US Hydropower & Environmental Mitigations: A 1998-2023 inventory of mitigation measures inside licensing documents

Federal Energy Regulatory Commission (FERC) license documents mandate environmental mitigation requirements to reduce potential environmental damage caused by non-federal hydropower facilities. This StoryMap showcases a dataset that leveraged Natural Language Processing (NLP) to inventory environmental mitigations from 465 FERC licenses that were issued from 1998-2023 (Ruggles et al, 2025). Users can explore trends in mitigation requirements over time and space with interactive maps and are presented with a demonstration use case.

Ruggles, Thomas A. [Oak Ridge National Laboratory ↗

Complete Documentation of Applicable Regulations and Regulatory Authority for Transportation

This report fulfills the M4 milestone M4MR-20PN0303023, “Complete Documentation of Applicable Regulations and Regulatory Authority for Transportation. Microreactors are very small nuclear reactors with a power output of 20MWe or less and are designed to be factory-built, modular in nature, and highly portable. The objective of this report is to identify and document applicable regulations, the appropriate regulatory authority, and the associated framework for microreactor transport. Sections 2 and 3 of this report summarize U.S. Department of Transportation (DOT) and NRC regulations related to the transportation of Class 7 (radioactive) materials. These sections concentrate on the transport of fissile material packages and Type B packages, which would be most applicable to the transport of a microreactor before and after irradiation. Section 4 summarizes DOE hazardous and radioactive material transportation regulations. Section 5 summarizes U.S. Coast Guard regulations related to the transport of radioactive material. Section 6 discusses state requirements for the permitting of oversize and/or overweight truck shipments. Section 7 presents detailed schedules of requirements for transporting fissile material packages and Type B packages based on NRC and DOT regulations. The schedules are presented in a two-column format, the right column is the regulatory requirement and the left column is the citation of the regulation in which the requirement is found.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Estimated capital costs of fish exclusion technologies for hydropower facilities

Hydropower is a reliable source of renewable energy, and its future expansion is likely to be in the form of either smaller new stream development (NSD) projects or powering existing non-powered dams. Thresholds for entrainment risk to fish and the requirements for fish exclusion at hydropower facilities often differ depending on the species involved, the characteristics of the facility, and the goals of stakeholders, but little quantitative information is present within the literature regarding the specific costs of fish exclusion measures. Cost data associated with protection, mitigation, and enhancement (PM&E) measures related to positive barrier screening were identified using keyword searches of an existing environmental mitigation cost data set and manual extraction from regulatory licensing documents available in the Federal Energy Regulatory Commission (FERC) eLibrary. This approach yielded a total of 50 p.m.&E mitigation measures with estimated capital construction costs pertaining to positive barrier screens and represented <10% of the 171 total FERC project dockets available in the data set. These data were highly skewed toward conventional relicensing projects, as <7% were associated with NSD projects. Results indicate highly variable costs are associated with fish screening, with flow-normalized costs one to two orders of magnitude higher for screening with the highest exclusion capability (≤0.09 in. spacing) compared with coarser screening (1–2 in.). These data provide an initial baseline for estimating exclusion costs for hydropower development and may help developers consider options for more fish-friendly generation technologies, though gaps remain relating to a lack of data, particularly for NSD projects.

13 HYDRO ENERGY↗

Cost of Fish Exclusion and Passage Technologies for Hydropower

Hydropower represents a reliable source of renewable energy and accounts for approximately 7% of the total electrical generation in the United States. Future expansion of hydropower is likely to be in the form of either smaller new stream development projects or powering existing non-powered dams. For these new projects to be successful, careful analysis of risks, costs, and uncertainty to offset reduced power production as well as ensuring the protection and safe passage of migratory fish to gain public support, will be required. Exclusion and passage are two common approaches to protect fish from entrainment and impingement at hydropower facilities. The thresholds for entrainment risk and requirements for exclusion and passage often differ depending on the species involved, the characteristics of the facility, and the goals of stakeholders. While the costs associated with environmental mitigations represent a large proportion of the total costs required for the licensing of hydropower facilities, little quantitative information is present within the literature regarding the specific costs of fish exclusion and passage. Working with FOA awardee Natel Energy, scientists at Oak Ridge National Laboratory were tasked with assessing the capital construction costs for downstream fish exclusion and passage infrastructure. This report used keyword searches of an existing environmental mitigation cost data set and manual extraction of additional cost data associated with protection, mitigation, and enhancement (PM&E) measures related to positive barrier screening and passage from regulatory licensing documents available in the Federal Energy Regulatory Commission (FERC) eLibrary. This approach yielded a total of 50 PM&E mitigation measures with estimated capital construction costs pertaining to positive barrier screens, 142 pertaining to passage studies, and 26 pertaining to passage-related studies. PM&E measures associated with positive barrier screens represented <10% of the 171 total FERC project dockets available in the data set. These data were highly skewed toward conventional relicensing projects, as <7% were associated with new stream development (NSD) projects. Results from these data indicate highly variable costs associated with fish screening, with flow-normalized costs one to two orders of magnitude higher for screening with the highest exclusion capability (≤0.09 in. spacing) compared with coarser screening (1 to 2 in.). Furthermore, estimated capital costs of passage infrastructure were positively related to the scale of the project based on installed capacity for some, but not all, types of passage. These data provide an initial baseline for estimating exclusion and passage costs for hydropower development and may help developers consider options for more fish-friendly generation technologies, though gaps remain relating to a lack of data, particularly for NSD projects. More data may still be available within the FERC eLibrary, but significant effort will be required to manually identify and extract the data for future analyses.

13 HYDRO ENERGY↗

Scaling open-weight large language models for hydropower regulatory information extraction: A systematic analysis

Information extraction from regulatory and technical documents using large language models (LLMs) involves practical trade-offs between extraction quality and computational cost. We evaluate eight open-weight LLMs spanning 0.6B–70B parameters on hydropower licensing documents and report deployment-oriented evidence under a unified extraction schema and evaluation protocol. Across the model set, we observe clear scale-dependent trends in both baseline extraction quality and the effectiveness of reflective reasoning (self-checking) under our fixed-prompt, no-augmentation setting. Mid-scale models often provide a favorable balance of accuracy and efficiency, whereas the smallest models show limited or inconsistent gains from the reasoning variants tested. Larger models achieve the highest overall F1 scores but incur substantially greater compute and infrastructure requirements. We further find that reliability failure modes can distort conventional metrics in this domain: in particular, high recall can coincide with systematic extraction errors when models fabricate values for fields that are absent from the source text, underscoring the importance of conservative null handling and evidence-grounded evaluation. Overall, our study provides a reproducible resource–performance comparison for open-weight LLM-based extraction in hydropower regulatory documentation and offers practical guidance for model selection under different deployment constraints.

Evaluation protocol↗

Moving from scientific research to consenting guidance for MRE environmental risk

Potential environmental effects from tidal and wave devices are of concern to regulators, advisors, and other stakeholders in many nations. Monitoring results from early deployments and the first commercial arrays, coupled with targeted research studies, are providing a growing base of knowledge of how components of tidal turbines and wave energy converters might interact with marine animals and habitats. Efforts are underway to organize and direct these findings towards facilitating consenting that allays concerns and allows the marine renewable energy (MRE) industry to move forward. The OES-Environmental international initiative has developed scientific evidence bases for several key interactions from MRE devices, organized around stressors (portions of MRE systems that may cause injury or stress to the marine ecosystem), and receptors (the animals, habitats, and ecosystem processes that may be affected). This paper summarizes the evidence bases for four stressors (underwater noise, electromagnetic fields, habitat change, and changes in oceanographic systems) and presents the process of moving from the scientific knowledge into guidance documents to support the regulatory process. The guidance documents will serve as a broad guide that can be used internationally to look at stressor-receptor interactions of interest within a regulatory context. The evidence bases and guidance documents aim to assist MRE developers, regulators, and advisors with project scoping, consenting, and licensing processes.

Copping, Andrea E.↗

A Deep Learning Based Framework to Identify Undocumented Orphaned Oil and Gas Wells from Historical Maps: A Case Study for California and Oklahoma

Undocumented Orphaned Wells (UOWs) are wells without an operator that have limited or no documentation with regulatory authorities. An estimated 310,000 to 800,000 UOWs exist in the United States (US), whose locations are largely unknown. These wells can potentially leak methane and other volatile organic compounds to the atmosphere, and contaminate groundwater. In this study, we developed a novel framework utilizing a state-of-the-art computer vision neural network model to identify the precise locations of potential UOWs. The U-Net model is trained to detect oil and gas well symbols in georeferenced historical topographic maps, and potential UOWs are identified as symbols that are further than 100 m from any documented well. A custom tool was developed to rapidly validate the potential UOW locations. We applied this framework to four counties in California and Oklahoma, leading to the discovery of 1301 potential UOWs across >40,000 km 2 . We confirmed the presence of 29 UOWs from satellite images and 15 UOWs from magnetic surveys in the field with a spatial accuracy on the order of 10 m. This framework can be scaled to identify potential UOWs across the US since the historical maps are available for the entire nation.

54 ENVIRONMENTAL SCIENCES↗

The dynamic nature of risk in DOE facilities in the surveillance and maintenance program–with observations for risk communications

Here, we explore three case studies of facilities at two US Department of Energy (DOE) former nuclear weapons research and production sites—the Oak Ridge National Laboratory and the Hanford site—whose risk profiles have changed during their long-term management under the DOE's surveillance and maintenance (S&M) program. These case studies provide examples of the challenges faced in communicating to external stakeholders, such as federal and state regulators, local communities surrounding the site, as well as the general public, the circumstances surrounding unexpected events or the emergence/discovery of new risk-important information at historically high-risk sites. We identify common topics of importance from these case studies and suggest a taxonomy for risk communicators to use in informing the dialogues with individuals and organizations that may not be technically oriented or fully informed on the subject matter. The taxonomy is based on technical insights from the quintessential definition of risk known as the Kaplan–Garrick “risk triplet” as well as insights from regulatory guidance documents on risk communication with external stakeholders originally developed for the commercial nuclear power industry.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Offshore Wind Electrical Safety Standards Harmonization (Workshop Proceedings)

Offshore wind (OSW) development activity is accelerating in the United States, with over 10 gigawatts (GW) of capacity likely to be installed on the Atlantic coast before 2030. In addition, states have committed to procure over 29 GW of offshore wind. Experienced European offshore wind energy developers are beginning to make large investments into offshore wind projects in American waters, and some U.S. developers have submitted key design documents for regulatory review. European offshore wind developers possess extensive experience in other geographic markets, which greatly increases confidence that the U.S. offshore wind industry will be successful. Nonetheless, existing U.S. electrical standards and European electrical standards are significantly different. If not addressed, these differences could potentially impact worker safety.

17 WIND ENERGY↗

Engaging the Regulatory Community to Aid Environmental Consenting/Permitting Processes for Marine Renewable Energy

Regulators involved in consenting/permitting marine renewable energy (MRE) have faced multiple challenges due to relatively new, unfamiliar technologies and uncertainty surrounding potential environmental impacts. This has resulted in slow progress for the MRE industry, including long consenting timeframes and extensive and expensive monitoring requirements, which increase financial risk for investors. OES-Environmental has surveyed regulators internationally to understand their key knowledge gaps and perspectives to support the development of the MRE industry. From the results of these surveys a data transferability process and a risk retirement pathway have been developed to assess consenting and monitoring requirements in proportion to risk. A tool for discovering existing data sets by using an online matrix has been developed, along with training materials, regulatory guidance documents, and a strategic outreach plan to engage regulators and advisers. his engagement and the application of these products should lead to a better understanding of the environmental effects of marine energy, and more efficient consenting processes.

16 TIDAL AND WAVE POWER↗

Panel Session 26: Risk-Based Approaches to Environmental Remediation and Adaptive Site Management

This panel discussed the needs and importance of developing risk-based approaches to environmental remediation that will enable complex sites to be adaptively managed by applying cost-effective remedies that are protective of human health and the environment. The discussion emphasized risk-based approaches within decision processes and subsequent incorporation into regulatory decision documents. Remedy approaches, remediation exit strategies, and long-term monitoring plans that support risk-based end-states for difficult-to-remediate sites were discussed Panelists with presentations: Risk-Informed Approaches to Environmental Remediation and Adaptive Site Management (Vicky Freedman); ITRC Adaptive Site Management Perspective (Michael Truex); Optimization During Operations and Maintenance Phase at the Hanford Site 200-ZP-1 Groundwater Operable Unit (Emerald Laija, Kate Amrhein, Michael Truex); Adaptive Management: EPA Overview (Benjamin Simes); Decommissioning and Environmental Remediation Section Division of Nuclear Fuel Cycle and Waste Technology (Horst Monken Fernandes)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Addressing Regulatory Challenges to Tribal Solar Deployment

This project, Addressing Regulatory Challenges to Tribal Solar Deployment, seeks to unlock some of this potential by bringing Tribal, regulatory, utility, and other stakeholders together to articulate key barriers to Tribal solar adoption and develop replicable solutions. By increasing institutional capacity and developing frameworks, trainings, and a technical document repository for regulatory bodies, utilities, and Tribes, this project can help expand an emerging market.

14 SOLAR ENERGY↗

Addressing Regulatory Challenges to Tribal Solar Deployment: Key Findings

Tribal land in the United States represents approximately 2% of the country's total landmass and holds more than 5% of solar photovoltaic potential (Doris, Lopez, and Beckley 2013). This resource is largely untapped. Many Tribes note that regulatory challenges often are roadblocks to taking advantage of solar potential. This report serves as a summary of a larger project, Addressing Regulatory Challenges to Tribal Solar Deployment. The project seeks to unlock some of this potential by bringing Tribal, regulatory, utility, and other stakeholders together to articulate key barriers to Tribal solar adoption and develop replicable solutions. By increasing institutional capacity and developing frameworks, trainings, and a technical document repository for regulatory bodies, utilities, and Tribes, this project can help expand an emerging market.

14 SOLAR ENERGY↗

Digital Safety Analysis for Small Modular Nuclear Reactors (SMRs)

The licensing process for any nuclear installation generally requires the review and approval of numerous documents by a regulatory body. Alternate approaches are needed where similar nuclear installations are planned to be built and operated at multiple sites around the world. Such is the case for the deployment of small modular nuclear reactors (SMRs) under development by multiple enterprises in multiple countries. As a use case for this paper, the authors propose an alternative to the Documented Safety Analysis (DSA) required by the United States Department of Energy (DOE) for the licensing of its nuclear installations. The DSA is a DOE construct that requires the review and approval of numerous documents. It includes an in-depth description of hazards, safe boundaries, and hazard controls.

Microreactors↗

Idaho National Laboratory Integrated Multisite SSHAC Level 3: Probabilistic Volcanic Hazards Assessment

The Idaho National Laboratory (INL) resides on the eastern Snake River Plain (ESRP), part of the Snake River Plain (SRP) with a complex origin and geologic history of volcanism. Much of the Quaternary (last 2.58 million years) volcanism within 400 km of INL is genetically associated with a major thermal anomaly referred to as the Yellowstone hotspot, which is currently located more than 180 km northeast of INL. Near INL, local volcanic sources include silicic domes near its southern border, and numerous dike-fed basaltic vents of the ESRP, some of which are near or within the INL boundaries. Quantitative probabilistic assessments of screened-in volcanic hazardous phenomena for nine different facility complexes at the INL are presented for a Senior Seismic Hazard Analysis Committee (SSHAC) Level 3 (SL3) study. The comprehensive, integrated multisite SSHAC study consists of a single regional Probabilistic Volcanic Hazards Assessment (PVHA) that pertains to all nine INL facility complexes, with site-specific information developed at each respective area of interest (AOI), referred to as the "INL facility AOI" (Figure ES-1). Hazard products are generated for specified INL facility AOIs for use by multiple stakeholders from different agencies in risk-informed decision-making regarding site selection, operations, and design of nuclear facilities at INL, consistent with U.S. Department of Energy (DOE) and U.S. Nuclear Regulatory Commission (NRC) regulatory guidance. The study also serves as the basis for future periodic safety assessments required for existing DOE facilities, such as 10-year evaluations of natural-phenomena hazards. Elements of the INL PVHA including initial characterization, screening, quantitative assessments of eruption and hazard potential, and consideration of facility needs are conducted using the three phases of the SSHAC process: evaluation, integration, and documentation. As per regulatory guidance, the SSHAC framework provided the necessary processes and procedures for the PVHA Technical Integration (TI) team, at three workshops, five formal working meetings and many TI team remote meetings, to conduct initial characterization, screen the volcanic hazards, create PVHA model inputs, exercise those models in the PVHA, consider facility-specific volcanic hazard needs, and perform final hazard calculations. The Participatory Peer Review Panel (PPRP) provided independent oversight and performed process and technical reviews of the PVHA throughout its duration. The study included an extensive New Data Collection and Analyses (NDCA) program developed by the PVHA TI team to reduce uncertainties in hazard-significant elements in the PVHA model. NDCA activities generated 20 reports providing important contributory datasets and results to the project database for characterizing the ESRP. For example, a report compiling the dimensions of ESRP shield volcanoes and lava fields was used to construct volcanic footprints (areas of impact), was compared with data from INL subsurface cores, and was used to validate the results of lava-flow inundation modeling on the contemporary terrain. Another example is the acquisition of aeromagnetic data over INL and its surrounding area, with maps of buried magmatic features (e.g., subsurface volcanoes and swarms of feeder dikes) that informed the PVHA conceptual model of volcanism. The SSHAC evaluation process was used to conduct all elements of the PVHA including initial characterization and screening. Existing data and NDCA activities provided the foundation to develop the tectonomagmatic conceptual model of volcanism for the region of geographical interest in the SRP and Yellowstone hotspot volcanic system, and for considering volcanoes in the western US. Considering Quaternary volcanic sources active during this period, the screening approach identified and evaluated magma compositions, types of eruptive and intrusive phenomena, types of hazardous phenomena, and proximity of sources to INL. The PVHA TI team evaluated 18 types of magmatic sources in terms of 20 potentially hazardous phenomena, resulting in 360 screening decisions. The screening process resulted in 140 screened-in hazardous volcanic phenomena for Quaternary volcanic sources 1) proximal to INL facility complexes in the ESRP (64 basaltic and 54 silicic), 2) regional sources associated with the Yellowstone caldera system and Blackfoot Reservoir volcanic field (7), and 3) more distal sources from thirteen Cascade volcanoes and two volcanoes at Long Valley caldera (CA).

58 GEOSCIENCES↗

In-situ Detection of Glovebox Glove Degradation Prior to Glove Failure; Effects on Safety, Waste, and Operational Costs - 20402

Glovebox glove pressure decay leak testing and analysis of the data can greatly improve glovebox safety, minimize Transuranic (TRU) glove waste, and minimize operational cost. It is well known, the weakest point of containment on a glovebox is the glove. Mitigating unplanned openings in gloves is critical to minimizing operational and safety costs in glovebox operations. Mitigating unplanned glove openings due to glove failures will be discussed in this paper. The lack of an engineered solution to determine a gloves operational life in nuclear operations, has lead to use of theoretical and manual subjective methods to determine the life and safety of a glovebox glove. Whether the glove is inspected visually prior to use, or gloves are changed regularly to theoretically avoid failure, both the operators PPE and the room are being exposed to contamination, or un-necessary amounts of TRU glove waste are being generated. Millions of dollars yearly in operational costs are spent on glove failures due to loss of production, incident analysis, regulatory audits, clean up, and paperwork. In a nuclear application, a glove failure could contaminate an operator and laboratory, shut down the operation for weeks, potentially create a regulatory audit, and potentially create a media frenzy; the damages to the organization can be astronomical. Elimination of glove failures is possible by tracking glove material degradation and setting limits to allow glove change when it becomes necessary, prior to glove failure. Analytical pressure decay leak testing allows the detection of material degradation, and in turn the ability to limit operational glove failures. A German based company called MK Versuchsanlagen, e.K., has developed an advanced Glove Integrity Testing System. The system, with its use of proprietary RFID and special software technology, is unique in its capabilities. The system is capable to perform highly accurate regular glove testing on any size glovebox line in minimal time. The system records and can analyze a tremendous amount of system data that in turn can determine, for example, a safe glove change time prior to a glove material failure. This paper will show how an advanced Glove Integrity Testing System can detect glove material degradation and help determine a safe change point prior to glove failure. Pressure decay curves of new gloves and recorded effects of accelerated aging on the glove over time will be shown. The use of this technology in nuclear facilities can greatly improve glovebox operational safety, minimize glovebox glove TRU waste, and save organizations tremendous costs in downtime, clean up, documentation, and potential regulatory review. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Understanding the Environmental Study Life Cycle in the United States Hydropower Licensing and Federal Authorization Process

We analyzed United States Federal Energy Regulatory Commission (FERC) documents prepared for 29 recently licensed hydropower projects and created two novel datasets to improve understanding of the environmental study life cycle, defined here as the process that begins with an environmental study being requested by a hydropower stakeholder or regulator, and ends with the study either being rejected or approved/conducted. Our two datasets consisted of summaries of information taken from (1), study determination letters prepared by FERC for 23 projects that were using the integrated licensing process, and (2), environmental study submittals and issuances tracked and attributed to seven projects using the FERC record. Our objective was to use the two resulting environmental life cycle datasets to understand which types of environmental studies are approved, rejected, and implemented during FERC licensing, and how consistently those types of studies are required across multiple hydropower projects. We matched the requested studies to a set of 61 river function indicators in eight categories and found that studies related to the category of biota and biodiversity were requested most often across all 29 projects. Within that category, studies related to river function indicators of presence, absence, detection of species and habitat/critical habitat were the most important to stakeholders, based on the relative number of studies requested. The study approval, rejection, and request rates were similar within each dataset, although the 23 projects with study determination letters had many rejected studies, whereas the dataset created from the seven projects had very few rejected studies.

13 HYDRO ENERGY↗

Proactive Regulatory Approaches to Electrification and Load Growth: Pre-read Document to Support the July 10-11 th Workshop

This document summarizes objectives and context related to a DOE-funded workshop on proactive regulatory approaches to electrification and load growth. It briefly summarizes some of the regulatory barriers to pursuing a proactive approach and some of the risks associated with such an approach. It then summarizes a selection of recent utility proposals and public utility commission actions related to proactive approaches.

24 POWER TRANSMISSION AND DISTRIBUTION↗