Search NASA⌕ Search

SEARCH · Search NASA

Results for “Salt Processing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Results for the April 2025 Semiannual Salt Waste Processing Facility Decontaminated Salt Solution Sample

In this Technical Report, the chemical and radionuclide contaminant results from the April 2025 Semiannual sample of the Salt Waste Processing Facility (SWPF) Decontaminated Salt Solution (DSS) salt solution are presented in tabulated form. The information from this characterization will be used by Savannah River Mission Completion (SRMC) for the transfer of aqueous waste from SWPF to the Saltstone Production Facility (SPF) where the waste will be treated and disposed in the Saltstone Disposal Facility. This Technical Report compares results, where applicable, to SPF Waste Acceptance Criteria (WAC) LIMITS and TARGETS that were established at the time the SWPF DSS sample was obtained. The April 2025 Semiannual sample of the SWPF DSS is a composite from the six months of SWPF processing during the First Quarter Fiscal Year 2025 (1QFY2025) and the Second Quarter Fiscal Year 2025 (2QFY2025).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Results for the October 2025 Semiannual Salt Waste Processing Facility Decontaminated Salt Solution Sample

In this Technical Report, the chemical and radionuclide contaminant results from the October 2025 Semiannual sample of the Salt Waste Processing Facility (SWPF) Decontaminated Salt Solution (DSS) salt solution are presented in tabulated form. The information from this characterization will be used by Savannah River Mission Completion (SRMC) for the transfer of aqueous waste from SWPF to the Saltstone Production Facility (SPF) where the waste will be treated and disposed in the Saltstone Disposal Facility. This Technical Report compares results, where applicable, to SPF Waste Acceptance Criteria (WAC) LIMITS and TAR GETS that were established at the time the SWPF DSS sample was obtained. 1 The October 2025 Semiannual sample of the SWPF DSS is a composite from one month of SWPF processing during the Third Quarter Fiscal Year 2025 (3QFY2025) and two months of SWPF processing during the Fourth Quarter Fiscal Year 2025 (4QFY2025).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Investigation of Undissolved Solids from Salt Waste Processing Facility (SWPF) Salt Batches Collected via Filtration

SRNL researchers performed six experiments wherein 0.1 μm-grade stainless steel filters were used to filter samples pulled from salt batches 6, 9B, and 11B, without the addition of monosodium titanate. Three of these experiments were performed to collect filterable solids from each salt batch and characterize trapped solids via scanning electron microscopy. The remaining three experiments were performed to collect and then dissolve the same solids using 3.5 M nitric acid (similar to that employed in the Salt Waste Processing Facility) for characterization via Inductively-coupled plasma atomic emission spectroscopy.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

April 2025 Semiannual Composite Salt Waste Processing Facility (SWPF) Decontaminated Salt Solution (DSS) Toxicity Characteristic Leaching Procedure (TCLP) Results

The aqueous waste from the Salt Waste Processing Facility is sampled semiannually for transfers to the Saltstone Production Facility. Salt solution is treated at the Saltstone Production Facility and disposed of in the Saltstone Disposal Facility. Per request of customer, X-TTR-Z-00027, Revision 0, one Saltstone Disposal Facility waste form was prepared at Savannah River National Laboratory using the Salt Waste Processing Facility Decontaminated Salt Solution and Z-area premix material for the April 2025 semiannual Toxicity Characteristic Leaching Procedure sample. The sample contained 60:40 (by weight) of slag and fly ash (referred to as the “Cement-Free grout sample”). Results from the technical report support Task 2: ‘Grout Leaching Analyses’ of the Task Technical Request prepared by Savannah River Mission Completion. At 43 days cured, the Saltstone sample was collected and shipped to a certified laboratory for analysis using the Toxicity Characteristic Leaching Procedure. The April 2025 semiannual Cement-Free grout sample met the South Carolina Code of Regulations for Hazardous Waste Management Regulations 61-79.261.24 and 61-79.268.48 requirements for a non-hazardous waste form with respect to the Resource Conservation and Recovery Act metals and Underlying Hazardous Constituents, and met the Saltstone Production Facility Waste Acceptance Criteria that was in effect at the time of the sample collection at the Salt Waste Processing Facility.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

April 2024 Semiannual Composite Salt Waste Processing Facility (SWPF) Decontaminated Salt Solution (DSS) Toxicity Characteristic Leaching Procedure (TCLP) Results

The aqueous waste from the Salt Waste Processing Facility (SWPF) is sampled semiannually for transfers to the Saltstone Production Facility (SPF). Salt solution is treated at SPF and disposed of in the Saltstone Disposal Facility (SDF). Per request of customer, X-TTR-Z-00027, Revision 0, one SDF waste form (saltstone) sample was prepared in the Savannah River National Laboratory (SRNL) from the SWPF Decontaminated Salt Solution (DSS) Waste Acceptance Criteria (WAC) sample and Z-area premix material for the April 2024 semiannual Toxicity Characteristic Leaching Procedure (TCLP) sample. The sample contained 60:40 (by weight) of slag and fly ash (referred to as the “Cement-Free grout sample”). Results from the technical report support Task 2: ‘Grout Leaching Analyses’ of the Task Technical Request (TTR) prepared by Savannah River Mission Completion (SRMC). After at least 28 days cured, a sample of the SDF waste form was collected and shipped to a certified laboratory for analysis using the Toxicity Characteristic Leaching Procedure (TCLP). The April 2024 semiannual Cement-Free grout sample met the South Carolina (SC) Code of Regulations for Hazardous Waste Management Regulations (HWMR) 61-79.261.24 and 61-79.268.48 requirements for a non-hazardous waste form with respect to the Resource Conservation and Recovery Act (RCRA) metals and Underlying Hazardous Constituents (UHCs), and met the SPF WAC that was in effect at the time of the tank sampling.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

October 2024 Semiannual Composite Salt Waste Processing Facility (SWPF) Decontaminated Salt Solution (DSS) Toxicity Characteristic Leaching Procedure (TCLP) Results

The aqueous waste from the Salt Waste Processing Facility (SWPF) is sampled semiannually for transfers to the Saltstone Production Facility (SPF). Salt solution is treated at SPF and disposed of in the Saltstone Disposal Facility (SDF). Per request of customer, X-TTR-Z-00027, Revision 0, one SDF waste form (saltstone) sample was prepared in the Savannah River National Laboratory (SRNL) from the SWPF Decontaminated Salt Solution (DSS) Waste Acceptance Criteria (WAC) sample and Z-area premix material for the October 2024 semiannual Toxicity Characteristic Leaching Procedure (TCLP) sample. The sample contained 60:40 (by weight) of slag and fly ash (referred to as the “Cement-Free grout sample”). Results from the technical report support Task 2: ‘Grout Leaching Analyses’ of the Task Technical Request (TTR) prepared by Savannah River Mission Completion (SRMC). At 64 days cured, a sample of the SDF waste form was collected and shipped to a certified laboratory for analysis using the Toxicity Characteristic Leaching Procedure (TCLP). The October 2024 semiannual Cement-Free grout sample met the South Carolina (SC) Code of Regulations for Hazardous Waste Management Regulations (HWMR) 61-79.261.24 and 61-79.268.48 requirements for a non-hazardous waste form with respect to the Resource Conservation and Recovery Act (RCRA) metals and Underlying Hazardous Constituents (UHCs), and met the SPF WAC that was in effect at the time of the sample collection at SWPF.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

OPERATIONS REVIEW OF THE SAVANNAH RIVER SITE INTEGRATED SALT DISPOSITION PROCESS - 11327

The Savannah River Site (SRS) is removing liquid radioactive waste from its Tank Farm. To treat waste streams that are low in Cs-137, Sr-90, and actinides, SRS developed the Actinide Removal Process and implemented the Modular Caustic Side Solvent Extraction (CSSX) Unit (MCU). The Actinide Removal Process contacts salt solution with monosodium titanate to sorb strontium and select actinides. After monosodium titanate contact, the resulting slurry is filtered to remove the monosodium titanate (and sorbed strontium and actinides) and entrained sludge. The filtrate is transferred to the MCU for further treatment to remove cesium. The solid particulates removed by the filter are concentrated to {approx} 5 wt %, washed to reduce the sodium concentration, and transferred to the Defense Waste Processing Facility for vitrification. The CSSX process extracts the cesium from the radioactive waste using a customized solvent to produce a Decontaminated Salt Solution (DSS), and strips and concentrates the cesium from the solvent with dilute nitric acid. The DSS is incorporated in grout while the strip acid solution is transferred to the Defense Waste Processing Facility for vitrification. The facilities began radiological processing in April 2008 and started processing of the third campaign ('MarcoBatch 3') of waste in June 2010. Campaigns to date have processed {approx}1.2 million gallons of dissolved saltcake. Savannah River National Laboratory (SRNL) personnel performed tests using actual radioactive samples for each waste batch prior to processing. Testing included monosodium titanate sorption of strontium and actinides followed by CSSX batch contact tests to verify expected cesium mass transfer. This paper describes the tests conducted and compares results from facility operations. The results include strontium, plutonium, and cesium removal, cesium concentration, and organic entrainment and recovery data. Additionally, the poster describes lessons learned during operation of the facility.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Impact of Salt Waste Processing Facility Streams on the Nitric-Glycolic Flowsheet in the Chemical Processing Cell

An evaluation of the previous Chemical Processing Cell (CPC) testing was performed to determine whether the planned concurrent operation, or “coupled” operations, of the Defense Waste Processing Facility (DWPF) with the Salt Waste Processing Facility (SWPF) has been adequately covered. Tests with the nitricglycolic acid flowsheet, which were both coupled and uncoupled with salt waste streams, included several tests that required extended boiling times. This report provides the evaluation of previous testing and the testing recommendation requested by Savannah River Remediation. The focus of the evaluation was impact on flammability in CPC vessels (i.e., hydrogen generation rate, SWPF solvent components, antifoam degradation products) and processing impacts (i.e., acid window, melter feed target, rheological properties, antifoam requirements, and chemical composition).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Integrated salt waste processing at the Savannah River Site - 15301

Treatment and disposition of salt waste is the critical path to completion of the Savannah River Site Liquid Waste (LW) Disposition and Cleanup Program. The new Salt Waste Processing Facility (SWPF) is a critical link in the pre-treatment chain and will process high curie salt waste removed from various SRS liquid waste storage tanks. Significant infrastructure modifications are needed in the existing LW facilities in order to integrate the SWPF into the LW system. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Selection of glasses in support of the Sludge Batch 9 variability study for coupled operation with the Salt Waste Processing Facility

Prior to the processing of Sludge Batch 9 (SB9) with Frit 803 at the Defense Waste Processing Facility (DWPF), assessments and experimental glass work were completed to support the qualification of SB9 coupled processing with streams from the Actinide Removal Process (ARP) and Modular Caustic Side Solvent Extraction Unit (MCU). This previous work did not address coupled processing with streams from the Salt Waste Processing Facility (SWPF) because the Product Composition Control System (PCCS) models limited the TiO 2 concentration in glass to 2 weight percent (wt.%). These high activity streams from SWPF include monosodium titanate (MST) and sludge solids from the Sludge Solids Receipt Tank as well as Cs-containing strip effluent. The incorporation of these SWPF streams is expected to reach TiO2 concentrations in glass greater than 2 wt.% based on an MST addition of 0.4 g MST/L of salt solution. If double strike operation is required, then the MST addition is increased to 0.8 g MST/L of salt solution. Therefore, revisions to the models contained in PCCS were completed to allow the evaluation of glasses containing greater than 2 wt.% TiO 2 , but less than 6 wt.%. To support the implementation of the revised PCCS for SB9 – Frit 803 processing at DWPF prior to SWPF startup, the applicability of the new durability models for the SB9 variability study glasses was verified. Since the initial SB9 qualification for ARP-MCU coupled operation, additional Tank 40 analyses have been completed, which served as the basis for an updated projection of the SB9 blend composition in Tank 40. To identify a frit optimized for SB9 coupled operation with SWPF, the Savannah River National Laboratory (SRNL) performed a paper-study by utilizing Measurement Acceptance Region (MAR) assessments with DWPF PCCS. Based on these MAR assessment results, Frit 625 was recommended for processing both single and double MST strike scenarios. Savannah River Remediation (SRR) requested that SRNL perform a variability study with both Frit 803 and Frit 625 for SB9 coupled operation with SWPF. The objective of the variability study is to demonstrate that the Product Consistency Test (PCT) responses of the glasses are acceptable relative to the chemical durability of the Environmental Assessment (EA) reference glass and predictable by the current DWPF PCCS models for durability. This report documents the development of a test matrix that will support the variability study. To provide operational flexibility prior to SWPF startup, the predictability of glasses within the glass region for Frit 625-SB9 coupled operation with ARP-MCU was also confirmed.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Integrated Salt Waste Processing at the Savannah River Site - 17413

Treatment and disposition of salt waste is the critical path to completion of the Savannah River Site (SRS) Liquid Waste (LW) Disposition and Cleanup Program. The new Salt Waste Processing Facility (SWPF) is a critical link in the pre-treatment chain and will process high-curie salt waste removed from various SRS liquid waste storage tanks. Significant infrastructure modifications are underway throughout the existing LW facilities to integrate the SWPF into the LW system. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Frit Recommendation For Sludge Batch 9 Coupled Operation With The Salt Waste Processing Facility

Prior to the processing of Sludge Batch 9 (SB9) with Frit 803 at the Defense Waste Processing Facility (DWPF), assessments and experimental glass work were completed to support SB9 coupled processing with streams from the Actinide Removal Process (ARP) and Modular Caustic Side Solvent Extraction Unit (MCU). This previous work did not address coupled processing with streams from the Salt Waste Processing Facility (SWPF) because the Product Composition Control System (PCCS) models limited the TiO2 concentration in glass to 2 weight percent (wt.%). These high activity streams from SWPF include monosodium titanate (MST) and sludge solids from the Sludge Solids Receipt Tank (SSRT) as well as Cscontaining strip effluent (SE). The SWPF streams are expected to reach TiO2 concentrations in glass greater than 2 wt.% based on an MST strike of 0.4 g MST/L of salt solution. Therefore, revisions to the models contained in PCCS were completed to allow the evaluation of glasses containing greater than 2 wt.% TiO2, but less than 6 wt.%. Since the initial SB9 qualification for ARP-MCU coupled operation, additional Tank 40 analyses have been completed, which served as the basis for an updated projection of the SB9 blend composition in Tank 40. This projection will be used to support SB9 coupled operation with SWPF in 2019. Savannah River Remediation (SRR) has requested that the Savannah River National Laboratory (SRNL) select a second frit to optimize SB9 coupled operation with SWPF. The selected frit would provide operational flexibility by allowing an acceptable waste loading (WL) to be targeted while maintaining an operating window of at least ± 4 percentage points around this target. The objective of this study was to select a second frit based on a paper-study utilizing Measurement Acceptance Region (MAR) assessments with DWPF PCCS. To support these assessments, SRNL developed a new method for rigorous and directed optimization of frit compositions, which allowed for rapid screening and an assessment of a large array of candidate frits, and the ability to simultaneously satisfy the following single and double MST strike operating scenarios.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Selection of Glasses in Support of the Sludge Batch 9 Sulfate Solubility Limit for Coupled Operation with the Salt Waste Processing Facility

For Sludge Batches 3 through 8, the sulfate (SO 4 2- )solubility limit for the Defense Waste Processing Facility (DWPF) has been determined by laboratory-scale crucible testing. In preparation for Sludge Batch 9 (SB9) processing, a comparison demonstrated that minor compositional differences existed between the Sludge Batch 8 (SB8)-Frit 803 and SB9-Frit 803 glass composition regions for sludge-only and coupled operations with the Actinide Removal Process (ARP) and Modular Caustic Side Solvent Extraction Unit (MCU). Thus, no experimental testing was necessary and the SB8 SO 4 2- limit of 0.65 wt.% was recommended for SB9 processing. This previous SB9 assessment did not address coupled processing with streams from the Salt Waste Processing Facility (SWPF), which is anticipated to start operations in November 2019. These high activity streams will include monosodium titanate (MST) and sludge solids from the Sludge Solids Receipt Tank (SSRT) as well as Cs-containing strip effluent (SE). The incorporation of these SWPF streams is expected to reach TiO 2 concentrations in glass greater than 2 wt.% based on single and double MST strike scenarios. In support of coupled operation with SWPF, the DWPF Product Composition Control System was revised and allows a TiO 2 concentration of up to 6 wt.% (minus measurement uncertainty) in glass. For the SB8-Frit 803 SO 4 2- solubility study, the maximum TiO 2 concentration evaluated was 0.94 wt.%. Since the influence of increased TiO 2 on the retention of SO 4 2- in the SB9 glass region is unknown, a test matrix of ten glass compositions has been proposed to determine whether the 0.65 wt.% SO 4 2- limit is still appropriate for SB9 coupled operation with SWPF. This report documents the development of a test matrix that will support this study.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Characterization of Salt Waste Processing Facility August 2022 Tank 201 sample

Two Salt Waste Processing Facility (SWPF) Tank 201 samples were collected from the replacement of the decontaminated salt solution (DSS) coalescer at different times; one in December of 2021 and the other in August 2022. The December 2021 sample was collected after nitric and water flushing of the DSS Coalescer. The Aug 2022 sample was collected after water flushing only. The December 2021 Tank 201 solids were previously characterized and documented. SWPF requested the characterization of the August 2022 Tank 201 sample, and the comparison of the characterization results for these two Tank 201 solids collected at different dates.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Material Compatibility of Elastomers Used in the Salt Waste Processing Facility(SWPF)

Near the beginning of calendar year 2021, Salt Waste Processing Facility (SWPF) processed nearly a million gallons of initially diluted, and subsequently undiluted, supernatant. Higher than usual levels of Isopar L were detected in the Decontaminated Salt Solution (DSS). After shutting down the process and inspecting the DSS coalescers, personnel discovered the coalescers media appeared deformed and at least one had extruded out of the sealing surfaces. The gasket material was removed and sent to the Savannah River National Laboratory to possibly determine the cause of gasket degradation. A memorandum was issued documenting the results that could not rule out assembly error of the coalescer. For example, over torquing the gaskets beyond their recommended degree of compression, may have been a potential failure mode. SRNL recommended performing a quick compatibility test between the different process solutions used at SWPF and four different polymeric materials (the fifth one-Kalrez ® -arrived at the end of this test).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Waste Determination Equivalency - 12172

The Savannah River Site (SRS) is a Department of Energy (DOE) facility encompassing approximately 800 square kilometers near Aiken, South Carolina which began operations in the 1950's with the mission to produce nuclear materials. The SRS contains fifty-one tanks (2 stabilized, 49 yet to be closed) distributed between two liquid radioactive waste storage facilities at SRS containing carbon steel underground tanks with storage capacities ranging from 2,800,000 to 4,900,000 liters. Treatment of the liquid waste from these tanks is essential both to closing older tanks and to maintaining space needed to treat the waste that is eventually vitrified or disposed of onsite. Section 3116 of the Ronald W. Reagan National Defense Authorization Act of Fiscal Year 2005 (NDAA) provides the Secretary of Energy, in consultation with the Nuclear Regulatory Commission (NRC), a methodology to determine that certain waste resulting from prior reprocessing of spent nuclear fuel are not high-level radioactive waste if it can be demonstrated that the waste meets the criteria set forth in Section 3116(a) of the NDAA. The Secretary of Energy, in consultation with the NRC, signed a determination in January 2006, pursuant to Section 3116(a) of the NDAA, for salt waste disposal at the SRS Saltstone Disposal Facility. This determination is based, in part, on the Basis for Section 3116 Determination for Salt Waste Disposal at the Savannah River Site and supporting references, a document that describes the planned methods of liquid waste treatment and the resulting waste streams. The document provides descriptions of the proposed methods for processing salt waste, dividing them into 'Interim Salt Processing' and later processing through the Salt Waste Processing Facility (SWPF). Interim Salt Processing is separated into Deliquification, Dissolution, and Adjustment (DDA) and Actinide Removal Process/Caustic Side Solvent Extraction Unit (ARP/MCU). The Waste Determination was signed by the Secretary of Energy in January of 2006 based on proposed processing techniques with the expectation that it could be revised as new processing capabilities became viable. Once signed, however, it became evident that any changes would require lengthy review and another determination signed by the Secretary of Energy. With the maturation of additional salt removal technologies and the extension of the SWPF start-up date, it becomes necessary to define 'equivalency' to the processes laid out in the original determination. For the purposes of SRS, any waste not processed through Interim Salt Processing must be processed through SWPF or an equivalent process, and therefore a clear statement of the requirements for a process to be equivalent to SWPF becomes necessary. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Full-Scale Cross-Flow Filter Testing in Support of the Salt Waste Processing Facility Design

Parsons and its team members General Atomics and Energy Solutions conducted a series of tests to assess the constructability and performance of the Cross-Flow Filter (CFF) system specified for the Department of Energy (DOE) Salt Waste Processing Facility (SWPF). The testing determined the optimum flow rates, operating pressures, filtrate-flow control techniques, and cycle timing for filter back pulse and chemical cleaning. Results have verified the design assumptions made and have confirmed the suitability of cross-flow filtration for use in the SWPF. In conclusion: The CFF Test Program demonstrated that the SWPF CFF system could be successfully fabricated, that the SWPF CFF design assumptions were conservative with respect to filter performance and provided useful information on operational parameters and techniques. The filter system demonstrated performance in excess of expectations. (authors)

42 ENGINEERING↗

Characterization of the Soluble and Insoluble Portions of Solids from the Salt Waste Processing Facility Tank 201 and Tank 202 Samples

The Salt Waste Processing Facility (SWPF) Tank 201 and Tank 202 samples have been characterized using X-ray diffraction (XRD), scanning electron microscope/energy dispersive x-ray (SEM/EDX), particle size analysis (PSA-Microtrac), Fourier transform-infrared (FT-IR) and nuclear magnetic resonance ( 1 H NMR) spectroscopic techniques to characterize and identify organic and inorganic components in Tanks 201 and 202 as part of efforts to understand the problems occurring at SWPF due to the presence of solids in the recovered solvent.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗