Search NASA⌕ Search

SEARCH · Search NASA

Results for “Reliability and Maintainability”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Reliability and Maintainability Analysis for the Amine Swingbed Carbon Dioxide Removal System

I have performed a reliability & maintainability analysis for the Amine Swingbed payload system. The Amine Swingbed is a carbon dioxide removal technology that has gone through 2,400 hours of International Space Station on-orbit use between 2013 and 2016. While the Amine Swingbed is currently an experimental payload system, the Amine Swingbed may be converted to system hardware. If the Amine Swingbed becomes system hardware, it will supplement the Carbon Dioxide Removal Assembly (CDRA) as the primary CO2 removal technology on the International Space Station. NASA is also considering using the Amine Swingbed as the primary carbon dioxide removal technology for future extravehicular mobility units and for the Orion, which will be used for the Asteroid Redirect and Journey to Mars missions. The qualitative component of the reliability and maintainability analysis is a Failure Modes and Effects Analysis (FMEA). In the FMEA, I have investigated how individual components in the Amine Swingbed may fail, and what the worst case scenario is should a failure occur. The significant failure effects are the loss of ability to remove carbon dioxide, the formation of ammonia due to chemical degradation of the amine, and loss of atmosphere because the Amine Swingbed uses the vacuum of space to regenerate the Amine Swingbed. In the quantitative component of the reliability and maintainability analysis, I have assumed a constant failure rate for both electronic and nonelectronic parts. Using this data, I have created a Poisson distribution to predict the failure rate of the Amine Swingbed as a whole. I have determined a mean time to failure for the Amine Swingbed to be approximately 1,400 hours. The observed mean time to failure for the system is between 600 and 1,200 hours. This range includes initial testing of the Amine Swingbed, as well as software faults that are understood to be non-critical. If many of the commercial parts were switched to military-grade parts, the expected mean time to failure would be 2,300 hours. Both calculated mean times to failure for the Amine Swingbed use conservative failure rate models. The observed mean time to failure for CDRA is 2,500 hours. Working on this project and for NASA in general has helped me gain insight into current aeronautics missions, reliability engineering, circuit analysis, and different cultures. Prior my internship, I did not have a lot knowledge about the work being performed at NASA. As a chemical engineer, I had not really considered working for NASA as a career path. By engaging in interactions with civil servants, contractors, and other interns, I have learned a great deal about modern challenges that NASA is addressing. My work has helped me develop a knowledge base in safety and reliability that would be difficult to find elsewhere. Prior to this internship, I had not thought about reliability engineering. Now, I have gained a skillset in performing reliability analyses, and understanding the inner workings of a large mechanical system. I have also gained experience in understanding how electrical systems work while I was analyzing the electrical components of the Amine Swingbed. I did not expect to be exposed to as many different cultures as I have while working at NASA. I am referring to both within NASA and the Houston area. NASA employs individuals with a broad range of backgrounds. It has been great to learn from individuals who have highly diverse experiences and outlooks on the world. In the Houston area, I have come across individuals from different parts of the world. Interacting with such a high number of individuals with significantly different backgrounds has helped me to grow as a person in ways that I did not expect. My time at NASA has opened a window into the field of aeronautics. After earning a bachelor's degree in chemical engineering, I plan to go to graduate school for a PhD in engineering. Prior to coming to NASA, I was not aware of the graduate Pathways program. I intend to apply for the graduate Pathways program as positions are opened up. I would like to pursue future opportunities with NASA, especially as my engineering career progresses.

Dunbar, Tyler↗

Explained: Maintaining a Reliable Future Grid with More Wind and Solar

Since the early 2000s, maintaining grid reliability has become more complex due to a variety of factors, including the changing generation mix, the creation of wholesale energy markets, and a growing number of extreme weather events. Parts of the U.S. grid are already operating with significant amounts of wind and solar generation - with 2022 annual wind and solar generation in the range of 25% to 40%. Even without considering the effects of extreme weather, maintaining reliability will require new capacity to address both growth in electric demand and retiring capacity. Based on the 2022 North American Electric Reliability Corporation (NERC) Long-Term Reliability Assessment, the combination of both growth in peak demand and retirements suggests a need for more than 100 gigawatts (GW) of new capacity by 2032. In general, there are a five categories of resources that are expected to be deployed and used to meet the challenge of maintaining an adequate source of supply in the coming decades: new wind and solar resources (accounting for their reliability contributions), energy storage, demand response resources, expanded transmission, and continued use of thermal generators.

power grid↗

Evolving Reliability and Maintainability Allocations for NASA Ground Systems

This paper describes the methodology that was developed to allocate reliability and maintainability requirements for the NASA Ground Systems Development and Operations (GSDO) program's subsystems. As systems progressed through their design life cycle and hardware data became available, it became necessary to reexamine the previously derived allocations. Allocating is an iterative process; as systems moved beyond their conceptual and preliminary design phases this provided an opportunity for the reliability engineering team to reevaluate allocations based on updated designs and maintainability characteristics of the components. Trade-offs in reliability and maintainability were essential to ensuring the integrity of the reliability and maintainability analysis. This paper will discuss the value of modifying reliability and maintainability allocations made for the GSDO subsystems as the program nears the end of its design phase.

allocations↗

Evolving Reliability and Maintainability Allocations for NASA Ground Systems

This paper describes the methodology and value of modifying allocations to reliability and maintainability requirements for the NASA Ground Systems Development and Operations (GSDO) program’s subsystems. As systems progressed through their design life cycle and hardware data became available, it became necessary to reexamine the previously derived allocations. This iterative process provided an opportunity for the reliability engineering team to reevaluate allocations as systems moved beyond their conceptual and preliminary design phases. These new allocations are based on updated designs and maintainability characteristics of the components. It was found that trade-offs in reliability and maintainability were essential to ensuring the integrity of the reliability and maintainability analysis. This paper discusses the results of reliability and maintainability reallocations made for the GSDO subsystems as the program nears the end of its design phase.

allocations↗

Recommended techniques for effective maintainability. A continuous improvement initiative of the NASA Reliability and Maintainability Steering Committee

This manual presents a series of recommended techniques that can increase overall operational effectiveness of both flight and ground based NASA systems. It provides a set of tools that minimizes risk associated with: (1) restoring failed functions (both ground and flight based); (2) conducting complex and highly visible maintenance operations; and (3) sustaining a technical capability to support the NASA mission using aging equipment or facilities. It considers (1) program management - key elements of an effective maintainability effort; (2) design and development - techniques that have benefited previous programs; (3) analysis and test - quantitative and qualitative analysis processes and testing techniques; and (4) operations and operational design techniques that address NASA field experience. This document is a valuable resource for continuous improvement ideas in executing the systems development process in accordance with the NASA 'better, faster, smaller, and cheaper' goal without compromising safety.

Source record↗

Evolving Reliability and Maintainability Allocations for NASA Ground Systems

This paper describes the methodology and value of modifying allocations to reliability and maintainability requirements for the NASA Ground Systems Development and Operations (GSDO) programs subsystems. As systems progressed through their design life cycle and hardware data became available, it became necessary to reexamine the previously derived allocations. This iterative process provided an opportunity for the reliability engineering team to reevaluate allocations as systems moved beyond their conceptual and preliminary design phases. These new allocations are based on updated designs and maintainability characteristics of the components. It was found that trade-offs in reliability and maintainability were essential to ensuring the integrity of the reliability and maintainability analysis. This paper discusses the results of reliability and maintainability reallocations made for the GSDO subsystems as the program nears the end of its design phase.

reliability↗

Reliability and Maintainability Engineering - A Major Driver for Safety and Affordability

The United States National Aeronautics and Space Administration (NASA) is in the midst of an effort to design and build a safe and affordable heavy lift vehicle to go to the moon and beyond. To achieve that, NASA is seeking more innovative and efficient approaches to reduce cost while maintaining an acceptable level of safety and mission success. One area that has the potential to contribute significantly to achieving NASA safety and affordability goals is Reliability and Maintainability (R&M) engineering. Inadequate reliability or failure of critical safety items may directly jeopardize the safety of the user(s) and result in a loss of life. Inadequate reliability of equipment may directly jeopardize mission success. Systems designed to be more reliable (fewer failures) and maintainable (fewer resources needed) can lower the total life cycle cost. The Department of Defense (DOD) and industry experience has shown that optimized and adequate levels of R&M are critical for achieving a high level of safety and mission success, and low sustainment cost. Also, lessons learned from the Space Shuttle program clearly demonstrated the importance of R&M engineering in designing and operating safe and affordable launch systems. The Challenger and Columbia accidents are examples of the severe impact of design unreliability and process induced failures on system safety and mission success. These accidents demonstrated the criticality of reliability engineering in understanding component failure mechanisms and integrated system failures across the system elements interfaces. Experience from the shuttle program also shows that insufficient Reliability, Maintainability, and Supportability (RMS) engineering analyses upfront in the design phase can significantly increase the sustainment cost and, thereby, the total life cycle cost. Emphasis on RMS during the design phase is critical for identifying the design features and characteristics needed for time efficient processing, improved operational availability, and optimized maintenance and logistic support infrastructure. This paper discusses the role of R&M in a program acquisition phase and the potential impact of R&M on safety, mission success, operational availability, and affordability. This includes discussion of the R&M elements that need to be addressed and the R&M analyses that need to be performed in order to support a safe and affordable system design. The paper also provides some lessons learned from the Space Shuttle program on the impact of R&M on safety and affordability.

Safie, Fayssal M.↗

Proposal for a Comparison of Reliability and Maintainability Activities Across ESA, JAXA, and NASA

NASA has developed an objectives based hierarchy for guiding Reliability and Maintainability activities. This presentation overviews the hierarchy and proposes to the international trilateral partners to formulate a task force to consider the elements of the NASA RM framework, as captured in the hierarchy of RM considerations, to identify commonalities and differences in the way reliability and maintainability is addressed by the flight projects among the partners.

JAXA↗

Reliability and Maintainability Data for Lead Lithium Cooling Systems

This article presents component failure rate data for use in assessment of lead lithium cooling systems. Best estimate data applicable to this liquid metal coolant is presented. Repair times for similar components are also referenced in this work. These data support probabilistic safety assessment and reliability, availability, maintainability and inspectability analyses.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Integrating O/S models during conceptual design, part 2

This report documents the procedures for utilizing and maintaining the Reliability & Maintainability Model (RAM) developed by the University of Dayton for the National Aeronautics and Space Administration (NASA) Langley Research Center (LaRC) under NASA research grant NAG-1-1327. The purpose of the grant is to provide support to NASA in establishing operational and support parameters and costs of proposed space systems. As part of this research objective, the model described here was developed. Additional documentation concerning the development of this model may be found in Part 1 of this report. This is the 2nd part of a 3 part technical report.

Ebeling, Charles E.↗

Ethernet for Aerospace Applications - Ethernet Heads for the Skies

One of the goals of aerospace applications is to reduce the cost and complexity of avionic systems. Ethernet is a highly scalable, flexible, and popular protocol. The aerospace market is large, with a forecasted production of over 50,000 turbine-powered aircraft valued at $1.7 trillion between 2012 and 2022. Boeing estimates demand for commercial aircraft by 2033 to total over 36,000 with a value of over $5 trillion. In 2014 US airlines served over 750 million passengers and this is growing over 2% yearly. Electronic fly-by-wire is now used for all airliners and high performance aircraft. Although Ethernet has been widely used for four decades, its use in aerospace applications is just beginning to become common. Ethernet is the universal solution in commercial networks because of its high bandwidths, lower cost, openness, reliability, maintainability, flexibility, and interoperability. However, when Ethernet was designed applications with time-critical, safety relevant and deterministic requirements were not given much consideration. Many aerospace applications use a variety of communication architectures that add cost and complexity. Some of them are SpaceWire, MIL-STD-1553, Avionics Full Duplex Switched Ethernet (AFDX), and Time-Triggered Ethernet (TTE). Aerospace network designers desire to decrease the number of networks to reduce cost and effort while improving scalability, flexibility, openness, maintainability, and reliability. AFDX and TTE are being considered more for critical aerospace systems because they provide redundancy, failover protection, guaranteed timing, and frame priority and are based on Ethernet IEEE 802.3. This paper explores the use of AFDX and TTE for aerospace applications.

Ethernet↗

The New NASA Approach to Reliability and Maintainability

In 2017, after 20 years, NASA issued a major revision of its reliability and maintainability (R&M) policy, NASA-STD- 8729.1A. Formerly NASA required certain specific R&M activities during each succeeding phase of project development. Now NASA requires a project to start by including the initial development of R&M requirements and the devising of strategies to implement and verify them. Rather than resolving all the requirements first and then designing the system, as has been usual in systems design, the design process now is to work top down by layers. It begins by first identifying the top level requirements and suggesting top level design strategies for those, then making these higher strategies the basis for a lower level set of requirements, and so on down to the lowest components. This approach is intended to ensure that R&M is designed in from the beginning rather than added later with difficulty to a completed design concept. The new R&M standard uses an innovative and effective top-down system design approach intended to effectively implement R&M.

Jones, Harry W.↗