Search NASA⌕ Search

SEARCH · Search NASA

Results for “Risk mitigation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Decision Aid for Conjunction Risk Mitigation by Differential Drag

In the previous five years, the rate of conjunctions that the NASA Conjunction Assessment Risk Analysis (CARA) team processed and analyzed has more than tripled. (NASA CARA, 2024) New missions in the early development phases are now required to plan for dealing with conjunctions under the present space environment, and also projecting forward into a future likely with even further increased utilization of the space environment. Some missions are investigating the possibility of using differential drag to remediate conjunctions without expending limited fuel or for missions without propulsive capabilities. The NASA CARA team studied the historical record of conjunctions to evaluate the circumstances under which differential drag may be successfully applied and have developed a series of tables to use as a decision aid for missions considering differential drag. Currently, if a CARA-protected mission with maneuvering capabilities is predicted to have a conjunction with probability of collision (Pc) greater than 7E-5 (the default value of the ‘yellow threshold’, which may have some other value agreed by CARA and the mission during the Orbital Collison Avoidance Planning (OCAP) process), CARA will use its Maneuver Trade Space (MTS) tool to evaluate and recommend options for the timing and magnitude of a risk mitigation maneuver (RMM), based on the mission’s capabilities. If the conjunction’s Pc is greater than 1E-4, the ‘red threshold’, then an RMM must be executed per NASA Procedural Requirements (NPR) 8079.1 (NASA, 2023), although missions may execute an RMM even if the Pc is lower. The magnitude of the maneuver is typically a few cm/s, and CARA estimates how many will be required for the mission’s nominal lifetime – typically a few per year – during the OCAP process, to inform the mission’s delta-V requirement. For traditional satellites, this is usually smaller than other requirements for orbit insertion, maintenance, and disposal, but for CubeSats or other small satellite missions, a propulsion system may not provide much more than a few cm/s of delta-V or may not fit at all within the available budget of money, time, size, weight, and/or power (SWaP). Conversely, CubeSats often have deployable solar panels, which offer the capacity to have much higher areas facing some directions than others. Such a mission can instead use ‘differential drag’ to remediate a conjunction -- in other words, change its drag area (usually increasing) to deviate from the predicted collision course. This is how Planet’s Dove spacecraft maintain their formations and remediate conjunction risks without having on-board propulsion (Foster, et al., 2017) (Griffith, et al., 2021). CARA has been developing improvements to MTS to support differential-drag for NASA's missions -- where it is effective. CARA records all conjunctions of their protected payloads, with historical records starting in 2005 (with significant conjunction events starting to occur on or after 2013). From this record, approximately 7,300 had a Pc greater than 1E-4 at 3 days prior to the time of closest approach, the time analyzed for differential drag efficacy. Of those, approximately 4,300 had fully-defined covariance matrices stored for both the primary and secondary objects; this set of conjunctions is the basis for the analysis of this work. CARA’s MTS tool was used to propagate the primary satellite forward from that decision point with varying degrees of increase to ballistic coefficient (BC). Because these conjunctions came from multiple missions, the nondimensional ‘delta-BC’ factor was used to quantify and normalize the increase in ballistic coefficient, defined as follows: Delta-BC = BC_new / BC_old - 1 Positive delta-BC factors represent an increase in drag compared to the nominal attitude, while negative delta-BC factors (to a minimum of -1) represent a decrease in drag. At the conclusion of the differential-drag ‘maneuver’, the Pc was recalculated to evaluate whether or not the conjunction was mitigated (Pc < 3E-6). These results were then binned and sorted along several axes, including altitude, amount of delta-BC, and (pre-maneuver) rate of energy dissipation (EDR), to identify underlying patterns. The altitude plot is shown in Figure 1. To validate this analysis, we consulted the record of a NASA mission which uses differential drag to maintain its orbit and remediate conjunction risk. CARA’s empirical record of the mission’s orbit history suggests it achieves a delta-BC of 2.2. Of the twenty-one RMM plans that were submitted by this mission, eighteen were matched with conjunctions in the historical record; of those, twelve were successfully remediated (final measured Pc < 3E-6), and six were not. This is consistent with the expected efficacy for missions orbiting at that altitude. We are presently simulating this mission’s RMMs with MTS; this work is ongoing, but so far, the MTS results are qualitatively in agreement with the empirical results -- correctly predicting that a maneuver would or would not remediate a conjunction, if not exactly matching the final post-remediation Pc value. We found that differential drag was most successful for satellites with perigees below 560 km, and which could adopt an average delta-BC of 2 or greater (that is, increasing their ballistic coefficient by a factor of 3). However, this is a difficult threshold for a mission to clear; very few spacecraft are capable of adopting a high-drag configuration for 72 hours continuously. Planet’s Dove spacecraft use differential drag to remediate conjunctions (Griffith, et al., 2021), and they have a maximum delta-BC factor of 9, but in practice (with mission and charging constraints) they achieve a time-averaged delta-BC that is closer to 2 (Foster, et al., 2017). A mission’s differential drag utility strongly depends on the operational constraints that has the capacity to limit the time-averaged delta-BC. A mission with a high maximum delta-BC of 5 or more can have an effective delta-BC of less than 1 due to operational constraints such as instrument and solar panel pointing, especially if this constraint results in holding an intermediate drag value for most of its orbit. CARA has developed tables that can be used as decision aids to advise missions-in-development about the best way to utilize their differential drag capabilities. For missions below 560 km with the operational flexibility to devote multiple days to holding a high-drag configuration (or a sufficiently high drag ratio to compensate for limitations on that time), they are -- more likely than not -- able to successfully remediate high-risk conjunctions. Conversely, missions that do not meet these exacting criteria -- most missions -- can instead be advised to use on-board propulsion systems to perform RMMs, or to turn their minimum-area face towards the approach vector, thereby reducing Pc at the moment of conjunction due to the decreased Hard-Body Radius (HBR), that is a strongly correlated variable in the Pc calculations. (NASA, 2023)

conjunction assessment↗

The Sensor Test for Orion RelNav Risk Mitigation (STORRM) Development Test Objective

The Sensor Test for Orion Relative-Navigation Risk Mitigation (STORRM) Development Test Objective (DTO) flew aboard the Space Shuttle Endeavour on STS-134 in May- June 2011, and was designed to characterize the performance of the flash LIDAR and docking camera being developed for the Orion Multi-Purpose Crew Vehicle. The flash LIDAR, called the Vision Navigation Sensor (VNS), will be the primary navigation instrument used by the Orion vehicle during rendezvous, proximity operations, and docking. The DC will be used by the Orion crew for piloting cues during docking. This paper provides an overview of the STORRM test objectives and the concept of operations. It continues with a description of STORRM's major hardware components, which include the VNS, docking camera, and supporting avionics. Next, an overview of crew and analyst training activities will describe how the STORRM team prepared for flight. Then an overview of in-flight data collection and analysis is presented. Key findings and results from this project are summarized. Finally, the paper concludes with lessons learned from the STORRM DTO.

Christian, John A.↗

Assessing Risk and Driving Risk Mitigation for First-of-a-Kind Advanced Reactors

Planning and decision making amidst programmatic and technological risks represent significant challenges for projects. This presentation addresses the four step risk-assessment process needed to determine clear path forward to mature needed technology and design, license, and construct advanced nuclear power plants, which have never been built before, including Small Modular Reactors. This four step process has been carefully applied to the Next Generation Nuclear Plant. STEP 1 - Risk Identification Risks are identified, collected, and categorized as technical risks, programmatic risks, and project risks, each of which result in cost and schedule impacts if realized. These include risks arising from the use of technologies not previously demonstrated in a relevant application. These risks include normal and accident scenarios which the SMR could experience including events that cause the disablement of engineered safety features (typically documented in Phenomena Identification Ranking Tables (PIRT) as produced with the Nuclear Regulatory Commission) and design needs which must be addressed to further detail the design. Product - Project Risk Register contained in a database with sorting, presentation, rollup, risk work off functionality similar to the NGNP Risk Management System . STEP 2 - Risk Quantification The risks contained in the risk register are then scored for probability of occurrence and severity of consequence, if realized. Here the scoring methodology is established and the basis for the scoring is well documented. Product - Quantified project risk register with documented basis for scoring. STEP 3 - Risk Handling Strategy Risks are mitigated by applying a systematic approach to maturing the technology through Research and Development, modeling, test, and design. A Technology Readiness Assessment is performed to determine baseline Technology Readiness Levels (TRL). Tasks needed to mature the technology are developed and documented in a roadmap. Product - Risk Handling Strategy. STEP 4 - Residual Risk Work off The risk handling strategy is entered into the Project Risk Allocation Tool (PRAT) to analyze each task for its ability to reduce risk. The result is risk-informed task prioritization. The risk handling strategy is captured in the Risk Management System, a relational database that provides conventional database utility, including data maintenance, archiving, configuration control, and query ability. The tool's Hierarchy Tree allows visualization and analyses of complex relationships between risks, risk mitigation tasks, design needs, and PIRTs. Product - Project Risk Allocation Tool and Risk Management System which depict project plan to reduce risk and current progress in doing so.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

The 7 Year Evolution of EOS CA Support for Planning & Executing Risk Mitigation Maneuvers

This presentation will discuss the evolution of Collision Avoidance (CA) support for planning and executing Risk Mitigation Maneuvers (RMMs) for the Earth Observing System (EOS) Aqua, Aura, and Terra satellites within the seven-year period of January 2015 through December 2021. Several enhancements were implemented by the EOS team to expedite and improve the RMM planning and execution process, including updates to High Interest Event (HIE) analysis, maneuver preparation, maneuver ephemeris generation, conjunction event data screening, and maneuver commanding. As of 2022, these advancements allow the EOS team to plan and execute an RMM within 5 hours of identification with an accurate and low-risk solution. This represents a vast improvement from the 30 hours required to turn around an RMM back in 2015. In addition, the current process is substantially less error prone. Details of this progression and the specific aspects of each supporting component are explicated in the content of the presentation.

Syed Hasan↗

Integrated Transmission-Distribution Multi-Period Switching for Wildfire Risk Mitigation: Improving Speed and Scalability with Distributed Optimization: Preprint

With increasingly severe wildfire conditions driven by climate change, utilities must manage the risk of wildfire ignitions from electric power lines. During "public safety power shutoff'" events, utilities de-energize power lines to reduce wildfire ignition risk, which may result in load shedding. Distributed energy resources provide flexibility that can help support the system to reduce load shedding when lines are de-energized. We investigate a coordinated transmission-distribution optimization problem that balances wildfire risk mitigation and load shedding. We model distribution systems that include battery energy storage systems which may support loads when transmission lines are de-energized. This multi-period integrated transmission-distribution optimal switching problem jointly optimizes line switching decisions, the generators' setpoints, load shedding, and the batteries' states of charge, resulting in significant computational challenges. To improve scalability, we decompose the problem over both space and time and apply a distributed optimization algorithm. Using a large-scale synthetic California test case with realistic distribution models and real wildfire risk data, we show that distributed optimization can solve large-scale multi-period switching problems that are otherwise intractable for centralized solvers. We also discuss challenges and future directions for improving the distributed algorithm's convergence performance as the number of time periods increases.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Ground Data System Risk Mitigation Techniques for Faster, Better, Cheaper Missions

With the advent of faster, cheaper, and better missions, NASA Projects acknowledged that a higher level of risk was inherent and accepted with this approach. It was incumbent however upon each component of the Project whether spacecraft, payload, launch vehicle, or ground data system to ensure that the mission would nevertheless be an unqualified success. The Small Explorer (SMEX) program's ground data system (GDS) team developed risk mitigation techniques to achieve these goals starting in 1989. These techniques have evolved through the SMEX series of missions and are practiced today under the Triana program. These techniques are: (1) Mission Team Organization--empowerment of a closeknit ground data system team comprising system engineering, software engineering, testing, and flight operations personnel; (2) Common Spacecraft Test and Operational Control System--utilization of the pre-launch spacecraft integration system as the post-launch ground data system on-orbit command and control system; (3) Utilization of operations personnel in pre-launch testing--making the flight operations team an integrated member of the spacecraft testing activities at the beginning of the spacecraft fabrication phase; (4) Consolidated Test Team--combined system, mission readiness and operations testing to optimize test opportunities with the ground system and spacecraft; and (5). Reuse of Spacecraft, Systems and People--reuse of people, software and on-orbit spacecraft throughout the SMEX mission series. The SMEX ground system development approach for faster, cheaper, better missions has been very successful. This paper will discuss these risk management techniques in the areas of ground data system design, implementation, test, and operational readiness.

Catena, John J.↗

Supply Chain Risk Mitigation for Scientific Facilities and Tools

In November 2021, the U.S. Department of Energy (DOE) Office of Science (SC) convened a roundtable on “Supply Chain Risk Mitigation for Scientific Facilities and Tools” to gather information about current supply chain challenges in key technology areas unique to SC or critical to its mission. The roundtable brought together technical, project management, and procurement experts from DOE national laboratories, industry, academia, and other government agencies. Panelists explored opportunities, possible partnerships, and mechanisms to strengthen the domestic supply chain for critical SC technologies.

99 GENERAL AND MISCELLANEOUS↗

Subsidence Risk Mitigation in LLW Final Covers: A Case History - 18286

Typical waste packaging and disposal practices at low-level radioactive waste (LLW) disposal facilities, while adequate for safe transportation and facility operations, introduce significant subsidence risk for the facilities' final cover systems. Subsidence is often caused by the collapse of voids in the waste packaging and surrounding cover soils that eventually propagate to the ground surface. This subsidence could result in the loss of final cover system integrity, stormwater ponding, concentrated flow of surface water and/or gas, increased leachate generation, transport of contaminants from the landfill, and potential adverse chemical reactions within the waste mass. For new LLW facilities, steps can be taken to minimize the subsidence potential of newly placed waste. However, there is a significant inventory of existing disposal facilities (trenches, pits, shafts, vaults, etc.), tank farms, and historic, subsurface burial grounds that require final covers - all of which present real subsidence risks. Final covers for these existing LLW disposal sites can be engineered to mitigate these risks. A case history of a 60-acre LLW final cover system design and construction project illustrates an innovative approach to this problem that offers superior risk mitigation compared to typical final cover design practice. This approach combines engineering simulations of the projected final cover mechanical performance, specific probabilistic performance targets, and targeted cover system improvements to manage the subsidence risk in the final design. The result is a successful final cover project that meets the needs of the community, state and federal regulators, and facility owner. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Utilizing Open-Source Earth Observations to Inform the Toa Baja Municipality’s Flood Risk Mitigation Efforts and Educate the Public

Global climate changes contribute to more intense and frequent tropical storms, subjecting places like Toa Baja, Puerto Rico to critical damage. Known as “the underwater city” due to its propensity to flood, residents of Toa Baja face constant flood risk. During extreme tropical storm events, such as Hurricane Maria in 2017, residents experienced up to 20 feet of inundation. The NASA DEVELOP National Program collaborated with the Municipio Autónomo de Toa Baja, ResilientSEE-PR, and the MIT Urban Risk Lab to supplement 2018 FEMA HEC-RAS flood maps that designate 63% of Toa Baja as a flood plain. This analysis provides a high-resolution interpretation of flood risk through two lenses; susceptibility and vulnerability. For this analysis, susceptibility consists of nine weighted layers: NDVI, landcover, slope, elevation, topographic wetness index, height above nearest drainage, saturated hydraulic conductivity, distance to water, and storm surge. These factors are consistently used to evaluate susceptibility to flood, but their weights vary by analysis. Vulnerability consists of population, informal settlements, and building density, which were given equal weight. Susceptibility and vulnerability were combined to map flood risk. This analysis used a bivariate legend to understand the different levels of risk along a spectrum from low susceptibility and low vulnerability (low risk) to high susceptibility and high vulnerability (high risk). Data processed in Google Earth Engine, which identified historical inundation on various occasions, were used to validate the flood susceptibility layers. Results showed 89% of areas designated as high susceptibility are located within the floodway designated by the FEMA HEC-RAS maps. The eastern region of Toa Baja is most at risk for flooding due to high susceptibility to flooding along with a high density of population, buildings, and informal settlements. The resulting map also reveals the presence of smaller high-risk areas all around the municipality. This analysis provides scientific evidence for flood risk mitigation in Toa Baja by highlighting areas that might be impacted by strong floods in the future. Additionally, these results are communicated in an Esri ArcGIS StoryMap, an accessible platform that can easily inform the public about the flood risk in their neighborhood.

Adriana Le Compte↗

Full-Scaled Advanced Systems Testbed: Ensuring Success of Adaptive Control Research Through Project Lifecycle Risk Mitigation

The National Aeronautics and Space Administration's Dryden Flight Research Center completed flight testing of adaptive controls research on the Full-Scale Advance Systems Testbed (FAST) in January of 2011. The research addressed technical challenges involved with reducing risk in an increasingly complex and dynamic national airspace. Specific challenges lie with the development of validated, multidisciplinary, integrated aircraft control design tools and techniques to enable safe flight in the presence of adverse conditions such as structural damage, control surface failures, or aerodynamic upsets. The testbed is an F-18 aircraft serving as a full-scale vehicle to test and validate adaptive flight control research and lends a significant confidence to the development, maturation, and acceptance process of incorporating adaptive control laws into follow-on research and the operational environment. The experimental systems integrated into FAST were designed to allow for flexible yet safe flight test evaluation and validation of modern adaptive control technologies and revolve around two major hardware upgrades: the modification of Production Support Flight Control Computers (PSFCC) and integration of two, fourth-generation Airborne Research Test Systems (ARTS). Post-hardware integration verification and validation provided the foundation for safe flight test of Nonlinear Dynamic Inversion and Model Reference Aircraft Control adaptive control law experiments. To ensure success of flight in terms of cost, schedule, and test results, emphasis on risk management was incorporated into early stages of design and flight test planning and continued through the execution of each flight test mission. Specific consideration was made to incorporate safety features within the hardware and software to alleviate user demands as well as into test processes and training to reduce human factor impacts to safe and successful flight test. This paper describes the research configuration, experiment functionality, overall risk mitigation, flight test approach and results, and lessons learned of adaptive controls research of the Full-Scale Advanced Systems Testbed.

Pavlock, Kate M.↗

Numerical Simulations of Geologic Storage Reservoir Management to Support Risk Mitigation Evaluation

This report provides a detailed description of a set of numerical simulations that represent reservoir behavior over time in response to different operational decision scenarios for detection of potential leakage and reduction or avoidance of leakage impact at a hypothetical geological carbon storage (GCS) site. These simulations serve as the basis for a series of GCS leakage risk forecasts that are to be developed using the National Risk Assessment Partnership’s Open-Source Integrated Assessment Model (NRAP-Open-IAM), and a demonstration of a simple decision support workflow for evaluation of mitigation strategies based on results of those system model forecasts. This risk assessment and decision support study is forthcoming. Four injection scenarios were considered: a constant rate carbon dioxide (CO 2 ) injection case (base case), a case with CO 2 injection rate adjustment, a case with early termination of injection operations, and a case with brine extraction. CO 2 injection operations were controlled to ensure that the pressure transient remains below the defined manageable reservoir fracture pressure, with consideration shown to hypothetical locations within the modeled spatial domain where the overburden was weaker and lower transient pressure increases were allowable. Additionally, a brine extraction alternative was considered as a reservoir management and risk mitigation option to reduce reservoir pressure, steer the plume away from any hypothetical geohazard such as fault as needed, and enhance storage capacity. Such operational actions contribute to risk management overtime. This study explores the potential utility of reservoir management for risk reduction at GCS sites. This study shows that the injection design may modify the time to CO 2 breakthrough at a legacy well; in particular, these results show that brine extraction can add value for mitigating risk both by delaying leakage and reducing pressure build-up. For the scenario considered, both pressure plots and pressure distributions demonstrate that pressure build-up was decreased by 3% with brine extraction. Additionally, extraction of brine afforded enhancement of CO 2 storage capacity by 5% compared to the base case. These findings suggest that brine extraction has substantial potential to steer the risk-related reservoir effects away from known geohazards (e.g., faults and legacy wells) by conducting pressure transient effects and CO 2 plume movement toward the production well. Injection rate adjustment scenarios considered in this study show potential value for managing both reservoir pressure transients and CO 2 plume behavior. Operational actions for reducing injection and/or early termination of injection (as compared to the base case), however, require careful design; tailoring both the extent and timing of injection rate adjustment over the injection and post-injection operational period must be thoroughly planned to balance maximizing storage and minimizing subsurface environmental risk. The study also gives preliminary consideration to the effectiveness that monitoring strategy may play in providing useful information to inform reservoir management decisions for risk reduction. Two types of monitoring were considered: 1) pressure build-up or pressure transient; and 2) potential leakage detection from a CO 2 mass or plume. Four hypothetical legacy wells, two plugged and two abandoned, were placed in the model domain. Monitoring along these wells was measured over time in individual stacked reservoir formations and shale formations to support risk mitigation decisions, especially operational decisions that assisted in risk reduction. These simulations will serve as the basis for a series of GCS leakage risk forecasts that are to be developed using NRAP’s Open-IAM, and demonstration of a simple decision support workflow for comparative assessment of mitigation alternatives based on results of those system model forecasts. This risk assessment and decision support study is forthcoming.

54 ENVIRONMENTAL SCIENCES↗

InVEST Urban Development: Incorporating Earth Observation Data into the Integrated Valuation of Ecosystem Services and Tradeoffs (InVEST) Urban Flood Risk Mitigation Model Python API

Urban flooding poses as one of the biggest issues for cities today, as its impacts are amplified by both climate change and urbanization. The Natural Capital Project’s Integrated Valuation of Ecosystem Services and Tradeoffs (InVEST) Urban Flood Risk Mitigation (UFRM) model, which benefits from its simplicity and robustness, is commonly used in NASA DEVELOP projects for disaster mitigation, urban planning, and environmental justice issues. While InVEST UFRM model was able to produce the surface water runoff and retention map sufficient for the scopes of past projects, the model accuracy and spatial variability need improvement. Since the current InVEST UFRM model employs constant rainfall depth for all pixels in the area of interest (AOI), the model suffers from inaccurately estimating rainfall depth, runoff volume, and flood depth. Therefore, we adapted the model so that satellite-based precipitation raster datasets (i.e., Integrated Multi-satellitE Retrievals for Global Precipitation Measurement [GPM IMERG]) can be used instead of a single constant value. We simulated the flood events on August 21st and August 22nd, 2017 in Wyandotte County, Kansas using both our modified and the original InVEST UFRM model and then compared the results after incorporating the rainfall raster into the model. Areas with developed land on the land use map predicted moderate to high flood volume in the original volume regardless of the actual amount of precipitation. The modified model considered the rainfall depth’s spatial variation achieving less overestimation of flood runoff and volume at low-to-moderate rainfall area.

Son Do↗

InVEST Urban Development: Incorporating Earth Observation Data into the Integrated Valuation of Ecosystem Services and Tradeoffs (InVEST) Urban Flood Risk Mitigation Model Python API

Urban flooding poses as one of the biggest issues for cities today as its impacts are amplified by both climate change and urbanization. The Natural Capital Project’s Integrated Valuation of Ecosystem Services and Tradeoffs (InVEST) Urban Flood Risk Mitigation (UFRM) model, which benefits from its simplicity and robustness, is commonly used in NASA DEVELOP projects for disaster mitigation, urban planning, and environmental justice issues. While the InVEST UFRM model was able to produce the surface water runoff and retention map sufficient for the scopes of past projects, the model’s accuracy and spatial variability need improvement. Since the current InVEST UFRM model employs constant rainfall depth for all pixels in the area of interest (AOI), the model suffers from inaccurately estimating rainfall depth, runoff volume, and flood depth. Therefore, we adapted the model so that satellite-based precipitation raster datasets (i.e., Integrated Multi-satellitE Retrievals for Global Precipitation Measurement [GPM IMERG]) can be used instead of a single constant value. We simulated the flood events on August 21st and August 22nd, 2017, in Wyandotte County, Kansas using both our modified and the original InVEST UFRM model and then compared the results after incorporating rainfall raster into the model. Areas with developed land on the land use map predicted moderate to high flood volume in the original volume regardless of the actual amount of precipitation. The modified model considered the rainfall depth’s spatial variation achieving less overestimation of flood runoff and volume at low-to-moderate rainfall area.

Urban flooding↗

Supporting Technology at GRC to Mitigate Risk as Stirling Power Conversion Transitions to Flight

Stirling power conversion technology has been reaching more advanced levels of maturity during its development for space power applications. The current effort is in support of the Advanced Stirling Radioisotope Generator (ASRG), which is being developed by the U.S. Department of Energy (DOE), Lockheed Martin Space Systems Company (LMSSC), Sunpower Inc., and the NASA Glenn Research Center (GRC). This generator would use two high-efficiency Advanced Stirling Convertors (ASCs) to convert thermal energy from a radioisotope heat source into electricity. Of paramount importance is the reliability of the power system and as a part of this, the Stirling power convertors. GRC has established a supporting technology effort with tasks in the areas of reliability, convertor testing, high-temperature materials, structures, advanced analysis, organics, and permanent magnets. The project utilizes the matrix system at GRC to make use of resident experts in each of the aforementioned fields. Each task is intended to reduce risk and enhance reliability of the convertor as this technology transitions toward flight status. This paper will provide an overview of each task, outline the recent efforts and accomplishments, and show how they mitigate risk and impact the reliability of the ASC s and ultimately, the ASRG.

Schreiber, Jeffrey G.↗

Supporting Technology at GRC to Mitigate Risk as Stirling Power Conversion Transitions to Flight

Stirling power conversion technology has been reaching more advanced levels of maturity during its development for space power applications. The current effort is in support of the Advanced Stirling Radioisotope Generator (ASRG), which is being developed by the U.S. Department of Energy (DOE), Lockheed Martin Space Systems Company (LMSSC), Sunpower Inc., and the NASA Glenn Research Center (GRC). This generator would use two high-efficiency Advanced Stirling Convertors (ASCs) to convert thermal energy from a radioisotope heat source into electricity. Of paramount importance is the reliability of the power system and as a part of this, the Stirling power convertors. GRC has established a supporting technology effort with tasks in the areas of reliability, convertor testing, high-temperature materials, structures, advanced analysis, organics, and permanent magnets. The project utilizes the matrix system at GRC to make use of resident experts in each of the aforementioned fields. Each task is intended to reduce risk and enhance reliability of the convertor as this technology transitions toward flight status. This paper will provide an overview of each task, outline the recent efforts and accomplishments, and show how they mitigate risk and impact the reliability of the ASC s and ultimately, the ASRG.

Schreiber, Jeffrey G.↗

Milwaukee Urban Development: Assessing the Drivers of Urban Flood Vulnerability in Milwaukee using the Integrated Valuation of Ecosystem Services and Tradeoffs Urban Flood Risk Mitigation Model (InVEST)

Milwaukee County has experienced an increase in flooding due to climate change and urbanization. The frequency and severity of flooding vary spatially due to differences in land cover, surface permeability, and infrastructure. Marginalized communities tend to experience disproportionately high flooding and damage due to infrastructural inequalities and limited access to resources. To quantify these differences, we used the Natural Capital Project’s Integrated Valuation of Ecosystem Services and Tradeoffs (InVEST) Urban Flood Risk Mitigation Model to calculate and create maps of runoff retention, nominal flood depth, and economic damage to buildings in Milwaukee. Our model inputs included land cover, surface permeability, and rainfall. To inform our precipitation inputs, we used NASA’s Integrated Multi-satellite Retrievals for Global Precipitation Measurement (GPM IMERG) and National Weather Service (NWS) data. We assessed the relationship between flood risk and social and environmental spatial data including redlining, racial demographics, greenspace, and community resilience. The data demonstrate that flood risk is higher in historically redlined neighborhoods, majority Hispanic and Black census block groups, areas that lack parks and trees, and areas of low community resilience as measured by the Census Bureau’s Community Resilience Estimates (CRE). These findings will support our partners, Groundwork Milwaukee and Groundwork USA, in their efforts to promote the equitable distribution of resources and support environmental health in urban spaces. The end products of this project provide our partners with tools to assess urban flooding vulnerability, guide future intervention projects, quantify the effects of environmental injustice, and improve stakeholder access to data.

Madeleine Tango↗

Trajectory Design to Mitigate Risk on the Transiting Exoplanet Survey Satellite (TESS) Mission

The Transiting Exoplanet Survey Satellite (TESS) will employ a highly eccentric Earth orbit, in 2:1 lunar resonance, reached with a lunar flyby preceded by 3.5 phasing loops. The TESS mission has limited propellant and several orbit constraints. Based on analysis and simulation, we have designed the phasing loops to reduce delta-V and to mitigate risk due to maneuver execution errors. We have automated the trajectory design process and use distributed processing to generate and to optimize nominal trajectories, check constraint satisfaction, and finally model the effects of maneuver errors to identify trajectories that best meet the mission requirements.

design↗

Trajectory Design Enhancements to Mitigate Risk for the Transiting Exoplanet Survey Satellite (TESS)

The Transiting Exoplanet Survey Satellite (TESS) will employ a highly eccentric Earth orbit, in 2:1 lunar resonance, which will be reached with a lunar flyby preceded by 3.5 phasing loops. The TESS mission has limited propellant and several constraints on the science orbit and on the phasing loops. Based on analysis and simulation, we have designed the phasing loops to reduce delta-V (DV) and to mitigate risk due to maneuver execution errors. We have automated the trajectory design process and use distributed processing to generate and optimal nominal trajectories; to check constraint satisfaction; and finally to model the effects of maneuver errors to identify trajectories that best meet the mission requirements.

satellite↗