Search NASA⌕ Search

SEARCH · Search NASA

Results for “SHIFT PROCESSES”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Autonomous Mission Operations Roadmap

As light time delays increase, the number of such situations in which crew autonomy is the best way to conduct the mission is expected to increase. However, there are significant open questions regarding which functions to allocate to ground and crew as the time delays increase. In situations where the ideal solution is to allocate responsibility to the crew and the vehicle, a second question arises: should the activity be the responsibility of the crew or an automated vehicle function? More specifically, we must answer the following questions: What aspects of mission operation responsibilities (Plan, Train, Fly) should be allocated to ground based or vehicle based planning, monitoring, and control in the presence of significant light-time delay between the vehicle and the Earth?How should the allocated ground based planning, monitoring, and control be distributed across the flight control team and ground system automation? How should the allocated vehicle based planning, monitoring, and control be distributed between the flight crew and onboard system automation?When during the mission should responsibility shift from flight control team to crew or from crew to vehicle, and what should the process of shifting responsibility be as the mission progresses? NASA is developing a roadmap of capabilities for Autonomous Mission Operations for human spaceflight. This presentation will describe the current state of development of this roadmap, with specific attention to in-space inspection tasks that crews might perform with minimum assistance from the ground.

Mission Operations↗

Dual-task performance with ideomotor-compatible tasks: is the central processing bottleneck intact, bypassed, or shifted in locus?

The present study examined whether the central bottleneck, assumed to be primarily responsible for the psychological refractory period (PRP) effect, is intact, bypassed, or shifted in locus with ideomotor (IM)-compatible tasks. In 4 experiments, factorial combinations of IM- and non-IM-compatible tasks were used for Task 1 and Task 2. All experiments showed substantial PRP effects, with a strong dependency between Task 1 and Task 2 response times. These findings, along with model-based simulations, indicate that the processing bottleneck was not bypassed, even with two IM-compatible tasks. Nevertheless, systematic changes in the PRP and correspondence effects across experiments suggest that IM compatibility shifted the locus of the bottleneck. The findings favor an engage-bottleneck-later hypothesis, whereby parallelism between tasks occurs deeper into the processing stream for IM- than for non-IM-compatible tasks, without the bottleneck being actually eliminated.

Psychomotor Performance↗

A High-Throughput, Adaptive FFT Architecture for FPGA-Based Space-Borne Data Processors

Historically, computationally-intensive data processing for space-borne instruments has heavily relied on ground-based computing resources. But with recent advances in functional densities of Field-Programmable Gate-Arrays (FPGAs), there has been an increasing desire to shift more processing on-board; therefore relaxing the downlink data bandwidth requirements. Fast Fourier Transforms (FFTs) are commonly used building blocks for data processing applications, with a growing need to increase the FFT block size. Many existing FFT architectures have mainly emphasized on low power consumption or resource usage; but as the block size of the FFT grows, the throughput is often compromised first. In addition to power and resource constraints, space-borne digital systems are also limited to a small set of space-qualified memory elements, which typically lag behind the commercially available counterparts in capacity and bandwidth. The bandwidth limitation of the external memory creates a bottleneck for a large, high-throughput FFT design with large block size. In this paper, we present the Multi-Pass Wide Kernel FFT (MPWK-FFT) architecture for a moderately large block size (32K) with considerations to power consumption and resource usage, as well as throughput. We will also show that the architecture can be easily adapted for different FFT block sizes with different throughput and power requirements. The result is completely contained within an FPGA without relying on external memories. Implementation results are summarized.

Nguyen, Kayla↗

Advanced miniature processing handware for ATR applications

A Hybrid Optoelectronic Neural Object Recognition System (HONORS), is disclosed, comprising two major building blocks: (1) an advanced grayscale optical correlator (OC) and (2) a massively parallel three-dimensional neural-processor. The optical correlator, with its inherent advantages in parallel processing and shift invariance, is used for target of interest (TOI) detection and segmentation. The three-dimensional neural-processor, with its robust neural learning capability, is used for target classification and identification. The hybrid optoelectronic neural object recognition system, with its powerful combination of optical processing and neural networks, enables real-time, large frame, automatic target recognition (ATR).

Chao, Tien-Hsin↗

ISS Operations Cost Reductions Through Automation of Real-Time Planning Tasks

In 2008 the Johnson Space Center s Mission Operations Directorate (MOD) management team challenged their organization to find ways to reduce the costs of International Space station (ISS) console operations in the Mission Control Center (MCC). Each MOD organization was asked to identify projects that would help them attain a goal of a 30% reduction in operating costs by 2012. The MOD Operations and Planning organization responded to this challenge by launching several software automation projects that would allow them to greatly improve ISS console operations and reduce staffing and operating costs. These projects to date have allowed the MOD Operations organization to remove one full time (7 x 24 x 365) ISS console position in 2010; with the plan of eliminating two full time ISS console support positions by 2012. This will account for an overall 10 EP reduction in staffing for the Operations and Planning organization. These automation projects focused on utilizing software to automate many administrative and often repetitive tasks involved with processing ISS planning and daily operations information. This information was exchanged between the ground flight control teams in Houston and around the globe, as well as with the ISS astronaut crew. These tasks ranged from managing mission plan changes from around the globe, to uploading and downloading information to and from the ISS crew, to even more complex tasks that required multiple decision points to process the data, track approvals and deliver it to the correct recipient across network and security boundaries. The software solutions leveraged several different technologies including customized web applications and implementation of industry standard web services architecture between several planning tools; as well as a engaging a previously research level technology (TRL 2-3) developed by Ames Research Center (ARC) that utilized an intelligent agent based system to manage and automate file traffic flow, archiving f data, and generating console logs. This technology called OCAMS (OCA (Orbital Communication System) Management System), is now considered TRL level 9 and is in daily use in the Mission Control Center in support of ISS operations. These solutions have not only allowed for improved efficiency on console; but since many of the previously manual data transfers are now automated, many of the human error prone steps have been removed, and the quality of the planning products has improved tremendously. This has also allowed our Planning Flight Controllers more time to focus on the abstract areas of the job, (like the complexities of planning a mission for 6 international crew members with a global planning team), instead of being burdened with the administrative tasks that took significant time each console shift to process. The resulting automation solutions have allowed the Operations and Planning organization to realize significant cost savings for the ISS program through 2020 and many of these solutions could be a viable

Hall, Timothy A.↗

Science data systems

Video film converter for data processing, linear feedback shift registers, and woven plated wire memory storage units for science missions

MEMORY STORAGE UNIT↗

Hydrogen enrichment of synthetic fuel

Synthetic gas may be produced at lower cost and higher efficiency by using outside source of hydrogen. Method is compatible with same temperatures and pressures as shift reaction. Process increases efficiency by using less coal and water to provide equal amount of synthetic gas.

Jay, C. G.↗

Computer simulations of postural change, water immersion and bedrest - An integrative approach for understanding the spaceflight response

Mathematical modeling techniques were used to simulate the fluid electrolyte (F-E) responses during gravity unloading. It is shown that the response to weightlessness can best be understood by separately examining the acute (hours to days) and chronic (days to weeks) phases, and assuming the presence of normal, although complex, feedback regulatory processes. Headward shifts of fluid are shown to be primarily responsible for acute body losses of extracellular F-E. Losses of body water are closely related to the volume of fluid shifts from the legs. A diuresis is predicted within the first several hours of hypogravity, and this may be obscured by a reduced F-E intake; on Skylab, early F-E losses occurred primarily by deficit intake.

Leonard, J. I.↗

A Novel Approach to Solving the Problem of Needle Microcrystals (A Case Study of Ribosome Crystals)

Different morphology crystals (needle, rod-tetragonal and wedge-shaped) were grown from the same solution of ribosome; furthermore, in the same drop using 10- 15% 2-methyl-2,4pentanediol as a precipitant. The crystals appeared in 5-48 hours. Observations of the kinetics of crystals appearance lead to the conclusion that higher supersaturation of ribosome solution produces needle-shaped crystals, while the tetragonal-rod and the wedge-shaped crystals grow at lower supersaturation. The ribosome packing in the crystals was characterized by electron microscopy (EM). An analysis of EM ultrathin sections indicates that the unit cells, with a high degree of probability, are the same in the crystals of different morphology. The data obtained suggests how to shift the process of crystal formation from the needles to the crystals with comparative size in all three dimensions.

Karpova, Elizaveta A.↗

Preparations for Integrating Space-Based Total Lightning Observations into Forecast Operations

NASA's Short-term Prediction Research and Transition (SPoRT) Center has been a leader in collaborating with the United States National Weather Service (NWS) offices to integrate ground-based total lightning (intra-cloud and cloud-to-ground) observations into the real-time operational environment. For much of these collaborations, the emphasis has been on training, dissemination of data to the NWS AWIPS system, and focusing on the utility of these data in the warning decision support process. A shift away from this paradigm has occurred more recently for several reasons. For one, SPoRT's collaborations have expanded to new partners, including emergency managers and the aviation community. Additionally, and most importantly, is the impending launch of the GOES-R Geostationary Lightning Mapper (GLM). This has led to collaborative efforts to focus on additional forecast needs, new data displays, develop training for GLM uses based on the lessons learned from ground-based lightning mapping arrays, and ways to better relate total lightning data to other meteorological parameters. This presentation will focus on these efforts to prepare the operational end user community for GLM with an eye towards sharing lessons learned as EUMETSAT prepares for the Meteosat Third Generation Lightning Imager. This will focus on both software and training needs. In particular, SPoRT has worked closely with the Meteorological Development Laboratory to create the total lightning tracking tool. This software allows for NWS forecasters to manually track storms of interest and display a time series trend of observations. This tool also has been expanded to work on any gridded data set allowing for easy visual comparisons of multiple parameters in addition to total lightning. A new web display has been developed for the ground-based observations that can be easily extended to satellite observations. This paves the way for new collaborations outside of the NWS, both domestically and internationally, as the web display will be functional on PCs and mobile devices. Furthermore, SPoRT has helped developed the software plug-in to visualize GLM data. Examples using the official GLM proxy product will be used to provide a glimpse as to what real-time GLM and likely MTG-LI data will be in the near future.

GLM↗

Possible Role for Tectonics in the Evolving Stability of the Greenland Ice Sheet

The history of the Greenland Ice Sheet has been influenced by the geodynamic response to ice sheet fluctuations, and this interaction may help explain past deglaciations under modest climate forcing. We hypothesize that when the Iceland hot spot passed beneath north‐central Greenland, it thinned the lithosphere and left anomalous heat likely with partially melted rock; however, it did not break through the crust to supply voluminous flood basalts. Subsequent Plio‐Pleistocene glacial‐interglacial cycles caused large and rapidly migrating stresses, driving dike formation and other processes that shifted melted rock toward the surface. The resulting increase in surface geothermal flux favored a thinner, faster‐responding ice sheet that was more prone to deglaciation. If this hypothesis of control through changes in geothermal flux is correct, then the long‐term (10 (sup 5) to 10 (sup 6) years) trend now is toward lower geothermal flux, but with higher‐frequency (less than or equal to 10( sup 4) to 10 (sup 5) years) oscillations linked to glacial‐interglacial cycles. Whether the geothermal flux is increasing or decreasing now is not known but is of societal relevance due to its possible impact on ice flow. We infer that projections of the future of the ice sheet and its effect on sea level must integrate geologic and geophysical data as well as glaciological, atmospheric, oceanic, and paleoclimatic information.

Greenland Ice Sheet↗

Radio Doppler navigation of interplanetary spacecraft using different data processing modes

Doppler shift measurements derived from closed-loop radio tracking of distant spacecraft by ground stations of the Deep Space Network (DSN) are one of the principal means used for interplanetary navigation. This paper describes an investigation of the navigation accuracy that can be achieved with two-way coherent X-band (7.2 to 8.4 GHz) Doppler phase and frequency data; both theoretical and practical aspects of the two Doppler formulations are addressed. A new filtering strategy is also proposed, which differs from current approaches in that most of the ground system calibration errors affecting the Doppler data are represented as filter parameters, in addition to the spacecraft trajectory parameters. Error covariance computations for application of the proposed filter to a navigation scenario derived from the Mars Observer mission are provided, in order to assess the performance that might be obtained in practice. The results indicate that with a phase formulation of the Doppler data and the new filter, navigation accuracies of 15 km at Mars (0.05 microrad in an angular sense) are possible with the DSN's present X-band Doppler tracking system.

Thurman, S. W.↗

Repetitive Interrogation of 2-Level Quantum Systems

Trapped ion clocks derive information from a reference atomic transition by repetitive interrogations of the same quantum system, either a single ion or ionized gas of many millions of ions. Atomic beam frequency standards, by contrast, measure reference atomic transitions in a continuously replenished "flow through" configuration where initial ensemble atomic coherence is zero. We will describe some issues and problems that can arise when atomic state selection and preparation of the quantum atomic system is not completed, that is, optical pumping has not fully relaxed the coherence and also not fully transferred atoms to the initial state. We present a simple two-level density matrix analysis showing how frequency shifts during the state-selection process can cause frequency shifts of the measured clock transition. Such considerations are very important when a low intensity lamp light source is used for state selection, where there is relatively weak relaxation and re-pumping of ions to an initial state and much weaker 'environmental' relaxation of the atomic coherence set-up in the atomic sample.

Rabi interrogation↗

Boundary-Layer Cloud Modeling Challenges on the North Slope of Alaska

The accurate modeling and prediction of cloud base heights is critical for energy balance calculations and aviation operations, alike. Low-level (i.e., boundary-layer) Arctic clouds can be difficult to model, making prediction of formation and dissipation challenging. Primarily mixed-phase, these clouds typically contain low quantities of supercooled liquid water and often slowly precipitate relatively small amounts of moderately and heavily rimed snow particles. While this appears to be the predominant cloudy state on the North Slope of Alaska (NSA), the delicate balance of microphysical, dynamical, radiative, surface coupling, and advective processes can rapidly shift to heavy snow (with various degrees of riming) or to a complete dissipation of the cloud layer without any precipitation, depending on the dominant processes. Here we strive to disentangle these various processes. First, we compare the predictive performances of four different numerical weather models in forecasting the presence and base-heights of low-level clouds: the High-Resolution Rapid Refresh - Alaska (HRRR-AK) model, the Polar Weather Research and Forecasting (Polar WRF) model, the Unified Model (UM), and the European Centre for Medium-range Weather Forecasting (ECMWF) model. Initial results comparing model output at two U.S. Department of Energy Atmospheric Radiation Measurement (AMT) NSA sites, during the fall season in 2019 and 2022, show that the UM slightly outperforms the HRRR-AK in terms of accurately forecasting the presence of a low-level cloud layer (89% of the time). All models have a significant bias of 300 to 800 meters in forecasting cloud base height (lower than is observed); however, the UM and ECMWF models have the lowest biases. Finally, a case study for a particularly challenging April 2017 thin-cloud event is presented, wherein we compare the performance of four different bulk microphysical parameterization schemes using a higher-resolution large eddy simulation (LES) model, the WRF-LES. Initial results show that the Thompson scheme was the only one able to reproduce and sustain a substantial supercooled liquid layer, but it was unable to reproduce the transition from a deep, liquid-rich cloud to a thin layer with moderately and heavily rimed precipitation. This is the first step in linking simulated LES-scale riming processes with those parameterized at a coarser mesoscale model scale. This has important implications for forecasting low-level clouds in an operational environment, given the efficiency of the riming process.

cloud base heights↗

(abstract) ARGOS: a System to Monitor Ulysses Nutation and Thruster Firings from Variations of the Spacecraft Radio Signal

Ulysses is a spin-stabilized spacecraft that experienced significant nutation after its launch in October 1990. This was due to the Sun-spacecraft-Earth geometry, and a study of the phenomenon predicted that the nutation would again be a problem during 1994-95. The difficulty of obtaining nutation estimates in real time from the spacecraft telemetry forced the ESA/NASA Ulysses Team to explore alternative information sources. The work performed by the ESA Operations Team provided a model for a system that uses the radio signal strength measurements to monitor the spacecraft dynamics. These measurements (referred to as AGC) are provided once per second by the tracking stations of the DSN. The system was named ARGOS (Attitude Reckoning from Ground Observable Signals) after the ever-vigilant, hundred-eyed giant of Greek Mythology. The ARGOS design also included Doppler processing, because Doppler shifts indicate thruster firings commanded by the active nutation control carried out onboard the spacecraft. While there is some visibility into thruster activity from telemetry, careful processing of the high-sample-rate Doppler data provides an accurate means of detecting the presence and time of thruster firings. DSN Doppler measurements are available at a ten-per-second rate in the same tracking data block as the AGC data.

Ulysses nutation Doppler radio signal strength mea↗