NuScale Power: A Mature, Near-Term Deployable, SMR Solution
A presentation about NuScale Power's market readiness
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
A presentation about NuScale Power's market readiness
Abstract not provided.
An overview of NuScale Power
Hydrogen production through conventional steam methane reforming. To access the model referenced in the report, please visit https://www.netl.doe.gov/energy-analysis/details?id=bbb35592-8589-4187-be70-f6a2466762b4
The Columbia Basin Consulting Group (CBCG) is developing an advanced reactor cooled by Lead-Bismuth (Pb-Bi). The design is being developed for a high level of passive safety. It has the advantages of the classical liquid metal (sodium) reactor, i.e. small size and passive safety, while having the additional advantage of chemically inert coolant.
Small modular reactors (SMRs) and microreactors are entering the U.S. distribution grid as synchronous generation on feeders designed for loads and inverter-based distributed energy resources (DERs). No existing cybersecurity training program addresses this intersection of nuclear operations, DER management, and operational technology security. As subcontractor to Iowa State University on the CyDERMS Center, Argonne analyzed the relevant standards and training landscape, translated the resulting gaps into a twelve-objective competency framework across distribution-operator and graduate-analyst role tracks, and built a containerized training lab using a ∼400-bus composite grid model behind a realistically simulated Modbus TCP SCADA stack. The analysis isolates the balance-of-plant / energy-management-system (BOP/EMS) boundary as the critical jurisdictional seam where, as of March 2026, neither NRC nor NERC CIP cleanly claims cybersecurity responsibility for distribution-connected SMRs. The framework maps each objective across NIST CSF 2.0, ISA/IEC 62443, NIST NICE Task–Knowledge–Skill statements, and NRC RG 5.71 awareness-and-training controls. The training lab implements operator-recognition assessment scenarios spanning grid-side disturbances and telemetry-layer anomalies.
The high-velocity Ly(Alpha) emission from SN 1987A observed with the Space Telescope Imaging Spectrograph (STIS) evidently comes from a reverse shock formed where the outer envelope of SN 1987A strikes ionized gas inside the inner circumstellar ring. The observations can be explained by a simple kinematic model, in which the Ly(Alpha) emission comes from hydrogen atoms with radial velocity approximately 15,000 km s(exp -1) crossing a reverse shock in the shape of a slightly prolate ellipsoid with equatorial radius 4.8 x 10(exp 17) cm or approximately 80% of the distance to the inner surface of the inner ring. N v double Lambda 1239, 1243 emission, if present, has a net luminosity approximately less than 30% times that of the Ly(Alpha) emission. Future STIS observations should enable us to predict the time of impact with the inner ring and to determine unambiguously whether or not N v emission is present. These observations will offer a unique opportunity to probe the structure of SN 1987A's circumstellar environment and the hydrodynamics and kinetics of very fast shocks.
With the increase of integration of variable renewable into the grid, grid resilience can be compromised without flexible electricity suppliers. Flexible operation of NPP can expand the scope of integration of new nuclear power plants in regions with high share of renewables. It also provides opportunity to increase profits through participation in ancillary services. In this research, NuScale modules are used as the case study. NuScale is an integrated pressurized water reactor with thermal power of 250 MWth. Having multiple units can provide higher flexibility in changing power levels and supplying the grid with electricity all year long. Additionally, load-following might perturbate the ordered sequence of refueling (every 24 months for NuScale). To maintain the 2 year refueling cycles, the loading patterns will need to be adjusted in a year-to-year basis, resulting in additional unnecessary costs. Another solution is to find the optimal outage schedule. This will also shift the focus of the planned outage to a more optimized predictive outages and maintenance. Results from short-term optimization (i.e., daily participation in energy and ancillary services markets) shows that average commitment to regulation down ancillary service markets during late night and early morning hours can increase revenues. Participating in upward reserves during pre-work commuting hours and early evening hours can also generate additional revenues due to high ramp up of electricity demand. Having multiple units at a single site can also help operate flexibly. Results from long-term optimization show that daily fluctuation in electric power is usually handled by few units while other units operate on base-load profile. It is possible to combine base-load operation with flexible operation to extend component remaining useful life in some units and find optimal outage schedule for the units.
Explore the source record for details and available documents.
For presentation at the 40th Annual International Pittsburgh Coal Conference. Istanbul, Turkey, October 4-6, 2023.
Defined as nuclear reactors with a power output up to 300 megawatts electrical (MWe) by the International Atomic Energy Agency (IAEA) and targeted for multipurpose applications, small modular reactors (SMRs) have been recognized as a very promising, clean, affordable, and sustainable energy source by many countries. At present, more than 80 SMRs are under design, development, demonstration, deployment, and beyond (4D+) phases worldwide. This study focuses on the current world status of SMRs and focuses on the necessary developments to accelerate the process of adopting SMRs as a major energy source globally. SMRs are not a new concept, but they do represent a new vision for older concepts if the challenges inherent within them are mitigated with strategic and realistic solution approaches. The major challenges for SMRs 4D+ like any new reactors are: (a) qualifying the advanced fuel-to-reactor design; (b) supporting rapid scaled/prototypic experimentations; (c) maintaining local and global codes, standards, and licensing; (d) supply chain issues;(e) effective cradle-to-grave nuclear fuel cycle and fuel material transportation, and (f) mitigating financial and environmental risks. These upfront challenges can be mitigated with a synergistic solution approach among the various stakeholders: industry, academia, research, government, and international entities.
Defined as nuclear reactors with a power output up to 300 megawatts electrical (MWe) by the International Atomic Energy Agency (IAEA) and targeted for multipurpose applications, small modular reactors (SMRs) have been recognized as a very promising, clean, affordable, and sustainable energy source by many countries. At present, more than 80 SMRs are under design, development, demonstration, deployment, and beyond (4D+) phases worldwide. This paper focuses on the current world status of SMRs and focuses on the necessary developments to accelerate the process of adopting SMRs as a major energy source globally. SMRs are not a new concept, but they do represent a new vision for older concepts if the challenges inherent within them are mitigated with strategic and realistic solution approaches. The major challenges for SMRs 4D+ like any new reactors are: (a) qualifying the advanced fuel-to-reactor design; (b) supporting rapid scaled/prototypic experimentations; (c) maintaining local and global codes, standards, and licensing; (d) supply chain issues; (e) effective cradle-to-grave nuclear fuel cycle and fuel material transportation, and (f) mitigating financial and environmental risks. These upfront challenges can be mitigated with a synergistic solution approach among the various stakeholders: industry, academia, research, government, and international entities.
Defined as nuclear reactors with a power output up to 300 megawatts electrical (MWe) by the International Atomic Energy Agency (IAEA) and targeted for multipurpose applications, small modular reactors (SMRs) have been recognized as a very promising, clean, affordable, and sustainable energy source by many countries. At present, more than 80 SMRs are under design, development, demonstration, deployment, and beyond (4D+) phases worldwide. This study focuses on the current world status of SMRs and focuses on the necessary developments to accelerate the process of adopting SMRs as a major energy source globally. SMRs are not a new concept, but they do represent a new vision for older concepts if the challenges inherent within them are mitigated with strategic and realistic solution approaches. The major challenges for SMRs 4D+ like any new reactors are: (a) qualifying the advanced fuel-to-reactor design; (b) supporting rapid scaled/prototypic experimentations; (c) maintaining local and global codes, standards, and licensing; (d) supply chain issues;(e) effective cradle-to-grave nuclear fuel cycle and fuel material transportation, and (f) mitigating financial and environmental risks. These upfront challenges can be mitigated with a synergistic solution approach among the various stakeholders: industry, academia, research, government, and international entities.
The development of advanced Small Modular Reactors (SMRs) is ongoing. A customer-focused development approach requires accelerated design and analysis of the reactor system while minimizing engineering, regulatory, and economic challenges. SMRs, although not a new concept, are being considered for rapid deployment with optimized economic scalability, and several designs are currently seeking approval. Understanding the research and development needs, with adequate safety support, accelerates reactor development.
Explore the source record for details and available documents.
Here, small modular nuclear reactors (SMRs) represent a robust opportunity to develop low-carbon and reliable power with the potential to meet cost parity with conventional power systems. This study presents a detailed, bottom-up economic evaluation of a 12 × 77 MW e (924 MW e total) light-water SMR (LW-SMR) plant, a 4 × 262 MW e (1,048 MW e ) gas-cooled SMR (GC-SMR) plant, and a 5 × 200 MW e (1,000 MW e total) molten salt SMR (MS-SMR) plant. Cost estimates are derived from equipment costs, labor hours, material inputs, and process-engineering models. The advanced SMRs are compared to natural gas combined cycle plants with and without post-combustion carbon capture and a conventional large nuclear reactor. Overnight capital cost (OCC) and levelized cost of energy (LCOE) estimates are developed. The OCC of the LW-SMR, GC-SMR, and MS-SMR are found to be $\$4,844$/kW, $\$4,355$/kW, and $\$3,985$/kW respectively. The LCOE of the LW-SMR, GC-SMR, and MS-SMR are found to be $\$89.6$/MWh, $\$81.5$/MWh, and $\$80.6$/MWh respectively. A Monte Carlo analysis is performed, for which the OCC and construction time of the LW-SMR is found to have a lower mean and standard deviation than a conventional large reactor. The LW-SMR OCC is found to have a mean of $\$5,233$/kW with a standard deviation of $\$658$/kW and a 90 % probability of remaining between $\$4,254$/kW and $\$6,399$/kW, while the construction duration is found to have a mean of 4.5 years with a standard deviation of 0.8 years and a 90 % probability of remaining between 3.4 and 6.0 years. The economic impact of economies of scale, simplification, modularization, and construction time for SMRs are discussed. Additionally, policy implications for direct SMR capital subsidies and the impact of a carbon tax on natural gas emissions are explored.