Search NASA⌕ Search

SEARCH · Search NASA

Results for “Supplier”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Advanced Transmission Technologies (ATTs) Supplier Cohort Workshops Cohort Summary [Slides]

This Summary slide deck summarizes the key outcomes of the Advanced Transmission Technologies (ATTs) supplier cohort, part of Idaho National Laboratory’s (INL) Technical Assistance for Digital Assurance (TADA) program. The program aimed to strengthen grid resilience through cybersecurity controls, supply-chain security, and Cyber-Informed Engineering (CIE) for advanced transmission technologies. The cohort brought together vendors representing the full range of Grid-Enhancing Technologies (GETs), including providers of Dynamic Line Ratings (DLR), Advanced Power Flow Control (APFC), Transmission Topology Optimization (TTO), and High-Performance Conductors (HPCs). Discussions focused on institutional, integration, and operational barriers limiting GET adoption; cybersecurity risks at EMS/SCADA, cloud, and network integration points; and supply-chain transparency issues such as semiconductor dependence and SBOM/HBOM expectations. Participants also addressed operator trust, human-in-the-loop requirements, and challenges with utility adoption, while exploring how CIE can support secure deployment of GETs. This deck represents a consolidated summary of challenges and risks identified by vendors, cross-cutting themes and technology-specific insights from three cohort workshops, and actionable mitigations to guide utilities, vendors, and the Department of Energy in advancing secure, trusted deployment of GETs.

24 - POWER TRANSMISSION AND DISTRIBUTION↗

Active and Passive Supplier Assessment Program (ASAP & PSAP) WWW Sites http://nepp.nasa.gov/imd/asap http://nepp.nasa.gov/imd/psap

The Active and Passive Supplier Assessment Programs (ASAP and PSAP) WWW Sites provide general information to the electronic parts community regarding the availability of electronic parts. They also provide information to NASA regarding modifications to commonly used procurement specifications and test methods. The ASAP and PSAP www sites are ongoing resources produced by Code 562 in support of the NASA HQ funded NASA Electronic Parts and Packaging (NEPP) Program. These WWW sites do not provide information pertaining to patented or proprietary information. All of the information contained in these www sites is available through various other public domain resources such as US Military Qualified Producers Listings (QPLs) and Qualified Manufacturer Listings (QMLs) and industry working groups such as the Electronics Industry Alliance (EIA) and the Space Parts Working Group (SPWG).

Brusse, Jay↗

UTM UAS Service Supplier Specification

Within the Unmanned Aircraft Systems (UAS) Traffic Management (UTM) system, the UAS Service Supplier (USS) is a key component. The USS serves several functions. At a high level, those include the following: Bridging communication between UAS Operators and Flight Information Management System (FIMS) Supporting planning of UAS operations Assisting strategic deconfliction of the UTM airspace Providing information support to UAS Operators during operations Helping UAS Operators meet their formal requirements This document provides the minimum set of requirements for a USS. In order to be recognized as a USS within UTM, successful demonstration of satisfying the requirements described herein will be a prerequisite. To ensure various desired qualities (security, fairness, availability, efficiency, maintainability, etc.), this specification relies on references to existing public specifications whenever possible.

UTM↗

UTM UAS Service Supplier Development: Sprint 2 Toward Technical Capability Level 4

NASA's UAS Traffic Management (UTM) Project has been tasked with developing concepts and initial implementations for integrating and managing small unmanned aircraft systems (UAS) into the low altitude airspace. To accomplish this task, the UTM Project planned a phased approach based on four Technical Capability Levels (TCLs). As of this writing, TCL4 is currently in development for a late Spring 2019 flight demonstration. This TCL is focused on operations in an urban environment and includes the handling of high density environments, large-scale off-nominal conditions, vehicle-to-vehicle communications, detect-and-avoid technologies, communication requirements, public safety operations, airspace restrictions, and other related goals. Through research and testing to date, NASA has developed an architecture for UTM that depends on commercial entities collaboratively providing services that are traditionally provided by the Air Navigation Service Provider (ANSP) in manned aviation. A key component of this architecture is the UAS Service Supplier (USS), which acts as a communications bridge between UAS operators and the ANSP when necessary. In addition, the collection of USSs form a USS Network to collaboratively manage the airspace through the sharing of data and the adherence to a standard or set of standards required to participate in this USS Network. This document provides a record of the second of four planned steps in the development of interoperable USSs that will ultimately support TCL4 flight testing and formalization of the overall UTM concept. To develop these USSs and their underlying specifications, NASA has planned a series of "Sprints" to work with industry partners in implementing the features and develop proposed specifications for USSs in order to to participate in TCL4. This report describes Sprint Two. In this Sprint, there was a major theme with four goals. The theme was the development and testing of a new USS discovery system, to better enable USSs to find and communicate with each other. The goals supporting this theme were: participants needed to implement and exercise the discovery service for USS-USS communications; USSs needed to demonstrate strategic deconfliction through operation sharing; the systems were to use discovery to aid in handling off-nominal operations; and finally, there was an investigation of an initial off-nominal reporting capability.

software engineering↗

UAS Service Supplier Framework for Authentication and Authorization

The Unmanned Aircraft Systems (UAS) Traffic Management (UTM) Service Supplier (USS) Framework for Authentication and Authorization (UFAA) is the basis for secure and confident data exchanges between the Flight Information Management System (FIMS) and the USS Network and within the USS Network itself. UFAA is built upon the OAuth 2.0 approach to federated authorization, with details supplied by various Internet Engineering Task Force (IETF) Request for Comment documents (RFCs). Whenever possible, a specific standard is used to support a design decision within UFAA, and when an applicable standard is not found/used, the technical decision is explained as much as possible. This document describes UFAA in detail. It is intended to serve as a reference for other key UTM documents and should be useful to many UTM stakeholders. This is an informative document. The requirements stated or implied in this document will need to be fully vetted and reviewed by appropriate stakeholders before becoming operational. It is highly encouraged that in any design decisions for future applicable standards that are counter to or missing from the decisions presented herein be justified in that future standard.

UTM↗

UAS Service Supplier Specification

Within the Unmanned Aircraft Systems (UAS) Traffic Management (UTM) system, the UAS Service Supplier (USS) is a key component. The USS serves several functions. At a high level, those include the following: Bridging communication between UAS Operators and Flight Information Management System (FIMS) Supporting planning of UAS operations Assisting strategic deconfliction of the UTM airspace Providing information support to UAS Operators during operations Helping UAS Operators meet their formal requirements This document provides the minimum set of requirements for a USS. In order to be recognized as a USS within UTM, successful demonstration of satisfying the requirements described herein will be a prerequisite. To ensure various desired qualities (security, fairness, availability, efficiency, maintainability, etc.), this specification relies on references to existing public specifications whenever possible.

Rios, Joseph L.↗

UAS Service Supplier Network Performance

This report summarizes the performance of Unmanned Aircraft System (UAS) Service Suppliers (USS) in the Technical Capability Level 4 (TCL4) flight test performed by NASA and its partners in support of the UAS Traffic Management (UTM) concept. TCL4 is the final in a series of TCL demonstrations of a traffic management system for small UAS (sUAS). All demonstrations have been executed in collaboration with industry partners. The [FAA 2018] UTM Concept of Operations document describes UTM as:...the manner in which the FAA will support operations for predominantly sUAS operating in low altitude airspace. UTM utilizes industry’s ability to supply services under FAA’s regulatory authority where these services do not currently exist. It is a community-based traffic management system, where the Operators are responsible for the coordination, execution, and management of operations, with rules of the road established by FAA. UTM is designed to support the demand and expectations for a broad spectrum of operations with ever-increasing complexity and risk. UTM should be considered a collection of services rather than a monolithic application. The following section describes the architecture at a high level. For further insight, the FAA’s concept document [FAA 2018] or NASA’s earlier concept publication [NASA 2016] should be consulted.

Rios, Joseph L.↗

Third-Party Supplier Risk Re-Classification Using Multi-Model Semantic Voting and External Web Augmentation

Risk decisions in many third-party risk management (TPRM) workflows rely on static inherent risk questionnaires (IRQ). These static forms provide a snapshot of the vendor from the business users’ perspective, as these requests are processed without cross-referencing for evidence. Consequently, responses can be misinformed or embellished with inaccuracies, thereby masking the vendor’s true risk to the enterprise. This paper presents a multi-stage verification framework to augment IRQs with web evidence and a deterministic ensemble of large language model assessors to reclassify risk. In a case study of 100 submissions previously misclassified as low risk, the proposed framework correctly identified 76% of the cases as high risk, while the existing workflow identified none. McNemar’s continuity corrected statistics of 74 were obtained with a two sided p-value of 2.65 × 10-23, indicating a significantly more effective workflow compared to the legacy model.

99 - GENERAL AND MISCELLANEOUS↗

Consent Order Site Presentation For LANL Supplier Forum [Slides]

Consent Order Sites are contaminated and potentially contaminated sites in and around LANL that require further investigation and/or remediation. They are referred to as Solid Waste Management Units (SWMUs) and Areas of Concern (AOCs).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Business Opportunities in Clean Energy Supply Chains: Guidebook for Small and Medium-Sized Automotive Suppliers

This is the final report for the referenced TCF award which ran from Oct. 2019 through Jan. 2024 in conjunction with the industry partner Swift Solar. The long duration of the program was due to several factors including the pandemic and a technical work stoppage due to changes in the scope. Additionally, Swift’s business focus shifted during the course of the program. As a result of these factors, this program underwent two distinct modifications that dramatically changed the work scope. The following report is organized into three separate sections, each of which addresses a distinct work scope. Those scope changes, what necessitated them, and any new tasks/milestones are given, briefly, at the top of each section. The work performed was research on the hybrid halide perovskites (HHP), both the absorber material itself as well as other material layers that are required in a full device stack. At the start of the period of performance, there were two distinct challenges that we sought to address: (1) a wide band gap absorber (>1.6 eV), and (2) a recombination layer for tandem devices that provided good sequestration of the individual cell absorber materials in their respective device layers. NREL had previously published, and patented, advancements in both of these areas and they were the focus of much of the work throughout the program. The auto manufacturing space is evolving quickly. Sales of various electrified vehicles (xEVs) continue to grow steadily, which has medium to long-term ramifications for the thousands of U.S. manufacturers and hundreds of thousands of workers that contribute to the domestic automotive supply chain. In tandem with this growth in xEV sales, domestic clean energy manufacturing is surging (both for the xEV supply chain and other technologies), with public incentives spurring billions in private sector investment. Moreover, the next 2–3 years will see new and expanded industrial facilities come online to make products like hydrogen electrolyzers, solar panels, batteries, advanced electronics—and will create new supply chain needs and business opportunities as they do. DOE’s Office of Manufacturing and Energy Supply Chains (MESC) and Argonne National Laboratory developed this report to help automotive manufacturers—alongside various business support partners— understand these trends and their response options, and to make the most of current federal assistance programs for manufacturers. These market changes may create opportunities for small- and medium-sized manufacturers (SMMs) to expand production, grow profit margins, and diversify their businesses. For instance, SMMs could take advantage of engineering and process design similarities with new end-use industries that might enable greater business growth and stability as markets continue to change.

14 SOLAR ENERGY↗

Potential of a nitrogen tetroxide spill or emission during movement from supplier to user

The type of equipment used to transport nitrogen tetroxide is described along with various methods of shipping utilized. Emphasis is placed on reduction of accident rate. Potential areas for leaks, emissions, or spills discussed include: accidental spills, transfer operations, sampling, and the so-called 'empty' trailer. Corrective actions taken to reduce the occurrence of these problems are briefly discussed.

Watje, W. F.↗

The international aerospace industry - New challenges and opportunities for translation suppliers

Attention is given to the recent trend toward internationalization in the aerospace industry and its effects on commercial and governmental translation programs. The aerospace industry, once dominated by organizations from a small number of countries, is now widely international in scope. In effect, there has been in increase in the demand for translations from German, Japanese, Chinese, French and Spanish source material while that for translation from Russian source material has remained constant. The impact of the Challenger disaster on aerospace translation programs is discussed as well as the impact of international participation in Space Station research.

Rowe, T.↗

The orbital debris detector consortium: Suppliers of instruments for in-situ measurements of small-particles in the space environment

Industry and university participants have joined together to form the IMPA:Ct consortium (In-situ Monitors of the Particulate Ambient: Circumterrestrial) which offers a broad range of flight qualified instruments for monitoring the small particle (0.1 micron to 10 cm) environment in space. Instruments are available in 12 months or less at costs ranging from 0.5 to 1.5 million dollars (US) for the total program. Detector technologies represented by these groups are: impact-induced capacitor-discharge (MOS, metal-oxide-silicon), cratering or penetration of electroactive thin film (polyvinylidene fluoride (PVDF)), impact-plasma detection, acoustic detection, CCD tracking of optical scatter of sunlight, and photodiode detection of optical scatter of laser light. The operational characteristics, general spacecraft interface and resource requirements (mass/power/telemetry), cost and delivery schedules, and points of contact for seven different instruments are presented.

Simon, C. G.↗