Stormwater Pollution Prevention Plan for: Technical Area 3 Power and Steam Plant
This report describes a pollution prevention plan for the LANL power and steam plant in area 3.
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
This report describes a pollution prevention plan for the LANL power and steam plant in area 3.
This Storm Water Pollution Prevention Plan (SWPPP) was developed in accordance with the provisions of the Clean Water Act (33 U.S.C. §§1251 et seq., as amended), and the Multi-Sector General Permit for Storm Water Discharges Associated with Industrial Activity (U.S. EPA, June 2015) issued by the U.S. Environmental Protection Agency (EPA) for the National Pollutant Discharge Elimination System (NPDES) and using the industry specific permit requirements for Sector O-Steam Electric Generating Facilities as a guide. This SWPPP applies to discharges of stormwater from the operational areas of the TA-03-22 Power and Steam Plant at Los Alamos National Laboratory. Los Alamos National Laboratory (also referred to as LANL or the “Laboratory”) is owned by the Department of Energy (DOE), and is operated by Los Alamos National Security, LLC (LANS). Throughout this document, the term “facility” refers to the TA-03-22 Power and Steam Plant and associated areas. The current permit expires at midnight on June 4, 2020.
The TA-03-22 Power and Steam Plant (PSP) is part of LANL’s Utilities and Institutional (UI) Facilities Operations Directorate (FOD) with day-to-day management provided by UI facility and operations personnel; which has established a Stormwater Pollution Prevention Team (PPT) whose members are responsible for assisting the facility manager in developing and revising the facility’s SWPPP as well as maintaining control measures and taking corrective actions when required. All PPT members will have access to either a hard copy or an electronic version of this SWPPP.
This Stormwater Pollution Prevention Plan (SWPPP) was developed in accordance with the provisions of the Clean Water Act (33 U.S.C. §§1251 et seq., as amended), and the United States Environmental Protection Agency (EPA) National Pollutant Discharge Elimination System (NPDES) Multi-Sector General Permit for Stormwater Discharges Associated with Industrial Activity (MSGP) (U.S. EPA, June 2015) issued by EPA, and using the industry specific permit requirements for Sector O-Steam Electric Generating Facilities as a guide. The applicable stormwater discharge permit is EPA General Permit Tracing Number NMR050013 [Triad National Security, LLC (Triad)]. This SWPPP applies to discharges of stormwater from the operational areas of the TA-03-22 Power and Steam Plant at Los Alamos National Laboratory. Los Alamos National Laboratory (also referred to as LANL or the “Laboratory”) is owned by the Department of Energy (DOE), and is operated by Triad. Throughout this document, the term “facility” refers to the TA-03-22 Power and Steam Plant (PSP). The current MSGP expires at midnight on June 4, 2020.
This report offers training for employees who work at TA-3-22, the Power and Steam Plant that move product, metal, and other pollutants like oil, fuel, equipment, pumps, etc. outside or that work outside with industrial materials exposed to storm water.
This report is a description of the storm water pollution prevention plan for LANL's power and steam plant.
This Storm Water Pollution Prevention Plan (SWPPP) was developed in accordance with the provisions of the Clean Water Act (33 U.S.C. §§1251 et seq., as amended), and the Multi-Sector General Permit for Storm Water Discharges Associated with Industrial Activity (U.S. EPA, June 2015) issued by the U.S. Environmental Protection Agency (EPA) for the National Pollutant Discharge Elimination System (NPDES) and using the industry specific permit requirements for Sector O-Steam Electric Generating Facilities as a guide. The applicable stormwater discharge permit is EPA General Permit Registration Number NMR053915 (Los Alamos National Security (LANS) (U.S. EPA, June 2015). This SWPPP applies to discharges of stormwater from the operational areas of the TA-03-22 Power and Steam Plant at Los Alamos National Laboratory. Los Alamos National Laboratory (also referred to as LANL or the “Laboratory”) is owned by the Department of Energy (DOE), and is operated by Los Alamos National Security, LLC (LANS). Throughout this document, the term “facility” refers to the TA-03-22 Power and Steam Plant and associated areas. The current permit expires at midnight on June 4, 2020.
This is a regulatory compliance report for the TA-3 Power and Steam plant.
The Gas Technology Institute (GTI) has developed a pressurized oxy-coal fired molten bed boiler (MBB) concept, in which coal and oxygen are fired directly into a bed of molten coal slag through burners located on the bottom of the boiler and fired upward. Circulation of heat by the molten slag eliminates the need for a flue gas recirculation loop and provides excellent heat transfer to steam tubes in the boiler walls. Advantages of the MBB technology over other boilers include higher efficiency (from eliminating flue gas recirculation), a smaller and less expensive boiler, modular design leading to direct scalability, decreased fines carryover and handling costs, smaller exhaust duct size, and smaller emissions control equipment sizes. The objective of this project was to conduct techno-economic analyses and an engineering design of the MBB project and to support this work with thermodynamic analyses and oxy-coal burner testing. Techno-economic analyses of GTI’s pressurized oxy-coal fired MBB technology found that the overall plant with compressed CO2 has an efficiency of 31.6%. This is a significant increase over calculated 29.2% efficiency of first generation oxy-coal plants. Cost of electricity (COE) for the pressurized MBB supercritical steam power plant with CO2 capture and compression was calculated to be 134% of the COE for an air-coal supercritical steam power plant with no CO2 capture. This compares positively with a calculated COE for first generation oxy-coal supercritical steam power plants with CO2 capture and compression of 164%. The COE for the MBB power plant is found to meet the U.S. Department of Energy (DOE) target of 135%, before any plant optimization. The MBB power plant was also determined to be simpler than other oxy-coal power plants with a 17% lower capital cost. No other known combustion technology can produce higher efficiencies or lower COE when CO2 capture and compression are included. A thermodynamic enthalpy and exergy analysis found a number of modifications and adjustments that could provide higher efficiency and better use of available work. Conclusions from this analysis will help guide the analyses and CFD modeling in future process development. The MBB technology has the potential to be a disruptive technology that will enable coal combustion power plants to be built and operated in a cost effective way, cleanly with no carbon dioxide emissions. A large amount of work is needed to quantify and confirm the great promise of the MBB technology. A Phase 2 proposal was submitted to DOE and other sponsors to address the most critical MBB process technical gaps. The Phase 2 proposal was not accepted for current DOE support.
Potential thermionic power systems for space or terrestrial applications are described so that the development goals can be clearly identified. The thermionic power systems considered are a space nuclear power system, a fossil-fuel thermionic topping steam power system, a solar thermionic topping steam power system, and advanced systems. Attention is given to a discussion of the current status of technology development in thermionic converters and associated elements in power systems. Future prospects of thermionic power systems are also discussed. It is concluded that thermionic conversion has a great potential for a variety of applications.
Steam rankine cycle solar power system
An experimental technology for the removal of insoluble impurities from a horizontal steam generator with purge water during planned shutdowns of the power generating unit is improved through a more representative determination of the concentration of impurities in the purge water ahead of the water cleanup facility and a more precise effective time for the duration of the purge process. Tests with the improved technique at power generating unit No. 1 of the Rostov Nuclear Power Plant show that the efficiency with which insoluble impurities are removed from the steam generator volume was more than two orders of magnitude greater than under the standard regulations.
This report presents improvements made to RELAP-7 for modeling Rankine power cycles, which are used on the secondary side of some advanced reactor concepts. For example, for a High-Temperature gas-cooled Reactor Pebble bed Module (HTR-PM), in the primary loop, helium transfers heat from the fuel to a steam generator, and on the secondary side, dry steam from the steam generator applies work to a turbine, which is converted into electrical power by a generator. After passing through the turbine, the steam passes through a condenser and pumped to the steam generator inlet, completing a Rankine cycle on the secondary side. This HTR-PM concept is used as an example to demonstrate a steam-electric power cycle capability in RELAP-7. This power cycle requires a number of different physical components, including a pump, compressor, turbine, steam generator, and condenser. The steam generator is modeled using a heat exchange between primary and secondary loops, and the condenser is modeled using a cooling source term. Recent efforts demonstrated preliminary models for the turbomachinery components (pump/compressor and turbine), but more physical models were required. Furthermore, several improvements were made for the robustness of mixed single-phase/two-phase flow present in a Rankine cycle.
This project was aimed at obtaining process engineering and scale-up data at a laboratory scale to investigate the technical and economic feasibility of a patented post-combustion carbon dioxide (CO 2 ) capture process-the Integrated Vacuum Carbonate Absorption Process (IVCAP). Unique features of the IVCAP include its ability to be fully-integrated with the power plant's steam cycle and potential for combined sulfur dioxide (SO 2 ) removal and CO 2 capture. Theoretical and experimental studies of this project were aimed at answering three major technical questions: 1) What additives can effectively reduce the water vapor saturation pressure and energy requirement for water vaporization in the vacuum stripper of the IVCAP? 2) What catalysts can promote CO 2 absorption into the potassium carbonate (PC) solution to achieve an overall absorption rate comparable to monoethanolamine (MEA) and are the catalysts stable at the IVCAP conditions and in the flue gas environment? 3) Are any process modifications needed to combine SO 2 and CO 2 removal in the IVCAP? Lab-scale experiments and thermodynamic and process simulation studies performed to obtain detailed information pertinent to the above three technical questions produced the following results: 1) Two additives were identified that lower the saturation pressure of water vapor over the PC solution by about 20%. 2) The carbonic anhydrase (CA) enzyme was identified as the most effective catalyst for promoting CO 2 absorption. The absorption rate into the CO 2 -lean PC solution promoted with 300 mg/L CA was several times slower than the corresponding 5 M MEA solution, but absorption into the CO 2 -rich PC solution was comparable to the CO 2 -rich MEA solution. The tested CA enzymes demonstrated excellent resistance to major flue gas impurities. A technical-grade CA enzyme was stable at 40°C (104°F) over a six-month test period, while its half-life was about two months at 50°C (122°F). Enzyme immobilization improved the CA enzyme's thermal stability by up to three times compared to its free counterpart. 3) Two process modifications were proposed to improve the technical performance of the IVCAP for combined SO 2 removal and CO 2 capture. The results from a techno-economic study of a 528 MWe (gross) pulverized coal-fired, subcritical steam power plant revealed that the cost of CO 2 avoidance with the IVCAP was about 30% lower than conventional MEA-based processes. The levelized cost of electricity (LCOE) of the IVCAP ranged from $\$$40 to 46/MWh, an increase of 60 to 70% compared to a reference power plant without CO 2 capture. The overall conclusion of this study is that the IVCAP is a technically feasible and economically more attractive process than available MEA-based processes. A scale-up study using the slipstream of an actual coal-derived flue gas and development of a more stable CA enzyme are recommended for future studies.
Steam generators are integral components of both conventional and advanced reactors utilizing steam power cycles, as they influence the power conversion performance. Steam generator designs are highly influenced by the type of reactor coolant used, which mainly governs the different control, monitoring, and safety system actuation requirements. Therefore, the present work reviews the thermal hydraulics instrumentation within steam generators designed for pressurized water reactors (PWRs), high-temperature gas-cooled reactors (HTGRs), sodium fast reactors (SFRs), and molten salt cooled reactors (MSRs). Emphasis is given to measurement techniques that are either unique or particularly important to specific reactor types. Lastly, a discussion is provided on the instrumentation and measured parameters. The work identifies standard parameters of interest and is expected to aid the development of test beds and novel measurements techniques.
A comprehensive techno-economic analysis of destabilized Li hydrides, used as thermal energy storage systems in concentrating solar power plants, is presented and discussed. Two systems, operating at temperatures on the order of 550–650 °C, are selected as thermal energy storage units for steam power plants, namely the Si-destabilized Li hydride (LiSi) and the Al-destabilized Li hydride (LiAl). Two thermal energy storage systems, operating at temperatures on the order of 700–750 °C, are selected for integration in supercritical CO2 power plants, namely the Si-destabilized Li hydride (LiSi) and the Sn-destabilized Li hydride (LiSn). Each storage system demonstrates excellent volumetric capacity, achieving values between 100 and 250 kWhth/m3. The LiSi-based thermal energy storage systems can be integrated with steam and supercritical CO2 plants at a specific cost between 107 US$/kWhth and 109 US$/kWhth, with potential to achieve costs on the order of 74 US$/kWhth under enhanced configurations and scenarios. The LiAl-based storage system has the highest potential for large scale applications. The specific cost of the LiAl system, integrated in solar steam power plants, is equal to approximately 74 US$/kWhth, with potential to reach values on the order of 51 US$/kWhth under enhanced performance configurations and scenarios.
For the past several years Alstom Power Inc. (Alstom), a leading world-wide power system manufacturer and supplier, has been in the initial stages of developing an entirely new, ultra-clean, low cost, high efficiency power plant for the global power market. This new power plant concept is based on a hybrid combustion-gasification process utilizing high temperature chemical and thermal looping technology The process consists of the oxidation, reduction, carbonation, and calcination of calcium-based compounds, which chemically react with coal, biomass, or opportunity fuels in two chemical loops and one thermal loop. The chemical and thermal looping technology can be alternatively configured as (i) a combustion-based steam power plant with CO{sub 2} capture, (ii) a hybrid combustion-gasification process producing a syngas for gas turbines or fuel cells, or (iii) an integrated hybrid combustion-gasification process producing hydrogen for gas turbines, fuel cells or other hydrogen based applications while also producing a separate stream of CO{sub 2} for use or sequestration. In its most advanced configuration, this new concept offers the promise to become the technology link from today's Rankine cycle steam power plants to tomorrow's advanced energy plants. The objective of this work is to develop and verify the high temperature chemical and thermal looping process concept at a small-scale pilot facility in order to enable AL to design, construct and demonstrate a pre-commercial, prototype version of this advanced system. In support of this objective, Alstom and DOE started a multi-year program, under this contract. Before the contract started, in a preliminary phase (Phase 0) Alstom funded and built the required small-scale pilot facility (Process Development Unit, PDU) at its Power Plant Laboratories in Windsor, Connecticut. Construction was completed in calendar year 2003. The objective for Phase I was to develop the indirect combustion loop with CO{sub 2} separation, and also syngas production from coal with the calcium sulfide (CaS)/calcium sulfate (CaSO{sub 4}) loop utilizing the PDU facility. The results of Phase I were reported in Reference 1, 'Hybrid Combustion-Gasification Chemical Looping Coal Power Development Technology Development Phase I Report' The objective for Phase II was to develop the carbonate loop--lime (CaO)/calcium carbonate (CaCO{sub 3}) loop, integrate it with the gasification loop from Phase I, and ultimately demonstrate the feasibility of hydrogen production from the combined loops. The results of this program were reported in Reference 3, 'Hybrid Combustion-Gasification Chemical Looping Coal Power Development Technology Development Phase II Report'. The objective of Phase III is to operate the pilot plant to obtain enough engineering information to design a prototype of the commercial Chemical Looping concept. The activities include modifications to the Phase II Chemical Looping PDU, solids transportation studies, control and instrumentation studies and additional cold flow modeling. The deliverable is a report making recommendations for preliminary design guidelines for the prototype plant, results from the pilot plant testing and an update of the commercial plant economic estimates.
The overall goal is to improve the performance and economics of existing coal fired power plants by extending low load boiler operation to lower loads than is currently achievable. The objective of this program is to develop and validate sensor hardware and analytical algorithms to lower plant operating expenses (OPEX) for the currently operating pulverized coal utility boiler fleet. Coal fired utility boilers are increasingly under grid dispatch pressure. In some cases, the coal fired cost of generation is noncompetitive with respect to natural gas generation and subsidized renewable sources. To remain profitable and remain fully compliant with existing environmental regulations, the installed coal fired fleet must find technologies which allow it to move into a more flexible cyclic load dispatch model. Today the installed coal fired utility fleet must be cost of generation competitive, fully emissions compliant, and responsive to the variability inherent in renewable energy generation sources. In the Phase I of the project, GE Steam Power, Inc. (GE) performed modeling of different operating scenarios for low load operation using an existing full plant dynamic model developed for a 660MW steam power plant. Sensors and analytic algorithms to enable a stable and steady coal supply for low load pulverizer operation were identified and tested at the Pulverizer Development Facility (PDF) at GE’s Clean Energy Center in Bloomfield, Connecticut. Sensors and analytic algorithms to enable stable combustion for low load operation were identified and tested at the 15 MWth Industrial Scale Burner facility (ISBF) at GE’s Clean Energy Center. A concept was developed to test the sensors and control algorithms, down selected after testing, at a full-scale coal fired power plant. A budget estimate was then developed, and the concept was implemented at an existing utility power plant. The specific objectives of the experimental work were to: • Identify and select sensors and analytic algorithms for monitoring coal pulverizer operation at lower loads to provide stable operation and appropriate coal fineness at lower coal throughput; Identify and select sensors and analytic algorithms for a Boiler Flame Stability Monitor to better balance air and fuel at each burner. This enables a reduction in a coal boiler’s safe low load power level while maintaining stable flame characteristics; Develop a concept in Phase I for low load operation of a full-scale power plant and develop a budget estimate for testing and execute the test plan at an existing plant in Phase II; Validate the capability of the extended low load boiler system to extend the minimum load operating point in a safe and reliable manner on an existing full-scale utility boiler. At the completion of this experimental study, GE has developed a set of sensors and analytic algorithms, down selected after testing, that have the potential to enable safe low load operation of a utility boiler. GE has also identified a host site for testing these identified sensors and analytic algorithms. GE has generated a full set of deliverables that provide sufficient information to proceed with the next step of testing at a host site. This includes a potential host site and budget estimate for concept testing at host site. In the Phase II of the project, a series of field tests were completed to validate the extended low load boiler operation, which consisted of detailed engineering, installation, commissioning, and testing the additional sensors and analytics for the coal-fired combustion system on an existing full-scale utility boiler. The optimization work has been supported by the host plant and endorsed by their engineering and operation staff.