Search NASA⌕ Search

SEARCH · Search NASA

Results for “Reliability allocation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Design for Reliability (DfR) in Space Life Support

The engineering process of Design for Reliability (DfR) is well established in the automotive and aerospace industries. DfR should be useful in the future development of space life support systems. DfR is a sequence of tasks that develop system requirements and plan reliability analysis and testing. First and fundamentally, the reliability requirement is defined. Next the system reliability model is developed, often using a reliability block diagram. The overall system reliability requirement is allocated to the subsystems and an estimate of the attainable reliability is made. This expected reliability can be improved by simplifying the design by removing components or by replacing less reliable components. Improving reliability can require difficult compromises, such as reducing performance requirements, increasing budget, or extending testing. The actual system reliability can be determined only by testing, which should continue long enough to provide the required confidence in the measured value. New systems often have unexpected design errors that cause failures in early testing. The usual reliability improvement process of testing, finding the failure modes, and redesigning to remove them reduces the failure rate and is referred to as “reliability growth.” After redesign has been completed, the system should be further tested to determine the actual achieved reliability more accurately. If the final system failure rate is too high, redundant systems can be used to improve overall operational reliability. Adding redundancy simply to increase the one- or two-fault tolerance metric may sometimes reduce reliability. Reliability can be improved in three ways: redesigning the system to include more reliable subsystems and components, reliability growth testing and failure mode removal, and by using parallel redundant systems. DfR should combine these approaches to achieve the required reliability while managing performance, cost, and schedule.

Reliability↗

Developing Ultra Reliable Life Support for the Moon and Mars

Recycling life support systems can achieve ultra reliability by using spares to replace failed components. The added mass for spares is approximately equal to the original system mass, provided the original system reliability is not very low. Acceptable reliability can be achieved for the space shuttle and space station by preventive maintenance and by replacing failed units, However, this maintenance and repair depends on a logistics supply chain that provides the needed spares. The Mars mission must take all the needed spares at launch. The Mars mission also must achieve ultra reliability, a very low failure rate per hour, since it requires years rather than weeks and cannot be cut short if a failure occurs. Also, the Mars mission has a much higher mass launch cost per kilogram than shuttle or station. Achieving ultra reliable space life support with acceptable mass will require a well-planned and extensive development effort. Analysis must define the reliability requirement and allocate it to subsystems and components. Technologies, components, and materials must be designed and selected for high reliability. Extensive testing is needed to ascertain very low failure rates. Systems design should segregate the failure causes in the smallest, most easily replaceable parts. The systems must be designed, produced, integrated, and tested without impairing system reliability. Maintenance and failed unit replacement should not introduce any additional probability of failure. The overall system must be tested sufficiently to identify any design errors. A program to develop ultra reliable space life support systems with acceptable mass must start soon if it is to produce timely results for the moon and Mars.

Jones, Harry W.↗

Thermal Protection for Mars Sample Return Earth Entry Vehicle: A Grand Challenge for Design Methodology and Reliability Verification

Mars Sample Return is our Grand Challenge for the coming decade. TPS (Thermal Protection System) nominal performance is not the key challenge. The main difficulty for designers is the need to verify unprecedented reliability for the entry system: current guidelines for prevention of backward contamination require that the probability of spores larger than 1 micron diameter escaping into the Earth environment be lower than 1 million for the entire system, and the allocation to TPS would be more stringent than that. For reference, the reliability allocation for Orion TPS is closer to 11000, and the demonstrated reliability for previous human Earth return systems was closer to 1100. Improving reliability by more than 3 orders of magnitude is a grand challenge indeed. The TPS community must embrace the possibility of new architectures that are focused on reliability above thermal performance and mass efficiency. MSR (Mars Sample Return) EEV (Earth Entry Vehicle) will be hit with MMOD (Micrometeoroid and Orbital Debris) prior to reentry. A chute-less aero-shell design which allows for self-righting shape was baselined in prior MSR studies, with the assumption that a passive system will maximize EEV robustness. Hence the aero-shell along with the TPS has to take ground impact and not break apart. System verification will require testing to establish ablative performance and thermal failure but also testing of damage from MMOD, and structural performance at ground impact. Mission requirements will demand analysis, testing and verification that are focused on establishing reliability of the design. In this proposed talk, we will focus on the grand challenge of MSR EEV TPS and the need for innovative approaches to address challenges in modeling, testing, manufacturing and verification.

Design and Verification for Reliability↗

A PC program to optimize system configuration for desired reliability at minimum cost

High reliability is desired in all engineered systems. One way to improve system reliability is to use redundant components. When redundant components are used, the problem becomes one of allocating them to achieve the best reliability without exceeding other design constraints such as cost, weight, or volume. Systems with few components can be optimized by simply examining every possible combination but the number of combinations for most systems is prohibitive. A computerized iteration of the process is possible but anything short of a super computer requires too much time to be practical. Many researchers have derived mathematical formulations for calculating the optimum configuration directly. However, most of the derivations are based on continuous functions whereas the real system is composed of discrete entities. Therefore, these techniques are approximations of the true optimum solution. This paper describes a computer program that will determine the optimum configuration of a system of multiple redundancy of both standard and optional components. The algorithm is a pair-wise comparative progression technique which can derive the true optimum by calculating only a small fraction of the total number of combinations. A designer can quickly analyze a system with this program on a personal computer.

Hills, Steven W.↗

Performance results for a hybrid coding system.

Results of computer simulation studies of the hybrid pull-up bootstrap decoding algorithm, using a constraint length 24, nonsystematic, rate 1/2 convolutional code for the symmetric channel with both binary and eight-level quantized outputs. Computational performance was used to measure the effect of several decoder parameters and determine practical operating constraints. Results reveal that the track length may be reduced to 500 information bits with small degradation in performance. The optimum number of tracks per block was found to be in the range from 7 to 11. An effective technique was devised to efficiently allocate computational effort and identify reliably decoded data sections. Long simulations indicate that a practical bootstrap decoding configuration has a computational performance about 1.0 dB better than sequential decoding and an output bit error rate about .0000025 near the R sub comp point.

Hoffman, L. B.↗

Analysis and Optimization of Test Plans for Advanced Exploration Systems Reliability and Supportability

Future crewed exploration missions beyond Low Earth Orbit (LEO) will operate farther from Earth and be logistically isolated for longer than any previous human spaceflight mission. Under these conditions, supportability and reliability willbestronger drivers of mission mass and risk than they have been in the past. Items with high failure rates, or uncertain failure rates, can result in high spares mass requirements and/or high risk on deep space missions. Testing is a critical element of system development which provides the opportunity to identify and resolve design issues, defects, or other failure modes before they cause problems during a mission. Reliability growth programs can reduce failure rates by identifying and remove failure modes via design changes, and long-duration life testing can provide valuable data to reduce failure rate estimate uncertainty and verify (to some level of confidence) that components are as reliable as expected. Testing activities take time and resources, however, and must be incorporated into program plans in order to be fully effective. This paper presents an integrated reliability test plan analysis and optimization methodology, which has been used to inform Advanced Exploration Systems (AES) Life Support Systems (LSS) ground test planning for future missions. The methodology determines the optimal number of test units to purchase and allocation of test time –split between reliability growth and uncertainty reduction testing –across a given set of items in order to minimize spares mass for a given mission under constraints on total test cost and schedule. Model outputs also include expected spares mass after testing and the expected number of modifications or refurbishments during testing, both of which can inform program planning. Discussion of the model, conclusions, and future work are also presented.

Testing↗

Analysis and Optimization of Test Plans for Advanced Exploration Systems Reliability and Supportability

Future crewed exploration missions beyond Low Earth Orbit (LEO) will operate farther from Earth and be logistically isolated for longer than any previous human spaceflight mission. Under these conditions, supportability and reliability willbestronger drivers of mission mass and risk than they have been in the past. Items with high failure rates, or uncertain failure rates, can result in high spares mass requirements and/or high risk on deep space missions. Testing is a critical element of system development which provides the opportunity to identify and resolve design issues, defects, or other failure modes before they cause problems during a mission. Reliability growth programs can reduce failure rates by identifying and remove failure modes via design changes, and long-duration life testing can provide valuable data to reduce failure rate estimate uncertainty and verify (to some level of confidence) that components are as reliable as expected. Testing activities take time and resources, however, and must be incorporated into program plans in order to be fully effective. This paper presents an integrated reliability test plan analysis and optimization methodology, which has been used to inform Advanced Exploration Systems (AES) Life Support Systems (LSS) ground test planning for future missions. The methodology determines the optimal number of test units to purchase and allocation of test time –split between reliability growth and uncertainty reduction testing –across a given set of items in order to minimize spares mass for a given mission under constraints on total test cost and schedule. Model outputs also include expected spares mass after testing and the expected number of modifications or refurbishments during testing, both of which can inform program planning. Discussion of the model, conclusions, and future work are also presented.

Testing↗

Minimum-Variance Control Allocation Considering Parametric Model Uncertainty

The control allocation problem was investigated for linear dynamical systems with known parametric uncertainty. Minimizing a cost function that penalizes the variance of the error in achieving commanded forces and moments on the vehicle resulted in a special case of the weighted pseudo-inverse allocator. Rather than an engineer designing the weighting matrix, it is computed from the covariances of the control effectiveness parameters. This minimum-variance allocator balances the effectiveness of the control inputs against the corresponding levels of uncertainty. The approach was demonstrated using simulations of aircraft with realistic uncertainty levels operating in open-loop and closed-loop configurations. Results showed that when model uncertainty is known, significant, and unevenly distributed amongst the controls, the minimum-variance allocator more often achieves the intended forces and moments on the vehicle in comparison to other allocators, which can lead to increased performance, reliability, and safety during flight tests. The cost for this robustness is a diminished achievable moment space for the vehicle.

Control allocation↗

Probabilistic resource allocation system with self-adaptive capability

A probabilistic resource allocation system is disclosed containing a low capacity computational module (Short Term Memory or STM) and a self-organizing associative network (Long Term Memory or LTM) where nodes represent elementary resources, terminal end nodes represent goals, and weighted links represent the order of resource association in different allocation episodes. Goals and their priorities are indicated by the user, and allocation decisions are made in the STM, while candidate associations of resources are supplied by the LTM based on the association strength (reliability). Weights are automatically assigned to the network links based on the frequency and relative success of exercising those links in the previous allocation decisions. Accumulation of allocation history in the form of an associative network in the LTM reduces computational demands on subsequent allocations. For this purpose, the network automatically partitions itself into strongly associated high reliability packets, allowing fast approximate computation and display of allocation solutions satisfying the overall reliability and other user-imposed constraints. System performance improves in time due to modification of network parameters and partitioning criteria based on the performance feedback.

Yufik, Yan M.↗

Probabilistic resource allocation system with self-adaptive capability

A probabilistic resource allocation system is disclosed containing a low capacity computational module (Short Term Memory or STM) and a self-organizing associative network (Long Term Memory or LTM) where nodes represent elementary resources, terminal end nodes represent goals, and directed links represent the order of resource association in different allocation episodes. Goals and their priorities are indicated by the user, and allocation decisions are made in the STM, while candidate associations of resources are supplied by the LTM based on the association strength (reliability). Reliability values are automatically assigned to the network links based on the frequency and relative success of exercising those links in the previous allocation decisions. Accumulation of allocation history in the form of an associative network in the LTM reduces computational demands on subsequent allocations. For this purpose, the network automatically partitions itself into strongly associated high reliability packets, allowing fast approximate computation and display of allocation solutions satisfying the overall reliability and other user-imposed constraints. System performance improves in time due to modification of network parameters and partitioning criteria based on the performance feedback.

Yufik, Yan M.↗

Laser data links for communication satellites

Laser data relays potentially offer continuous 1 Gb/sec bandwidths, drastically increasing low-altitude satellite data collection capacity over present store-and-dump techniques. Availability of the laser link as a reliable alternative, operating within conventional low-altitude communication subsystem weight and power allocations, will create customer pressure for adoption. Major communication relay system impacts are discussed including reliability, mechanical design, attitude control, on-board data handling, contamination control, and traffic-net management. Interface parameters which drive the fundamental relay satellite design concepts are discussed, and conditions requiring early quantitative analysis are identified.

Ohern, W. L.↗

Interrelation Between Safety Factors and Reliability

An evaluation was performed to establish relationships between safety factors and reliability relationships. Results obtained show that the use of the safety factor is not contradictory to the employment of the probabilistic methods. In many cases the safety factors can be directly expressed by the required reliability levels. However, there is a major difference that must be emphasized: whereas the safety factors are allocated in an ad hoc manner, the probabilistic approach offers a unified mathematical framework. The establishment of the interrelation between the concepts opens an avenue to specify safety factors based on reliability. In cases where there are several forms of failure, then the allocation of safety factors should he based on having the same reliability associated with each failure mode. This immediately suggests that by the probabilistic methods the existing over-design or under-design can be eliminated. The report includes three parts: Part 1-Random Actual Stress and Deterministic Yield Stress; Part 2-Deterministic Actual Stress and Random Yield Stress; Part 3-Both Actual Stress and Yield Stress Are Random.

Elishakoff, Isaac↗

A decomposition method for optimization of large-system reliability

This paper considers a decomposition approach for optimization of the reliability of a large system with a general network structure. A 3-level methodology is developed for optimal allocation of available resources among subsystems in order to ensure maximization of system-reliability. The decentralized nature of this methodology greatly reduces the complexity of the large problem and facilitates seeking the optimal solution. Two examples show that the complexity of a large system can be greatly reduced by solving several smaller-dimensional sub-problems iteratively. Sub-problems whose dimensions are small can be efficiently solved by any existing nonlinear programming method. Another important feature of this approach is the possible simplification of the objective function during the solution. This leads in some cases to an analytic solution for the lower-level optimization problems in a 3-level decomposition solution.

Li, Duan↗

System Engineering on the Use for Ares I,V - the Simpler, the Better

The Ares I and Ares V Vehicles will utilize the J-2X rocket engine developed for NASA by the Pratt & Whitney Rocketdyne Company. The J-2X is an improved higher power version of the original J-2 engine used during the Apollo program. With higher power and updated requirements for safety and performance, the J-2X becomes a new engine using state-of-the-art design methodology, materials and manufacturing processes. The implementation of Systems Engineering (SE) principles enables the rapid J-2X development program to remain aligned with the ARES I and V vehicle programs, Meeting the aggressive development schedule is a challenge. Coordinating the best expertise thai NASA and PWR have to offer requires effectively utilizing resources at multiple sites. This presents formidable communication challenges. SE allows honest and open discussions of issues and problems. This simple idea is often overlooked in large and complex SE programs. Regular and effective meetings linking SE objectives to component designs are used to voice differences of opinions with customer and contractor in attendance so that the best mutual decisions can be made on the shortest possible schedule. Regular technical interchange meetings on secure program wide computer networks and CM processes are effective,in the "Controlled Change" process that exemplifies good SE. Good communication is a key effective SE implementation. The System of Systems approach is the vision of the Orion program which facilitates the establishment of dynamic SE processes at all levels including the engine. SE enables requirements evolution by facilitating organizational and process agility. Flow down and distribution of requirements is controlled by Allocation Reports which breakdown numerical design objectives (weight, reliability, etc.) into quanta goals for each component area. Linked databases of design and verification requirements helps eliminate redundancy and potential mistakes inherent m separated systems. Another tool, the Architecture Design Description, is being used to control J-2X system architecture and effectively communicate configuration changes to those involved in the design process. But the proof is in successful program accomplishment. The SE is the methodology being used to meet the challenge of completing J-2X engine certification 2 years ahead of any engine program ever developed at PWR. The Ares I SE system of systems has delivered according to expectations thus far. All major design reviews (SRR. PDR, CDR) have been successfully conducted to satisfy overall program objectives using SE as the basis for accomplishment. The paper describes SE tools and techniques utilized to achieve this success.

Kelly, William↗

Constellation Ground Systems Launch Availability Analysis: Enhancing Highly Reliable Launch Systems Design

Success of the Constellation Program's lunar architecture requires successfully launching two vehicles, Ares I/Orion and Ares V/Altair, within a very limited time period. The reliability and maintainability of flight vehicles and ground systems must deliver a high probability of successfully launching the second vehicle in order to avoid wasting the on-orbit asset launched by the first vehicle. The Ground Operations Project determined which ground subsystems had the potential to affect the probability of the second launch and allocated quantitative availability requirements to these subsystems. The Ground Operations Project also developed a methodology to estimate subsystem reliability, availability, and maintainability to ensure that ground subsystems complied with allocated launch availability and maintainability requirements. The verification analysis developed quantitative estimates of subsystem availability based on design documentation, testing results, and other information. Where appropriate, actual performance history was used to calculate failure rates for legacy subsystems or comparative components that will support Constellation. The results of the verification analysis will be used to assess compliance with requirements and to highlight design or performance shortcomings for further decision making. This case study will discuss the subsystem requirements allocation process, describe the ground systems methodology for completing quantitative reliability, availability, and maintainability analysis, and present findings and observation based on analysis leading to the Ground Operations Project Preliminary Design Review milestone.

Gernand, Jeffrey L.↗

Constellation Ground Systems Launch Availability Analysis: Enhancing Highly Reliable Launch Systems Design

Success of the Constellation Program's lunar architecture requires successfully launching two vehicles, Ares I/Orion and Ares V/Altair, in a very limited time period. The reliability and maintainability of flight vehicles and ground systems must deliver a high probability of successfully launching the second vehicle in order to avoid wasting the on-orbit asset launched by the first vehicle. The Ground Operations Project determined which ground subsystems had the potential to affect the probability of the second launch and allocated quantitative availability requirements to these subsystems. The Ground Operations Project also developed a methodology to estimate subsystem reliability, availability and maintainability to ensure that ground subsystems complied with allocated launch availability and maintainability requirements. The verification analysis developed quantitative estimates of subsystem availability based on design documentation; testing results, and other information. Where appropriate, actual performance history was used for legacy subsystems or comparative components that will support Constellation. The results of the verification analysis will be used to verify compliance with requirements and to highlight design or performance shortcomings for further decision-making. This case study will discuss the subsystem requirements allocation process, describe the ground systems methodology for completing quantitative reliability, availability and maintainability analysis, and present findings and observation based on analysis leading to the Ground Systems Preliminary Design Review milestone.

Gernand, Jeffrey L.↗

Models and metrics for software management and engineering

This paper attempts to characterize and present a state of the art view of several quantitative models and metrics of the software life cycle. These models and metrics can be used to aid in managing and engineering software projects. They deal with various aspects of the software process and product, including resources allocation and estimation, changes and errors, size, complexity and reliability. Some indication is given of the extent to which the various models have been used and the success they have achieved.

Basili, V. R.↗