Search NASA⌕ Search

SEARCH · Search NASA

Results for “SPS System”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

SIMULATION OF E-CLOUD DRIVEN INSTABILITY AND ITS ATTENUATION USING A FEEDBACK SYSTEM IN THE CERN SPS

Electron clouds have been shown to trigger fast growing instabilities on proton beams circulating in the SPS [1], and a feedback system to control the instabilities is under active development [2]. We present the latest improvements to the Warp-Posinst simulation framework and feedback model, and its application to the self-consistent simulations of two consecutive bunches interacting with an electron cloud in the SPS.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

System size dependence of particle production at the SPS

Recent results on the system size dependence of net-baryon and hyperon production as measured at the CERN SPS are discussed. The observed N{sub part} dependences of yields, but also of dynamical properties, such as average transverse momenta, can be described in the context of the core corona approach. Other observables, such as antiproton yields and net-protons at forward rapidities, do not follow the predictions of this model. Possible implications for a search for a critical point in the QCD phase diagram are discussed. Event-by-event fluctuations of the relative core to corona source contributions might influence fluctuation observables (e.g., multiplicity fluctuations). The magnitude of this effect is investigated.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

DESIGN AND PROTOTYPING OF A 400 MHz RF-DIPOLE CRABBING CAVITY FOR THE LHC HIGH-LUMINOSITY UPGRADE

LHC High Luminosity Upgrade is in need of two crabbing systems that deflects the beam in both horizontal and vertical planes. The 400 MHz rf-dipole crabbing cavity system is capable of crabbing the proton beam in both planes. At present we are focusing our efforts on a complete crabbing system in the horizontal plane. Prior to LHC installation the crabbing system will be installed for beam test at SPS. The crabbing system consists of two rf-dipole cavities in the cryomodule. This paper discusses the electromagnetic design and mechanical properties of the rf-dipole crabbing system for SPS beam test.

De Silva, Payagalage Subashini↗

Energy requirements of the switchable polarity solvent forward osmosis (SPS-FO) water purification process

A model was developed to estimate the process energy requirements of a switchable polarity solvent forward osmosis (SPS FO) system for water purification from aqueous NaCl feed solution concentrations ranging from 0.5 to 4.0 molal at an operational scale of 480 m3/day (feed stream). The model indicates recovering approximately 90% of the water from a feed solution with NaCl concentration similar to seawater using SPS FO would have total equivalent energy requirements between 2.4 and 4.3 kWh per m 3 of purified water product. The process is predicted to be competitive with current costs for disposal/treatment of produced water from oil and gas drilling operations. As a result, once scaled up the SPS FO process may be a thermally driven desalination process that can compete with the cost of seawater reverse osmosis.

15 GEOTHERMAL ENERGY↗

SPS High Bandwidth Transverse Feedback System MD (1/23/2012)

We continue to have problems remaining synchronized with the beam. At this point we are not sure what the cause is. Typical problems associated with the timing shift: loss of synchronization of back end timing with the bunch by as much at a fraction of a nanosecond to several nanoseconds. Sometimes the front end timing changes and sometimes not. We eventually were able to synchronize quickly, by simply looking at the kicker load signal. JC has begun to recognize waveform traces typical of proper synchronization. For these initial tests, this should be good enough. Used a 200 MHz non amplitude modulated signal, measured the sum of the 200 MHz signal out of excitation and feedback systems, file Jan-22-932. Typically, out of the H9, 320 mV pp corresponds to both system begin aligned, with set attenuation. We were able to take many measurements where we scanned the phase of the FIR filter and varied the gain to determine the phase that damps the beam motion. $\phi$ ~ 90°. Performed some drive and damp measurements, driving mode 0, see Table 2 for details. Had a chromaticity sweep implemented and monitored the bunch with feedback on and off, see Table 3 for details.

ACCPHY↗