Search NASA⌕ Search

SEARCH · Search NASA

Results for “Supplier”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

UAS Service Supplier Framework for Authentication and Authorization

The Unmanned Aircraft Systems (UAS) Traffic Management (UTM) Service Supplier (USS) Framework for Authentication and Authorization (UFAA) is the basis for secure and confident data exchanges between the Flight Information Management System (FIMS) and the USS Network and within the USS Network itself. UFAA is built upon the OAuth 2.0 approach to federated authorization, with details supplied by various Internet Engineering Task Force (IETF) Request for Comment documents (RFCs). Whenever possible, a specific standard is used to support a design decision within UFAA, and when an applicable standard is not found/used, the technical decision is explained as much as possible. This document describes UFAA in detail. It is intended to serve as a reference for other key UTM documents and should be useful to many UTM stakeholders. This is an informative document. The requirements stated or implied in this document will need to be fully vetted and reviewed by appropriate stakeholders before becoming operational. It is highly encouraged that in any design decisions for future applicable standards that are counter to or missing from the decisions presented herein be justified in that future standard.

UTM↗

UAS Service Supplier Specification

Within the Unmanned Aircraft Systems (UAS) Traffic Management (UTM) system, the UAS Service Supplier (USS) is a key component. The USS serves several functions. At a high level, those include the following: Bridging communication between UAS Operators and Flight Information Management System (FIMS) Supporting planning of UAS operations Assisting strategic deconfliction of the UTM airspace Providing information support to UAS Operators during operations Helping UAS Operators meet their formal requirements This document provides the minimum set of requirements for a USS. In order to be recognized as a USS within UTM, successful demonstration of satisfying the requirements described herein will be a prerequisite. To ensure various desired qualities (security, fairness, availability, efficiency, maintainability, etc.), this specification relies on references to existing public specifications whenever possible.

Rios, Joseph L.↗

UAS Service Supplier Network Performance

This report summarizes the performance of Unmanned Aircraft System (UAS) Service Suppliers (USS) in the Technical Capability Level 4 (TCL4) flight test performed by NASA and its partners in support of the UAS Traffic Management (UTM) concept. TCL4 is the final in a series of TCL demonstrations of a traffic management system for small UAS (sUAS). All demonstrations have been executed in collaboration with industry partners. The [FAA 2018] UTM Concept of Operations document describes UTM as:...the manner in which the FAA will support operations for predominantly sUAS operating in low altitude airspace. UTM utilizes industry’s ability to supply services under FAA’s regulatory authority where these services do not currently exist. It is a community-based traffic management system, where the Operators are responsible for the coordination, execution, and management of operations, with rules of the road established by FAA. UTM is designed to support the demand and expectations for a broad spectrum of operations with ever-increasing complexity and risk. UTM should be considered a collection of services rather than a monolithic application. The following section describes the architecture at a high level. For further insight, the FAA’s concept document [FAA 2018] or NASA’s earlier concept publication [NASA 2016] should be consulted.

Rios, Joseph L.↗

Potential of a nitrogen tetroxide spill or emission during movement from supplier to user

The type of equipment used to transport nitrogen tetroxide is described along with various methods of shipping utilized. Emphasis is placed on reduction of accident rate. Potential areas for leaks, emissions, or spills discussed include: accidental spills, transfer operations, sampling, and the so-called 'empty' trailer. Corrective actions taken to reduce the occurrence of these problems are briefly discussed.

Watje, W. F.↗

The international aerospace industry - New challenges and opportunities for translation suppliers

Attention is given to the recent trend toward internationalization in the aerospace industry and its effects on commercial and governmental translation programs. The aerospace industry, once dominated by organizations from a small number of countries, is now widely international in scope. In effect, there has been in increase in the demand for translations from German, Japanese, Chinese, French and Spanish source material while that for translation from Russian source material has remained constant. The impact of the Challenger disaster on aerospace translation programs is discussed as well as the impact of international participation in Space Station research.

Rowe, T.↗

The orbital debris detector consortium: Suppliers of instruments for in-situ measurements of small-particles in the space environment

Industry and university participants have joined together to form the IMPA:Ct consortium (In-situ Monitors of the Particulate Ambient: Circumterrestrial) which offers a broad range of flight qualified instruments for monitoring the small particle (0.1 micron to 10 cm) environment in space. Instruments are available in 12 months or less at costs ranging from 0.5 to 1.5 million dollars (US) for the total program. Detector technologies represented by these groups are: impact-induced capacitor-discharge (MOS, metal-oxide-silicon), cratering or penetration of electroactive thin film (polyvinylidene fluoride (PVDF)), impact-plasma detection, acoustic detection, CCD tracking of optical scatter of sunlight, and photodiode detection of optical scatter of laser light. The operational characteristics, general spacecraft interface and resource requirements (mass/power/telemetry), cost and delivery schedules, and points of contact for seven different instruments are presented.

Simon, C. G.↗

Primesupplier Podcast

PrimeSupplier, s supplier cross program and element impact simulation model with supplier solvency indicator (SSI), has been developed so that the Shuttle Program can see an early indicator of supplier and product line stability while identifying the various elements and/or programs that have a particular supplier of product designed into the system. The model calculates two categories of benchmarks to determine the SSI with one category focusing on Agency programmatic and the other being a supplier financial liquidity.

Galluzzi, Michael↗

NASA Goddard Space Flight Center Supply Chain Management Program

This slide presentation reviews the working of the Supplier Assessment Program at NASA Goddard Space Flight Center. The program supports many GSFC projects to ensure suppliers are aware of and are following the contractual requirements, to provide an independent assessment of the suppliers' processes, and provide suppliers' safety and mission assurance organizations information to make the changes within their organization.

Kelly, Michael P.↗

Qualifying Bulk Metallic Glass Gear Materials for Spacecraft Applications

NASA is evaluating bulk metallic glass (BMG) gears for extreme environment (cryogenic) applications; e.g., Europa Lander. The main purpose of this report is to recommend a quality assurance (QA) protocol for the production of consistent and reliable gear castings. Currently, there are two, separate manufacturers involved; Materion Corporation produces re-melt stock and Visser Precision Cast, Inc. produces BMG castings. Division of the existing alloy specifications document into material supplier-specific documents is proposed. Until a composition-based specification is established, processability- and performance-based methodologies may be an option during manufacturing development. It is recommended that each of the documents has a distinct focus; the processing behavior of crystalline feedstock, and the mechanical behavior of amorphous castings. The report addresses the “gray area” in QA testing between these materials suppliers by outlining an equitable division of responsibilities. The use of a number of dedicated reference dies to produce witness materials for physical and mechanical property evaluation is strongly recommended. Allocation of QA tests between screen testing of gear castings, and formal testing of witness materials, including cryogenic properties, is also proposed. The most effective suite of tests for both physical and mechanical property determination are down-selected from available national and international standards. The contents of this report create a solid basis for selection of QA tests, thereby setting the stage for negotiations between the materials suppliers and the customer.This technical paper:a) provides recommendations to advance materials specifications document JPL D-56223,Rev. A from “draft” to “preliminary” status;b) proposes division of the current document into two supplier-specific documents;c) separates testing methods by “ingots/castings” and “witness materials”;d) classifies test methodology based on “processability” and “performance”;e) assembles candidate ASTM specifications for “screen testing” and “formal testing”;f) identifies standard tests compatible with evaluation of BMG flexspline gears;g) suggests division of responsibilities for processability and performance testing; andh) addresses the QA “gray area” between production of ingots and castings.The report recommends that:a) processability- and performance-based QA methods might be used in lieu ofcompositional specifications during manufacturing development only;b) reference dies be designed for “acceptance” and “qualification” castings;c) witness materials provide physical and mechanical property data;d) formal testing be conducted at ambient and cryogenic temperatures; ande) processing/properties be correlated with compositional variations.

Hales, Stephen J.↗

Contracting Quality Early in the Lifecycle Using AS9145 Data Deliverables

Development schedules and a highly dynamic supply chain are a challenge to developers of complex systems produced at low volume. Flaws in designs, parts and materials availability problems, poor manufacturability, and a lack of knowledge about critical items and key process attributes can be realized well before traditional second-party quality assurance activities begin. Supplier audits and product inspections may have little mitigating effect once these foundational problems have been realized. Their impacts can be significant lifecycle disruption, cost overruns, inability to deliver to plan, and even project cancellation. AS9145, Requirements for Advanced Product Quality Planning and Production Part Approval Process, can be used to drive quality engineering practices into early development lifecycles to significantly reduce this late-cycle risk and to reduce the cost of quality overall. Since its initial publication in 2016, it has had very limited adoption by the DoD, no adoption by NASA, and sparse adoption in the aerospace and defense supply chain. A task group within the Aerospace Industries Association's (AIA) Joint Strategic Quality Council (JSQC) identified that both acquirers and suppliers see as AS9145 as a cost-adder and are hesitant to use it as an alternative to late-stage-heavy quality assurance approaches. A lack of prior use creates large capability gaps in request-for-proposal (RFP) teams, proposal teams, suppliers’ quality management systems (QMS), and in experienced personnel executing the early lifecycle approach. To create a more realizable on-ramp for using AS9145 in the space and defense sectors, the AIA JSQC task team created five deliverable requirements descriptions (DRDs) that can be used in a contract to begin to engage both parties in early lifecycle quality engineering and quality assurance activities, that reduce exposure to late-stage cost and schedule collapse due to unidentified risks in design, supply chain, and manufacturability. These DRDs drive the parties to engage in planning and analysis discussions early on to understand what production risks can be known and how they will focus resources based on safety criticality and the key elements of design and construction. The suppliers and acquirers who will produce the data and information required by the DRD will be able to incrementally evolve their QMS and the acquirer will incrementally be able to track and understand the benefits of cost shifting from late to early development phases. A white paper describing this approach and the five recommended DRDs will be published by the AIA in late 2024 or early 2025.

Jeannette Plante↗

Utilizing Supply Chain Assessments to Achieve Excellence, Reduce Risks and Improve Processes

Utilizing Supply Chain Assessments to Achieve Excellence, Reduce Risks and Improve Processes Supply Chain Management: Why it is important Strategic Challenge: Supply Chain RisksHistory of supply chain assessments at GoddardExamining case studies on successes and lessons learnedEnabling teams to develop tools to manage GSFC supply chainGaining supplier insight through IT tools that combines supplier data and provides supplier alerts

Risk Management↗

Multiple Access Trade Study

The Personal Access Satellite System (PASS) strawman design uses a hybrid Time Division Multiple Access (TDMA)/Frequency Division Multiple Access (FDMA) implementation. TDMA is used for the forward direction (from Suppliers to Users), and FDMA for the return direction (from Users to Suppliers). An alternative architecture is proposed that will require minimal real time coordination and yet provide a fast access method by using random access Code Division Multiple Access (CDMA). The CDMA system issues are addressed such as connecting suppliers and users, both of whom may be located anywhere in the CONUS, when the user terminals are constrained in size and weight; and providing efficient traffic routing under highly variable traffic requirements. It is assumed that bandwidth efficiency is not of paramount importance. CDMA or Spread Spectrum Multiple Access (SSMA) communication is a method in which a group of carriers operate at the same nominal center frequency but are separable from each other by the low cross correlation of the spreading codes used. Interference and multipath rejection capability, ease of selective addressing and message screening, low density power spectra for signal hiding and security, and high resolution ranging are among the benefits of spread spectrum communications.

Motamedi, Masoud↗