West Valley Demonstration Project (WVDP) (Annual Site Environmental Report (ASER), Calendar Year 2022)

The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2022. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2022 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2023

The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2023. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2023 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

Record of Decision↗

PV Production - Conceptual Location Analysis

The purpose of a Conceptual Location Analysis is to identify potential project/building sites in the planning phase of a project. The analysis includes review and comment on the potential sites by relevant disciplines. Site criteria encompasses DOE and NNSA requirements pertaining to real property and environmental stewardship and additionally addresses SNL site planning objectives such as sustainability and efficiency. This analysis is intended to be used as a tool to provide a comprehensive perspective on siting decisions, and is not intended to supersede previous siting decisions or agreements. This conceptual location analysis is for the siting of PV for power production. The goal of this Conceptual Location Analysis is to weigh different sites, and come to a consensus on preferred sites for potential solar arrays through an Energy Savings Performance Contract (ESPC) or a Utility Energy Service Contract (UESC).

14 SOLAR ENERGY↗

Panel Session 133: Integrating Economic Redevelopment and Workforce Transition Into DOE Site Closure Planning (R1.18)

This panel focused on post-closure impacts to the long-term site workforce and communities in DoE's approach to accelerated site cleanup and expedited reduction of long-term financial liabilities. At sites where Cold-War workers shifted from weapons production to the cleanup effort, a more holistic approach to the workforce transition Post-EM cleanup is needed. This holistic approach would include incentives for expedited closure, trade re-training, and a vision for future site commercial activities. The panel discussed the importance of the right workforce incentives that includes appropriate training for displaced workers so that they can be integrated into a next job. A key aspect of this discussion was to re-assess the current and future land use opportunities related to land re-use concepts. By re-arranging cleanup sequencing is it possible to divest land sooner than originally projected for productive commercial use hence reducing the DOE long-term liability and consequently increasing an economic soft landing for those Cold-War workers. Panelists with presentations: Integrating Economic Redevelopment and Workforce Transition Into DOE Site Closure Planning (Sean Todd); Sustaining, Growing and Re-Developing DOD/DOD Facilities and Assets (Jonathan Taylor)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Los Alamos National Laboratory Campus Master Plan Communication Strategy

The purpose of this Campus Master Plan (CMP) Communication Strategy is to establish an appropriate approach to communication that ensures the comprehensive site planning (henceforth campus master planning) process and associated products for the Los Alamos National Laboratory (LANL) site are effective and sustainable.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

Energy-Storing Cryogenic Carbon Capture™ for Utility and Industrial-scale Processes (Final Report)

This project leverages work completed under funding from previous U.S. Department of Energy (DOE) projects and other sources of funding around the Cryogenic Carbon Capture Process™ (CCC). The purpose of this project is to further develop a perturbation of the CCC process that stores energy called the Cryogenic Carbon Capture™ Energy Storing (CCC-ES) process. The successful completion of the tasks in this project has prepared the CCC-ES process for scaling and developed initial plans and a feasibility analysis for an engineering-scale or small-commercial scale system that can store at least 10 MWh of energy. The specific areas of work in this project are: (1) Develop a conceptual, site-specific integrated process flow diagram: Sustainable Energy Solutions (SES) developed a conceptual, site-specific plan including a process flow diagram for integrating CCC-ES at a specific location. The proposed system was based on a typical engineering-scale CCC system designed to capture 30-50 metric tonnes of CO 2 per day (TPD), with modifications and additional changes and equipment put in place to add the energy storage element to the system. The 30-50 TPD scale corresponds to the required 10 MWh of stored energy. This task includes updating simulation software for transient analysis. SES also coordinated with the Jim Bridger Power Plant in Point of Rocks, Wyoming to get site-specific data. Using these data, SES completed site-specific preliminary process flow diagrams, estimated capital and operating costs for the CCC-ES system, and used the upgraded software package to estimate the primary figures of merit. (2) Complete a technoeconomic analysis (TEA): SES completed a full-scale TEA of the CCC-ES system to meet specific success criteria. This TEA used process information from the host site selected above. (3) Technology and data gap assessment for the CCC-ES process: As part of the technology gap assessment, SES performed an assessment of the best alternative energy storage solutions including figures of merit and operational strengths and weaknesses. SES then compared the proposed system with a discussion of how it addresses the weaknesses of alternative systems, showing for example a cost of stored energy at less than $50/MWh and with a roundtrip efficiency of greater than 95%. This assessment includes technical and other risk analyses and technology gaps with research and development needs to commercialize the process by 2030. Finally, work includes a commercialization roadmap/development pathway outlining the major milestones to move to a commercially operating CCC-ES system. (4) Phase II pre-FEED project plan: SES completed a project plan for the Phase II pre-FEED analysis using the same host site as in the Phase I conceptual study.

03 NATURAL GAS↗

Appropriations and Financing: Strategic Use of Funding for Performance Contracts

42 U.S.C. § 8253 Sections 432 and 512 (EISA of 2007) authorize agencies to use appropriations, private financing, or a combination of appropriations and private financing to comply with its requirements. With this flexibility in mind, federal agencies should evaluate funding options early and employ a strategy that optimizes the impact of existing appropriations and financing options. Maximize value to government through strategic use of appropriations and energy savings, an optimal set of infrastructure improvements that meet site needs and program objectives, and an actionable plan for sustained performance.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Comprehensive Land Use and Environmental Stewardship

Comprehensive Land Use and Environmental Stewardship (CLUES) Report serves as a summary document of the land use and environmental stewardship activities occurring on the Idaho National Laboratory (INL) Site (Desert) and the Research and Education Campus (REC) within Idaho Falls. Land and facility use planning and decisions at the INL Site are guided by a comprehensive planning process in accordance with the United States (U.S.) Department of Energy (DOE) Order 430.1C, “Real Property Asset Management,” which states "Establish a data-driven, risk-informed, performance-based approach to the life-cycle management of real property assets that aligns the real property portfolio with DOE mission needs; acquire, manage, positively account for, and dispose of real property assets in a safe, secure, cost-effective, and sustainable manner; and ensure the real property portfolio is appropriately sized, aligned, and in the proper condition to support efficient mission execution." Land use planning, like Campus Master Planning and 5-Year Facility Planning, provides a means for better, more sustainable use of the INL Site in a coordinated effort to ensure current and future mission needs are met, including acquisition, recapitalization, maintenance, disposition, real property utilization and long-term stewardship. This document and all functions of INL are guided by the DOE Vision for INL and the INL Mission and builds on the baseline established in the FY 2015 CLUES Report. However, it delivers a revised structure with focus on new resource management zones, which provide organization of key management considerations and access restrictions to optimize land use and environmental stewardship. A new set of thematic Guiding Principles presented in this report provide the intent and sustainable management direction to protect the INL Site natural environment. They demonstrate that the mission and vision of DOE and INL can be realized with inclusion of first of a kind technology, private sector development, and globally recognized testing and demonstration. This CLUES Report encourages comprehensive management decision-making with additional resource discussions for sustainability, the built environment, and the ecological landscape at the INL Site. Enhanced resource considerations and trends emphasize the importance of air, land use, environmental, subsurface, and cultural resources. The INL Site supports exceptional and interdependent resources. A diversity of bat species are accommodated by culturally significant caves distributed around the Site. Big game species like elk, deer, and moose seek vegetation communities which are protected by long-term stewardship and monitoring programs.

99 GENERAL AND MISCELLANEOUS↗

Golden Gate National Recreation Area Federal Fleet Tiger Team EVSE Site Assessment

The U.S. Department of Energy Federal Energy Management Program (FEMP) helps federal agencies reduce petroleum consumption and increase alternative fuel use through its resources for sustainable federal fleets. A key element of this assistance involves supporting agencies in the transition to zero-emission vehicles (ZEVs). Fleet electrification is part of a federal policy to achieve net-zero emissions economy-wide and a carbon pollution-free electricity sector, established through two executive orders (EOs) - EO 14008: Tackling the Climate Crisis at Home and Abroad and EO 14057: Catalyzing America's Clean Energy Industries and Jobs through Federal Sustainability. This site report supports the development of a ZEV deployment plan for the Golden Gate National Recreation Area, which can ultimately be incorporated into the overall U.S. Department of the Interior ZEV fleet strategy.

33 ADVANCED PROPULSION SYSTEMS↗

Grand Teton National Park Federal Fleet Tiger Team EVSE Site Assessment

The U.S. Department of Energy Federal Energy Management Program (FEMP) helps federal agencies reduce petroleum consumption and increase alternative fuel use through its resources for sustainable federal fleets. A key element of this assistance involves supporting agencies in the transition to zero-emission vehicles (ZEVs). Fleet electrification is part of a federal policy to achieve net-zero emissions economy-wide and a carbon pollution-free electricity sector, established through two executive orders (EOs) - EO 14008: Tackling the Climate Crisis at Home and Abroad and EO 14057: Catalyzing America's Clean Energy Industries and Jobs through Federal Sustainability. This site report supports the development of a ZEV deployment plan for the Grand Teton National Park (GRTE) that can ultimately be incorporated into the overall Department of the Interior ZEV fleet strategy.

33 ADVANCED PROPULSION SYSTEMS↗

Yellowstone National Park Federal Fleet Tiger Team EVSE Site Assessment [Slides]

The U.S. Department of Energy Federal Energy Management Program (FEMP) helps federal agencies reduce petroleum consumption and increase alternative fuel use through its resources for sustainable federal fleets. A key element of this assistance involves supporting agencies in the transition to zero-emission vehicles (ZEVs). Fleet electrification is part of a federal policy to achieve net-zero emissions economy-wide and a carbon pollution-free electricity sector, established through two executive orders (EOs) - EO 14008: Tackling the Climate Crisis at Home and Abroad and EO 14057: Catalyzing America's Clean Energy Industries and Jobs through Federal Sustainability. This site report supports the development of a ZEV deployment plan for Yellowstone National Park, which can ultimately be incorporated into the overall U.S. Department of the Interior ZEV fleet strategy.

33 ADVANCED PROPULSION SYSTEMS↗

Ames National Laboratory Annual Site Environmental Report for CY2021

The primary purpose of this report is to summarize the performance of Ames National Laboratory’s environmental programs, present highlights of significant environmental activities, and confirm compliance with environmental regulations and requirements for calendar year 2021. This report is a working requirement of Department of Energy Order 231.1B, Environment, Safety and Health Reporting. It includes descriptions of the Laboratory’s site, mission, the status of its compliance with applicable environmental regulations, its planning and activities to maintain compliance, and a comprehensive review of its environmental protection, surveillance and monitoring activities. Ames National Laboratory is located on the campus of Iowa State University (ISU) and occupies 13 buildings owned by the Department of Energy (DOE). See the Laboratory’s Web page for location and Laboratory overview. The Laboratory also leases space in ISU owned buildings. In 2021, the Laboratory accumulated and disposed of hazardous waste under a U.S. Environmental Protection Agency (EPA) issued generator number. All waste was handled according to applicable EPA, State, and local regulations and DOE Orders. The Laboratory operates as a Small Quantity Generator (SQG) of hazardous waste. There were no radiological air emissions or exposures to the general public due to Laboratory activities in 2021 (See U.S. Department of Energy Air Emissions Annual Report in Appendix A.) The Laboratory has an established Environmental Radiological Protection Program (Plan 10200.041) per DOE Order 458.1 requirements. Plans, policies, and procedures are in place to protect the public and the environment against undue risk from radiation associated with DOE radiological activities. As indicated in prior Site Environmental Reports, formal pollution prevention awareness, waste minimization and recycling programs have been in practice since 1990, with improvements implemented most recently in 2017 with Iowa State University’s shift toward single-stream recycling. Included in recycling efforts are items such as batteries, monitors, corrugated cardboard, lamps, miscellaneous electronic office equipment, mixed paper, newsprint, food/beverage containers, and laboratory glassware. Ames National Laboratory also recycles/reuses salvageable metal, used oil, and foamed polystyrene peanuts, and encourages chemical redistribution and sharing among research groups. Ames National Laboratory reported its contractual performance to DOE-Ames Site Office (AMSO) through the Laboratory’s Performance Evaluation Measurement Plan (PEMP), and a performance level of “B+” was achieved in 2021 for Sustain Excellence and Enhance Effectiveness of Integrated Safety, Health, and Environmental Protection As reported in Site Environmental Reports for prior years, the Laboratory’s Environmental Management System (EMS) has been integrated into the Laboratory’s Integrated Safety Management System (ISMS) since 2005. The integration of EMS into Laboratory business practices allows the Laboratory to systematically review, address and respond to environmental impacts. In addition to DOE-identified objectives and targets, the EMS Steering Committee recommends annual environmental goals for the Laboratory. Due to the COVID-19 pandemic and limited onsite work staff, goals of reducing water usage and travel/commuting to promote the reduction of scope 3 greenhouse gases were achieved. All contract deliverables and environmental compliance activities were still met during this time.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

New Beginnings: Optimising Waste and End-state at UK Nuclear Sites to Enable Environmental Permit surrender (the GRR) - 20193

The decommissioning of nuclear sites involves the management of large volumes of radioactive waste, other conventional waste, and the clean-up of land and groundwater contamination. In the UK, the disposal of radioactive waste from nuclear sites is regulated by the Environment Agency (England), Natural Resources Wales (Wales) and the Scottish Environment Protection Agency (Scotland). All three environment agencies seek to make sure that the generation and disposal of radioactive waste is optimised: ensuring impacts to people are 'as low as reasonably achievable' (ALARA). With a large proportion of UK nuclear sites embarking on decommissioning, the environment agencies have collaboratively developed new guidance: the 'Management of radioactive waste from the decommissioning of nuclear sites: Guidance on the Requirements for Release from radioactive substances regulation' (referred to as the GRR)[1]. The environment agencies worked in liaison with the Office for Nuclear Regulation (ONR), the UK nuclear safety regulator, and the UK government body responsible, the Nuclear Decommissioning Authority (NDA). Prior to finalising the guidance, a 12 month trial was completed at three of the NDA's nuclear sites, enabling the environment agencies to test their draft GRR guidance against 'real world scenarios' and the challenge of incorporating its requirements into decommissioning plans. Experience gained during the trial was incorporated into the current version of the GRR, published in July 2018. The GRR represents the 'new beginning' of this paper's title because for the first time, the UK environmental regulators have expressed in detail their requirements for surrender of environmental permits for nuclear sites. The GRR provides a framework for a UK nuclear site to plan, assess and justify its management of radioactive waste and deliver through decommissioning, an optimal, environmentally safe and sustainable end-state. This paper will describe the requirements and technical standards within the GRR, the establishment of defensible clean-up criteria and the production of a Waste Management Plan (WMP), supported by a Site-Wide Environmental Safety Case (SWESC). It will describe the experience gleaned by operators and regulators during the trial and it will highlight current work by regulators to implement the new approach proportionately. Finally, this paper will look forward and outline planned amendments to legislation in the UK affecting nuclear sites that should enable the full benefits of the GRR to be realised in the future. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Novel Carbon Storage Monitoring Methods

Conference presentation at American Institute of Chemical Engineers (AIChE) Annual Meeting, San Diego, California, October 27–31, 2024. We presented a high-level overview of many novel and sustainable carbon storage monitoring methods that are at various stages of planning or demonstration to accelerate the deployment of CCS technologies at future CCS sites across the United States. Our work impacts the general CCS industry by providing novel and more sustainable methods for tracking CO 2 plume migration and performing assurance monitoring. Our work primarily benefits three parties: 1) CCS community members through knowledge sharing of lessons learned; 2) CCS operators through commercialization of additional methods, including improvements on workflows and simplification of fieldwork; and 3) stakeholders of CCS projects through implementation of low-impact and more autonomous monitoring solutions.

02 PETROLEUM↗

Sustainable Transactions - The Fine Art of the Forever Deal - 19569

The U.S. Department of Energy Office of Legacy Management (LM) has various real property interests at the 92 sites within its current portfolio. Because of its unique mission, LM does not own most of the sites for which it has responsibility for long-term surveillance and maintenance (LTS and M). In addition to the sites it does own, LM works with various federal, state, local, and private entities to execute its obligations. Each site has its own narrative with respect to the real property assets: how they were acquired, how they are sustained, and how they were or will be dispositioned. Since the regulatory time frame for LTS and M activities at some sites can be in perpetuity, durable and effective instruments and documentation are necessary to support LM's mission as a federal land manager and steward. In addition, more than half of the sites currently in LM's inventory do not allow unrestricted use because of residual contamination from historical activities, and institutional controls are required to limit human and environmental exposures to residual contamination by controlling land use, restricting access to potential hazards, and making the public aware of potential dangers from the residual contamination. Thus, the overall real property interests and transactions associated with these sites not only have to address the environmental concerns associated with protection of human health and the environment but also how best to position LM's real property assets to support the mission for future generations. These types of transactions are often complex, requiring the negotiation of numerous documents to achieve and sustain protection of human health and the environment while allowing for future use. Such planning needs to be flexible enough to envision that the original transaction will likely change over time due to changing regulations, communities, stakeholders, and site conditions as operation and maintenance activities are performed. Planning for the integration of these requirements with the needs of the end users, stakeholders, and communities is paramount to a successful project, and various transactional considerations impact how best to achieve this goal. As such, these transactions have to be sustainable. Real property interests change over time, with new owners, operators, regulators, and stakeholders. Determining the sustainability of these real property interests, therefore, calculates the sustainability of each asset's physical attributes and also the sustainability of the various legal instruments and arrangements that are put in place at each site. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Interactive Visualizations for Communicating Compliance and Sustainability Statements in Annual Site Environmental Reports - 20419

The annual reports of organizations are a recurring type of public disclosure that communicates what an organization has done and/or plans to do. Worldwide, organizations use annual reports as powerful instruments for communication that is rich in narrative content and visuals. From the perspective of the leadership of an organization, statutory annual reports are communication devices to stakeholders. By analogy, from the perspective of stakeholders, the annual reports are learning devices that presents stakeholders with contents to generate knowledge about an organization. We have chosen the online accessible U.S. Department of Energy (DOE) Annual Site Environmental Reports (ASERs) as a collection of resources for communicating and learning the environmental management strategies on environmental compliance and environmental sustainability. Environmental Compliance 'consists of regulatory compliance and monitoring programs that implement federal, state, and local requirements, agreements, and permits.' Environmental Sustainability 'promotes and integrates initiatives such as energy and natural resource conservation, waste minimization, green remediation, and the use of sustainable products and services.' Interactive visualizations of textual data designed with visual analytics software can allow stakeholders to interact with statements on the environmental management strategies by performing diverse actions that promote learning. These actions include annotating, comparing, filtering, navigating, selecting and sharing relevant statements. We expect that the possibility of these multiple actions in an interactive manner help stakeholders to learn more effectively about the environmental strategies at U.S. DOE sites. The current case study for the project is a collection of 1,894 annotated (value-added) statements (sentence text) from the eight chapters of the 2017 Savanah River Site (SRS) annual site environmental report. The preliminary interactive visualizations are available online. (authors)

54 ENVIRONMENTAL SCIENCES↗

Evaluate Distributed Energy Technologies for Cost Savings and Resilience With REopt Lite

NREL's REopt Lite TM web tool evaluates the economics of grid connected photovoltaics (PV), wind, and battery storage at a site. It allows users to identify the system sizes and battery dispatch strategy that minimize a site's life cycle cost of energy, and it estimates the amount of time a PV, wind, battery, and diesel generator system can sustain the site's critical load during a grid outage.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Integration of Local Knowledge is a Key for the Remediation Success of Legacy Uranium Mine Sites - 19564

A key to success, during all aspects of the remediation process on legacy uranium sites, and easily transferable between countries and projects, is the integration of local knowledge. However, before this knowledge can be integrated, local trust and project understanding must be developed. Local trust and project understanding can only be developed through a principle-centred approach to a shared project vision, two-way communication of knowledge, alignment of project goals, and understanding the local needs early in the remediation process. Once public confidence is obtained, local trust and project understanding must be maintained throughout the entirety of the remediation process. Project understanding is an ongoing endeavor that needs continuous communication and varied methods to succeed. During the management of assessment, remediation, and post remediation monitoring on the Saskatchewan Research Council's CLEANS project (remediation of 37 legacy uranium mine sites in Northern Saskatchewan, Canada), integration of local knowledge has been an instrumental tool attributing to success. During site assessment, integration of local knowledge has included the development and implementation of land use surveys to determine realistic travel and occupancy on and adjacent to these legacy sites, and site specific traditional knowledge and land use studies that have contributed to the development of a detailed knowledge of local land use, resource utilization, country food intake, and human history of the sites. The local knowledge gained during the assessment process is invaluable as it provides information required to support remediation planning, such as: valued ecosystem components, human trophic utilization, length of site occupancy, cultural value assessment, and future land use considerations. During remediation planning, local and traditional knowledge can also be incorporated through determination of plant species suitability for revegetation, development and selection of remediation options, and setting realistic sustainable development targets for local project inclusion. During site remediation operations, local involvement can be utilized through direct labour and equipment, cultural resource monitoring (i.e. archaeological and heritage protection), local logistics and historic information transfer, and stakeholder communications and engagement support. Post remediation, local involvement is an efficient mechanism for long-term monitoring, and care and maintenance activities. Although there may be differences between countries, regions and sites, the remediation process on legacy uranium mines can universally be more successful through the integration of local knowledge; while developing rights/stakeholder engagement and capacity building. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗