Search NASA⌕ Search

SEARCH · Search NASA

Results for “Risk Resource”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Risk to Ecological Resources on Burial Waste Sites on the Hanford Site, Washington - 20248

The US and other nations have a large nuclear and chemical waste remediation task remaining from World War II, the Cold War, and industrial activities. The US Department of Energy (DOE) has the largest task in the U.S., with Hanford (Washington State) being the most contaminated site, with the longest and most costly cleanup program projected to extend to the end of the century. One of the greatest remediation problems at Hanford are the burial waste facilities, some of which are inside the 200 Areas on the Central Plateau, while others are outside the 200 Areas. These areas are associated with waste sites, pipes, and contaminated trenches, posing technical cleanup challenges to meet DoE's remediation goals, including protection of human health and the environment commensurate with Tri- Party Agreement and current regulatory requirements. In this paper we select one of the legacy waste sites (the BC Cribs and Trenches) as a case study to explore how risk to ecological resources varies during and as a consequence of remediation on sites primarily considered legacy waste sites. We used the risk methodology developed by the Consortium for Risk Evaluation with Stakeholder Participation (CRESP) during the Hanford Site-wide Risk Review. The CRESP methodology included evaluating the risk to receptors, including human health, the Columbia River, groundwater, and ecological and cultural resources. The risk evaluation process for ecological receptors included defining the boundaries of each evaluation unit (EU) to be remediated, definition of a suitable buffer area that might be affected, and consideration of the known resource value based on field work. This information, coupled with known remediation options or strategies, allowed us to develop a risk rating for ecological resources. Site risks were evaluated on a scale of 'not discernible' to 'very high' risk. Consideration of the risks at the buried waste sites was complicated by uncertainties in remediation methods and the degree of restoration that would occur as part of the remediation process. We use the BC Cribs and Trenches as a case study to explore why the risks are low currently but increase during remediation. The current 'not discernible to low' risk rating is due to the lack of high quality ecological resources on the BC Cribs and Trenches EU, except for edge areas (with some state-listed species). During remediation the risks increase to 'medium', mainly due to high quality resources on adjacent buffer lands, which could be disrupted during active remediation. Medium and high quality resources on the edge of the site are continuous with higher quality native shrub-steppe habitat on the buffer. Ecological resources on some of the areas surrounding the 200 East and West Areas are some of the highest quality shrub-steppe areas on the Hanford Site, and risk to these resources could be prevented by planning before and during remediation to minimize disruption. For example, lay down areas for the BC Cribs and Trenches can be minimized by careful planning. Heavy truck and other vehicular traffic can be minimized. Spread of the noxious weeds now on some of the site can be prevented, and the spread of invasive species into the site (particularly near undisturbed shrub-steppe habitat) can be reduced. Further, the areas around and between the 200 East and West Areas have been largely undisturbed and can serve as a source of seeds and propagules for any revegetation that occurs as part of the remediation process. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Risk to ecological resources following remediation can be due mainly to increased resource value of successful restoration: A case study from the Department of Energy's Hanford Site

Several nations are faced with the need to remediate large contaminated sites following World War II, the Cold War, and abandoned industrial sites, and to return them to productive land uses. In the United States, the Department of Energy (DOE) has the largest cleanup challenge, and its Hanford Site in the state of Washington has the most extensive and most expensive cleanup task. Ideally, the risk to ecological resources on remediation sites is evaluated before, during, and after remediation, and the risk from, or damage to, ecological resources from contaminants should be lower following remediation. In this paper, we report the risk to ecological resources before, during, and as a consequence of remediation on contaminated units requiring cleanup, and then examine the causes for changes in risk by evaluating 56 cleanup evaluation units (EUs) at the Hanford Site. In this case, remediation includes a restoration phase. In general, the risk to ecological and eco-cultural resources is currently not discernible or low at most contaminated units, increases during remediation, and decreases thereafter. Remediation often causes physical disruption to ecosystems as it reduces the risk from exposure to contaminants. Most new remediation projects at the Hanford Site include ecological restoration. Ecological restoration results in the potential for the presence of higher quality resources after remediation than currently exists on these contaminated lands and facilities. Although counter-intuitive, our evaluation of the risk to ecological resources following remediation indicated that a significant percentage of units (61%) will be at increased risk in the post-remediation period. This increased risk is due to DOE's successful remediation and restoration that results in a higher percent of native vegetation and higher ecological value on the sites in the post-remediation period than before. These newly-created resources can then be at risk from post-remediation activities. Risks to these new higher quality resources include the potential for spread of invasive species and of noxious grasses used in previous cleanup actions, disruption of ecosystems (including those with state or federally listed species and unique ecosystems), compaction of soil, use of pesticides to control invasive species, and the eventual need for continued monitoring activities. Thus, by greatly improving the existing habitat and health of eco-receptors, and maintaining habitat corridors between high quality habitats, the ecological resources in the post-remediated units are at risk unless care is taken to protect them. Many of the negative effects of both remediation and future monitoring (or other future land uses) can be avoided by planning and management early in the remediation process. We suggest DOE and other agencies convene a panel of managers, remediation scientists, regulators, environmental and ecological scientists, Native Americans, economists, and the public to develop a generic list of performance metrics for the restoration phase of remediation, including evaluation of success, which could be applied across the DOE complex.

54 ENVIRONMENTAL SCIENCES↗

Habitat use by female desert tortoises suggests tradeoffs between resource use and risk avoidance

Animals may select habitat to maximize the benefits of foraging on growth and reproduction, while balancing competing factors like the risk of predation or mortality from other sources. Variation in the distribution of food resources may lead animals to forage at times or in places that carry greater predation risk, with individuals in poor quality habitats expected to take greater risks while foraging. We studied Mojave desert tortoises ( Gopherus agassizii ) in habitats with variable forage availability to determine if risk aversion in their selection of habitat relative was related to abundance of forage. As a measure of risk, we examined tortoise surface activity and mortality. We also compared tortoise body size and body condition between habitats with ample forage plants and those with less forage plants. Tortoises from low forage habitats selected areas where more annual plants were nutritious herbaceous flowering plants but did not favor areas of greater perennial shrub cover that could shelter them or their burrows. In contrast, tortoises occupying high forage habitats showed no preference for forage characteristics, but used burrows associated with more abundant and larger perennial shrubs. Tortoises in high forage habitats were larger and active above ground more often but did not have better body condition. Mortality was four times higher for females occupying low forage habitat than those in high forage habitat. Our results are consistent with the idea that tortoises may minimize mortality risk where food resources are high, but may accept some tradeoff of greater mortality risk in order to forage optimally when food resources are limiting.

59 BASIC BIOLOGICAL SCIENCES↗

Cyber100 Compass User Guide

This document provides an overview of the Cyber100 Compass tool and serves as a guide to users interested in understanding the cybersecurity risks facing their clean energy transition. The National Renewable Energy Laboratory (NREL) developed the Cyber100 Compass tool for cyber risk assessment at the system-of-systems level for system planners trying to reach high levels of renewables. Two offices of the U.S. Department of Energy (DOE) - the Office of Electricity and the Office of Cybersecurity, Energy Security, and Emergency Response-funded NREL to develop this framework that will enable grid system planners to understand and mitigate cybersecurity risk for grids transitioning to high levels of renewable generation, including 100%. Cyber100 Compass can help systems planners apply the principle of security-by-design at scale. Investing in an upfront understanding of system-of-systems (where the constituent systems are operating entities of the different renewable resources) risks from high-renewable grids will result in a more resilient grid at a lower long-term cost.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Program Risk Planning with Risk as a Resource

The current focus of NASA on cost effective ways of achieving mission objectives has created a demand for a change in the risk management process of a program. At present, there is no guidelines as to when risk taking is justified due to high cost for a marginal improvement in risk. As a remedial step, Dr. Greenfield of NASA, developed a concept of risk management with risk as a resource. In the report, the following topics are addressed: (1) the risk management approach; (2) planning risk and program life cycle; (3) key components of a typical program; (4) the risk trading methodology; (5) review and decision process; (6) merits of the proposed risk planning approach; and (7) recommendations.

Ray, Paul S.↗

How Can Probabilistic Solar Power Forecasts Be Used to Lower Costs and Improve Reliability in Power Spot Markets? A Review and Application to Flexiramp Requirements

Net load uncertainty in electricity spot markets is rapidly growing. There are five general approaches by which system operators and market participants can use probabilistic forecasts of wind, solar, and load to help manage this uncertainty. These include operator situation awareness, resource risk hedging, reserves procurement, definition of contingencies, and explicit stochastic optimization. We review these approaches, and then provide a case study in which a method for using probabilistic solar forecasts to define needs for reserves is developed and evaluated. The case study has three parts. First, we describe building blocks for enhancing the Watt-Sun solar forecasting system to produce probabilistic irradiance and power forecasts. Second, relationships between Watt-Sun forecasts for multiple sites in California and the system's need for flexible ramp capability (flexiramp) are defined by machine learning and statistical methods. Third, the performance of present methods to defining flexiramp requirements, which are not conditioned on weather and renewables forecasts, is compared with that of probabilistic solar forecast-based requirements, using a multi-timescale production costing model with an 1820-bus representation of the WECC power system. Significant potential savings in fuel and flexiramp procurement costs from using solar-informed reserve requirements are found.

14 SOLAR ENERGY↗

Risk Analysis for Resource Planning Optimization

The main purpose of this paper is to introduce a risk management approach that allows planners to quantify the risk and efficiency tradeoff in the presence of uncertainties, and to make forward-looking choices in the development and execution of the plan. Demonstrate a planning and risk analysis framework that tightly integrates mathematical optimization, empirical simulation, and theoretical analysis techniques to solve complex problems.

resource planning optimization↗

Risk as a Resource - A New Paradigm

NASA must change dramatically because of the current United States federal budget climate. The American people and their elected officials have mandated a smaller, more efficient and effective government. For the past decade, NASA's budget had grown at or slightly above the rate of inflation. In that era, taking all steps to avoid the risk of failure was the rule. Spacecraft development was characterized by extensive analyses, numerous reviews, and multiple conservative tests. This methodology was consistent with the long available schedules for developing hardware and software for very large, billion dollar spacecraft. Those days are over. The time when every identifiable step was taken to avoid risk is being replaced by a new paradigm which manages risk in much the same way as other resources (schedule, performance, or dollars) are managed. While success is paramount to survival, it can no longer be bought with a large growing NASA budget.

Risk Resource↗

Risk Analysis for Resource Planning Optimization

This paper describes a systems engineering approach to resource planning by integrating mathematical modeling and constrained optimization, empirical simulation, and theoretical analysis techniques to generate an optimal task plan in the presence of uncertainties.

optimization↗

Perceptions of Climate Risk and Use of Climate Risk Information by Natural Resource Conservation Stakeholders Participating in ADVANCE Projects in Asia and Latin America

Integrating climate risk information into resilience-building activities in the field is important to ensure that adaptation is based on the best available science. Despite this, many challenges exist when developing, communicating, and incorporating climate risk information. There are limited resources on how stakeholders perceive risks, use risk information, and what barriers exist to limit knowledge integration. This paper seeks to define the following: 1) What do conservation stakeholders consider to be the most significant climate risks they face now and possibly in the future? 2) What have been the most significant barriers to their using climate risk information? 3) What sources and types of knowledge would be most useful for these managers to overcome these barriers? A survey was conducted among stakeholders (n = 224) associated with World Wildlife Fund projects in tropical and subtropical countries. A very high proportion of stakeholders used climate risk information and yet faced integration-related challenges, which included too much uncertainty and the lack of a relevant scale for planning. The main factors preventing the use of climate risk information in decision-making were unavailability of climate risk information, no or limited financial or human resources available to respond, lack of organizational mandate or support, and no or limited institutional incentives. Comparing perceived current and future risks revealed a decline in concern for some future climate hazards. Survey respondents identified scientific reports, climate scientists, and online sources as the most useful information sources of climate risk information, while (i) maps and illustrations; (ii) scenarios format; and (iii) data tables, graphs, and charts were identified as user-friendly formats.

Climate risk↗

The battery failure databank: Insights from an open-access database of thermal runaway behaviors of Li-ion cells and a resource for benchmarking risks

The thermal response of Li-ion cells can greatly vary for identical cell designs tested under identical conditions, the distribution of which is costly to fully characterize experimentally. The open-source Battery Failure Databank presented here contains robust, high-quality data from hundreds of abuse tests spanning numerous commercial cell designs and testing conditions. Data was gathered using a fractional thermal runaway calorimeter and contains the fractional breakdown of heat and mass that was ejected, as well as high-speed synchrotron radiography of the internal dynamic response of cells during thermal runaway. The distribution of thermal output, mass ejection, and internal response of commercial cells are compared for different abuse-test conditions, which when normalized on a per amp-hour basis show a strong positive correlation between heat output from cells, the fraction of mass ejected from the cells, their energy- and power-density. Ejected mass was shown to contain 10x more heat per gram than non-ejected mass. The causes of 'outlier' thermal and ejection responses i.e., extreme cases, are elucidated by high-speed radiography which showed how occurrences such as vent clogging can create more hazardous conditions. High-speed radiography also demonstrated how the time-resolved interplay of thermal runaway propagation and mass ejection influences the total heat generated.

25 ENERGY STORAGE↗

NASA Propulsion Concept Studies and Risk Reduction Activities for Resource Prospector Lander

The trade study has led to the selection of propulsion concept with the lowest cost and net lowest risk -Government-owned, flight qualified components -Meet mission requirements although the configuration is not optimized. Risk reduction activities have provided an opportunity -Implement design improvements while development with the early-test approach. -Gain knowledge on the operation and identify operation limit -Data to anchor analytical models for future flight designs; The propulsion system cold flow tests series have provided valuable data for future design. -The pressure surge from the system priming and waterhammer within component operation limits. -Enable to optimize the ullage volume to reduce the propellant tank mass; RS-34 hot fire tests have successfully demonstrated of using the engines for the RP mission -No degradation of performance due to extended storage life of the hardware. -Enable to operate the engine for RP flight mission scenarios, outside of the qualification regime. -Provide extended data for the thermal and GNC designs. Significant progress has been made on NASA propulsion concept design and risk reductions for Resource Prospector lander.

Trinh, Huu P.↗

Solar PV, Wind Generation, and Load Forecasting Dataset for ERCOT 2018: Performance-Based Energy Resource Feedback, Optimization, and Risk Management (P.E.R.F.O.R.M.)

This report describes the Advanced Research Projects Agency-Energy Performance-Based Energy Resource Feedback, Optimization, and Risk Management (PERFORM) Electric Reliability Council of Texas (ERCOT) dataset consisting of load, solar, and wind deterministic and probabilistic forecasts at three timescales. This dataset consists of 1 year of time-coincident load, wind, and solar actuals and probabilistic forecasts for a region similar to ERCOT. All the data are stored in Hierarchical Data Format 5 (HDF5) files and have been uploaded to an Amazon Web Services repository. The ERCOT data set has 2 years (2017, 2018) of actuals and 1 year (2018) of probabilistic forecasts. These data are provided at various spatial (i.e., site-level, zone-level, and system-level) and temporal scales (i.e., day-ahead, intraday, and intra-hour). Specifically, data are provided for 125 existing wind sites, 22 existing solar sites, 139 proposed wind sites, and 204 proposed solar sites.

14 SOLAR ENERGY↗

Risk-controlled Expansion Planning with Distributed Resources (REPAIR) v1.0

The Risk-controlled Expansion Planning with Distributed Resources (REPAIR) is an innovative tool to support decisions around utility grid planning to prevent and mitigate the impact of outages caused by routine equipment failures (reliability) or by extreme events (resilience), such as storms, earthquakes or wildfires that long term interruption of service. REPAIR is a risk-based optimization and decision-making model allowing informed and transparent "cost vs risk" decisions regarding infrastructural planning of electric utilities. The model considers long-term resilience and reliability planning strategies that rely on traditional infrastructure upgrade (e.g. circuit hardening, reinforcement, new substations, etc.) or new investment alternatives, such as DERs.

Heleno, Miguel [Lawrence Berkeley National Laborat↗