Search NASASearch

SEARCH · Search NASA

Results for “SATURN V LAUNCH VEHICLE”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

535 records · Page 2

The Micrometeoroid Satellite Explorer XIII (1961 CHI)

Papers on the spacecraft, experiments, telemeter, and power supply systems, as well as the launch vehicle, for the Explorer XIII micrometeoroid satellite are presented. In addition to the major contributions from the Langley Research Center, two papers from the Goddard Space Flight Center are included. The preflight test program and results are discussed. Ascent flight data and orbital performance are also presented. Finally, separate sections describe the aims of the experiments, discuss the design development, construction, and performance of the apparatus used, and report the results.

Micrometeoroid

Enhancing Nasa Sounding Rocket Capabilities Through Composite Material Adoption

Sounding rockets are a suborbital research platform employed by NASA for heliophysics, astrophysics, and geospace science investigations, and for technology development. They follow semi-parabolic trajectories and are launched using surplus military, and commercial, solid-propellant rocket motors. NASA sounding rocket payloads are comprised of standard, modular subassemblies, designed to perform specific functions critical to achieving mission success criteria. Since the program’s inception, payload length and mass have trended upwards, limiting the capability of the platform to reach exospheric apogees and decreasing the time above critical altitudes to observe solar and celestial targets. To offset this trend, composite materials may be of use in payload and subsystem design to decrease payload mass. This investigation seeks to understand if there is a practical benefit to introducing composite materials on the NSRP by assessing mission specific impacts to those missions conducted in fiscal year 2024. To accurately estimate the mass of a composites-based payload, a standard subsystem (NIACS) underwent structural reconfiguration. Materials were selected that align with NSRP design, manufacturing, and testing standards. NIACS reconfiguration resulted in a mass reduction of 19.6% which was then applied to the payload system in entirety. Using vehicle performance carpet plots, delta apogee and time above the Kármán line were determined. Performance improvements were then evaluated against that mission’s success criteria to determine if that mission would have benefitted from using composite materials. On average, each mission would have gained 59.8 kilometers apogee and 62.9 seconds above the Kármán line. However, only nine of the seventeen missions would have benefitted from these performance improvements. Two of the missions could have used a lower-impulse launch vehicle to achieve mission success. Upleg stability met programmatic criteria; downleg instability and dynamic pressure improved, showing that ballast would not offset the mass reduction of using composite materials. Cost analysis showed that production costs will increase 39%. For the two missions that could have used a lower-impulse launch vehicle, the cost of the launch vehicle would have offset payload production costs. In summary, composite materials are not recommended for universal use on NASA sounding rocket payloads due to unclear programmatic benefits and added cost. However, they are justified for optical astrophysics and heliophysics missions, high-apogee (exosphere) requirements, or when they reduce payload costs versus higher impulse launch vehicles. Reflown, recoverable subsystems should use composites to enhance apogee and observation time.

Robert Henry Burth

NASA Talks: Space Shuttle Columbia - Lessons Learned: Columbia Launch and Recovery

On February 25, 2026, this NASA Talk was held regarding the Space Shuttle Columbia (Columbia Launch & Recovery). Crew & Thermal System Division (EC) partnered with Kennedy Space Center (KSC) and Engineering Directorate (EA) to bring this talk to Johnson Space Center (JSC) centering on what led up to and transpired after the Space Shuttle Columbia accident. Some recovered debris was on exhibit during the talk. Retired NASA Columbia Vehicle Manager Scott Thurston presented this talk. Mr. Thurston brings a wealth of knowledge from his mission experience. This talk was timely and a solemn reminder of the critical importance of diligence, safety, and excellence in our work. EA Director Julie Kramer White welcomed the 400+ center-wide in-person audience, and EC Division Chief Rubik Sheth introduced the speakers. This event was held in the JSC Teague Auditorium, recorded, and executed by the EC in-house STAR Productions team. This record includes an mp4 video presentation with a run time of 36 min. 20 sec.; in color; with sound.

NASA Talks

NASA’s SLS (Space Launch System) Rocket Ready for Artemis II Lunar Mission

In early 2026, NASA will launch the Artemis II mission, an approximately 10-day long lunar mission that will fly three NASA astronauts and one CSA (Canadian Space Agency) astronaut on a free-return trajectory around the Moon, following a one-day checkout of their Orion spacecraft in Earth orbit. The mission will be the first to launch astronauts aboard NASA’s Orion spacecraft and on top of the agency’s SLS (Space Launch System) rocket. The mission will also deploy four 12U CubeSats as secondary payloads from the Orion stage adapter, following Orion separation and departure. The payloads, developed by four of NASA’s international partners, will perform a variety of science and technology investigations. The SLS and Orion for the mission are currently stacked in the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida and are undergoing final preparations to rollout to Launch Pad 39B for a tanking test before launch. In addition to preparations for the Artemis II mission, significant progress is being made on the SLS for the Artemis III mission, which is targeted to return astronauts to the lunar surface no later than 2029. Major components of the core stage and solid rocket boosters are already at NASA Kennedy undergoing build-up for the mission. Data from the Artemis II launch and mission, as well as progress to subsequent missions, as available, will be presented.

Bruce Askins

NASA’s SLS (Space Launch System) Rocket Ready for Artemis II Lunar Mission

In early 2026, NASA will launch the Artemis II mission, an approximately 10-day long lunar mission that will fly three NASA astronauts and one CSA (Canadian Space Agency) astronaut on a free-return trajectory around the Moon, following a one-day checkout of their Orion spacecraft in Earth orbit. The mission will be the first to launch astronauts aboard NASA’s Orion spacecraft and on top of the agency’s SLS (Space Launch System) rocket. The mission will also deploy four 12U CubeSats as secondary payloads from the Orion stage adapter, following Orion separation and departure. The payloads, developed by four of NASA’s international partners, will perform a variety of science and technology investigations. The SLS and Orion for the mission are currently stacked in the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida and are undergoing final preparations to rollout to Launch Pad 39B for a tanking test before launch. In addition to preparations for the Artemis II mission, significant progress is being made on the SLS for the Artemis III mission, which is targeted to return astronauts to the lunar surface no later than 2029. Major components of the core stage and solid rocket boosters are already at NASA Kennedy undergoing build-up for the mission. Data from the Artemis II launch and mission, as well as progress to subsequent missions, as available, will be presented.

Bruce R Askins

Artemis CubeSats Help Advance Exploration of the Moon, Mars, and Beyond

On April 1, NASA launched the Artemis II mission – the first crewed mission of the Artemis campaign. The nine-day lunar flyby launched on the agency’s SLS (Space Launch System) rocket and had four astronauts test the Orion spacecraft in high Earth orbit and in deep space. Four 12U CubeSats also launched on the mission, housed within the SLS’s Orion stage adapter (OSA). The spacecraft were deployed approximately five-and-a-half hours into the flight, following Orion separation and departure from SLS, as the SLS interim cryogenic propulsion stage (ICPS) and the attached OSA were in a high Earth orbit on an atmospheric disposal trajectory. All four CubeSats were successfully deployed from the launch vehicle. Deployment statuses of the spacecraft, along with updates about the SLS rocket and Artemis missions, are reported in this paper. The paper will also discuss opportunities for CubeSat payloads on future Artemis missions.

David Hitt

Artemis CubeSats Help Advance Exploration of the Moon, Mars, and Beyond

On April 1, NASA launched the Artemis II mission – the first crewed mission of the Artemis campaign. The nine-day lunar flyby launched on the agency’s SLS (Space Launch System) rocket and had four astronauts test the Orion spacecraft in high Earth orbit and in deep space. Four 12U CubeSats also launched on the mission, housed within the SLS’s Orion stage adapter (OSA). The spacecraft were deployed approximately five-and-a-half hours into the flight, following Orion separation and departure from SLS, as the SLS interim cryogenic propulsion stage (ICPS) and the attached OSA were in a high Earth orbit on an atmospheric disposal trajectory. All four CubeSats were successfully deployed from the launch vehicle. Deployment statuses of the spacecraft, along with updates about the SLS rocket and Artemis missions, are reported in this paper. The paper will also discuss opportunities for CubeSat payloads on future Artemis missions.

Russell Lane

General Purpose Data-Driven Monitoring for Space Operations

As modern space propulsion and exploration systems improve in capability and efficiency, their designs are becoming increasingly sophisticated and complex. Determining the health state of these systems, using traditional parameter limit checking, model-based, or rule-based methods, is becoming more difficult as the number of sensors and component interactions grow. Data-driven monitoring techniques have been developed to address these issues by analyzing system operations data to automatically characterize normal system behavior. System health can be monitored by comparing real-time operating data with these nominal characterizations, providing detection of anomalous data signatures indicative of system faults or failures. Data-driven techniques have a number of advantages over other methods for monitoring complex space vehicles. Unlike model-based systems, the developer does not need to understand or encode the internal operation of the system. The knowledge required to monitor the system is automatically derived from archived data from system operation. Unlike rule-based systems, data-driven systems do not require system analysts to define nominal relationships among sensors. Analysts can and often do determine these relationships for a system with few sensors; it is more difficult to analytically determine the nominal relationship among a large number of sensors. Data-driven techniques are not limited to low-dimensional spaces and work as effectively with dozens of parameters as they do with a few. Knowledge bases formed by data-driven techniques are also easy to update. As the operating envelope of the monitored system is expanded, data-driven techniques can be quickly retrained to incorporate the new behavior into the knowledge base. The expertise and time-consuming process of updating a model or rule base to maintain consistency with the new operation is not required. The Inductive Monitoring System (IMS) is a data-driven system health monitoring software tool that has been successfully applied to several aerospace applications. IMS uses a data mining technique called clustering to analyze archived system data and characterize normal interactions between parameters. This characterization, or model, of nominal operation is stored in a knowledge base that can be used for real-time system monitoring or analysis of archived events. System data is compared with the nominal IMS model to produce a measure of how well current system behavior matches the normal behavior defined by the training data. Significant deviations from the nominal system model can provide alerts to system malfunctions or precursors of significant failures. The scope of IMS based data-driven monitoring applications continues to expand with current development activities. Successful IMS deployment in the International Space Station (ISS) flight control room to monitor ISS attitude control systems has led to applications in other ISS flight control disciplines, such as thermal control. It has also generated interest in data-driven monitoring capability for Constellation, NASA's program to replace the Space Shuttle with new launch vehicles and spacecraft capable of returning astronauts to the moon, and then on to Mars. Several projects are currently underway to evaluate and mature the IMS technology and complementary tools for use in the Constellation program. These include an experiment on board the Air Force TacSat-3 satellite, and ground systems monitoring for NASA's Ares I-X and Ares I launch vehicles. The TacSat-3 Vehicle System Management (TVSM) project is a software experiment to integrate fault and anomaly detection algorithms and diagnosis tools with executive and adaptive planning functions contained in the flight software on-board the Air Force Research Laboratory TacSat-3 satellite. The TVSM software package will be uploaded after launch to monitor spacecraft subsystems such as power and guidance, navigation, and control (GN&C). It will analyze data in real-time to demonstrate detection of faults and unusual conditions, diagnose problems, and react to threats to spacecraft health and mission goals. The experiment will demonstrate the feasibility and effectiveness of integrated system health management (ISHM) technologies with both ground and on-board experiments. Initially, the TVSM software will run open loop, providing system health information and recommendations to ground operators, without automatically performing fault-mitigating corrective actions. After the end of the satellite's mission, closed loop tests combining TVSM monitoring and diagnosis with reactive capabilities by the flight software will be performed. In addition to monitoring for long periods of actual operation, the experiment will include fault injection into TacSat-3 data as well as commanded operations to test and evaluate automatic ISHM monitoring and recovery under controlled conditions.

Satellites

Terrestrial Environment (Climatic) Criteria Guidelines for Use in Aerospace Vehicle Development, 1973 Revision

This document provides guidelines on probable climatic extremes and probabilities-of-occurrence of terrestrial environment data specifically applicable for NASA space vehicles and associated equipment development. The geographic areas encompassed are The Eastern Test Range (Cape Kennedy, Florida); Huntsville, Alabama; New Orleans, Louisiana; The Space and Missile Test Center (Vandenberg AFB California); Sacramento, California; Wallops Test Range (Wallops Island, Virginia); White Sands Missile Range, New Mexico; and intermediate transportation areas. In addition, sections have been included to provide information on the general distribution of natural environment extremes in the United States (excluding Alaska and Hawaii), cloud cover, and some worldwide climatic extremes. Although all these areas are covered, the major emphasis is given to the Kennedy Space Center launch area and Vandenburg Air Force Base due to importance in NASA's future large space vehicle programs. This document presents the latest available information on probable climatic extremes, and supersedes information presented in TM X-64589. The information in this document is recommended for employment in the development of space vehicles and associated equipment design and operational criteria, unless otherwise stated in contract work specifications.

cloud cover

Modular Assembled Radiators for Nuclear Electric Propulsion (NEP) VehicLes (MARVL) Project Thermal Technology Development

Nuclear Electric Propulsion (NEP) has been considered for crew and cargo class missions to Mars for more than six decades. The Primary Heat Rejection Subsystem (PHRS) of an NEP vehicle expels the megawatts of waste heat generated by the Power Conversion Subsystem (PCS). In previous studies, integrating the majority of the NEP vehicle within a single launch fairing required the use of complex deployable elements and resulted in reduced PCS efficiency. To achieve the necessary radiating area, past design studies have utilized massive multi-wing folding radiators resulting in conceptual PHRS designs that have been widely acknowledged as non-optimal. The Modular Assembled Radiators for NEP VehicLes (MARVL) project is incorporating in-Space Assembly (iSA) into the design process to realize lightweight, modular, and more capable PHRS radiators. Since the project’s Authority to Proceed (ATP) date of October 2024, the project team has been developing a modular design for the PHRS radiators that will be suitable for both the Mars mission environments and iSA commissioning operations. This document captures the current progress of the incremental technology development for the thermal components of the MARVL System of Interest (SOI).

Modular Radiator

Battery Control Boards for Li-Ion Batteries on Mars Exploration Rovers

Rechargeable Lithium-ion batteries have been operating successfully on both Spirit and Opportunity rovers for the last two years, which includes six months of Assembly Launch and Test Operations (ATLO), seven months of cruise and about eleven months of surface operations. The Battery Control Boards designed and fabricated in-house would protect cells against overcharge and over-discharge and provide cell balance. Their performance has thus far been quite satisfactory. The ground data o the mission simulation battery project little capacity loss of less than 3% during cruise and 180 sols. Batteries are poised to extend the mission beyond six months, if not a couple of years.

Ewell, R.

The Origin of Palimpsests

Palimpsests are the most enigmatic impact features observed on icy worlds of the Solar System. Palimpsests are large impact features which are bright, old, mostly flat, and roughly circular. They range from >150 to ~350 km in diameter and sometimes exhibit recognizable associated radial secondary ejecta crater strings beyond their rims. Curiously, among all the Solar System's icy worlds, palimpsests are exclusively seen on the icy Galilean moons. Palimpsests are obviously different than similarly sized impact features seen on other icy satellites. For example, Evander, a 350 km diameter peak-ring impact basin on Saturn’s moon Dione, has a very low depth/diameter ratio of 0.008, indicating significant viscous relaxation. Nevertheless, it still retains short wavelength topography including a prominent central peak, peak ring, and a continuous rim, none of which are seen at palimpsests. Palimpsests display an approximately circular, and dominating, expanse of undulating plains, which is level with surrounding terrain and shows no recognizable rim. At the center of palimpsests are smooth central plains that are enclosed by a low scarp. Central plains material superposes the surrounding undulating plains and is littered with small blocks reminiscent of “small chaos” on Europa. Palimpsests have yet to be explored using modern impact simulation tools. We have begun to investigate two competing hypotheses: (A) Palimpsests form on targets which have a preexisting near-subsurface layer that is liquid or solid but very weak, and is excavated as proximal ejecta; or (B) They form in a solid ice target underlain by a steep thermal gradient that strongly influences the resulting impact feature, including the production of impact-induced melting at depth that is then a major component of proximal ejecta. Our results will have profound implications for the early thermal history of the icy Galilean satellites. We will test our two hypotheses for the formation of palimpsests on Ganymede (where they are both best observed and preserved) by means of 2D iSALE hydrodynamic simulations of impacts into ice targets that will be structured according to the scenarios for each hypothesis, with select runs in 3D. We have already conducted a pilot study using 2D iSALE that has yielded promising results, which we will report out at the meeting.

palimpsests

Crewed Space Vehicle Battery Safety Requirements

This requirements document is applicable to all batteries on crewed spacecraft, including vehicle, payload, and crew equipment batteries. It defines the specific provisions required to design a battery that is safe for ground personnel and crew members to handle and/or operate during all applicable phases of crewed missions, safe for use in the enclosed environment of a crewed space vehicle, and safe for use in launch vehicles, as well as in unpressurized spaces adjacent to the habitable portion of a space vehicle. The required provisions encompass hazard controls, design evaluation, and verification. The extent of the hazard controls and verification required depends on the applicability and credibility of the hazard to the specific battery design and applicable missions under review. Evaluation of the design and verification program results shall be completed prior to certification for flight and ground operations. This requirements document is geared toward the designers of battery systems to be used in crewed vehicles, crew equipment, crew suits, or batteries to be used in crewed vehicle systems and payloads (or experiments). This requirements document also applies to ground handling and testing of flight batteries. Specific design and verification requirements for a battery are dependent upon the battery chemistry, capacity, complexity, charging, environment, and application. The variety of battery chemistries available, combined with the variety of battery-powered applications, results in each battery application having specific, unique requirements pertinent to the specific battery application. However, there are basic requirements for all battery designs and applications, which are listed in section 4. Section 5 includes a description of hazards and controls and also includes requirements.

Jeevarajan, Judith A.

Uranus Orbiter and Probe: Mission Challenges and Concept Updates Since the Origins, Worlds, and Life Decadal Survey

Origins, Worlds, and Life: Planetary Science and Astrobiology in the Next Decade identified a Uranus Orbiter and Probe as the highest-priority strategic mission for the decade 2023–2032, as it enables broad cross-disciplinary science in the largely unexplored Uranian system. The mission architecture evaluated by the Decadal Survey was a singular proof of concept demonstrating that a moderately instrumented mission could deliver Decadal-priority science with a reduced cost and risk posture by leveraging existing technologies to the maximum extent possible. With revised assumptions since the Decadal, we have explored a large trade space including launch vehicles, propulsion options, cruise trajectories, available power sources, viable concept of operations, and science data return for later launch dates without a Jupiter gravity assist. The most repeatable trajectory solutions employ either a commercially derived solar electric propulsion (SEP) transfer stage or the availability of a more capable launch vehicle under development, such as the SpaceX Starship. Orbit insertion has been moved farther from Uranus to acknowledge the remaining uncertainty in Uranian ring structure. A streamlined, SEP-adaptable, orbiter design was developed using two Next Gen Radioisotope Thermoelectric Generators, and the probe design was matured, reducing the entry gravitational acceleration, and assuming the largest Decadal-recommended payload to provide margin for future instrument selections. With this updated design, we also constructed a detailed concept of operations for three representative science cases, returning 13–15 Gbit of science data and spacecraft telemetry per ∼34 day orbit.

Amy A Simon

The In-Orbit Battery Reconditioning Experience On Board the Orion 1 Spacecraft

The Orion 1 spacecraft is a three-axis stabilized geostationary earth orbiting commercial communications satellite which was launched on November 29, 1994 aboard an Atlas II launch vehicle. The power subsystem is a dual bus, dual battery semi-regulated system with one 78 Ampere-hour nickel-hydrogen battery per bus. The batteries were built and tested by Eagle Picher Industries, Inc., of Joplin, MO and were integrated into the spacecraft by its manufacturer, Matra Marconi Space UK Ltd. This paper presents the results obtained during the first four in-orbit reconditioning cycles and compares the battery performance to ground test data. In addition, the on-station battery management strategy and implementation constraints are described. Battery performance has been nominal throughout each reconditioning cycle and subsequent eclipse season.

Hoover, S. A.

Battery performance of the SKYNET 4A spacecraft during the first six years of on station operation

The SKYNET 4A spacecraft is a three-axis stabilized geostationary earth-orbiting military communications satellite which was launched on 1 Jan. 1990 aboard a Titan 3 launch vehicle. The power subsystem is a twin bus, twin battery semi-regulated system and is equipped with one 28-cell, 35 Ampere-hour battery per bus. The cells were manufactured by Gates Aerospace Batteries of Gainesville, FL, and the batteries were built, tested and integrated by British Aerospace Space Systems Ltd. This paper presents a brief survey of the first six years of on-station operation and the operational battery management strategy that has been adopted. Thermal management constraints have led to an unconventional battery operational regime. However, no sign of degradation is evident and the observed spacecraft battery performance remains nominal.

Johnson, P. J.

NASA Small Spacecraft and Distributed Systems Program - Recent and Upcoming Technology Demonstrations and Development Efforts

NASA’s Small Spacecraft & Distributed Systems (SSDS) program strengthens U.S. ability to conduct unique missions by rapidly developing and demonstrating capabilities for SmallSat exploration, science, and commercial space. In collaboration with NASA Centers, other government agencies, commercial industry, and academia, SSDS advances next generation SmallSat technologies like power, processing, propulsion, communications, autonomous navigation, architectures (swarms), and applications (AI/ML/Edge Computing)—to extend missions beyond LEO into cislunar and planetary space. Various investment mechanisms exist for SSDS to select and fund projects that will ultimately advance NASA’s Moon to Mars Architecture. Presented here are the latest achievements and findings from recently completed SSDS projects, along with updates from ongoing efforts and planned future work. Successful missions like Starling and CAPSTONE continue to demonstrate their capability after several years on-orbit. Advancements in next generation swarm configurations are being implemented by Starling for space traffic monitoring and management applications. Findings from recent SSDS flight projects are discussed: DiskSat, a unique SmallSat platform alternative to canisterized nanosatellites, launched December 2025 and is gathering data; the PTD series of missions concluded in December 2025. Current SSDS efforts are focused on addressing NASA Shortfalls relating to rendezvous and proximity operations, neuromorphic computing, and space situational awareness.

Roger C Hunter