Search NASA⌕ Search

SEARCH · Search NASA

Results for “Security Constrained Economic Dispatch”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Modeling distributed energy resource aggregations in security constrained unit commitment and economic dispatch

The Federal Energy Regulatory Commission (FERC) recently issued Order 2222, which requires all wholesale electricity markets in the US to allow distributed energy resources (DERs) to participate in the market as aggregated resources. These DER aggregations may be composed of many individual resources that are offered and dispatched by the market as a single entity. We present here a model of a distributed energy resource aggregator (DERA) that is scheduled by a market operator’s security constrained unit commitment (SCUC) and security constrained economic dispatch (SCED). The DERA model includes constraints for battery energy storage systems (BESSs), demand response resources (DRRs), and a simple distributed energy resource (DER). This paper describes a model for each resource type and presents two methods for the DERA to generate market offer curves: a profit-maximizing optimization to compute cost curves and a direct cost algorithm to determine dispatch costs for each resource and combine into cost curves. Once all participating DERAs are scheduled in SCUC/SCED, the model is then modified to dispatch individual DERs to maximize profit or minimize schedule deviation of the DERAs. A simulation of a representative day illustrates the DERA offers, the scheduled generation, and the DERA dispatch. Findings show the potential for unavoidable schedule deviations due to internal DER constraints and due to economic incentives to deviate from the SCUC/SCED schedules. This highlights the importance of DERA offer construction on market efficiency and system reliability. Novel aspects of our approach include: (1) We consider the asymmetry of price incentives impacting DERAs from the wholesale market compared to those impacting consumers from the retail market, as imposed by current regulations and laws. (2) We model aggregate consumer response through statistically parameterizable utility functions rather than a potentially impractical approach of modeling each individual consumer. (3) We show how to use the DERA operational dispatch model to create offers into the wholesale electricity market. (4) We show how DERAs may fail to meet their scheduled dispatch because the market offer format may not permit them to fully express their operational features such as intertemporal costs and constraints to the market.

aggregations↗

A Comprehensive Comparison of Current Operating Reserve Methodologies

Electric power systems are currently experiencing a paradigm shift from a traditionally static system to a system that is becoming increasingly more dynamic and variable. Emerging technologies are forcing power system operators to adapt to their performance characteristics. These technologies, such as distributed generation and energy storage systems, have changed the traditional idea of a distribution system with power flowing in one direction into a distribution system with bidirectional flows. Variable generation, in the form of wind and solar generation, also increases the variability and uncertainty in the system. As such, power system operators are revisiting the ways in which they treat this evolving power system, namely by modifying their operating reserve methodologies. This paper intends to show an in-depth analysis on different operating reserve methodologies and investigate their impacts on power system reliability and economic efficiency.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Profile of Resource Adequacy in the MISO Region

MISO is facing a number of generation resource challenges, ranging from large amounts of retirements, behind schedule retrofit projects, and internal resources committed to exporting power to PJM's capacity market. This report identifies potential issues with generator retirements and retrofits, as well as potential transmission issues, including the impact of imports and exports in a short-term outlook for resource adequacy in the MISO region, including specific concerns with the generation capacity expected to be available in the MISO North and Central regions from 2014 to 2016, as well as additional risks from proposed environmental regulations.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Interregional Transmission Operational Coordination (IRTOC)

This report presents a modeling and evaluation framework developed through the Inter-Regional Transmission Operational Coordination (IRTOC) project to study market-to-market (M2M) congestion management across day-ahead and real-time markets. The framework extends the Sienna platform through Sienna Decomposition, a multi-stage evaluation architecture that enables flexible representation of multiple regions and systematic assessment of alternative market coordination designs. Additional modeling capabilities include reserve deliverability constraints, High-Voltage Direct Current (HVDC) optimization for Alternating Current (AC) congestion management, and several real-time distributed coordination algorithms. Case studies using the RTS-GMLC test system and a large-scale Eastern Interconnection model demonstrate that the framework can evaluate alternative coordination structures and quantify their economic and operational impacts. The proposed framework provides a scalable platform for analyzing inter-regional coordination strategies in large-scale electricity markets.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Data-Driven Unit Commitment Refinement - a Scalable Approach for Complex Modern Power Grids

Integration of renewable generation, which is often intermittent and decentralized, substantially increases the stochasticity and complexity of power grid operations. Future power systems planning will require significant computational capability to evaluate balance between demand and supply under varying conditions, both temporally and spatially. The standard approach for generation unit commitment is to use mixed-integer linear programming to find the optimal generation schedule considering ramping and generator constraints. In the future grid this poses computational scalability challenges because generation and demand are not known with certainty due to stochasticity in weather and complexity of the grid. To address this challenge, we present a data-driven unit commitment approach that can efficiently include stochastic weather impacts and contingency considerations to improve unit commitment. Our approach uses graph-based data analytics techniques on solutions to the security constrained (and possibly stochastic) economic dispatch problem to identify potential improvements to a given unit commitment. Recent breakthroughs in fully-parallel stochastic economic dispatch software allow this approach to be scalably deployed. Simulations on synthetic South Carolina and Texas grids show this method can improve grid reliability with security constraints over a set of contingencies, while also meaningfully lowering total generation cost.

Holt, Timothy↗

Power generation-cooling water Nexus: Impacts of cooling water shortage on power system operation - a simulation case study in Illinois, U.S

Cooling water shortage, frequently attributed to drought and heat waves, poses a significant threat to the operations of thermoelectric power plants and further poses a challenge for the entire power system and environmental stakeholders. Recognizing the critical nexus between power generation and cooling water availability and the potential ability of power generations to adjust generation schedules during cooling water shortages, this paper introduces a security-constrained unit commitment and economic dispatch model considering water-energy nexus. In specific, the model is augmented with a unit-level cooling water requirement (CWR) model and multi-level cooling water availability (CWA) constraints. The unit-level CWR model quantifies the cooling water withdrawal per MWh of power generation, taking into account factors such as thermoelectric generation technologies, cooling system technologies, and environmental parameters. The multi-level CWA constraints incorporate pump-level, plant-level, watershed-level, and forced minimum power constraints, utilizing data derived from actual-based cooling water shortage scenarios. Using a simulation case study in Illinois, United States, this research examines the reliability, economic, and environmental implications of cooling water shortages on power system operations. The results show that Illinois may experience 10-15% daily load curtailment and severe congestion between certain regions from the east to central during cooling water shortages, while once-through and wet-tower units experience a 52% and 17% reduction in power generation. In conclusion, overall cooling water withdrawal decreases by 24-38% as severity intensifies.

Cooling water shortage↗

Quantifying the Value of Hydropower in the Electric Grid: Final Report

The report summarizes research to Quantify the Value of Hydropower in the Electric Grid. This 3-year DOE study focused on defining value of hydropower assets in a changing electric grid. Methods are described for valuation and planning of pumped storage and conventional hydropower. The project team conducted plant case studies, electric system modeling, market analysis, cost data gathering, and evaluations of operating strategies and constraints. Five other reports detailing these research results are available a project website, www.epri.com/hydrogrid. With increasing deployment of wind and solar renewable generation, many owners, operators, and developers of hydropower have recognized the opportunity to provide more flexibility and ancillary services to the electric grid. To quantify value of services, this study focused on the Western Electric Coordinating Council region. A security-constrained, unit commitment and economic dispatch model was used to quantify the role of hydropower for several future energy scenarios up to 2020. This hourly production simulation considered transmission requirements to deliver energy, including future expansion plans. Both energy and ancillary service values were considered. Addressing specifically the quantification of pumped storage value, no single value stream dominated predicted plant contributions in various energy futures. Modeling confirmed that service value depends greatly on location and on competition with other available grid support resources. In this summary, ten different value streams related to hydropower are described. These fell into three categories; operational improvements, new technologies, and electricity market opportunities. Of these ten, the study was able to quantify a monetary value in six by applying both present day and future scenarios for operating the electric grid. This study confirmed that hydropower resources across the United States contribute significantly to operation of the grid in terms of energy, capacity, and ancillary services. Many potential improvements to existing hydropower plants were found to be cost-effective. Pumped storage is the most likely form of large new hydro asset expansions in the U.S. however, justifying investments in new pumped storage plants remains very challenging with current electricity market economics. Even over a wide range of possible energy futures, up to 2020, no energy future was found to bring quantifiable revenues sufficient to cover estimated costs of plant construction. Value streams not quantified in this study may provide a different cost-benefit balance and an economic tipping point for hydro. Future studies are essential in the quest to quantify the full potential value. Additional research should consider the value of services provided by advanced storage hydropower and pumped storage at smaller time steps for integration of variable renewable resources, and should include all possible value streams such as capacity value and portfolio benefits i.e.; reducing cycling on traditional generation.

13 HYDRO ENERGY↗

Analysis of Unit-Level Changes in Operations with Increased SPP Wind from EPRI/LCG Balancing Study

Wind power development in the United States is outpacing previous estimates for many regions, particularly those with good wind resources. The pace of wind power deployment may soon outstrip regional capabilities to provide transmission and integration services to achieve the most economic power system operation. Conversely, regions such as the Southeastern United States do not have good wind resources and will have difficulty meeting proposed federal Renewable Portfolio Standards with local supply. There is a growing need to explore innovative solutions for collaborating between regions to achieve the least cost solution for meeting such a renewable energy mandate. The Department of Energy funded the project 'Integrating Midwest Wind Energy into Southeast Electricity Markets' to be led by EPRI in coordination with the main authorities for the regions: SPP, Entergy, TVA, Southern Company and OPC. EPRI utilized several subcontractors for the project including LCG, the developers of the model UPLAN. The study aims to evaluate the operating cost benefits of coordination of scheduling and balancing for Southwest Power Pool (SPP) wind transfers to Southeastern Electric Reliability Council (SERC) Balancing Authorities (BAs). The primary objective of this project is to analyze the benefits of regional cooperation for integrating mid-western wind energy into southeast electricity markets. Scenarios were defined, modeled and investigated to address production variability and uncertainty and the associated balancing of large quantities of wind power in SPP and delivery to energy markets in the southern regions of the SERC. DOE funded Oak Ridge National Laboratory to provide additional support to the project, including a review of results and any side analysis that may provide additional insight. This report is a unit-by-unit analysis of changes in operations due to the different scenarios used in the overall study. It focuses on the change in capacity factors and the number of start-ups required for each unit since those criteria summarize key aspects of plant operations, how often are they called upon and how much do they operate. The primary analysis of the overall project is based on security-constrained unit commitment (SCUC) and economic dispatch (SCED) simulations of the SPP-SERC regions as modeled for the year 2022. The SCUC/SCED models utilized for the project were developed through extensive consultation with the project utility partners, to ensure the various regions and operational practices are represented as best as possible in the model. SPP, Entergy, Oglethorpe Power Company (OPC), Southern Company, and the Tennessee Valley Authority (TVA) actively participated in the project providing input data for the models and review of simulation results and conclusions. While other SERC utility systems are modeled, the listed SERC utilities were explicitly included as active participants in the project due to the size of their load and relative proximity to SPP for importing wind energy.

17 WIND ENERGY↗

STOCHASTIC OPTIMAL POWER FLOW FOR REAL-TIME MANAGEMENT OF DISTRIBUTED RENEWABLE GENERATION AND DEMAND RESPONSE (Final Report)

To meet the grand challenge of a sustainable energy future, there has been a surge of interest in renewable energy. Today, the uncertainty associated with renewable resources is handled by using operating reserves. The high penetration of renewable resources, however, introduces difficult-to-control dynamics and challenges for power system operation. Decision support tools are necessary at the bulk system operational level to recognize and efficiently utilize renewable resources and distributed demand response products in concert with traditional grid resources. It is envisaged that responsive load can potentially have very significant cost advantages over either spinning or non-spinning ramping reserve. Critical decisions are made during hour(s)-ahead and real-time power system operation regarding the commitment and dispatch of generators to ensure power delivery is both reliable and economic. These decisions are typically made by a security constrained optimal flow, which determines future generator commitments, dispatches, and ensures adequate reserves are available in the event of a contingency (unexpected outage) or if future system conditions deviate from forecasts. However, security has been always based on a pre-specified subset of contingency constraints whose enforcement does not guarantee security under all possible future possibilities while also giving little or no weight to the likelihood of each contingent event or the severity of its consequences. Existing tools, which are based exclusively on deterministic optimization models, do not yield optimal operational decisions to address these new challenges, in terms of both reliability and cost-effectiveness. This project has focused on developing a stochastic optimal power flow (SOPF) framework, which integrates renewable resource uncertainty, load uncertainty, distributed storage (DS), demand response (DR) products, in a holistic manner to address the uncertainty associated with ever-increasing renewable resources, along with the inclusion of distributed demand response products in future power systems. A proof-of-concept problem was created using the Pennsylvania-Jersey-Maryland (PJM) power system network. Synthetic wind generation was added to the system to simulate 50% wind penetration. A 1-hour test of SOPF operation indicated more than 6% operational cost savings. The project continued by adding the Midwestern Independent System Operator (MISO) as a partner, with focus shifting from SOPF to Stochastic Look-Ahead Unit Commitment (SLAC). Unlike PJM, MISO is faced with significant renewable energy resources within its footprint and is challenged with substantial uncertainty in its operations. The SLAC distinguishes itself from existing tools that operators use. At best, today’s tools solve two to three cases independently, where one or two system parameters, such as forecasted load level (e.g., a low, base, and high forecast), are varied and the resulting scenarios are analyzed independently. The stochastic-based optimization of SLAC leverages statistical information from an ensemble of potential operational scenarios and their respective likelihood. The SLAC output can be translated into valuable information to the operator such as suggested commitments, optimal scheduling and dispatch of resources, reserve requirements at both locational and zonal resolutions, ramping availability and requirements, availability of demand response including operational guidance concerning the near-term and real-time coordination between distributed energy resources, and utilization of distributed storage resources. The developed SOPF/SLAC tool, a stand-alone tool compatible with existing EMSs, will provide system operators with unprecedented visibility, flexibility and predictability to these resources and operational guidance concerning the real-time coordination between DERs and DR/DS products. The game changing and practical impact of this disruptive technology will be dramatic and will usher in a new era in the electric power industry, wherein green energy concepts are fully embraced, and electric power costs are lowered throughout the nation.

42 ENGINEERING↗

Evaluation of Production Cost Savings from Consolidation of Balancing Authorities in the US Western Interconnection under High Wind and Solar Penetration

This paper introduces a comprehensive analysis to quantify the potential savings in production cost due to consolidation of 32 US western interconnection Balancing Authorities (BAs). Three simulation scenarios are developed: current Western Electricity Coordinating Council (WECC) BAs structure, full copper-sheet consolidation, and full consolidation with transmission congestion considered. The study uses WECC Transmission Expansion Planning Policy Committee (TEPPC) model that was developed for the year 2020. The model assumes 8% wind and 3% solar energy penetration as percentage of total WECC demand in 2020. Sensitivity analyses are carried out to assess the impact of transmission hurdle rates between WECC BAs on potential benefits. The study shows savings that ranges from $400 Million (2.4% of total one year production cost) to $600 Million (3.2%) per year in thermal units production cost due to consolidation can be achieved. The copper sheet consolidation scenario shows an extra savings of $240 Million (1.4%) per year.

Balancing authorities, hurdle rates, economic disp↗

Security Enhancement of Network Constraint Grid-Edge Energy Management System

Network constrained grid edge energy management system (EMS) provides economic solution for active and reactive power dispatch of distributed energy resources (DERs) at the grid edge level. Grid edge EMS ensures secure interconnection of a circuit segment to the distribution system by maintaining grid code requirements (e.g. IEEE 1547–2018). Grid edge EMS is dependent on communication to receive load measurement, which brings a risk of unobservable false data injection attacks (FDIAs). To mitigate the risk, this paper proposes a framework to enhance resilient operation of grid edge EMS by detecting the unobservable FDIAs on loads and replacing them with forecasted values. In this work, a two-step detection algorithm is proposed. In first step, conventional residual based algorithm is deployed. Autoencoder (AE) based data driven mechanism is included in second step to detect the presence of unobservable FDIAs. After ensuring the presence of FDIA, its specific location is detected by checking the maximum residue values till the predefined threshold value is reached. Detected false data injected loads are then replaced with forecasted load values following long-short term memory (LSTM) based forecast to ensure resilient performance of grid edge EMS in the presence of attacks. This proposed security enhancement framework for grid edge EMS is evaluated in IEEE 13 bus system with three integrated DERs. Numerical simulation shows the validation of the proposed framework by reducing voltage violation in real operation of grid edge EMS.

cyber attack detection↗

Comprehensive Solutions for Integration of Solar Resources into Grid Operations

The need for proactive closed-loop integration of uncertainty information into system operations and probability-based controls is widely recognized, but rarely implemented in system operations. Proactive integration for this project means that the information concerning expected uncertainty ranges for net load and balancing requirements, including required balancing capacity, ramping and ramp duration characteristics, will be fed back into the generation commitment and dispatch algorithms to modify their performance so that potential shortages of these characteristics can be prevented. This basic, yet important, premise is the motivating factor for this project. The achieved project goal is to demonstrate the benefit of such a system. The project quantifies future uncertainties, predicts additional system balancing needs including the prediction intervals for capacity and ramping requirements of future dispatch intervals, evaluates the impacts of uncertainties on transmission including the risk of overloads and voltage problems, and explores opportunities for intra-hour generation adjustments helping to provide more flexibility for system operators. The resulting benefits culminate in more reliable grid operation in the face of increased system uncertainty and variability caused by solar power. The project identifies that solar power does not require special separate penetration level restrictions or penalization for its intermittency. Ultimately, the collective consideration of all sources of intermittency distributed over a wide area unified with the comprehensive evaluation of various elements of balancing process, i.e. capacity, ramping, and energy requirements, help system operators more robustly and effectively balance generation against load and interchange. This project showed that doing so can facilitate more solar and other renewable resources on the grid without compromising reliability and control performance. Efforts during the project included developing and integrating advanced probabilistic solar forecasts, including distributed PV forecasts, into closed –loop decision making processes. Additionally, new uncertainty quantifications methods and tools for the direct integration of uncertainty and variability information into grid operations at the transmission and distribution levels were developed and tested. During Phase 1, project work focused heavily on the design, development and demonstration of a set of processes and tools that could reliably and efficiently incorporate solar power into California’s grid operations. In Phase 2, connectivity between the ramping analysis tools and market applications software were completed, multiple dispatch scenarios demonstrated a successful reduction of overall uncertainty and an analysis to quantify increases in system operator reliability, and the transmission and distribution system uncertainty prediction tool was introduced to system operation engineers in a live webinar. The project met its goals, the experiments prove the advancements to methods and tools, when working together, are beneficial to not only the California Independent System Operator, but the benefits are transferable to other system operators in the United States.

14 SOLAR ENERGY↗

Microgrid Design, Development and Demonstration - Final Report for Phase I and Phase II

This document constitutes GE’s final report for the Microgrid Design, Development and Demonstration program for DOE’s Office of Electricity Delivery and Energy Reliability, Award DE-FC02-05CH11349. It contains the final report for Phase I in Appendix I, and the results the work performed in Phase II. The program goal was to develop and demonstrate a Microgrid Energy Management (MEM) framework for a broad set of Microgrid applications that provides unified controls, protection, and energy management. This project contributed to the achievement of the U.S. Department of Energy’s Renewable and Distributed Systems Integration Program goals by developing a fully automated power delivery microgrid network that: - Reduces carbon emissions and emissions of other air pollutants through increased use of optimally dispatched renewable energy, - Increases asset use through integration of distributed systems, - Enhances reliability, security, and resiliency from microgrid applications in critical infrastructure protection, constrained areas of the electric grid, etc. - Improves system efficiency with on-site, distributed generation and improved economic efficiency through demand-side management.

24 POWER TRANSMISSION AND DISTRIBUTION↗

An Assessment of the Impact of Stochastic Day-Ahead SCUC on Economic and Reliability Metrics at Multiple Timescales

This paper incorporates the stochastic day-ahead security-constrained unit commitment (DASCUC) within a multi-timescale, multi-scheduling application with commitment, dispatch, and automatic generation control. The stochastic DASCUC is solved using a progressive hedging algorithm with constrained ordinal optimization to accelerate the individual scenario solution. Sensitivity studies are performed in the RTS-96 system, and the results show how this new scheduling application would impact costs and reliability with a closer representation of timescales of system operations in practice.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Adjustable and distributionally robust chance-constrained economic dispatch considering wind power uncertainty

This paper proposes an adjustable and distributionally robust chance-constrained (ADRCC) optimal power flow (OPF) model for economic dispatch considering wind power forecasting uncertainty. The proposed ADRCC-OPF model is distributionally robust because the uncertainties of the wind power forecasting are represented only by their first- and second-order moments instead of a specific distribution assumption. The proposed model is adjustable because it is formulated as a second-order cone programming (SOCP) model with an adjustable coefficient. This coefficient can control the robustness of the chance constraints, which may be set up for the Gaussian distribution, symmetrically distributional robustness, or distributionally robust cases considering wind forecasting uncertainty. The conservativeness of the ADRCC-OPF model is analyzed and compared with the actual distribution data of wind forecasting error. The system operators can choose an appropriate adjustable coefficient to tradeoff between the economics and system security.

17 WIND ENERGY↗

Intelligent Partitioning based Fully Parallel AC Security-Constrained Optimal Power Flow

Today’s power grid is becoming more diverse and integrated with high-level distributed energy resources and smart control technologies that is creating a new set of grid management challenges in terms of large-scale, nonlinear, and non-convex problem modeling, complex and time-consuming computation, as well as difficult uncertainty handling. This project focused on solving a challenging multi-period security-constrained generation scheduling problem, which is of great importance for maximizing the social welfare of real-time dispatch, day-ahead market, as well as weekly planning of power systems. Our developed software explored parallel optimization algorithms for complex and realistic power system models, and develop fast, efficient, and robust grid optimization solutions on the high-performance computing platform that will enable increased grid economics, flexibility, resilience, as well as energy security in the United States.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Real-time Implementation of Grid Code Compliant Grid Edge Energy Management System

Integrated distributed energy resources (DER) in a distribution system need to follow grid codes to avoid violations that result in DER/circuit segment disconnection. To comply with grid code requirements at the grid edge level, network constrained grid edge energy management system (EMS) can be deployed. The objective of grid edge EMS is to provide economic solution for active and reactive power DER setpoints at each dispatch interval and ensure voltage regulation to support secure interconnection of the grid edge segment to the distribution system with multiple inverter based DER units. In this work, real-time simulation of grid code compliant grid edge EMS is deployed in a realistic feeder circuit segment. For real-time simulation, communication between the grid edge EMS and DERs is done exploiting IEC 61850-7-420. It enables interoperability among different DERs and grid edge EMS. No prior art has deployed IEC 61850-7-420 GOOSE communication protocol for grid edge EMS. Conversion of IEC 61850 GOOSE messages to Modbus communication protocol is also performed to communicate with grid edge EMS in commodity-off the shelf embedded boards in this work. The real-time simulation in OPAL-RT real-time digital simulator shows the out-performance of grid edge EMS by reducing the voltage violation in the distribution circuit.

Energy management system↗

Network Constraints Consideration for Grid-Edge Energy Management System

Increased deployment of distributed energy resources (DER) in distribution system is bringing need for enhanced grid intelligence, control, and flexibility. This is significant at the edge of the grid where DERs, loads or microgrids are located. Integrated DERs in a distribution system need to follow grid codes to avoid violations that results in DER disconnection. To comply with grid code requirements (e.g. IEEE 1547-2018) at the grid edge level, network constrained grid edge energy management system (GEEMS) is proposed in this paper. The objective of GEEMS is to provide economic solution for active and reactive power dispatch set-points at each interval and ensure voltage regulation to support secure interconnection of the grid edge segment to the distribution system. To evaluate the proposed GEEMS framework, four DERs are included into IEEE 13 bus system. GEEMS outperforms the existing economic dispatch-based energy management system by reducing the voltage violation.

Electric vehicle depot charging station↗