Search NASA⌕ Search

SEARCH · Search NASA

Results for “Resource conservation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Tech House

The members of the Swain family- Dr. Charles "Bill" Swain, wife Elaine, daughter Carol, 17, son "Chuck", 12, and dog Susie have an interesting assignment. They are active participants in an important NASA research program involving the application of space-age technology to home construction. b' Transplanted Floridians, the Swains now reside in NASA's Tech House, lo~atedat Langley Research Center, Hampton, Virginia. Their job is to use and help evaluate the variety of advanced technology systems in Tech House. A contemporary three-bedroom home, Tech House incorporates NASA technology, the latest commercial building techniques and other innovations, all designed to reduce energy and water consumption and to provide new levels of comfort, convenience, security and fire safety. Tech House equipment performed well in initial tests, but a house is not a home until it has people. That's where the Swains come in. NASA wants to see how the various systems work under actual living conditions, to confirm the effectiveness of the innovations or to determine necessary modifications for improvement. The Swains are occupying the house for a year, during which NASA engineers are computer monitoring the equipment and assembling a record of day-to-day performance. . Tech House is a laboratory rather than a mass production prototype, but its many benefits may influence home design and construction. In a period of sharply rising utility costs, widespread adoption of Tech House features could provide large-scale savings to homeowners and potentially enormous national benefit in resources conservation. Most innovations are aerospace spinoffs: Some of the equipment is now commercially available; other systems are expected to be in production within a few years. Around 1980, a Tech House-type of home could be built for $45-50,000 (1 976 dollars). It is estimated that the homeowner would save well over $20,000 (again 1976 dollars) in utility costs over the average mortgage span of 20 years.

Source record↗

A First Approach to Global Runoff Simulation using Satellite Rainfall Estimation

Many hydrological models have been introduced in the hydrological literature to predict runoff but few of these have become common planning or decision-making tools, either because the data requirements are substantial or because the modeling processes are too complicated for operational application. On the other hand, progress in regional or global rainfall-runoff simulation has been constrained by the difficulty of measuring spatiotemporal variability of the primary causative factor, i.e. rainfall fluxes, continuously over space and time. Building on progress in remote sensing technology, researchers have improved the accuracy, coverage, and resolution of rainfall estimates by combining imagery from infrared, passive microwave, and space-borne radar sensors. Motivated by the recent increasing availability of global remote sensing data for estimating precipitation and describing land surface characteristics, this note reports a ballpark assessment of quasi-global runoff computed by incorporating satellite rainfall data and other remote sensing products in a relatively simple rainfall-runoff simulation approach: the Natural Resources Conservation Service (NRCS) runoff Curve Number (CN) method. Using an Antecedent Precipitation Index (API) as a proxy of antecedent moisture conditions, this note estimates time-varying NRCS-CN values determined by the 5-day normalized API. Driven by multi-year (1998-2006) Tropical Rainfall Measuring Mission (TRMM) Multi-satellite Precipitation Analysis, quasi-global runoff was retrospectively simulated with the NRCS-CN method and compared to Global Runoff Data Centre data at global and catchment scales. Results demonstrated the potential for using this simple method when diagnosing runoff values from satellite rainfall for the globe and for medium to large river basins. This work was done with the simple NRCS-CN method as a first-cut approach to understanding the challenges that lie ahead in advancing the satellite-based inference of global runoff. We expect that the successes and limitations revealed in this study will lay the basis for applying more advanced methods to capture the dynamic variability of the global hydrologic process for global runoff monlto~ngin real time. The essential ingredient in this work is the use of global satellite-based rainfall estimation.

Hong, Yang↗

Clearing the Air: New Approaches to Life Support in Outer Space

This article reports on research into atmospheric revitalization systems for long-term space travel and the use ofCOMSOL Multiphysics to understand how structured sorbents can be used to improve the performance of adsorption processes via thermal management. We are developing the next generation of atmosphere revitalization systems, which will reach for new levels of resource conservation via a high percentage of loop closure. For example, a high percentage of carbon dioxide, exhaled by crew, can be converted via reaction to drinking water, closing the loop from human metabolic waste to supply. Adsorption processes play a lead role in these new/closed loop systems.

Knox, J.↗

Mobile Launch Platform Vehicle Assembly Area (SWMU 056) Biosparge Expansion Interim Measures Work Plan

This document presents the design details for an Interim Measure (IM) Work Plan (IMWP) for the Mobile Launch Platform/Vehicle Assembly Building (MLPV) Area, located at the John F. Kennedy Space Center (KSC), Florida. The MLPV Area has been designated Solid Waste Management Unit Number 056 (SWMU 056) under KSC's Resource Conservation and Recovery Act (RCRA) Corrective Action Program. This report was prepared by Geosyntec Consultants (Geosyntec) for the National Aeronautics and Space Administration (NASA) under contract number NNK09CA02B and NNK12CA13B, project control number ENV1642. The Advanced Data Package (ADP) presentation covering the elements of this IMWP report received KSC Remediation Team (KSCRT) approval at the December 2015 Team Meeting; the meeting minutes are included in Appendix A.

IMWP↗

Kennedy Space Center Press Site (SWMU 074) Interim Measure Report

This report summarizes the Interim Measure (IM) activities conducted at the Kennedy Space Center (KSC) Press Site ("the Press Site"). This facility has been designated as Solid Waste Management Unit 074 under KSC's Resource Conservation and Recovery Act Corrective Action program. The activities were completed as part of the Vehicle Assembly Building (VAB) Area Land Use Controls Implementation Plan (LUCIP) Elimination Project. The purpose of the VAB Area LUCIP Elimination Project was to delineate and remove soil affected with constituents of concern (COCs) that historically resulted in Land Use Controls (LUCs). The goal of the project was to eliminate the LUCs on soil. LUCs for groundwater were not addressed as part of the project and are not discussed in this report. This report is intended to meet the Florida Department of Environmental Protection (FDEP) Corrective Action Management Plan requirement as part of the KSC Hazardous and Solid Waste Amendments permit and the U.S. Environmental Protection Agency's (USEPA's) Toxic Substance Control Act (TSCA) self-implementing polychlorinated biphenyl (PCB) cleanup requirements of 40 Code of Federal Regulations (CFR) 761.61(a).

Measures↗

Interim Measures Report for the Headquarters Building Area Location of Concern (LOC) 2E East SWMU 104 John F. Kennedy Space Center, Florida

The Hazardous and Solid Waste Amendment portion of the National Aeronautics and Space Administration (NASA) Resource Conservation and Recovery Act (RCRA) Permit issued by the Florida Department of Environmental Protection (FDEP), requires identification and evaluation of all known Solid Waste Management Units (SWMUs) and Locations of Concern (LOCs) located on Kennedy Space Center (KSC) property. The KSC Headquarters Building Area (KHQA) has been identified as SWMU 104 under KSC's RCRA Program. This report summarizes the Interim Measure (IM) conducted by Geosyntec Consultants (Geosyntec) for NASA under Indefinite Delivery Indefinite Quantity Contract NNK12CA13B at the KHQA to mitigate potential exposure to polychlorinated biphenyl (PCB)-affected media at the eastern side of LOC 2E. The IM activities were conducted in June and July 2015 to remediate PCBs above the FDEP Residential Direct-Exposure (R-) Soil Cleanup Target Level (SCTL) of 0.5 milligram per kilogram (mg/kg) established by Chapter 62-777, Florida Administrative Code. The IM was performed in accordance with the IM Work Plan (IMWP) approved by the FDEP, dated August 2012. IM activities were conducted in accordance with the KSC Generic PCB Work Plan (NASA 2007).

Sager, Eric D.↗

Building M7-0505 Treatment Tank (SWMU 039) Annual Performance Monitoring Report

This Annual Performance Monitoring Report presents a summary of Interim Measure (IM) activities and an evaluation of data collected during the third year (June 2014 to September 2015) of operation, maintenance, and monitoring (OM&M) conducted at the Building M7-505 (M505) Treatment Tank area, Kennedy Space Center (KSC), Florida ("the Site"). Under KSC's Resource Conservation and Recovery Act Corrective Action Program, the M505 Treatment Tank area was designated Solid Waste Management Unit 039. Arcadis U.S., Inc. (Arcadis) began IM activities on January 10, 2012, after completion of construction of an in situ air sparge (IAS) system to remediate volatile organic compounds (VOCs) in groundwater at concentrations exceeding applicable Florida Department of Environmental Protection (FDEP) Chapter 62-777, Florida Administrative Code, Natural Attenuation Default Concentrations (NADCs). This report presents a summary of the third year of OM&M activities conducted between June 2014 and September 2015.

Source record↗

Supply Warehouse#3, SWMU 088 Operations, Maintenance, and Monitoring Report Kennedy Space Center, Florida

This document presents the findings, observations, and results associated with Operations, Maintenance, and Monitoring (OM&M) activities of Corrective Measures Implementation (CMI) activities conducted at Supply Warehouse #3 (SW3) located at John F. Kennedy Space Center (KSC), Florida from October 8, 2015, to September 12, 2016, and performance monitoring results for semi-annual sampling events conducted in March and September 2016. The primary objective of SW3 CMI is to actively decrease concentrations of trichloroethene (TCE) and vinyl chloride (VC) to less than Florida Department of Environmental Protection (FDEP) Natural Attenuation Default Concentrations (NADCs), and the secondary objective is to reduce TCE, cis-1,2-dichloroethene (cDCE), trans-1,2-dichloroethene (tDCE), 1,1-dichloroethene (11DCE), and VC concentrations to less than FDEP Groundwater Cleanup Target Levels (GCTLs). The SW3 facility has been designated Solid Waste Management Unit (SWMU) 088 under KSC's Resource Conservation and Recovery Act (RCRA) Corrective Action Program. Based on the results to date, the SW3 air sparging (AS) system is operating at or below the performance criteria as presented in the 2008 SW3 Corrective Measures Implementation (CMI) Work Plan and 2009 and 2012 CMI Work Plan Addenda. Since the start of AS system operations on December 19, 2012, through the September 2016 groundwater sampling event, TCE concentrations have decreased to less than the GCTL in all wells within the Active Remediation Zone (ARZ), and VC results remain less than NADC but greater than GCTL. Based on these results, team consensus was reached at the October 2016 KSC Remediation Team (KSCRT) meeting to continue AS system operations and semi-annual performance monitoring of volatile organic compounds in March 2017 at ten monitoring wells at select locations, and in September 2017 at four monitoring wells at select locations to reduce VC concentrations to below GCTL. Additionally, surface water samples will be collected at locations SW0001, SW0002, and SW0003 during both the March and September 2017 events. Team consensus was also reached at the October 2017 KSCRT meeting to continue with operation and maintenance (O&M) of the AS system at SW3.

REPORT↗

The Future of Oaks in the Santa Monica Mountains: A Case Study in Using Remote Sensing Data for Species Distributions Models

The Woolsey Fire began on November 8, 2018, and lasted for almost two weeks, during which it burned almost 100,000 acres of valuable landscape and habitat, including a vast area of woodland. The persistence of key woodland species provides aesthetic, monetary, and ecological value to the landscape through carbon sequestration, air temperature moderation, and erosion mitigation, among other ecosystem services. This study investigated the impact of the Woolsey Fire on native woodland species distributions and identified areas suitable for restoration within the Santa Monica Mountains National Recreation Area. The team partnered with the Resource Conservation District of the Santa Monica Mountains; National Park Service, Santa Monica Mountains National Recreation Area; California Department of Parks and Recreation, Los Angeles County Division; County of Los Angeles Fire Department, Prevention Services Bureau, Forestry Division; County of Los Angeles Department of Regional Planning; and the University of Montana. The Earth observations used include data from Landsat 8 Operational Land Imager, NASA ER-2 Jet Airborne Visible InfraRed Imaging Spectrometer, Shuttle Radar Topography Mission, and RapidEye. The team produced maps of burn severity from the Woolsey Fire, its impact on plant species distributions, and habitat suitability projections for 2050 and 2099 to assist partners in prioritizing areas for restoration. A plant community classification was successfully created using Multiple Endmember Spectral Mixture Analysis (MESMA). Overall accuracy was assessed at 90.54% by comparing the classification to validation pixels derived from ground truth information provided by our partners.

Roger Ly↗

Area South of K7-516, SWMU 100 Operations, Maintenance, and Monitoring Report Kennedy Space Center, Florida

This Operations, Maintenance, and Monitoring Report documents groundwater interim measure activities from March 30, 2019 through December 31, 2019 at the Area South of K7-516 site located at Kennedy Space Center (KSC), Florida. An air sparge (AS) system consisting of 16 AS wells was installed along the Barge Canal in 2012 to be protective of the Outstanding Florida Waters (OFW). The AS system was expanded in 2015 by installing 40 AS wells to remediate the hot spot (HS) area. Additional expansion activities were performed in 2018 through the installation of eight additional AS wells along the Barge Canal. Currently 24 OFW and 40 HS AS wells are in operation. This report includes performance monitoring events for the OFW and HS areas, along with an annual Interim Groundwater Monitoring (IGWM) event in the Western Area. The 516S site has been designated Solid Waste Management Unit 100 under KSC’s Resource Conservation and Recovery Act Corrective Action program. This document was prepared by Tetra Tech, Inc., for the National Aeronautics and Space Administration under Indefinite Delivery Indefinite Quantity Contract 80KSC019D0011/80KSC019F0068. The OFW and HS AS systems are meeting the performance criteria and IM objectives of preventing contaminant migration and remediating groundwater within the treatment zone. Team consensus was reached to continue operation of the combined OFW and HS AS systems (Meeting Minute 2002-M02, Decisions 2002-D06, D09 and D04). Team consensus was also reached to continue semi-annual OFW performance monitoring and annual monitoring for the IGWM Western Area for the same wells sampled during 2019 events. In the eastern area, MW13, MW14, and MW15 will be reduced from semi-annual to annual frequency. For the HS Area, team consensus was reached to continue the current annual/biennial monitoring program (Meeting Minute 2002-M02, Decisions 2002-D02, D03, D05, D07 and D08).

Patrice L. Lehocky↗

Components Cleaning Facility, SWMU 30 Interim Groundwater Monitoring Report Kennedy Space Center, Florida

This Interim Groundwater Monitoring (IGWM) Report (IGWMR) presents the findings of IGWM completed in June and December 2019 at the eastern portion of the Components Cleaning Facility (CCF East) site located at Kennedy Space Center (KSC), Florida. The site has been designated Solid Waste Management Unit (SWMU) 030 under KSC’s Resource Conservation and Recovery Act Corrective Action Program.

Patrice L Lehocky↗

Corrosion Atmospheric Exposure Facility PRL #239 SWMU Assessment Report/Confirmation Sampling Work Plan

The National Aeronautics and Space Administration (NASA) Resource Conservation and Recovery Act (RCRA) permit requires identification and evaluation of known Solid Waste Management Units (SWMU) located at the Kennedy Space Center (KSC). The Corrosion Atmospheric Exposure Facility (CAEF), also known as facility number K8-0600, and the Corrosion Test Area (CTA); also known as facility number K8-0237, herein referred to as the site, is designated Potential Release Location (PRL) 239 under the NASA RCRA permit. A SWMU Assessment (SA) was conducted between November 2019 and February 2020 to identify potential environmental impacts related to current and historic operations being conducted at the site. The SA included a site reconnaissance visit in February 2020, interviews with various personnel possessing knowledge of past work practices and operations at the site, and review of available historical documentation, engineering drawings, and facility inspection reports. Current site conditions were documented in photographs. Soil types and wildlife habitat were also evaluated. The objective of the assessment was to identify potential locations of concern (LOC) at the site and to determine whether further evaluation is required.

Kimberly Clower↗

Former Central Heat Plant, SWMU 045 Implementation Work Plan Kennedy Space Center, Florida

This Implementation Work Plan (IWP) presents detailed design elements for the air sparging (AS) Interim Measure (IM) design provided in the IM Work Plan (IMWP) within the High Concentration Plume (HCP) at the Former Central Heat Plan (CHP) located at Kennedy Space Center (KSC), Florida. The IMWP presented an approach to implement an AS IM to reduce chlorinated volatile organic compound concentrations to concentrations that facilitate a transition to long-term monitoring. CHP has been designated Solid Waste Management Unit 045 under KSC’s Resource Conservation and Recovery Act Corrective Action Program.

Christopher J Pike↗

Hydrocarbon Burn Facility SWMU 007 Interim Groundwater Monitoring Report Kennedy Space Center, Florida

This Interim Groundwater Monitoring (IGWM) Report presents the findings of IGWM activities completed in November/December 2020 for the Volatile Organic Compound (VOC) Area of the Hydrocarbon Burn Facility (HBF) at Kennedy Space Center (KSC), Florida. HBF has been designated as Solid Waste Management Unit 007 under the KSC Resource Conservation and Recovery Act Corrective Action Program.

Jennifer Buel↗

Components Cleaning Facility, SWMU 030 Eastern High-Concentration Plume Area Implementation Work Plan Kennedy Space Center, Florida

This Implementation Work Plan (IWP) presents detailed design elements and coordination specifics to implement an air sparging (AS) Interim Measure (IM) to remediate groundwater at the Components Cleaning Facility (CCF), Eastern High Concentration Plume (HCP) Area located at Kennedy Space Center (KSC), Florida. The objective of the CCF East IM is to remediate groundwater where trichloroethene, cis-1,2-dichloroethene, and vinyl chloride concentrations exceed Florida Department of Environmental Protection Natural Attenuation Default Criteria (NADC) (identified as the HCP) via AS and to transition to monitored natural attenuation. CCF has been designated Solid Waste Management Unit 030 under KSC’s Resource Conservation and Recovery Act Corrective Action Program.

James Lloyd↗

C-5 Electrical Substation (SWMU 066) Performance Monitoring Report

The C-5 Electrical Substation (C5ES) is a National Aeronautics and Space Administration (NASA) operated electrical power substation located at the John F. Kennedy Space Center (KSC), Florida. This facility has been designated Solid Waste Management Unit (SWMU) 066 under KSC’s Resource Conservation and Recovery Act (RCRA) Corrective Action program. This Performance Monitoring Report (PMR) presents the Interim Measure (IM) activities, including baseline sampling, air sparge system construction and operation, and performance monitoring, that were completed to remediate chlorinated volatile organic compounds (CVOC) in groundwater exceeding the Florida Department of Environmental Protection (FDEP) natural attenuation default concentrations (NADC).

Andrew Scott Starr↗

Wilson Corners SWMU 001 2019-2020 Annual Long-Term Monitoring Report Kennedy Space Center, Florida

This report presents a summary of the long-term monitoring (LTM) activities that occurred in 2019 and 2020 at Wilson Corners, Solid Waste Management Unit 001, at the John F. Kennedy Space Center (KSC), Florida. The site is monitored under KSC’s Resource Conservation and Recovery Act Corrective Action Program. Adaptive site management is being utilized through ongoing assessment, design, and interim measures. This approach also meets the requirements of Chapter 62-780, Florida Administrative Code. The goal of LTM at this site is threefold: to determine groundwater flow characteristics, monitor the downgradient concentration trends, and monitor select locations internal to the groundwater plume. Every 5 years, upgradient and side-gradient monitoring wells are sampled to verify delineation. The last time this was performed was in 2015. Sampling of these wells in 2020 was replaced with the direct push technology investigations in October 2020 and April 2021. The activities presented in this report include three field events: (1) December 2019 -groundwater gauging of 38 monitoring wells and sampling of 36 monitoring wells; (2) May 2020 - groundwater sampling of 7 monitoring wells; and (3) December 2020 - groundwater gauging of 49 monitoring wells and sampling of 43 monitoring wells. During the December 2019 and May 2020 events, monitoring wells were sampled using passive diffusion bags and were analyzed for a “full list” of volatile organic compounds (VOCs), including Freon 113. During the December 2020 event, the low flow sampling method was used, and samples were analyzed for a “select list” of VOCs, including Freon 113. The following conclusions can be made based on the 2019 and 2020 LTM results: •In December 2019 and December 2020, groundwater flow for the site was generally to the west with the individual zones only varying by occasional northerly and southerly components. This is generally consistent with historical observations at the site. •The GCTL plume continues to extend both horizontally and vertically beyond our current monitoring well network. •The vertical extent of VOCs was historically generally delineated by monitoring wells screened greater than 48 feet bls. The results from the two vertical extent monitoring wells WILC-MW0078 and WILC-MW0130 that were sampled during the 2019 and 2020 LTM indicate that groundwater VOC concentrations in both wells were greater than the GCTL. •Freon 113 was not detected above GCTLs during the 2019 and 2020 LTM events. Based on groundwater sampling activities performed during this reporting period, including recent DPT groundwater sampling conducted for the implementation of an air sparge system, the following recommendations are provided: •Install 10 new monitoring wells, which will be sampled along with 49 existing monitoring wells, to assist with delineation of the low concentration plume. The wells are listed inTable 4-1, and the proposed locations are presented on Figures4 -1 through 4-5. (Figures 4-1, 4-2, 4-3, and 4-5 also show updated plumes and proposed performance monitoring well locations. This information will be discussed and presented under a separate cover.) •Modify the annual LTM sampling plan as presented inTable 4-1. •Sampling for future events at the site will be conducted using low flow pumping methods. The next annual LTM sampling event is currently planned for December 2021. Please note the 10 new monitoring wells will not be installed before this event but will be installed as part of the upcoming IM construction and will be sampled during baseline sampling, along with the 49 existing monitoring wells. Following this sampling event, it is recommended that the Annual LTM be combined with the performance monitoring under the IM implementation, and LTM be temporarily discontinued. Objectives of the 2021 LTM are to: (i) evaluate groundwater gradient and flow direction by collecting depth to water measurements from LTM wells; (ii) continue monitoring the peripheral VOC trends in the northern, southern, and western portions of the site by monitoring existing wells and installing and monitoring new wells as recommended; and (iii) monitor select internal plume wells.

Jennifer Lynn Joyal↗

PFAS Treatment Pilot Study using Granular Activated Carbon at Kennedy Space Center, Florida

Per- and polyfluoroalkyl substances (PFAS) have been found in investigative derived waste (IDW) generated from groundwater sampling and remediation activities conducted at Kennedy Space Center (KSC), Florida. PFAS are exceptionally strong compounds because of carbon-fluorine bonds resulting in resistance to degradation, low chemical reactivity, compound stability, and persistence in the environment. The regulatory status of PFAS is very dynamic. PFAS is not considered a hazardous waste and has no federal or state (Florida) cleanup requirements at this time. Due to the current and unknown future of the regulatory and treatment landscape, non-hazardous IDW, based upon site volatile organic compounds (VOCs) regulated under Title 40 of Federal Regulations part 261, containing PFAS is not being processed for off-site waste disposal under KSC’s Resource Conservation and Recovery Act permit as a proactive precaution. Long-term storage of aqueous IDW in the meantime was determined to be inadequate due to the potential for spills and/or leaks. A very limited number treatment methods are available at this time. To date, granular activated carbon (GAC) and ion exchange technologies have been found to be some of the most consistent treatment options for removing PFAS from aqueous media. Therefore, a pilot study using GAC was developed at KSC to determine the feasibility of treating non-hazardous IDW containing PFAS to reduce the total volume of PFAS waste and minimize the risk of leaks or spills while storing the waste until complete PFAS-destructive treatment options are more readily available. NASA wanted the pilot test to be able to demonstrate the ability to completely remove 18 PFAS compounds and the site VOCs to below the state of Florida groundwater cleanup target levels (GCTLs).

Michael J Deliz↗