Search NASA⌕ Search

SEARCH · Search NASA

Results for “SYSTEM MONITORING”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Remote monitoring system

A remote monitoring system for monitoring parameters of an underground asset, such as an electric cable system, a pipeline serving as a conduit for water, gas, oil, sewage, or the like. Parameter detectors, such as sensors that measure temperature, voltage, current, moisture, etc., are distributed along the asset to provide electrical signals that represent respective monitored parameters of the asset. An underground hub disposed in an underground vault, or manhole, through which the asset passes is coupled to the parameter detectors to acquire the signals provided by the parameter detectors. The hub includes a controller to provide data derived from the acquired signals, the data being transmitted to a remote central location by a transceiver, or modem, via LP-WAN communication. Signals from the transceiver are transmitted directly from underground.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Projected network performance for next generation aerosol monitoring systems

Aerosol monitoring for radioactivity is a mature and proven technology. However, by improving key specifications of aerosol monitoring equipment, more samples per day can be collected and analyzed with the same minimum detectable concentrations as current systems. This work models hypothetical releases of 140 Ba and 131 I over a range of magnitudes corresponding to the inventory produced from the fission of about 100 g to 1 kiloton TNT-equivalent of 235 U. The releases occur over an entire year to incorporate the natural variability in atmospheric transport. Sampling equipment located at the 79 locations for radionuclide stations identified in the Comprehensive Nuclear-Test-Ban Treaty (CTBT) for the International Monitoring System are used to determine the detections of the individual releases. Alternative collection schemes in next generation equipment that collect 2, 3, or 4 samples per day, rather than the current 1 sample per day, would result in detections in many more samples at more stations with detections for a given release level. The authors posit that next generation equipment will result in increased network resilience to outages and improved source-location capability for lower yield source releases. The application of dual-detector and coincidence measurements to these systems would significantly boost sensitivity for some isotopes and would further enhance the monitoring capability.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

OpenSM Monitoring System

The OpenSM Monitoring System includes a collection of diagnostic and monitoring tools for use on Infiniband networks. The information this system gathers is obtained from a service, which in turn is obtained directly from the OpenSM subnet manager.

Meier, T.A.↗

OpenSM Monitoring System

The OpenSM Monitoring System includes a collection of diagnostic and monitoring tools for use on Infiniband networks. The information this system gathers is obtained from a service, which in turn is obtained directly from the OpenSM subnet manager.

Meier, T. A.↗

Radionuclide measurements of the international monitoring system

The International Monitoring System (IMS) is a unique global network of sensors, tuned to measure various phenomenology, with the common goal of detecting a nuclear explosion anywhere in the world. One component of this network collects measurements of radioactive particulates and gases (collectively known as radionuclides) present in the atmosphere; through this, compliance with the Comprehensive Nuclear-Test-Ban Treaty (CTBT) can be verified. The radionuclide sub-network consists of 120 sensors across 80 locations, supported by 16 measurement laboratories. All radionuclide stations make use of a form of γ-ray spectroscopy to measure radionuclides from samples; this remains largely unchanged since the network was first established 25 years ago. Advances in sampling and spectroscopy systems can yield improvements to the sensitivity of the network to detect a nuclear explosion. This paper summarises the status of the IMS radionuclide network, the current suite of technology used and reviews new technology that could enhance future iterations, potentially improving the verification power of the IMS.

Goodwin, Matthew A.↗

Vector sensor-based acoustic monitoring system

An acoustic monitoring system characterizes, classifies, and geo-locates anthropogenic and natural sounds in near real time. The system includes a compact array of three acoustic vector sensors, which measures acoustic pressure and the three-dimensional particle velocity vector associated with the propagation of an acoustic wave, thereby inherently providing bearing information to an underwater source of sound. Beamforming techniques provide sound source localization, allowing for characterization of the acoustic signature of specific underwater acoustic sources.

Raghukumar, Kaustubha↗

Projected network performance for next-generation xenon monitoring systems

Next-generation radioxenon monitoring systems are reaching maturity and are expected to improve certain aspects of performance in verifying the absence of nuclear tests. To predict the improvement in detecting and locating nuclear releases, thousands of releases all over the globe were simulated and the global detection probability was calculated. This was done for the International Monitoring System network of noble gas samplers as it currently exists (25 certified stations), and how it would be for potential future network sizes of 39 and 79 stations. The probability of detection was calculated for releases ranging from 10 10 Bq to 10 16 Bq of 133 Xe and presented as coverage maps and global integrals for both current and next-generation monitoring systems. Similarly, the number of detecting stations and the number of detecting samples were tabulated to elucidate the possibilities for enhanced location capability. Improvements in global detection coverage are maximized at different release sizes in a way that depends on the station density. For example, for releases of 3×10 14 Bq and 39 stations, the detection probability would rise from 60% to 70% with next-generation systems, while for releases of 10 13 Bq and 79 stations, it would rise from 37% to 52%. Achieving an average of two detecting stations requires a 1015 Bq release for a 39-station network and a 10 14 Bq release for a 79-station network. The largest impact of using next-generation systems may be the confidence, failure tolerance, and location capability that arise from obtaining multiple samples associated with a single release event.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

PERFORMACE OF MULTI-PROBE CORROSION MONITORING SYSTEMS AT THE HANFORD SITE

Between 2007 and 2009, several different multi-probe corrosion monitoring systems were designed and installed in high-level nuclear waste tanks at the U.S. Department of Energy's Hanford Site in WaShington State. The probe systems are being monitored to ensure waste tanks operate in regions that minimize localized corrosion (i.e., pitting) and stress corrosion cracking. The corrosion monitoring systems have been installed in wastes with different chemistry types. An ongoing effort during the same time period has generated non-radioactive simulants that are tested in the laboratory to establish baseline corrosion monitoring system performance and characterize data to allow interpretation of readings from the multiple corrosion monitoring systems. Data collection from these monitoring systems has reached the point where the results allow comparison with the laboratory testing. This paper presents analytical results from the corrosion monitoring system development program.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Mock UF6 Feed and Withdrawal System for Testing Safeguards Monitoring Systems and Strategies Intended for Nuclear Fuel Enrichment and Processing Plants

This report describes an engineering-scale, mock UF6 feed and withdrawal (F&W) system, its operation, and its intended uses. This system has been assembled to provide a test bed for evaluating and demonstrating new methodologies that can be used in remote, unattended, continuous monitoring of nuclear material process operations. These measures are being investigated to provide independent inspectors improved assurance that operations are being conducted within declared parameters, and to increase the overall effectiveness of safeguarding nuclear material. Testing applicable technologies on a mock F&W system, which uses water as a surrogate for UF6, enables thorough and cost-effective investigation of hardware, software, and operational strategies before their direct installation in an industrial nuclear material processing environment. Electronic scales used for continuous load-cell monitoring also are described as part of the basic mock F&W system description. Continuous monitoring components on the mock F&W system are linked to a data aggregation computer by a local network, which also is depicted. Data collection and storage systems are described only briefly in this report. The mock UF{sub 6} F&W system is economical to operate. It uses a simple process involving only a surge tank between feed tanks and product and withdrawal (or waste) tanks. The system uses water as the transfer fluid, thereby avoiding the use of hazardous UF{sub 6}. The system is not tethered to an operating industrial process involving nuclear materials, thereby allowing scenarios (e.g., material diversion) that cannot be conducted otherwise. These features facilitate conducting experiments that yield meaningful results with a minimum of expenditure and quick turnaround time. Technologies demonstrated on the engineering-scale system lead to field trials (described briefly in this report) for determining implementation issues and performance of the monitoring technologies under plant operating conditions. The ultimate use of technologies tested on the engineering-scale test bed is to work with safeguards agencies to install them in operating plants (e.g., enrichment and fuel processing plants), thereby promoting new safeguards measures with minimal impact to operating plants. In addition, this system is useful in identifying features for new plants that can be incorporated as part of 'safeguards by design,' in which load cells and other monitoring technologies are specified to provide outputs for automated monitoring and inspector evaluation.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Used nuclear fuel dry storage cask materials monitoring system: a proof of concept to deploy retrieve monitoring equipment - 15504

The cask materials monitoring system is a proof-of-concept to deploy and retrieve monitoring equipment. The system is an airlock-type system that is bolted to the cask fill/drain port. It consists of the following major components: (1) a monitoring module that contains the equipment for monitoring the cask environment, (2) a sliding shield plug that provides radiation shielding throughout the deployment and retrieval of the monitoring equipment module, (3) a primary seal flange that is permanently installed on the cask that provides cask boundary confinement, and (4) a containment tube that provides the airlock function providing cask confinement when the primary seal is broken. In this proof-of-concept development, corrosion coupons were selected as the monitoring equipment for deployment into a spent nuclear fuel cask. However, the system has the potential for a variety of uses. The integration of a camera deployment system into the cask materials monitoring system will permit inspection of used nuclear fuel while maintaining cask atmosphere. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Singapore's Zero-Energy Building's daylight monitoring system

A setup to monitor the daylighting performance of different glazing types in Singapore is presented. The glazing is installed in the facade of four dedicated testing chambers in BCAA's Zero Energy Building in Singapore. These test rooms are equipped with sensors that both record illuminances on the work plane, and luminances as seen by occupants. The physical and logical design of the monitoring system is presented. Criteria to assess the daylighting performance are introduced, and initial results of the work in progress are presented.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Towards a Global Monitoring System for CMS Computing Operations

The operation of the CMS computing system requires a complex monitoring system to cover all its aspects: central services, databases, the distributed computing infrastructure, production and analysis workflows, the global overview of the CMS computing activities and the related historical information. Several tools are available to provide this information, developed both inside and outside of the collaboration and often used in common with other experiments. Despite the fact that the current monitoring allowed CMS to successfully perform its computing operations, an evolution of the system is clearly required, to adapt to the recent changes in the data and workload management tools and models and to address some shortcomings that make its usage less than optimal. Therefore, a recent and ongoing coordinated effort was started in CMS, aiming at improving the entire monitoring system by identifying its weaknesses and the new requirements from the stakeholders, rationalise and streamline existing components and drive future software development. This contribution gives a complete overview of the CMS monitoring system and a description of all the recent activities that have been started with the goal of providing a more integrated, modern and functional global monitoring system for computing operations.

Bauerdick, L. A.T.↗

A Prototype Wire Position Monitoring System

The Wire Position Monitoring System (WPM) will track changes in the transverse position of LCLS Beam Position Monitors (BPMs) to 1{micro}m over several weeks. This position information will be used between applications of beam based alignment to correct for changes in component alignment. The WPM system has several requirements. The sensor range must be large enough so that precision sensor positioning is not required. The resolution needs to be small enough so that the signal can be used to monitor motion to 1{micro}m. The system must be stable enough so that system drift does not mimic motion of the component being monitored. The WPM sensor assembly consists of two parts, the magnetic sensor and an integrated lock-in amplifier. The magnetic sensor picks up a signal from the alternating current in a stretched wire. The voltage v induced in the sensor is proportional to the wire displacement from the center of the sensor. The integrated lock-in amplifier provides a DC output whose magnitude is proportional to the AC signal from the magnetic sensor. The DC output is either read on a digital voltmeter or digitized locally and communicated over a computer interface.

43 PARTICLE ACCELERATORS↗

Projected network performance for multiple isotopes using next-generation xenon monitoring systems

Since about 2000 (Bowyer et al., 1998), radioxenon monitoring systems have been under development and testing for the verification of the Comprehensive Nuclear Test-Ban Treaty (CTBT). Operation of the systems since then has resulted in development of a next-generation of systems that are nearly ready for operational deployment. By 2010, the need to screen out civilian sources was well known (Auer et al., 2010; Saey, 2009), and isotopic ratio approaches were soon considered (Kalinowski et al., 2014) to identify specific sources. New generation systems are expected to improve the ability to verify the absence of nuclear tests by using isotopic ratios when multiple isotopes are detected. In this work, thousands of releases were simulated to compute the global detection probability of 131m Xe, 133m Xe, 133 Xe, and 135 Xe at 39 noble gas systems in the International Monitoring System (IMS) for both current and next-generation systems. Three release scenarios are defined at 1 h, 1 d, and 10 d past a 1 kt TNT equivalent 235U explosion event. Multiple cases using from one part in a million to the complete release of the xenon isotopic activity are evaluated for each scenario. Coverage maps and global integrals comparing current and next-generation monitoring systems are presented showing that next-generation noble gas systems will create measurable improvements in the IMS. The global detection probability for 133 Xe is shown to be strong in all scenarios, but only modestly improved by next-generation equipment. However, the detection probability for 131m Xe and 133m Xe increased to about 50% in different scenarios, providing a second detectable isotope for many events. As anticipated from shorter sampling intervals, the expected number of detecting samples roughly doubled and the expected number of detecting stations rose by approximately 50% for all release scenarios. Thus, it might be anticipated that future events would consist of multiple 133 Xe detections and one or more second isotope detections. In conclusion, signals of this nature should increase detection confidence, tighten release location estimates, improve rejection of civilian signals, and lessen the impacts from individual systems being offline for maintenance or repair reasons.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

SU-E-T-258: Development of a New Patient Set-Up Monitoring System Using Force Sensing Resistor (FSR) Sensor for the Radiation Therapy

Purpose: The purpose of this work is to develop a new patient set-up monitoring system using force sensing resistor (FSR) sensors that can confirm pressure of contact surface and evaluate its feasibility. Methods: In this study, we focused on develop the patient set-up monitoring system to compensate for the limitation of existing optical based monitoring system, so the developed system can inform motion in the radiation therapy. The set-up monitoring system was designed consisting of sensor units (FSR sensor), signal conditioning devices (USB cable/interface electronics), a control PC, and a developed analysis software. The sensor unit was made by attaching FSR sensor and dispersing pressure sponge to prevent error which is caused by concentrating specific point. Measured signal from the FSR sensor was sampled to arduino mega 2560 microcontroller, transferred to control PC by using serial communication. The measured data went through normalization process. The normalized data was displayed through the developed graphic user interface (GUI) software. The software was designed to display a single sensor unit intensity (maximum 16 sensors) and display 2D pressure distribution (using 16 sensors) according to the purpose. Results: Changes of pressure value according to motion was confirmed by the developed set-up monitoring system. Very small movement such as little physical change in appearance can be confirmed using a single unit and using 2D pressure distribution. Also, the set-up monitoring system can observe in real time. Conclusion: In this study, we developed the new set-up monitoring system using FSR sensor. Especially, we expect that the new set-up monitoring system is suitable for motion monitoring of blind area that is hard to confirm existing optical system and compensate existing optical based monitoring system. As a further study, an integrated system will be constructed through correlation of existing optical monitoring system. This work was supported by the Industrial R&D program of MOTIE/KEIT. [10048997, Development of the core technology for integrated therapy devices based on real-time MRI guided tumor tracking] and the Mid-career Researcher Program (2014R1A2A1A10050270) through the National Research Foundation of Korea funded by the Ministry of Science, ICT&Future Planning.

60 APPLIED LIFE SCIENCES↗

Definition, Capabilities, and Components of a Terrestrial Carbon Monitoring System

Research efforts for effectively and consistently monitoring terrestrial carbon are increasing in number. As such, there is a need to define carbon monitoring and how it relates to carbon cycle science and carbon management. There is also a need to identify intended capabilities of a carbon monitoring system and what system components are needed to develop the capabilities. This paper is intended to promote discussion on what capabilities are needed in a carbon monitoring system based on requirements for different areas of carbon-related research and, ultimately, for carbon management. While many methods exist to quantify different components of the carbon cycle, research is needed on how these methods can be coupled or integrated to obtain carbon stock and flux estimates regularly and at a resolution that enables attribution of carbon dynamics to respective sources. As society faces sustainability and climate change conerns, carbon management activities implemented to reduce carbon emissions or increase carbon stocks will become increasingly important. Carbon management requires moderate to high resolution monitoring. Therefore, if monitoring is intended to help inform management decisions, management priorities should be considered prior to development of a monitoring system.

West, Tristram O.↗