Search NASASearch

SEARCH · Search NASA

Results for “Storage Field Development Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

23 records · Page 2

Defining Infrastructure Feasibility for Hub-Scale Offshore Atlantic Carbon Storage in the Northeastern United States

In the Northeast U.S., deep rock formations along the Atlantic outer continental shelf may have the potential to sequester 150–1136 million metric tons of CO2. However, the design and infrastructure necessary to develop offshore carbon storage in this region is not well defined because there has been little oil and gas exploration and no commercial production. Consequently, an infrastructure feasibility design was completed for a hub-scale offshore CO2 storage system along the Northeast U.S. Atlantic. The design included development of a detailed, site-specific geological model for a location near the Great Stone Dome geological structure in the Baltimore Canyon Trough off the coast of Delaware, Maryland, and New Jersey. A field injection system topology design was completed to portray a design with eight wells in two clusters connected by central manifolds. Reservoir simulations were completed for the injection system that showed the hub may be able to inject 17 million metric tons (MMT) of CO2 per year for thirty years, but injection rates varied substantially across the eight wells. A CO2 pipeline design determined feasible routes from the east coast shoreline to the injection field. Finally, the CO2 injection system design included subsea injection trees, manifolds, and power umbilicals. This is the first study to define large-scale carbon storage design and infrastructure options for the offshore Atlantic, which can help to progress this region towards field characterization and early-mover deployment for future decarbonization in the region.

29 ENERGY PLANNING, POLICY, AND ECONOMY

An Architectural Survey of the U12G Tunnel Historic District, Nevada National Security Site, Nye County, Nevada

The U.S. Department of Energy (DOE), in conjunction with the National Nuclear Security Administration Nevada Field Office (NNSA/NFO), proposes to demolish six buildings and three storage areas located at the U12g Tunnel portal area in Area 12 of the Nevada National Security Site (NNSS). The buildings are 12-358 (Signal Vault); 12-201800 (Storage Quonset Hut); 12-202555 (Walker Shack); 12-868 (Pipe Assembly); 12-B100933 (Electrical Shop); 12-B100944 (Conference Room); and Storage Area 1; Storage Area 2; and Storage Area 3. The buildings and storage areas were selected for demolition as part of the DOE’s Real Property Efficiency Plan to reduce the footprint of unused and non-operational facilities on the NNSS. They are all vacant and have no proposed uses for current or upcoming NNSS missions. Demolition activities constitute an undertaking subject to review under Section 106 of the National Historic Preservation Act (NHPA) (54 United States Code [USC] § 306101) and its implementing regulations, 36 Code of Federal Regulations (CFR) Part 800. Identification efforts began with resources proposed for demolition in federal Fiscal Year (FY) 23. Four buildings were proposed to be demolished in FY23 (12-358, 12-868, 12-201800, and 12-202555). These buildings and the U12g Tunnel Historic District (SHPO No. D444) were recorded in Identification, Evaluation, and Finding of Adverse Effect for the Proposed Demolition of Five Buildings in Area 12, Nevada National Security Site, Nye County, Nevada (Menocal et al. 2023). Identification efforts indicated three buildings (12-358, 12-201800, and 12-868) supported nuclear testing in the U12g Tunnel. The fourth building post-dated the use of U12g Tunnel for nuclear testing activities. The report recommended that three of the four buildings (12-358, 12-201800, 12-868) and the U12g Tunnel Historic District may be eligible for the National Register of Historic Places (NRHP). The report also found that the undertaking would have an adverse effect on the three buildings and on the historic district. The Nevada State Historic Preservation Office (SHPO) concurred with the report’s findings (Reed 2023). The U12g Tunnel was determined eligible as a historic district under the Secretary of the Interior’s (SOI) Significance Criterion A, at the local level, in the context of the Cold War as an underground testing environment for the development of nuclear weapons and to assess the effects of a nuclear explosion on materials and equipment with a period of significance from 1959 to 1971. It was also determined eligible under Significance Criterion C for embodying the distinctive characters of a horizontal tunnel complex used for nuclear testing and as a significant and distinguishable entity. The three buildings were determined to be contributing elements of the district. The undertaking was expanded with the addition of two buildings and three storage areas proposed to be demolished and located within U12g Tunnel Historic District in FY24. These five resources (12-B100933, 12-B100944, and Storage Areas 1, 2, and 3) were recorded in Supplemental Identification, Evaluation, and Finding of Effect for Additional Proposed Demolition at U12g Tunnel, Area 12, Nevada national Security Site, Nye County, Nevada (Brannan et al. 2024). Identification efforts indicated that the two buildings and Storage Area 1 supported nuclear testing in the U12g Tunnel. Storage Area 1 and Storage Area 2 post-dated the nuclear testing activities at U12g Tunnel and were not recommended as contributing elements to the district. The report also found that the undertaking would have an adverse effect on the newly identified buildings and one storage area and on the historic district. The SHPO concurred that the expanded undertaking would result in adverse effects to historic properties (Reed 2025). To resolve these adverse effects, NNSA/NFO, in consultation with the SHPO, is following standard mitigation as stipulated in the 2024 Programmatic Agreement DE-GM58-22NA25554 Among the U.S. Department of Energy and the Nevada State Historic Preservation Officer and the Advisory Council on Historic Preservation Concerning the Protection of Historic Properties on the Nevada National Security Site, Nye County, Nevada (hereafter referred to as the NNSS PA). The standard mitigation measures are outlined in Appendix D of the NNSS PA. As such, this architectural survey has been prepared in accordance with Appendix D of the NNSS PA and follows the report format outlined in Appendix F. It includes a historic context that describes the district’s origin, history, and support functions, its significance in the context of nuclear testing on the NNSS, and identifies contributing and non-contributing elements within the district. The report is accompanied by Architectural Resource Assessment (ARA) forms for individual resources and a Historic District Resource Assessment (HDRA) for the U12g Tunnel Historic District. In total, this architectural report identified 32 primary resources within the district boundary. Six of the primary resources were previously identified as contributing elements. An additional 17 resources are recommended as contributing elements to the district for a total of 23 contributing elements. The other nine resources identified are recommended as non-contributing elements to the district.

12-201800

HERO CarbonSAFE Phase 2 Project in the Columbia River Basalt Group

The Hermiston, Oregon Basalt CarbonSAFE Phase II project (HERO CarbonSAFE) seeks to accelerate the deployment of commercial carbon dioxide (CO2) storage projects in basaltic rocks. Basalt CO2 storage has several advantages to conventional saline storage reservoirs including 1. The potential for rapid mineralization of CO2, 2. Associated decreases in pressure and CO2 migration risks, 3. Reduced long-term monitoring requirements with respect to plume tracking, 4. Widespread geographic distribution and, 5. Large storage potential due to thickness, porosity, and CO2 interactions with basalt. And for locations such as the Pacific Northwest, Hawaii, Iceland, India and Japan, basalts may offer the only economically feasible option for local CO2 storage. However, there are limited field-scale assessments of CO2 storage in basalt, and current carbon capture utilization and storage (CCUS) permitting and regulatory frameworks were developed for conventional saline reservoirs. HERO CarbonSAFE is designed to address research gaps and uncertainties associated with basalt storage. Specifically, the project will assess the feasibility of CO2 injection in the deep layered basalts, long-term storage (mineralization), practical approaches for large-scale implementation (50+ million metric tons of CO2 over 30 years), lithology-specific risks, and the technoeconomic potential for CO2 storage in basalts. The HERO CarbonSAFE project will assess feasibility of developing a commercial-scale (50+ million metric tons of CO2) geological storage complex within the Columbia River Basalt Group (CRBG), a layered continental flood basalt complex that underlies Calpine’s natural gas-fired Hermiston Power Project (HPP) in Hermiston, OR (Figure 1). Under this 2-year CarbonSAFE Phase II project, the HERO team will conduct a data acquisition campaign that includes drilling a stratigraphic well to a total depth of ~1,500 m into the thick layered basalts proximal to HPP. A comprehensive well logging and hydrologic testing program will be augmented with new core collected from flow zones and sealing units, and comprehensive laboratory testing to help refine the kinetic rates of mineralization. The newly acquired information will be integrated with existing data from regional wells to correlate basalt injection zone properties to develop storage hub/commercial-scale models. Using these models, the project team will evaluate injection scenarios to define the technical and economic potential for storing a minimum of 50 million metric tons of CO2 over a 30-year period, along with a robust sensitivity analysis on key parameters governing reservoir viability for sustainable injection over a commercial project lifetime. Specific technical objectives of HERO are: (1) assessing the reservoir response of a series of stacked layered reservoir flowtop sequences occurring in this area of the CRBG to commercial-scale injection volumes; (2) extending prior efforts by the project team to characterize the deep layered basalts encountered in regional studies, to leverage prior investments by U.S. Department of Energy’s (DOE) Carbon Storage program; (3) leveraging DOE’s mineralization characterization efforts to advance model parametrization for commercial scale injection of CO2 in basalts; (4) conducting risk assessments associated with scaling up to commercial storage hub injection goals, while validating DOE’s National Risk Assessment Partnership (NRAP) tools, to identify potential constraints that would prevent the CRBG from serving as a commercial-scale storage complex; (5) developing mitigation plans to address identified risks; (6) developing a commercial-scale injection and monitoring, verification and accounting (MVA) strategy; (7) utilizing computational models to define and minimize, if possible, the Area of Review (AoR) under Class VI regulations; and (8) developing a robust CO2 management strategy for CRBG that also considers a regional source/sink approach that is responsive to stakeholder needs and industrial demand. Specific institutional objectives are: (1) identifying and developing plans to mitigate the nontechnical challenges associated with the build-out of a commercial-scale storage complex within the CRBG with integrated CO2 sources; (2) implementing the community outreach plan; (3) conducting regulatory research, including a survey of issues related to pore space ownership, MVA and long-term assurance of mineralization-based storage, to support an eventual application for a UIC Class VI permit; (4) advancing the project’s plan for CO2 liability management; and (5) continuing to refine and update the project’s economic model. The final objective is the preparation of a comprehensive Site Characterization Plan that draws upon the technical and institutional feasibility assessments to prepare the project for future commercialization efforts.

58 GEOSCIENCES

Williston Basin Resource Study for Commercial-Scale Subsurface Hydrogen Storage

The Energy & Environmental Research Center (EERC), in partnership with the U.S. Department of Energy (DOE) National Energy Technology Laboratory (NETL), the EERC’s State Energy Research Center (SERC), MPLX Operations LLC, and TC Energy Development Holdings Inc. (a subsidiary of TC Energy Corporation), studied the potential for subsurface hydrogen storage and recovery in the Williston Basin of western North Dakota. The project’s goal was to evaluate the feasibility of large-scale, secure geologic H 2 storage to support future hydrogen generation, storage, and use. This work included laboratory testing, H 2 –rock–fluid exposure experiments, literature reviews on H 2 embrittlement, and reservoir modeling and simulations. The study included an assessment of storage potential across three types of storage reservoirs using both reservoir simulation and DOE’s web-based tool SHASTA-HELP (Subsurface Hydrogen Assessment, Storage, and Technology Acceleration – Hydrogen Estimator for Logistical Planning), as well as investigation of potential H 2 production and markets for commercial-scale deployment. Building on prior EERC gas storage research, three storage options were selected for detailed evaluation: the Broom Creek Formation (a clastic saline reservoir), the Dickinson Lodgepole Mounds (DLM) complex (carbonate mud mound structures) of the Lodgepole Formation (an active oil and gas producing reservoir), and the Dunham Salt Interval of the Piper Formation (to be used for engineered salt cavern development). These targets were prioritized based on prior EERC research using datasets related to seal capacity, reservoir quality, mechanical integrity, and injectivity. Exposure tests on Broom Creek and DLM samples showed mineral dissolution and precipitation that increased brine salinity and altered reservoir rock surfaces. Although these results provide useful insight, they are limited by small sample sizes and short-term (30-day) exposure, requiring further study to assess long-term storage integrity. Salt formations were not tested because of their known nonreactivity and established mechanical stability. Results of reservoir simulations performed for a single site demonstrated that the Broom Creek Formation may be capable of receiving up to 42,000 tonnes of injected H 2 over 7 months via one well. H 2 recovery took place over 5 months, resulting in approximately 26,000 tonnes (~62% without cushion gas [CG]). This work suggests water production may be important and subsequent cycles of injection and production may perform more efficiently; however, significant site-specific work in the future is needed to assess actual reservoir performance of injection and withdrawal of H 2 storage. For oil reservoir potential, a multiple-well model was used to simulate injection of approximately 32,000 tonnes of H 2 into a single wellbore while simultaneously producing in place reservoir fluids from four offset wells to maintain reservoir pressure. The simulation results suggested a high recovery (~98%); in addition, cost advantages through existing infrastructure could be realized. Challenges in this reservoir include vi managing gas purity and leakage risks. In both scenarios, production of H 2 takes place in a single-well scenario with 10 cycles (7 months of injection and 5 months of production) over 10 years. Finally, the use of engineered caverns in the Dunhan Salt was evaluated, and the results suggest that while they have a smaller capacity (<1000 tonnes per cavern), they exhibit nearly complete gas recovery (>99%), fast response times, and low purity risk. While caverns in North Dakota may be smaller in capacity, fields can be developed in galleries to accommodate the volumetric needs and rapid turnaround times necessary to meet market demands. Geographic limitations and thin salt intervals in North Dakota may represent less total storage potential than salt domes elsewhere, but significant opportunities exist to expand this market for gas storage in North Dakota. A basinwide assessment was performed to estimate a first-of-its-kind value for H 2 storage on a large scale. DOE’s SHASTA-HELP, combined with EERC simulation work, was used to perform the assessment. Estimated H 2 storage potential varied widely for each formation type. The Broom Creek saline formation was estimated to have a storage potential of approximately 1.7–90.5 million tonnes (MMt). The DLM oil reservoirs were estimated to have 0.07–0.19 MMt of capacity. Notably, each of these estimates relies on significant assumptions regarding reservoir thickness, porosity, permeability, and CG needed for operation. Much research is needed to understand the true site-specific storage resource potential of each formation. Using the Dunham Salt Interval for cavern development may result in as much as 4.79 MMt (up to 2.87 MMt working gas) of H 2 storage potential. An important note for consideration is that the values presented here need significantly more geological characterization and engineering assessments prior to gaining confidence in performance. This will be a focal point for future research and development needs. The basinwide evaluation also indicated that North Dakota has significant H 2 generation potential, with estimates up to a possible 13 MMt annually, suggesting a substantial opportunity for H 2 market development and thus the need for commercial-scale H 2 storage to facilitate growth and resilience. Key Recommendations 1. Conduct detailed site characterization (3D seismic, well logs, core sampling) to reduce geologic uncertainty. 2. Perform techno-economic analyses incorporating market, regulatory, and incentive frameworks. 3. Investigate long-term interactions among H 2 , CGs, well materials, and formations to assess risks. 4. Develop pilot- and field-scale demonstrations to validate models and establish best practices.

03 NATURAL GAS

MPEX AI Digital Twins

All magnetically confined plasma fusion power plant concepts (Tokamak, Spherical Tokamak, Stellarator, Mirror, ...) must exhaust the heat and plasma from the core confinement region to the material walls. The primary channel for this exhaust is through a plasma divertor which directs plasma along open magnetic field lines to a material target. The Material Plasma Exposure eXperiment (MPEX) illustrated in Figure 1, is a high-power, steady-state linear plasma device designed to produce the plasma material interaction (PMI) conditions of the divertor of future magnetic confinement fusion power plants: energy flux 20MW/m 2 , ion fluence 1031/m 2 , pulse duration 106 sec. These goals of plasma exposure in MPEX are well beyond those achieved in magnetic fusion experimental devices. Successfully achieving these high power steady state conditions for long pulses requires operational control of the heating and particle sources and the plasma flux to the walls and target. The MPEX AI Hot Spot Controller, proposed in this project, will help achieve the operational milestones of MPEX. The MPEX device will begin commissioning at the end of FY26. A smaller proto-MPEX was operated for 14,666 plasma discharges and will resume operation in September of 2025 as proto-MPEX-lite, with reduced capability, to test a new window for the Helicon plasma source. The proto-MPEX data has undergone surrogate modeling with machine learning methods (R. Archibald, 2022 IEEE International Conference on Big Data). This proto-MPEX data will be used to begin development of the AI digital twins described in this white paper. The scientific mission of MPEX is to qualify materials of different composition for use in the high energy and plasma flux conditions of a fusion power plant. The materials exposed in MPEX will in some cases be exposed to high neutron fluxes at other ORNL facilities to measure the changes to their PMI properties. The targets exposed in MPEX will be transported under vacuum to a Surface Analysis Station (SAS). The SAS will be equipped with the following diagnostics: Focused Ion Beam (FIB) for trench milling, 100-400 angstrom resolution scanning electron microscope (SEM), surface mapping x-ray spectrometer, high resolution camera, and a future upgrade to a laser induced breakdown spectroscopy quadruple mass spectrometer (LIBS-QMS). The MPEX experiments will generate diverse pre- and post-exposure measurement data of detailed material properties down to the crystal grain level in 3D for post-exposure assessment of PMI damage (e.g. cracking, melting, erosion and redeposition of the material). Physics models for the PMI, and how the material composition and manufacturing impact its performance under high energy plasma exposure, need to be validated with MPEX data to guide the selection of new candidate materials. Our vision for the MPEX AI Digital Twins project is to supply experimental and physics model simulation data to train Artificial Intelligence (AI) models for data processing, analysis, operational control, PMI and materials simulation to maximize the scientific output of the MPEX device. Ultimately, an AI digital twin of MPEX material assessment metrics for tested and synthetic material types with simulated PMI will be trained by the AI Modeling Teams on the experimental and physics simulation data submitted to the American Science Cloud by this project. A purely empirical search for the best material is inefficient given the finite number of samples that can be tested on MPEX. In order to expand the material properties database for training the MPEX Material Assessment AI Digital Twin, and to gain physics understanding of the PMI processes, physics models of the material properties and PMI processes are required. The physics simulations provide detailed simulation data, like impact angles for plasma ions, sputtering yields, transport of the ionized sputtered target material in the plasma, and redeposition locations. This simulation data expands the measurement data for deeper physics understanding. The experimental data is essential to validate the PMI and material structure simulation models. The validated models can then be used to generate new simulation data of MPEX material assessments for synthetic material compositions that have not been exposed in MPEX. These predictive simulations, plus the whole experimental dataset, will be used to train the MPEX Material Assessment AI Digital Twin allowing a rapid generative AI search for new materials with reduced PMI damage by interpolating the domain of the training set. These new optimum materials can be simulated with the physics codes and/or tested in MPEX. The ability of AI neural networks to interpolate multi-dimensional parameter spaces and generate virtual data is exploited for a more efficient search for optimum materials. The advent of the Transformational AI Models Consortium (TAIMC) is an opportunity to engage with state of the art private and public AI developers to achieve the goals of the AI digital twins and AI accelerated physics models proposed in this project. Our partners at ORNL from the Advance Scientific Computing Research (ASCR) organization will collaborate in accelerating the integrated plasma material interaction simulation framework. This simulation framework will provide a platform for generating simulation data across a range of physical fidelities, including hybrid methods that produce multi-fidelity results. This data will be leveraged for AI model development, both for generation of surrogates and the automation of simulation campaigns. A part of the research below will include collaborative efforts with the TAIMC to (i) adapt data storage approaches to ensure AI-readiness, (ii) provide a protypical exemplar to inform and exercise constructed workflows, and (iii) generate and share data, using the TAIMC unified AI data standard, for foundational models that will be trained from multiple sources across the DOE complex. We will also collaborate with the TAIMC, as well as the planned AI modeling teams, to develop approaches for reducing the cost of data generation. These include tailored multi-fidelity approaches as well as fine-tuning strategies to augment general, large-scale foundational models.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY