Search NASA⌕ Search

SEARCH · Search NASA

Results for “Substations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

ChatGPT and Other Large Language Models for Cybersecurity of Smart Grid Applications

Cybersecurity breaches targeting electrical substations constitute a significant threat to the integrity of the power grid, necessitating comprehensive defense and mitigation strategies. Any anomaly in information and communication technology (ICT) should be detected for secure communications between devices in digital substations. This paper proposes large language models (LLMs), e.g., ChatGPT, for the cybersecurity of IEC 61850-based communications. Multi-cast messages such as generic object oriented system events (GOOSE) and sampled values (SV) are used for case studies. The proposed LLM-based cybersecurity framework includes, for the first time, data pre-processing of communication systems and human-in-the-loop (HITL) training (considering the cybersecurity guidelines recommended by humans). The results show a comparative analysis of detected anomaly data carried out based on the performance evaluation metrics for different LLMs. A hardware-in-the-loop (HIL) testbed is used to generate and extract a dataset of IEC 61850 communications.

ChatGPT↗

Consumer safety-oriented scheduling of rotating power outages during heat waves

Extreme heat events have widespread effects on power systems, reducing available generation capacity, limiting transmission capabilities, and causing unusual demand patterns on the consumer side. As these combined effects expose bulk transmission systems to potential large-scale blackouts, utilities may be required to schedule and apply rotating outages, by temporarily and alternately disconnecting distribution substations to reduce overload. However, utilities lack mechanisms to inform these events, exacerbating the negative effects of heat waves on affected communities. This paper introduces a novel framework for scheduling rotating outages during heat waves while considering impacts on consumers’ safety. Instead of random sequential load shedding, we propose a methodology to rotate power outages considering a metric that quantifies the indoor overheating risk of groups of consumers during a power outage. The overheating risk is derived from a detailed building simulation using CityBES, where the buildings are modeled based on available data—use type, year built, floor area, number of stories, location—while presence of air conditioning and occupancy are calibrated from smart meter data. Based on the metric, an algorithm to schedule the rotating outages is applied to prioritize feeders for disconnection at each hour according to their overheating risk to meet a utility load reduction target. Applied to two substations and seven feeders in the Portland General Electric territory, the results show that this approach effectively leads to the lowest overheating risk during the resulting outage schedules, with an average 10.1% lower overheating compared to uninformed schedules.

Building thermal simulation↗

A cross-dimensional analysis of data-driven short-term load forecasting methods with large-scale smart meter data

Electricity load forecasting is essential to utility operation and power grid stability. A wide spectrum of data-driven methods, ranging from linear regression models to more recent deep learning models have been adopted to forecast electric load over the years. However, there still lacks a holistic evaluation of the applicability of conventional statistical and machine learning based algorithms with respect to different temporal and spatial scopes, computational requirements, and sensitivity of model-tuning. Enabled by a large-scale electricity load profile dataset of over 40,000 residential customers in a utility region, we conducted a cross-dimensional analysis of data-driven load forecasting methods. Three regression-based and seven deep learning algorithms with different model configurations were evaluated in terms of their overall and peak load prediction accuracy, and training burdens, across spatial aggregation levels ranging from the transformer, feeder, substation, to neighborhood. We found, first, the load forecasting accuracy is constrained by a predictability boundary, influenced by the forecasting horizon and spatial aggregation level. Specifically, RandomForest, XGBoost, TFT, TSMixer, and TiDE models achieved less than 10 % prediction error for up to 96-h ahead forecasting for district, substation, and feeder levels, while other models struggle at long-horizon predictions; Second, for winter and summer peak load dates, most models were able to predict the peak demand timing within ± 1 h, but the prediction percentage error varied by models, with TFT and TiDE models being the top performers; Third, models with similar prediction accuracy can differ in training burden by an order of magnitude. Therefore, choosing model configurations that balance prediction performance and computational resource is an important practical consideration for large-scale deployment of the machine learning based load forecasting. The outcome of this study can guide researchers and practitioners to choose the proper load forecasting algorithms based on their problem scope, required accuracy, and available resources. The predictability boundary can serve as a benchmark for electricity load forecasting problems with new algorithms and datasets.

Li, Han↗

Wildfire-Power Grid Interactions: Feedback, Impacts, Monitoring, Modeling, and Mitigation Strategies

Wildfires are increasingly interacting with electric power systems through a two-way hazard chain: fires damage grid assets and trigger cascading outages, while grid faults can ignite new fires under hot, dry, and windy conditions. This review synthesizes the state of knowledge across five domains: (i) physical impacts of flames, heat, and smoke on lines, towers, insulators, and substations; (ii) power-infrastructure-initiated ignitions via conductor clash, high-impedance faults, and corona discharge; (iii) widespread blackouts and disproportionate societal impacts; (iv) multi-scale monitoring spanning laboratory tests, in-situ and grid-integrated sensors, and Earth observation; (v) coupled modeling that links fire behavior with grid operations; and (vi) technological and strategic mitigation pathways spanning prevention, response, and recovery. We integrate these domains into a novel 'feedback-aware' socio-technical framework. Through a longitudinal analysis (2005-2025) of global incidents, we identify that while vegetation contact remains the most frequent ignition source, aging infrastructure failure has emerged as a critical driver of catastrophic 'mega-fires'. We further identify persistent gaps, including limited interoperability of high-frequency grid and environmental data, scarce real-time data assimilation, and under-developed equity metrics for outage management. We conclude by outlining a research agenda to (1) deploy interoperable sensing architectures, (2) advance feedback-coupled fire-grid simulations, and (3) evaluate mitigation portfolios through techno-economic and fairness lenses. Recognizing wildfire-grid interactions as coupled socio-technical systems is essential for protecting infrastructure and communities and for ensuring reliable, sustainable electricity in a changing world.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Machine Learning-Assisted Distribution System Network Reconfiguration Problem

High penetration from volatile renewable energy resources in the grid and the varying nature of loads raise the need for frequent line switching to ensure the efficient operation of electrical distribution networks. Operators must ensure maximum load delivery, reduced losses, and the operation between voltage limits. However, computations to decide the optimal feeder configuration are often computationally expensive and intractable, making it unfavorable for real-time operations. This is mainly due to the existence of binary variables in the network reconfiguration optimization problem. To tackle this issue, we have devised an approach that leverages machine learning techniques to reshape distribution networks featuring multiple substations. This involves predicting the substation responsible for serving each part of the network. Hence, it leaves simple and more tractable Optimal Power Flow problems to be solved. This method can produce accurate results in a significantly faster time, as demonstrated using the IEEE 37-bus distribution feeder. Compared to the traditional optimization-based approaches, a feasible solution is achieved approximately ten times faster for all the tested scenarios.

deep neural networks↗

Strategies for Flood Resilience and Grid Investment Among Iowa's Electric Distribution Utilities

Flooding poses a growing threat to Iowa's electric distribution system, yet utilities face significant data and modeling challenges in planning effective resilience investments. This report provides a foundational assessment of how distribution utilities in Iowa, investor-owned, municipal, and cooperative, approach resilience planning, with a focus on flood risk. It combines hazard characterization, review of state and utility practices, and application of NLR's Energy Resilience Analysis for Distribution Systems (ERAD) and Capacity Expansion Decision Support for Distribution Networks (CADET) tools. Using FEMA floodplains, Iowa Flood Center depth grids, and utility infrastructure data, the analysis quantifies asset exposure, simulates outage risks, and evaluates resilience strategies such as pole hardening, undergrounding, and substation protection. Results indicate that while feeder-level upgrades provide incremental benefits, the most significant reductions in outage risk are achieved through targeted substation interventions. The report highlights key data gaps, such as limited elevation data and fragility functions, and underscores the need for probability-weighted investment frameworks to address both frequent and catastrophic flood events. These insights aim to support utilities, state agencies, and federal partners in prioritizing resilience investments that safeguard Iowa's electric grid against future flooding.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Package Data for CERF-Data Centers

This dataset contains sample input 100m resolution raster files for running the CERF-DC python package (see https://github.com/IMMM-SFA/cerf_data_centers) at the state level across the CONUS. Due to data availability constraints, some of the items included in this dataset are proxies or assumptions for siting factors used in the model. These are individually noted in the item descriptions and can be exchanged with more detailed information upon availability. Data Descriptions The following raster files are included in the data download: state_siting_region.tif — State areas identified by state FIPS code composite_siting_suitability.tif — Value of 1 indicates suitable siting location, 0 otherwise. The following areas are excluded from siting: Areas within 300m of a federal airport runway Waterbodies Areas with slope >16% Areas susceptible to sinkholes High coastal or inland flood risk areas Local, state, and federal parks, leisure areas, and cemeteries Areas >2 km away from electric substations Areas >5 km away from a municipal water supplier service area Areas >2 km away from high-speed fiber provider service territory Protected Areas Database of the United States (PAD-US) areas Railroads, major roadways, and minor roadways Military areas and training grounds Developed lands Areas >0.8 km (0.5 miles) from developed lands land_value_dollar_per_sqft.tif — USD per square foot (sqft) derived from USDA $/acre land cost personal_property_tax_rate.tif — Personal property tax rate by state. Uses an assumed 0.0125 personal property tax rate for states with personal property tax, 0 for states without personal property tax. real_property_tax_rate.tif — Real property tax rate. Based on county level residential real estate property tax rates. sales_tax_rate.tif — Sales tax rate by state. mechanical_cooling_fraction.tif — Fraction of year (values between 0 and 1, inclusive) that the data center would be cooled through mechanical processes based on local water stress and humidity levels. water_cooling_fraction.tif — Fraction of year (values between 0 and 1, inclusive) that the data center would be cooled through evaporative (water cooled) processes based on local water stress and humidity levels. distance_to_substation.tif — Distance to nearest substation in hundreds of meters (i.e., value of 1 equals a distance of 100m). Offshore areas have a value of 0. industrial_electricity_rates_dollar_per_kwh.tif — USD/kWh industrial electricity rates. Represents the average industrial rate across all utilities that operate within a given county. Values are derived from the US Utility Rate Database. commercial_electricity_rates_dollar_per_kwh.tif — USD/kWh commercial electricity rates. Represents the average commercial rate across all utilities that operate within a given county. Values are derived from the US Utility Rate Database. data_center_market_locations.tif — Grid cells with positive values represent the centroid of existing data center market clusters. The value of non-zero grid cells represents the number of data centers in the market cluster. All other grid cells have a value of 0. Geospatial Metadata CRS: Albers Equal Area Conic (ESRI:102003) Extent: -2415585.0000000023283064,-1441981.2605773280374706 : 2384414.9999999976716936,1708018.7394226719625294 Dimensions: X: 48000 Y: 31500 Bands: 1 Origin: -2415585.0000000023283064,1708018.7394226719625294 Pixel Size: 100,-100 Acknowledgment IM3 is a multi-institutional effort led by Pacific Northwest National Laboratory and supported by the U.S. Department of Energy's Office of Science as part of research in MultiSector Dynamics, Earth and Environmental Systems Modeling Program. License This data is made available under a CCBY4.0 License Disclaimer This material was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor the United States Department of Energy, nor the Contractor, nor any or their employees, nor any jurisdiction or organization that has cooperated in the development of these materials, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness or any information, apparatus, product, software, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or any agency thereof, or Battelle Memorial Institute. The views and opinions of authors expressed herein do not necessarily state or reflect those of the United States Government or any agency thereof. PACIFIC NORTHWEST NATIONAL LABORATORYoperated byBATTELLEfor theUNITED STATES DEPARTMENT OF ENERGYunder Contract DE-AC05-76RL01830

Mongird, Kendall↗

Package Data for CERF-Data Centers

This dataset contains sample input 100m resolution raster files for running the CERF-DC python package (see https://github.com/IMMM-SFA/cerf_data_centers) at the state level across the CONUS. Due to data availability constraints, some of the items included in this dataset are proxies or assumptions for siting factors used in the model. These are individually noted in the item descriptions and can be exchanged with more detailed information upon availability. Data Descriptions The following raster files are included in the data download: state_siting_region.tif — State areas identified by state FIPS code composite_siting_suitability.tif — Value of 1 indicates suitable siting location, 0 otherwise. The following areas are excluded from siting: Areas within 300 m of a federal airport runway or within an airport area boundary Waterbodies Areas with slope >16% Areas susceptible to sinkholes High coastal or inland flood risk areas Local, state, and federal parks, leisure areas, and cemeteries Areas >2 km away from electric substations Areas >5 km away from a municipal water supplier service area Areas >2 km away from high-speed fiber provider service territory USGS Protected Areas Database of the United States (PAD-US) GAP status 1, 2, or 3 areas US National Parks Wetlands USFWS critical habitats BIA land areas Railroads, major roadways, and minor roadways Military areas and training grounds NLCD developed lands Areas >0.8 km (0.5 miles) from NLCD developed lands land_value_dollar_per_sqft.tif — USD per square foot (sqft) derived from USDA $/acre land cost personal_property_tax_rate.tif — Personal property tax rate by state. Uses an assumed 0.0125 personal property tax rate for states with personal property tax, 0 for states without personal property tax. real_property_tax_rate.tif — Real property tax rate. Based on county level residential real estate property tax rates. sales_tax_rate.tif — Sales tax rate by state. mechanical_cooling_fraction.tif — Fraction of year (values between 0 and 1, inclusive) that the data center would be cooled through mechanical processes based on local water stress and humidity levels. water_cooling_fraction.tif — Fraction of year (values between 0 and 1, inclusive) that the data center would be cooled through evaporative (water cooled) processes based on local water stress and humidity levels. distance_to_substation.tif — Distance to nearest substation in hundreds of meters (i.e., value of 1 equals a distance of 100m). Offshore areas have a value of 0. industrial_electricity_rates_dollar_per_kwh.tif — USD/kWh industrial electricity rates. Represents the average industrial rate across all utilities that operate within a given county. Values are derived from the US Utility Rate Database. commercial_electricity_rates_dollar_per_kwh.tif — USD/kWh commercial electricity rates. Represents the average commercial rate across all utilities that operate within a given county. Values are derived from the US Utility Rate Database. data_center_market_locations.tif — Grid cells with positive values represent the centroid of existing data center market clusters. The value of non-zero grid cells represents the number of data centers in the market cluster. All other grid cells have a value of 0. Geospatial Metadata CRS: Albers Equal Area Conic (ESRI:102003) Extent: -2415585.0000000023283064,-1441981.2605773280374706 : 2384414.9999999976716936,1708018.7394226719625294 Dimensions: X: 48000 Y: 31500 Bands: 1 Origin: -2415585.0000000023283064,1708018.7394226719625294 Pixel Size: 100,-100 Acknowledgment IM3 is a multi-institutional effort led by Pacific Northwest National Laboratory and supported by the U.S. Department of Energy's Office of Science as part of research in MultiSector Dynamics, Earth and Environmental Systems Modeling Program. License This data is made available under a CCBY4.0 License Disclaimer This material was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor the United States Department of Energy, nor the Contractor, nor any or their employees, nor any jurisdiction or organization that has cooperated in the development of these materials, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness or any information, apparatus, product, software, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or any agency thereof, or Battelle Memorial Institute. The views and opinions of authors expressed herein do not necessarily state or reflect those of the United States Government or any agency thereof. PACIFIC NORTHWEST NATIONAL LABORATORYoperated byBATTELLEfor theUNITED STATES DEPARTMENT OF ENERGYunder Contract DE-AC05-76RL01830

Mongird, Kendall↗

Laboratory Evaluation of Federated, Hierarchical Controls for Distribution Power System Management: Preprint

The connection of more loads and distributed energy resources (DERs) to the distribution power system brings both challenges and opportunities to system operators. There are opportunities to aggregate flexible loads and DERs to provide transmission grid services, but the coordinated actions of DERs being managed by independent, third-party DER aggregators to support transmission system operations can present challenges. We developed a federated DER management architecture and control framework that aims to manage heterogeneous DERs to deliver reliable transmission grid services while respecting distribution system constraints. The controls include stochastic day-ahead optimization, model predictive control, and a simple real-time management scheme. We present simulation results obtained from a realistic laboratory test bed of federated controls managing DERs within a substation service area to make the substation net power follow the optimal net power determined by the day-ahead optimization based on cost and limiting reverse power flow.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Trap‐Engineering the Persistent Luminescence of Ca 3 Ga 4 O 9 :Tb 3+ via Al 3+ Substitution for Optical Data Storage

Abstract Optically stimulated luminescence (OSL) materials hold great potential for optical data storage (ODS) and anticounterfeiting applications. Nevertheless, the scarcity of suitable luminescent materials with deep‐level traps remains a significant obstacle. Herein, a host substation strategy have been employed to tune the persistent luminescence (PersL) and OSL properties of Ca 3 Ga 4 O 9 :Tb 3+ by Al 3+ substitution through trap engineering and demonstrated their potential. Specifically, the photoluminescence of the Ca 2.985 (Ga 1‐y% Al y% ) 4 O 9 :0.5%Tb 3+ of Tb 3+ is first investigated due to its different occupancies of Ca 2+ . The influence of host substitution on the crystal structure, trap depth, trap density, PersL, and OSL properties have further investigated. A series of strong PersL and OSL peaks from the Ca 2.985 (Ga 1‐y% Al y% ) 4 O 9 :0.5%Tb 3+ with bluish‐green emissions have been observed. The Ca 2.985 (Ga 1‐y% Al y% ) 4 O 9 :0.5%Tb 3+ have shown controllable photon release upon thermal and optical stimuli, enhancing their performance for ODS. Thermally stimulated luminescence suggests that vacancy and defect concentrations inside the Ca 3‐x% (Ga 1‐y% Al y% ) 4 O 9 :x%Tb 3+ can be manipulated by Tb 3+ doping and Al 3+ substitution, which ultimately leads to the formation of deep traps and a broad distribution of traps with increased deep trap concentration. The work demonstrates that trap engineering through Al 3 ⁺ substitution is an effective method for tuning PersL and OSL properties of Ca 2.985 (Ga 1‐y% Al y% ) 4 O 9 :0.5%Tb 3+ for ODS.

Abeywickrama, Thulitha M. [Department of Chemistry↗

Exploring Wildfire & Energy data toward State Prioritization Index (WESPI)

Energy infrastructure can both induce and suffer risks from wildfires ranging from direct damage to energy assets such as substations and power lines to Public Safety Power Shutoffs. Recent wildfire events underscore the need for data-driven approaches that help states and utilities proactively plan for wildfire risk. Existing national tools such as Federal Emergency Management Agency (FEMA)’s National Risk Index (NRI) are valuable for community hazard planning. However, they are less suited for energy infrastructure, as they emphasize population and building exposure rather than system vulnerabilities. In this paper, we explore relationships between energy and wildfire data and present a Wildfire-Energy State Prioritization Index (WESPI). Our methodology combines data from the US Forest Service’s Fire Simulation (FSIM) dataset with energy resilience metrics, historical fire incidents, and geospatial data on transmission lines and fire stations. Correlation analyses suggest that FSIM burn probability is more strongly associated with power outage metrics (ρ = 0.32) than NRI wildfire frequency, and counties with a greater density of fire stations experience more frequent, but less intense wildfires. We further leverage data for burn probability, transmission line density, and fire station density to develop a Wildfire-Energy State Prioritization Index (WESPI) to highlight counties where wildfire hazard, infrastructure exposure, and limited suppression capacity converge. The index provides a consistent, scalable framework for state energy offices and utilities to screen counties for vegetation management, optimization of outage management system deployment, and to inform wildfire mitigation plans.

Critical infrastructure↗

On the Impact of High-Order Harmonic Generation in Electrical Distribution Systems

The modern power grid has seen a rise in the integration of non-linear loads, presenting a significant concern for operators. These loads introduce unwanted harmonics, leading to potential issues such as overheating and improper functioning of circuit breakers. In pursuing a more sustainable grid, the adoption of electric vehicles (EVs) and photovoltaic (PV) systems in residential networks has increased. Understanding and examining the effects of high-order harmonic frequencies beyond $1.5$ kHz is crucial to understanding their impact on the operation and planning of electrical distribution systems under varying nonlinear loading conditions. This study investigates a diverse set of critical power electronic loads within a household modeled using PSCAD/EMTdc, analyzing their unique harmonic spectra. This information is utilized to run the time-series harmonic analysis program in OpenDSS on a modified IEEE 34 bus test system model. The impact of high-order harmonics is quantified using metrics that evaluate total harmonic distortion (THD), transformer harmonic-driven eddy current loss component, and propagation of harmonics from the source to the substation transformer.

Peerzada, Aaqib A. [BATTELLE (PACIFIC NW LAB)]↗

A Third Harmonic Voltage Injection Technique to Improve The Power Transmission Capacity

To facilitate the growing deployment of renewable energy sources and increasing load demand, it is imperative to increase the power transmission capacity of the existing transmission corridors. The available power uprating techniques are either costly, or require significant alteration to the existing system. Moreover, most of these techniques are suitable for long transmission lines. In light of these limitations, a third harmonic voltage injection based power uprating technique is proposed in this article. The proposed technique is economic, immune to line impedance unbalance, and is applicable for any length of transmission line. Most importantly, the technique needs very minimal modification in the existing system at the substation level. The efficacy of the proposed technique is validated through simulation and experiments.

Das, Anubrata↗

Black-Starting Microgrids Using Inverter-Based Distributed Energy Resources

Recent trends in power systems show increasing deployment of inverter-based distributed energy resources (DERs) at the distribution level. Efforts have also been made to use inverter-based DERs for system restoration of critical sections of distribution feeders. In the past few years, there has been active consideration of using local grid-forming (GFM) DERs, which can form their own voltage and frequency, to black-start microgrids instead of waiting for the bulk system for supply restoration. However, using current-limited inverter-based DERs for black-start operations with high inrush currents can pose some technical challenges. This paper presents detailed electromagnetic transient studies on a digital real-time simulator to assess the operational feasibility of using local inverter-based GFM DERs for microgrid black-start operations as a bottom-up approach instead of a top-down approach where the substation is used to restore critical sections of the feeder. The paper presents key modeling details for distribution system components for studying GFM DER-based microgrid black-start operations. The paper presents simulation results comparing different black-start approaches using GFM DERs for two test systems: i) a simple test microgrid and ii) a real-world utility microgrid currently being designed and deployed by Holy Cross Energy in Colorado.

black start↗

Unsupervised anomaly clustering via offset alignment in multivariate grid sensing data

Modern industries increasingly rely on multi-sensor technologies to acquire complex, high-dimensional data streams, enabling advanced monitoring and control systems. One critical application is online anomaly detection in electrical smart grids, where multivariate and multimodal sensing technologies play a vital role. However, detecting anomalies in such time-series data is challenging due to their inherent temporal dependencies and stochastic behavior. Traditional approaches based on supervised and semi-supervised learning methods depend on labeled datasets, which are often unavailable in real-world scenarios. While unsupervised methods have emerged as promising alternatives, these methods are highly susceptible to noise and outliers commonly present in sensing applications. Furthermore, deep learning-based anomaly detection methods, despite their performance, are often criticized for their black-box nature, limiting their applicability in safety-critical and online environments where interpretability and explainability are paramount. In this work, we propose an unsupervised anomaly clustering method leveraging a cyclic alignment-based offset detection algorithm for multivariate time-series signals. The proposed method is applied to multivariate data collected from vibrational, voltage, and magnetic field sensors deployed in a local grid substation. Our results demonstrate the robustness of the algorithm in accurately clustering various anomalies/events across different sensing modalities. Additionally, we compare the effectiveness of the proposed approach against a simple pattern-based anomaly detection method, which performs well for univariate data but fails to generalize to multivariate and multimodal time-series data.

Mukherjee, Subrata [ORNL] (ORCID:0000000309930338)↗

An Introduction to the Federated Architecture for Secure and Transactive Distributed Energy Management Solutions (FAST-DERMS)

Deployment and capability of distributed energy resources (DER) in power systems is growing rapidly. These resources present an opportunity for low-cost provision of energy and grid services. The Federal Energy Regulatory Commission recently provided rulings to enable market participation of these distribution-connected resources, but the prevailing strategies for their management may not scale well to meet future needs. This paper introduces the Federated Architecture for Secure and Transactive Distributed Energy Management Solutions (FAST-DERMS) which was designed to address this need. In it we describe the architectural features of the approach, and a reference controls implementation employing a hierarchical coordination that includes stochastic optimization, model predictive control, and a simple real-time management scheme. Sample results from simulation show firm transmission-level service provision measured at the distribution substation.

grid architecture↗

Netload Range Cost Curves for Coordinated Transmission-Distribution Planning Under DER Growth Uncertainty

The increasing penetration of distributed energy resources (DERs) requires better coordination between transmission and distribution (T&D) planning to ensure system security and cost efficiency. However, misaligned planning horizons, computational burdens, and privacy concerns hinder effective coordination, leading to either underutilized resources caused by overinvestments or reliability risks due to underinvestment. To address this challenge, we introduce netload range cost curves (NRCCs), a novel approach for managing long-term DER growth uncertainty through T&D coordination, while preserving existing data-sharing and regulatory structures. NRCCs provide pairs of (i) peak substation netload guarantees and (ii) corresponding distribution upgrade options and costs, enabling their seamless integration into transmission planning workflows. To compute NRCCs efficiently, we develop a transmission-aware distribution network planning (TADNP), which is subsequently integrated to an iterative computation procedure. These NRCCs are then embedded into an NRCC-informed transmission planning model to enable resource-efficient coordination. We illustrate our proposed approach with a case study based on realistic distribution and transmission systems in the San Francisco Bay Area, California. Our results indicate the possibility of dramatic savings in transmission investments by incorporating the proposed NRCC-integrated T&D coordination framework.

Li, Yujia↗

Distributed Coordination of Networked Microgrids for Voltage Support in Bulk Power Grids

The increasing deployment of distributed energy resources (DERs) and microgrids (MGs) in power distribution systems has enabled the adjustment of reactive power consumption as seen at the substation, which can be used to provide voltage support for the bulk power system (BPS). Leveraging this new capability will provide greater resiliency to the power system as a whole. Here, the goal of this paper is to develop and compare three different algorithms, namely distributed optimal power flow, distributed consensus algorithm, and fully decentralized collaborative autonomy for unbalanced distribution systems for microgrid coordination. These algorithms use networked MGs to support the BPS voltage when a contingency at the bulk grid results in abnormally low voltages, which may be a precursor to voltage collapse. Our comparative analysis includes both qualitative and quantitative assessments of the three algorithms and a discussion of the trade-offs between the decentralized and distributed methods in normal and disrupted conditions. Each algorithm was evaluated on the modified IEEE 13-bus system and a real power distribution system at Chattanooga, Tennessee, that encompasses more than 4500 buses. Each algorithms excels differently and may be suited for different scenarios depending on the condition, operations, and priorities of the power and communication systems.

24 POWER TRANSMISSION AND DISTRIBUTION↗