: Risk-Based Approaches to Environmental Remediation and Adaptive Site Management

This panel discussed the needs and importance of developing risk-based approaches to environmental remediation that will enable complex sites to be adaptively managed by applying cost-effective remedies that are protective of human health and the environment. The discussion emphasized risk-based approaches within decision processes and subsequent incorporation into regulatory decision documents. Remedy approaches, remediation exit strategies, and long-term monitoring plans that support risk-based end-states for difficult-to-remediate sites were discussed Panelists with presentations: Risk-Informed Approaches to Environmental Remediation and Adaptive Site Management (Vicky Freedman); ITRC Adaptive Site Management Perspective (Michael Truex); Optimization During Operations and Maintenance Phase at the Hanford Site 200-ZP-1 Groundwater Operable Unit (Emerald Laija, Kate Amrhein, Michael Truex); Adaptive Management: EPA Overview (Benjamin Simes); Decommissioning and Environmental Remediation Section Division of Nuclear Fuel Cycle and Waste Technology (Horst Monken Fernandes)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Addressing Regulatory Challenges to Tribal Solar Deployment

This project, Addressing Regulatory Challenges to Tribal Solar Deployment, seeks to unlock some of this potential by bringing Tribal, regulatory, utility, and other stakeholders together to articulate key barriers to Tribal solar adoption and develop replicable solutions. By increasing institutional capacity and developing frameworks, trainings, and a technical document repository for regulatory bodies, utilities, and Tribes, this project can help expand an emerging market.

14 SOLAR ENERGY↗