Search NASASearch

SEARCH · Search NASA

Results for “Reusable Launch Vehicle”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

264 records · Page 2

Moon Base Transportation - Deliveries to the Lunar Surface

Development of the Moon Base will enable a home away from home for astronauts who will live and work at humanity’s first lunar outpost. In this effort, NASA’s Moon Transportation Office is responsible for enabling the transformational missions required to deliver habitats, supplies, science payloads, and all other elements needed to cultivate a permanent presence on the Lunar Surface. The Mission Concept (MC) is characterized through evaluation of an end-to-end architecture that can successfully deliver a generalized heavy large-volume payload, in excess of 4000 kg, to a precision landing and touchdown on the lunar surface. The mission architecture utilizes a single launch configuration of a Lunar Lander (LL) with a unique propellant system. The LL has an integral orbital transfer capability and features jettisonable elements. The design circumvents the need for prop transfer on orbit and multiple launch configurations. The launch vehicle (LV) for this work will assume the capability to deliver a payload in excess of 40,000 kg to orbit, affording multiple LV solutions. Considerations for the LL and payload deployment from the fairing are assumed to be handled through compliance with a launch providers’ Interface Requirements Document (IRD). The MC will span from launch at Kennedy Space Center (KSC) to terminal descent and touchdown on the lunar surface, requiring a total ΔV on the order of 6 km/s beyond what is required to get the vehicle stack to a 200 km circular Low Earth Orbit (LEO). Major mission phases include: launch and launch vehicle separation, transfer operations, pre-landing navigation, and lunar descent and touchdown. A Concept of Operations (ConOps) is used as the primary design driver for defining architecture of the vehicles necessary to achieve final payload delivery. Numerous ground rules and assumptions will be provided for each phase of the mission. Concept designs for the LL is presented. An emphasis of the design maximizes a feasible path for maturation, manufacturing, and operation. A self-imposed practical consideration for this effort is the incorporation of legacy designed hardware to minimize expensive, time-intensive, and high-risk hardware development cycles. The propulsion system of the LL adopts a conventional storable bipropellant configuration of monomethyl hydrazine (MMH) and mixed oxides of nitrogen (MON3). This effort will showcase a unique propellant delivery system to minimize the reliance on propellant management devices (PMDs) during descent. Numerous key constraints have been considered, across the multiple segments of the mission. These include the unique aspects of center of gravity (CG) management, thruster plume effects including self-impingement, propulsion system hardware limitations, navigation during multiple mission phases, and landing gear geometry for uneven terrain. These constraints shape the trades necessary for precision landing of heavy cargo and ensure compatibility with broader Moon Base Transportation concepts. The resulting insights inform future transportation strategies for the Moon and beyond; directly contributing to the development of cargo‑delivery standards that will support the long‑term buildup of a sustainable, continuously inhabited Moon Base.

Lunar Habitat

Ares I-X Ground Diagnostic Prototype

Automating prelaunch diagnostics for launch vehicles offers three potential benefits. First, it potentially improves safety by detecting faults that might otherwise have been missed so that they can be corrected before launch. Second, it potentially reduces launch delays by more quickly diagnosing the cause of anomalies that occur during prelaunch processing. Reducing launch delays will be critical to the success of NASA's planned future missions that require in-orbit rendezvous. Third, it potentially reduces costs by reducing both launch delays and the number of people needed to monitor the prelaunch process. NASA is currently developing the Ares I launch vehicle to bring the Orion capsule and its crew of four astronauts to low-earth orbit on their way to the moon. Ares I-X will be the first unmanned test flight of Ares I. It is scheduled to launch on October 27, 2009. The Ares I-X Ground Diagnostic Prototype is a prototype ground diagnostic system that will provide anomaly detection, fault detection, fault isolation, and diagnostics for the Ares I-X first-stage thrust vector control (TVC) and for the associated ground hydraulics while it is in the Vehicle Assembly Building (VAB) at John F. Kennedy Space Center (KSC) and on the launch pad. It will serve as a prototype for a future operational ground diagnostic system for Ares I. The prototype combines three existing diagnostic tools. The first tool, TEAMS (Testability Engineering and Maintenance System), is a model-based tool that is commercially produced by Qualtech Systems, Inc. It uses a qualitative model of failure propagation to perform fault isolation and diagnostics. We adapted an existing TEAMS model of the TVC to use for diagnostics and developed a TEAMS model of the ground hydraulics. The second tool, Spacecraft Health Inference Engine (SHINE), is a rule-based expert system developed at the NASA Jet Propulsion Laboratory. We developed SHINE rules for fault detection and mode identification. The prototype uses the outputs of SHINE as inputs to TEAMS. The third tool, the Inductive Monitoring System (IMS), is an anomaly detection tool developed at NASA Ames Research Center and is currently used to monitor the International Space Station Control Moment Gyroscopes. IMS automatically "learns" a model of historical nominal data in the form of a set of clusters and signals an alarm when new data fails to match this model. IMS offers the potential to detect faults that have not been modeled. The three tools have been integrated and deployed to Hangar AE at KSC where they interface with live data from the Ares I-X vehicle and from the ground hydraulics. The outputs of the tools are displayed on a console in Hangar AE, one of the locations from which the Ares I-X launch will be monitored. In a previous publication, we discussed how we selected the three tools based primarily on their ability to be certified for human spaceflight and described our plans for the prototype. This abstract is due October 23, 2009, and the Ares I-X launch is currently scheduled for October 27, 2009. If this abstract is accepted, then the full paper will describe how the prototype performed before the launch. It will include an analysis of the prototype's accuracy, including false-positive rates, false-negative rates, and receiver operating characteristics (ROC) curves. It will also include a description of the prototype's computational requirements, including CPU usage, main memory usage, and disk usage. If the prototype detects any faults during the prelaunch period then the paper will include a description of those faults. Similarly, if the prototype has any false alarms then the paper will describe them and will attempt to explain their causes. Also, the paper will describe the three tools and how they are used in the prototype. It will include a description of the TEAMS models of the Ares I-X first-stage TVC and associated ground hydraulics and how we adapted the TVC model for use in real-time diagnostics. It will describe the SHINE rules used for fault detection and mode identification and the software architecture that interfaces the various pieces of existing software that are part of the prototype to one another. It will describe how we selected the sensor values and commands that were used to train the IMS model and how we optimized the number of clusters in the IMS model. It will include screen shots of the graphical display that we developed in Java to display the outputs of the three tools. Because Ares I-X data was not yet available to us while we were developing the prototype, we used historical data from the Space Shuttle's Solid Rocket Booster (SRB) TVCs and the associated ground hydraulics to train IMS and to test the entire prototype. Because most of the failure modes that we modeled have never occurred in the Shuttle we inserted simulated failures into the Shuttle data. The Ares I-X first-stage TVC is very similar to the SRB TVC and we expect the data will be very similar. After the launch, we will determine how similar the data actually is and report how any differences in the data affected the diagnostic accuracy of the prototype. Finally, although we did not get the prototype certified, we designed it in a way that it could be certified and wrote a preliminary certification plan. The paper will include a brief summary of how we considered the need for certification in the design of the prototype, how we tested the prototype before deploying it to Hangar AE, and how we would propose to get it certified if it were deployed as an operational system. The paper will conclude with a description of some of the challenges we faced and some of the lessons learned in developing and deploying the prototype.

International Space Station

The Micrometeoroid Satellite Explorer XIII (1961 CHI)

Papers on the spacecraft, experiments, telemeter, and power supply systems, as well as the launch vehicle, for the Explorer XIII micrometeoroid satellite are presented. In addition to the major contributions from the Langley Research Center, two papers from the Goddard Space Flight Center are included. The preflight test program and results are discussed. Ascent flight data and orbital performance are also presented. Finally, separate sections describe the aims of the experiments, discuss the design development, construction, and performance of the apparatus used, and report the results.

Micrometeoroid

Enhancing Nasa Sounding Rocket Capabilities Through Composite Material Adoption

Sounding rockets are a suborbital research platform employed by NASA for heliophysics, astrophysics, and geospace science investigations, and for technology development. They follow semi-parabolic trajectories and are launched using surplus military, and commercial, solid-propellant rocket motors. NASA sounding rocket payloads are comprised of standard, modular subassemblies, designed to perform specific functions critical to achieving mission success criteria. Since the program’s inception, payload length and mass have trended upwards, limiting the capability of the platform to reach exospheric apogees and decreasing the time above critical altitudes to observe solar and celestial targets. To offset this trend, composite materials may be of use in payload and subsystem design to decrease payload mass. This investigation seeks to understand if there is a practical benefit to introducing composite materials on the NSRP by assessing mission specific impacts to those missions conducted in fiscal year 2024. To accurately estimate the mass of a composites-based payload, a standard subsystem (NIACS) underwent structural reconfiguration. Materials were selected that align with NSRP design, manufacturing, and testing standards. NIACS reconfiguration resulted in a mass reduction of 19.6% which was then applied to the payload system in entirety. Using vehicle performance carpet plots, delta apogee and time above the Kármán line were determined. Performance improvements were then evaluated against that mission’s success criteria to determine if that mission would have benefitted from using composite materials. On average, each mission would have gained 59.8 kilometers apogee and 62.9 seconds above the Kármán line. However, only nine of the seventeen missions would have benefitted from these performance improvements. Two of the missions could have used a lower-impulse launch vehicle to achieve mission success. Upleg stability met programmatic criteria; downleg instability and dynamic pressure improved, showing that ballast would not offset the mass reduction of using composite materials. Cost analysis showed that production costs will increase 39%. For the two missions that could have used a lower-impulse launch vehicle, the cost of the launch vehicle would have offset payload production costs. In summary, composite materials are not recommended for universal use on NASA sounding rocket payloads due to unclear programmatic benefits and added cost. However, they are justified for optical astrophysics and heliophysics missions, high-apogee (exosphere) requirements, or when they reduce payload costs versus higher impulse launch vehicles. Reflown, recoverable subsystems should use composites to enhance apogee and observation time.

Robert Henry Burth

PROTECT: Production and Reuse of Thermally Efficient Ceramic Thermal Protection Systems

PROTECT (Production and Reuse Of Thermally Efficient Ceramic TPS) is a NASA Early Career Initiative focused on developing the next generation of reusable ceramic thermal protection systems (TPS). This project addresses key challenges in TPS design, including temperature capability, thermal stability, and refurbishment time, by integrating novel material development with predictive modeling. Leveraging enhanced capabilities in NASA’s Porous Microstructure Analysis (PuMA) software, PROTECT introduces new modeling tools to predict the thermal and mechanical behavior of fibrous ceramic materials. These tools enable accurate prediction of performance metrics such as thermal conductivity and structural integrity, reducing reliance on costly physical testing. Preliminary advances in these areas will be presented. To support model validation, PROTECT is building a comprehensive database of raw material properties using advanced characterization techniques, including micro computed tomography (CT) scanning in collaboration with the University of Illinois Urbana-Champaign (UIUC). The presentation will detail the sampling workflows and analysis methods used to generate this detailed microstructural data and how it is used to develop improved models in PuMA. This multi-center collaboration, spanning NASA (JSC, ARC, KSC, GRC), Oak Ridge National Laboratory, UIUC, and SpaceX, is developing tailored TPS solutions for LEO, lunar, and Martian missions. By bridging heritage systems with the demands of modern spaceflight, PROTECT contributes to the advancement of reusable TPS technologies for future exploration missions.

Propulsion, Refractory, and Coating Materials

Manned Lunar Landing Via Rendezvous

In any mission description, the vehicles, the flight profiles, and the astrionics hardware to im- plement the mission are all tightly interwoven things. A final result evolves only after many iterations to the solution are made. This paper will describe one of these iterations in the Saturn C-5 Earth Orbit Rendezvous approach to the Manned Lunar Landing Program. Since the iter- ation to be described in an nthone, there exists some basis for the hope that the perturbation from the final solution is small. This paper is not concerned with the landing itself, but only with those operations leading to injection of the space craft into the lunar trans- fer trajectory. However, as is to be expected, it is the target conditions which set the pace for the overall operation. The entire operation must be sized to culminate at a time and place which places the lunar target in an attainable position. The procedure would call for a burst of activity lasting over a relatively short time as compared to the long and extensive preparations leading up to it. The activity must be aimed at the opening of the lunar "launch window". Figure 1 illustrates the variation in the velocity increment required to launch a vehicle into a lunar transfer trajectory from a 485 kilometer earth orbit. The minima are at irregularly spaced intervals and are a func- tion of the inclination of the lunar and the earth satellite planes and of the position of the moon in its orbit around the earth (i. e. , the day of the month). In an operations analysis these spacings will influence the number of vehicles on the launch pad (primary and back-up) , their state of readi- ness, the firing rate, and also the flight profile to be chosen. Whether it is decided to go by "con- necting" or by "tanking" mode, the objective must be to get the spacecraft in the launch ready state at the opening of one of these launch windows. It may be desired that the first vehicle be capable of remaining in a functionally capable state even after bridging one or more of the gaps between the windows. This consideration will influence the design of the vehicles as well as the operational modes to be designed into the flight control hard- ware. For example, a sleep switch may be de- sirable from the standpoint of savings in battery we ight.

LUNAR LANDING

NASA Talks: Space Shuttle Columbia - Lessons Learned: Columbia Launch and Recovery

On February 25, 2026, this NASA Talk was held regarding the Space Shuttle Columbia (Columbia Launch & Recovery). Crew & Thermal System Division (EC) partnered with Kennedy Space Center (KSC) and Engineering Directorate (EA) to bring this talk to Johnson Space Center (JSC) centering on what led up to and transpired after the Space Shuttle Columbia accident. Some recovered debris was on exhibit during the talk. Retired NASA Columbia Vehicle Manager Scott Thurston presented this talk. Mr. Thurston brings a wealth of knowledge from his mission experience. This talk was timely and a solemn reminder of the critical importance of diligence, safety, and excellence in our work. EA Director Julie Kramer White welcomed the 400+ center-wide in-person audience, and EC Division Chief Rubik Sheth introduced the speakers. This event was held in the JSC Teague Auditorium, recorded, and executed by the EC in-house STAR Productions team. This record includes an mp4 video presentation with a run time of 36 min. 20 sec.; in color; with sound.

NASA Talks

PROTECT: Production and Reuse of Thermally Efficient Ceramic Thermal Protection Systems

PROTECT (Production and Reuse Of Thermally Efficient Ceramic TPS) is a NASA Early Career Initiative focused on developing the next generation of reusable ceramic thermal protection systems (TPS). This project addresses key challenges in TPS design, including temperature capability, thermal stability, and refurbishment time, by integrating novel material development with predictive modeling. Leveraging enhanced capabilities in NASA’s Porous Microstructure Analysis (PuMA) software, PROTECT introduces new modeling tools to predict the thermal and mechanical behavior of fibrous ceramic materials. These tools enable accurate prediction of performance metrics such as thermal conductivity and structural integrity, reducing reliance on costly physical testing. Preliminary advances in these areas will be presented. To support model validation, PROTECT is building a comprehensive database of raw material properties using advanced characterization techniques, including micro computed tomography (CT) scanning in collaboration with the University of Illinois Urbana-Champaign (UIUC). The presentation will detail the sampling workflows and analysis methods used to generate this detailed microstructural data and how it is used to develop improved models in PuMA. This multi-center collaboration, spanning NASA (JSC, ARC, KSC, GRC), Oak Ridge National Laboratory, UIUC, and SpaceX, is developing tailored TPS solutions for LEO, lunar, and Martian missions. By bridging heritage systems with the demands of modern spaceflight, PROTECT contributes to the advancement of reusable TPS technologies for future exploration missions.

Propulsion, Refractory, and Coating Materials

NASA’s SLS (Space Launch System) Rocket Ready for Artemis II Lunar Mission

In early 2026, NASA will launch the Artemis II mission, an approximately 10-day long lunar mission that will fly three NASA astronauts and one CSA (Canadian Space Agency) astronaut on a free-return trajectory around the Moon, following a one-day checkout of their Orion spacecraft in Earth orbit. The mission will be the first to launch astronauts aboard NASA’s Orion spacecraft and on top of the agency’s SLS (Space Launch System) rocket. The mission will also deploy four 12U CubeSats as secondary payloads from the Orion stage adapter, following Orion separation and departure. The payloads, developed by four of NASA’s international partners, will perform a variety of science and technology investigations. The SLS and Orion for the mission are currently stacked in the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida and are undergoing final preparations to rollout to Launch Pad 39B for a tanking test before launch. In addition to preparations for the Artemis II mission, significant progress is being made on the SLS for the Artemis III mission, which is targeted to return astronauts to the lunar surface no later than 2029. Major components of the core stage and solid rocket boosters are already at NASA Kennedy undergoing build-up for the mission. Data from the Artemis II launch and mission, as well as progress to subsequent missions, as available, will be presented.

Bruce Askins

NASA’s SLS (Space Launch System) Rocket Ready for Artemis II Lunar Mission

In early 2026, NASA will launch the Artemis II mission, an approximately 10-day long lunar mission that will fly three NASA astronauts and one CSA (Canadian Space Agency) astronaut on a free-return trajectory around the Moon, following a one-day checkout of their Orion spacecraft in Earth orbit. The mission will be the first to launch astronauts aboard NASA’s Orion spacecraft and on top of the agency’s SLS (Space Launch System) rocket. The mission will also deploy four 12U CubeSats as secondary payloads from the Orion stage adapter, following Orion separation and departure. The payloads, developed by four of NASA’s international partners, will perform a variety of science and technology investigations. The SLS and Orion for the mission are currently stacked in the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida and are undergoing final preparations to rollout to Launch Pad 39B for a tanking test before launch. In addition to preparations for the Artemis II mission, significant progress is being made on the SLS for the Artemis III mission, which is targeted to return astronauts to the lunar surface no later than 2029. Major components of the core stage and solid rocket boosters are already at NASA Kennedy undergoing build-up for the mission. Data from the Artemis II launch and mission, as well as progress to subsequent missions, as available, will be presented.

Bruce R Askins

Parameterization of Nuclear Electric Propulsion Trajectories for Outer Solar System Science Missions Methodology

This manuscript addresses the methodology used to create a database of low thrust missions to outer planets. This database utilizes previous work modeling NEP systems to determine the maximum delivered mass to outer planets based on a range of mission parameters, such as time of flight, launch vehicle, and power system mass. Trajectories were selected which best utilized NEP benefits. Additionally, a discussion on the database outputs for missions to Saturn is included, such as time of flight based on trajectory type and maximum payload, given a specific launch vehicle. The purpose of this work was to create a basis for future mission design, and a tool to investigate general trends across mission options.

Outer Planets

Artemis CubeSats Help Advance Exploration of the Moon, Mars, and Beyond

On April 1, NASA launched the Artemis II mission – the first crewed mission of the Artemis campaign. The nine-day lunar flyby launched on the agency’s SLS (Space Launch System) rocket and had four astronauts test the Orion spacecraft in high Earth orbit and in deep space. Four 12U CubeSats also launched on the mission, housed within the SLS’s Orion stage adapter (OSA). The spacecraft were deployed approximately five-and-a-half hours into the flight, following Orion separation and departure from SLS, as the SLS interim cryogenic propulsion stage (ICPS) and the attached OSA were in a high Earth orbit on an atmospheric disposal trajectory. All four CubeSats were successfully deployed from the launch vehicle. Deployment statuses of the spacecraft, along with updates about the SLS rocket and Artemis missions, are reported in this paper. The paper will also discuss opportunities for CubeSat payloads on future Artemis missions.

David Hitt

Artemis CubeSats Help Advance Exploration of the Moon, Mars, and Beyond

On April 1, NASA launched the Artemis II mission – the first crewed mission of the Artemis campaign. The nine-day lunar flyby launched on the agency’s SLS (Space Launch System) rocket and had four astronauts test the Orion spacecraft in high Earth orbit and in deep space. Four 12U CubeSats also launched on the mission, housed within the SLS’s Orion stage adapter (OSA). The spacecraft were deployed approximately five-and-a-half hours into the flight, following Orion separation and departure from SLS, as the SLS interim cryogenic propulsion stage (ICPS) and the attached OSA were in a high Earth orbit on an atmospheric disposal trajectory. All four CubeSats were successfully deployed from the launch vehicle. Deployment statuses of the spacecraft, along with updates about the SLS rocket and Artemis missions, are reported in this paper. The paper will also discuss opportunities for CubeSat payloads on future Artemis missions.

Russell Lane

General Purpose Data-Driven Monitoring for Space Operations

As modern space propulsion and exploration systems improve in capability and efficiency, their designs are becoming increasingly sophisticated and complex. Determining the health state of these systems, using traditional parameter limit checking, model-based, or rule-based methods, is becoming more difficult as the number of sensors and component interactions grow. Data-driven monitoring techniques have been developed to address these issues by analyzing system operations data to automatically characterize normal system behavior. System health can be monitored by comparing real-time operating data with these nominal characterizations, providing detection of anomalous data signatures indicative of system faults or failures. Data-driven techniques have a number of advantages over other methods for monitoring complex space vehicles. Unlike model-based systems, the developer does not need to understand or encode the internal operation of the system. The knowledge required to monitor the system is automatically derived from archived data from system operation. Unlike rule-based systems, data-driven systems do not require system analysts to define nominal relationships among sensors. Analysts can and often do determine these relationships for a system with few sensors; it is more difficult to analytically determine the nominal relationship among a large number of sensors. Data-driven techniques are not limited to low-dimensional spaces and work as effectively with dozens of parameters as they do with a few. Knowledge bases formed by data-driven techniques are also easy to update. As the operating envelope of the monitored system is expanded, data-driven techniques can be quickly retrained to incorporate the new behavior into the knowledge base. The expertise and time-consuming process of updating a model or rule base to maintain consistency with the new operation is not required. The Inductive Monitoring System (IMS) is a data-driven system health monitoring software tool that has been successfully applied to several aerospace applications. IMS uses a data mining technique called clustering to analyze archived system data and characterize normal interactions between parameters. This characterization, or model, of nominal operation is stored in a knowledge base that can be used for real-time system monitoring or analysis of archived events. System data is compared with the nominal IMS model to produce a measure of how well current system behavior matches the normal behavior defined by the training data. Significant deviations from the nominal system model can provide alerts to system malfunctions or precursors of significant failures. The scope of IMS based data-driven monitoring applications continues to expand with current development activities. Successful IMS deployment in the International Space Station (ISS) flight control room to monitor ISS attitude control systems has led to applications in other ISS flight control disciplines, such as thermal control. It has also generated interest in data-driven monitoring capability for Constellation, NASA's program to replace the Space Shuttle with new launch vehicles and spacecraft capable of returning astronauts to the moon, and then on to Mars. Several projects are currently underway to evaluate and mature the IMS technology and complementary tools for use in the Constellation program. These include an experiment on board the Air Force TacSat-3 satellite, and ground systems monitoring for NASA's Ares I-X and Ares I launch vehicles. The TacSat-3 Vehicle System Management (TVSM) project is a software experiment to integrate fault and anomaly detection algorithms and diagnosis tools with executive and adaptive planning functions contained in the flight software on-board the Air Force Research Laboratory TacSat-3 satellite. The TVSM software package will be uploaded after launch to monitor spacecraft subsystems such as power and guidance, navigation, and control (GN&C). It will analyze data in real-time to demonstrate detection of faults and unusual conditions, diagnose problems, and react to threats to spacecraft health and mission goals. The experiment will demonstrate the feasibility and effectiveness of integrated system health management (ISHM) technologies with both ground and on-board experiments. Initially, the TVSM software will run open loop, providing system health information and recommendations to ground operators, without automatically performing fault-mitigating corrective actions. After the end of the satellite's mission, closed loop tests combining TVSM monitoring and diagnosis with reactive capabilities by the flight software will be performed. In addition to monitoring for long periods of actual operation, the experiment will include fault injection into TacSat-3 data as well as commanded operations to test and evaluate automatic ISHM monitoring and recovery under controlled conditions.

Satellites

Terrestrial Environment (Climatic) Criteria Guidelines for Use in Aerospace Vehicle Development, 1973 Revision

This document provides guidelines on probable climatic extremes and probabilities-of-occurrence of terrestrial environment data specifically applicable for NASA space vehicles and associated equipment development. The geographic areas encompassed are The Eastern Test Range (Cape Kennedy, Florida); Huntsville, Alabama; New Orleans, Louisiana; The Space and Missile Test Center (Vandenberg AFB California); Sacramento, California; Wallops Test Range (Wallops Island, Virginia); White Sands Missile Range, New Mexico; and intermediate transportation areas. In addition, sections have been included to provide information on the general distribution of natural environment extremes in the United States (excluding Alaska and Hawaii), cloud cover, and some worldwide climatic extremes. Although all these areas are covered, the major emphasis is given to the Kennedy Space Center launch area and Vandenburg Air Force Base due to importance in NASA's future large space vehicle programs. This document presents the latest available information on probable climatic extremes, and supersedes information presented in TM X-64589. The information in this document is recommended for employment in the development of space vehicles and associated equipment design and operational criteria, unless otherwise stated in contract work specifications.

cloud cover

Modular Assembled Radiators for Nuclear Electric Propulsion (NEP) VehicLes (MARVL) Project Thermal Technology Development

Nuclear Electric Propulsion (NEP) has been considered for crew and cargo class missions to Mars for more than six decades. The Primary Heat Rejection Subsystem (PHRS) of an NEP vehicle expels the megawatts of waste heat generated by the Power Conversion Subsystem (PCS). In previous studies, integrating the majority of the NEP vehicle within a single launch fairing required the use of complex deployable elements and resulted in reduced PCS efficiency. To achieve the necessary radiating area, past design studies have utilized massive multi-wing folding radiators resulting in conceptual PHRS designs that have been widely acknowledged as non-optimal. The Modular Assembled Radiators for NEP VehicLes (MARVL) project is incorporating in-Space Assembly (iSA) into the design process to realize lightweight, modular, and more capable PHRS radiators. Since the project’s Authority to Proceed (ATP) date of October 2024, the project team has been developing a modular design for the PHRS radiators that will be suitable for both the Mars mission environments and iSA commissioning operations. This document captures the current progress of the incremental technology development for the thermal components of the MARVL System of Interest (SOI).

Modular Radiator

Crewed Space Vehicle Battery Safety Requirements

This requirements document is applicable to all batteries on crewed spacecraft, including vehicle, payload, and crew equipment batteries. It defines the specific provisions required to design a battery that is safe for ground personnel and crew members to handle and/or operate during all applicable phases of crewed missions, safe for use in the enclosed environment of a crewed space vehicle, and safe for use in launch vehicles, as well as in unpressurized spaces adjacent to the habitable portion of a space vehicle. The required provisions encompass hazard controls, design evaluation, and verification. The extent of the hazard controls and verification required depends on the applicability and credibility of the hazard to the specific battery design and applicable missions under review. Evaluation of the design and verification program results shall be completed prior to certification for flight and ground operations. This requirements document is geared toward the designers of battery systems to be used in crewed vehicles, crew equipment, crew suits, or batteries to be used in crewed vehicle systems and payloads (or experiments). This requirements document also applies to ground handling and testing of flight batteries. Specific design and verification requirements for a battery are dependent upon the battery chemistry, capacity, complexity, charging, environment, and application. The variety of battery chemistries available, combined with the variety of battery-powered applications, results in each battery application having specific, unique requirements pertinent to the specific battery application. However, there are basic requirements for all battery designs and applications, which are listed in section 4. Section 5 includes a description of hazards and controls and also includes requirements.

Jeevarajan, Judith A.