Search NASA⌕ Search

SEARCH · Search NASA

Results for “System Development”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

APPLICATION OF OBJECTIVES-DRIVEN ASSURANCE CASES TO SYSTEM DEVELOPMENT IN AN EVOLVING ACQUISITION MODEL

System properties such as “safety” and “dependability” cannot, in practice, be proven, and must be argued in an “assurance case” aimed at supporting risk-acceptance decisions that have to be made by system acquirers and/or regulatory authorities. The paper is concerned with applications of the “assurance case” idea early in design and development of new systems, when (apart from dedicated testing) the only available operating experience information derives from previous (non-identical) systems. Much of the discussion is based on an evolving acquisition model at the US National Aeronautics and Space Administration; previously, most major systems were developed in-house, but some major systems will now be developed by and acquired from commercial providers. Key points discussed include the following. (1) By promoting a particular kind of focused discussion between acquirers and providers, the use of assurance cases should be particularly valuable under the new acquisition model. (2) In principle, objectives-driven (sometimes called “performance-based”) approaches to assurance of performance have significant advantages in cases where they are applicable. (3) For truly novel systems, completeness of the safety analysis is a significant issue; it is important for the assurance case to include a commitment by the provider (or applicant) to seriously pursue analysis of operating experience, so that previously unrecognized hazards can be identified and addressed. (4) Inquiries into major accidents often point to deficiencies in management oversight in all parts of the life cycle; management processes need to be addressed in the formulation and the implementation of an assurance case. Under the new acquisition model, these considerations imply a serious reconsideration of the way in which the development process is managed by both providers and acquirers.

99 GENERAL AND MISCELLANEOUS↗

Application of Objectives-Driven Assurance Cases to System Development in an Evolving Acquisition Model

System properties such as “safety” and “dependability” cannot, in practice, be proven, and must be argued in an “assurance case” aimed at supporting risk-acceptance decisions that have to be made by system acquirers and/or regulatory authorities. The paper is concerned with applications of the “assurance case” idea early in design and development of new systems, when (apart from dedicated testing) the only available operating experience information derives from previous (non-identical) systems. Much of the discussion is based on an evolving acquisition model at the US National Aeronautics and Space Administration; previously, most major systems were developed in-house, but some major systems will now be developed by and acquired from commercial providers. Key points discussed include the following. (1) By promoting a particular kind of focused discussion between acquirers and providers, the use of assurance cases should be particularly valuable under the new acquisition model. (2) In principle, objectives-driven (sometimes called “performance-based”) approaches to assurance of performance have significant advantages in cases where they are applicable. (3) For truly novel systems, completeness of the safety analysis is a significant issue; it is important for the assurance case to include a commitment by the provider (or applicant) to seriously pursue analysis of operating experience, so that previously unrecognized hazards can be identified and addressed. (4) Inquiries into major accidents often point to deficiencies in management oversight in all parts of the life cycle; management processes need to be addressed in the formulation and the implementation of an assurance case. Under the new acquisition model, these considerations imply a serious reconsideration of the way in which the development process is managed by both providers and acquirers.

99 GENERAL AND MISCELLANEOUS↗

The National Carbon Capture Center at the Power Systems Development Facility

The National Carbon Capture Center (NCCC) at the Power Systems Development Facility supports the Department of Energy (DOE) goal of promoting the United States’ energy security through reliable, clean, and affordable energy produced from coal. Work at the NCCC supports the development of new power technologies and the continued operation of conventional power plants under CO 2 emission constraints. The NCCC includes adaptable slipstreams that allow technology development of CO 2 capture concepts using coal-derived syngas and flue gas in industrial settings. Because of the ability to operate under a wide range of flow rates and process conditions, research at the NCCC can effectively evaluate technologies at various levels of maturity and accelerate their development path to commercialization. During its first contract period, from October 1, 2008, through December 30, 2014, the NCCC designed, constructed, and began operation of the Post-Combustion Carbon Capture Center (PC4). Testing of CO 2 capture technologies commenced in 2011, and through the end of the contract period, more than 25,000 hours of testing had been achieved, supporting a variety of technology developers. Technologies tested included advanced solvents, enzymes, membranes, sorbents, and associated systems. The NCCC continued operation of the existing gasification facilities, which have been in operation since 1996, to support the advancement of technologies for next-generation gasification processes and pre-combustion CO 2 capture. The gasification process operated for 13 test runs, supporting over 30,000 hours combined of both gasification and pre-combustion technology developer testing. Throughout the contract period, the NCCC incorporated numerous modifications to the facilities to accommodate technology developers and increase test capabilities. Preparations for further testing were ongoing to continue advancement of the most promising technologies for future power generation processes.

01 COAL, LIGNITE, AND PEAT↗

Development and Demonstration of a Prototype Molten Salt Sampling System

Molten salt reactors (MSRs) offer potential operability and safety advantages when compared to commercial light water reactors (LWRs). However, operating experience with MSRs is sparse in comparison to what exists for LWRs. Further, the chemical and isotopic composition of the fuel and/or coolant salt is dynamic and difficult to characterize continuously, posing potential safety, operability, and safeguards unknowns that need to be addressed. A molten salt sampling system (MSSS) is regarded as a necessary subsystem within first generation MSRs used to obtain samples of salt for chemical and isotopic analysis in support of the need to monitor and control salt composition during operation. The MSSS is being developed using the Safety-in-Design (SiD) methodology, which incorporates incremental integration of safety analysis into the design process. The MSSS conceptual design emerging from the application of the early stages of the SiD methodology consists of a sample collection system and its housing, a freeze port, and inert gas control and delivery systems. This article describes the prototypes developed to test the functions of these MSSS subsystems, presents the results of testing in both dry and molten salt environments (including reliability data collection performed in accordance with the principles of SiD and the development of a semiquantitative fault tree model), and summarizes the opportunities for future design and testing enhancements based on the results of prototype testing.

molten salt reactor↗

Demonstrating Hierarchical System Development With the Common Community Physics Package Single‐Column Model: A Case Study Over the Southern Great Plains

This study demonstrates a specific application of the hierarchical system development (HSD) approach to investigate, analyze, and attribute model issues within the Unified Forecast System (UFS), with a focus on process isolation. By evaluating a non‐precipitating, shallow cumulus case at the Atmospheric Radiation Measurement Southern Great Plains site in the UFS global forecast against the observation, the investigation identifies a warmer and deeper daytime convective planetary boundary layer (PBL) and misrepresented nocturnal PBL transition. Hypothesis testing, which employs the Common Community Physics Package (CCPP) single‐column model (SCM) and uses the same physics as the UFS global model, confirms that these issues are attributed to the model physics and initialization. Specifically, misrepresented PBL processes are linked to problematic surface condition and a lack of cloud formation, which may stem from deficiencies in PBL and cloud microphysics parameterizations and their interactions. The UFS initial condition contributes to an earlier, excessively collapsed daytime convective boundary layer and a lack of decoupling between the stable boundary layer and residual layer late in the afternoon. This work introduces an avenue for the community to engage with the application of HSD, along with the CCPP and CCPP SCM, to understand the interplay of model physics, disentangle the roles of model components, as well as facilitate model and forecast improvement.

54 ENVIRONMENTAL SCIENCES↗

Power Systems Development Facility

In support of technology development to utilize coal for efficient, affordable, and environmentally clean power generation, the Power Systems Development Facility (PSDF), located in Wilsonville, Alabama, has routinely demonstrated gasification technologies using various types of coals. The PSDF is an engineering scale demonstration of key features of advanced coal-fired power systems, including a Transport Gasifier, a hot gas particulate control device, advanced syngas cleanup systems, and high-pressure solids handling systems. This final report summarizes the results of the technology development work conducted at the PSDF through January 31, 2009. Twenty-one major gasification test campaigns were completed, for a total of more than 11,000 hours of gasification operation. This operational experience has led to significant advancements in gasification technologies.

01 COAL, LIGNITE, AND PEAT↗

Counter Trafficking System Development "Analysis Training Program"

This document will detail the training curriculum for the Counter-Trafficking System Development (CTSD) Analysis Modules and Lesson Plans are derived from the United States Military, Department of Energy doctrine and Lawrence Livermore National Laboratory (LLNL), Global Security (GS) S Program.

99 GENERAL AND MISCELLANEOUS↗

Controls system developments for the ERL facility

The BNL Energy Recovery LINAC (ERL) is a high beam current, superconducting RF electron accelerator that is being commissioned to serve as a research and development prototype for a RHIC facility upgrade for electron-ion collision (eRHIC). Key components of the machine include a laser, photocathode, and 5-cell superconducting RF cavity operating at a frequency of 703 MHz. Starting with a foundation based on existing ADO software running on Linux servers and on the VME/VxWorks platforms developed for RHIC, we are developing a controls system that incorporates a wide range of hardware I/O interfaces that are needed for machine R&D. Details of the system layout, specifications, and user interfaces are provided.

43 PARTICLE ACCELERATORS↗

Lean Miller Cycle System Development for Light-Duty Vehicles (Final Report)

This report summarizes activities conducted in support of the project “Lean Miller Cycle System Development for Light-Duty Vehicles” under Cooperative Agreement Number DE-EE0006853. In order to accomplish the government objective of achieving breakthrough thermal efficiencies while meeting U.S. EPA emission standards, this project focused on combining two enabling technologies in a gasoline engine: lean combustion and “Miller Cycle.” Lean combustion is thermodynamically more efficient than stoichiometric combustion but requires a more complex exhaust aftertreatment system compared to a traditional three-way catalyst system. The “Miller Cycle” concept increases expansion of combustion gases to extract additional work, reduces pumping losses, and increases efficiency. The objective of the project was to research, develop, and demonstrate the new Lean Miller Cycle (LMC) combustion concept to achieve a 35% improvement in fuel economy over a 2010 production baseline vehicle. The baseline vehicle chosen was a Chevrolet Impala equipped with a 3.5L V6 port-fuel injected naturally-aspirated engine, a four-speed automatic transmission with a peak-power and -torque of 157 kW and 290 N-m respectively. The enabling technologies were developed and demonstrated on a single cylinder engine and then integrated into a multicylinder engine and aftertreatment system. Along with achieving the efficiency targets, the downsized boosted LMC engine system was projected to achieve a peak-power and –torque of 172 kW at 354 Nm respectively exceeding the baseline engine performance. The multicylinder engine was optimized and calibrated over a set of steady-state operating points on an engine dynamometer. The target of the project was a 35% improvement in combined city/highway fuel economy at SULEV30 tailpipe emissions over the baseline vehicle. The project achieved a projected 42.4% from the vehicle drive cycle analysis assuming no penalty for management of the lean-aftertreatment system. This penalty was projected to fall within the fuel economy margin achieved and include control and calibration compromises for catalyst heating, NH3 formation for lean-NOx SCR and drive quality. A final vehicle demonstration was planned where emissions, drivability and performance were to be confirmed. Four decision gates were set up annually with deliverables to assess progress and determine whether status to deliverables warranted project continuation through the final vehicle demonstration. The project was closed in June 2019 at the end of budget period three after not passing the third decision gate due to projected system costs prohibiting economic feasibility in the light-duty vehicle industry landscape. However, the project’s efficiency targets were achieved by validation through steady-state dynamometer testing of the multicylinder engine.

33 ADVANCED PROPULSION SYSTEMS↗

Power Systems Development Facility Gasification Test Campaign TC22

In support of technology development to utilize coal for efficient, affordable, and environmentally clean power generation, the Power Systems Development Facility (PSDF), located in Wilsonville, Alabama, routinely demonstrates gasification technologies using various types of coals. The PSDF is an engineering scale demonstration of key features of advanced coal-fired power systems, including a KBR Transport Gasifier, a hot gas particulate control device, advanced syngas cleanup systems, and high-pressure solids handling systems. This report summarizes the results of TC22, the first test campaign using a high moisture lignite from Mississippi as the feedstock in the modified Transport Gasifier configuration. TC22 was conducted from March 24 to April 17, 2007. The gasification process was operated for 543 hours, increasing the total gasification operation at the PSDF to over 10,000 hours. The PSDF gasification process was operated in air-blown mode with a total of about 1,080 tons of coal. Coal feeder operation was challenging due to the high as-received moisture content of the lignite, but adjustments to the feeder operating parameters reduced the frequency of coal feeder trips. Gasifier operation was stable, and carbon conversions as high as 98.9 percent were demonstrated. Operation of the PCD and other support equipment such as the recycle gas compressor and ash removal systems operated reliably.

01 COAL, LIGNITE, AND PEAT↗

Power Systems Development Facility Gasification Test Campaign TC24

In support of technology development to utilize coal for efficient, affordable, and environmentally clean power generation, the Power Systems Development Facility (PSDF), located in Wilsonville, Alabama, routinely demonstrates gasification technologies using various types of coals. The PSDF is an engineering scale demonstration of key features of advanced coal-fired power systems, including a KBR Transport Gasifier, a hot gas particulate control device, advanced syngas cleanup systems, and high-pressure solids handling systems. This report summarizes the results of TC24, the first test campaign using a bituminous coal as the feedstock in the modified Transport Gasifier configuration. TC24 was conducted from February 16, 2008, through March 19, 2008. The PSDF gasification process operated for about 230 hours in air-blown gasification mode with about 225 tons of Utah bituminous coal feed. Operational challenges in gasifier operation were related to particle agglomeration, a large percentage of oversize coal particles, low overall gasifier solids collection efficiency, and refractory degradation in the gasifier solids collection unit. The carbon conversion and syngas heating values varied widely, with low values obtained during periods of low gasifier operating temperature. Despite the operating difficulties, several periods of steady state operation were achieved, which provided useful data for future testing. TC24 operation afforded the opportunity for testing of various types of technologies, including dry coal feeding with a developmental feeder, the Pressure Decoupled Advanced Coal (PDAC) feeder; evaluating a new hot gas filter element media configuration; and enhancing syngas cleanup with water-gas shift catalysts. During TC24, the PSDF site was also made available for testing of the National Energy Technology Laboratory's fuel cell module and Media Process Technology's hydrogen selective membrane.

01 COAL, LIGNITE, AND PEAT↗

Power Systems Development Facility Gasification Test Campaign TC25

In support of technology development to utilize coal for efficient, affordable, and environmentally clean power generation, the Power Systems Development Facility (PSDF), located in Wilsonville, Alabama, routinely demonstrates gasification technologies using various types of coals. The PSDF is an engineering scale demonstration of key features of advanced coal-fired power systems, including a KBR Transport Gasifier, a hot gas particulate control device, advanced syngas cleanup systems, and high-pressure solids handling systems. This report summarizes the results of TC25, the second test campaign using a high moisture lignite coal from the Red Hills mine in Mississippi as the feedstock in the modified Transport Gasifier configuration. TC25 was conducted from July 4, 2008, through August 12, 2008. During TC25, the PSDF gasification process operated for 742 hours in air-blown gasification mode. Operation with the Mississippi lignite was significantly improved in TC25 compared to the previous test (TC22) with this fuel due to the addition of a fluid bed coal dryer. The new dryer was installed to dry coals with very high moisture contents for reliable coal feeding. The TC25 test campaign demonstrated steady operation with high carbon conversion and optimized performance of the coal handling and gasifier systems. Operation during TC25 provided the opportunity for further testing of instrumentation enhancements, hot gas filter materials, and advanced syngas cleanup technologies. The PSDF site was also made available for testing of the National Energy Technology Laboratory's fuel cell module and Media Process Technology's hydrogen selective membrane with syngas from the Transport Gasifier.

01 COAL, LIGNITE, AND PEAT↗

Low-Cost Hydrogen Distributed Production System Development

H{sub 2}Gen, with the support of the Department of Energy, successfully designed, built and field-tested two steam methane reformers with 578 kg/day capacity, which has now become a standard commercial product serving customers in the specialty metals and PV manufacturing businesses. We demonstrated that this reformer/PSA system, when combined with compression, storage and dispensing (CSD) equipment could produce hydrogen that is already cost-competitive with gasoline per mile driven in a conventional (non-hybrid) vehicle. We further showed that mass producing this 578 kg/day system in quantities of just 100 units would reduce hydrogen cost per mile approximately 13% below the cost of untaxed gasoline per mile used in a hybrid electric vehicle. If mass produced in quantities of 500 units, hydrogen cost per mile in a FCEV would be 20% below the cost of untaxed gasoline in an HEV in the 2015-2020 time period using EIA fuel cost projections for natural gas and untaxed gasoline, and 45% below the cost of untaxed gasoline in a conventional car. This 20% to 45% reduction in fuel cost per mile would accrue even though hydrogen from this 578 kg/day system would cost approximately $4.14/kg, well above the DOE hydrogen cost targets of $2.50/kg by 2010 and $2.00/kg by 2015. We also estimated the cost of a larger, 1,500 kg/day SMR/PSA fueling system based on engineering cost scaling factors derived from the two H{sub 2}Gen products, a commercial 115 kg/day system and the 578 kg/day system developed under this DOE contract. This proposed system could support 200 to 250 cars per day, similar to a medium gasoline station. We estimate that the cost per mile from this larger 1,500 kg/day hydrogen fueling system would be 26% to 40% below the cost per mile of untaxed gasoline in an HEV and ICV respectively, even without any mass production cost reductions. In quantities of 500 units, we are projecting per mile cost reductions between 45% (vs. HEVs) and 62% (vs ICVs), with hydrogen costing approximately $2.87/kg, still above the DOE's 2010 $2.50/kg target. We also began laboratory testing of reforming ethanol, which we showed is currently the least expensive approach to making renewable hydrogen. Extended testing of neat ethanol in micro-reactors was successful, and we also were able to reform E-85 acquired from a local fueling station for 2,700 hours, although some modifications were required to handle the 15% gasoline present in E-85. We began initial tests of a catalyst-coated wall reformer tube that showed some promise in reducing the propensity to coke with E-85. These coated-wall tests ran for 350 hours. Additional resources would be required to commercialize an ethanol reformer operating on E-85, but there is no market for such a product at this time, so this ethanol reformer project was moth-balled pending future government or industry support. The two main objectives of this project were: (1) to design, build and test a steam methane reformer and pressure swing adsorption system that, if scaled up and mass produced, could potentially meet the DOE 2015 cost and efficiency targets for on-site distributed hydrogen generation, and (2) to demonstrate the efficacy of a low-cost renewable hydrogen generation system based on reforming ethanol to hydrogen at the fueling station.

08 HYDROGEN↗

Masters Thesis- Criticality Alarm System Design Guide with Accompanying Alarm System Development for the Radioisotope Production Laboratory in Richland, Washington

A detailed instructional manual was created to guide criticality safety engineers through the process of designing a criticality alarm system (CAS) for Department of Energy (DOE) hazard class 1 and 2 facilities. Regulatory and technical requirements were both addressed. A list of design tasks and technical subtasks are thoroughly analyzed to provide concise direction for how to complete the analysis. An example of the application of the design methodology, the Criticality Alarm System developed for the Radioisotope Production Laboratory (RPL) of Richland, Washington is also included. The analysis for RPL utilizes the Monte Carlo code MCNP5 for establishing detector coverage in the facility. Significant improvements to the existing CAS were made that increase the reliability, transparency, and coverage of the system.

42 ENGINEERING↗

Creating an EPICS Based Test Stand Development System for a BPM Digitizer of the Linac Coherent Light Source

The Linac Coherent Light Source (LCLS) is required to deliver a high quality electron beam for producing coherent X-rays. As a result, high resolution beam position monitoring is required. The Beam Position Monitor (BPM) digitizer acquires analog signals from the beam line and digitizes them to obtain beam position data. Although Matlab is currently being used to test the BPM digitizer?s functions and capability, the Controls Department at SLAC prefers to use Experimental Physics and Industrial Control Systems (EPICS). This paper discusses the transition of providing similar as well as enhanced functionalities, than those offered by Matlab, to test the digitizer. Altogether, the improved test stand development system can perform mathematical and statistical calculations with the waveform signals acquired from the digitizer and compute the fast Fourier transform (FFT) of the signals. Finally, logging of meaningful data into files has been added.

43 PARTICLE ACCELERATORS↗

Ongoing Space Nuclear Systems Development in the United States

Reliable, long-life power systems are required for ambitious space exploration missions. Nuclear power and propulsion options can enable a bold, new set of missions and introduce propulsion capabilities to achieve access to science destinations that are not possible with more conventional systems. Space nuclear power options can be divided into three main categories: radioisotope power for heating or low power applications; fission power systems for non-terrestrial surface application or for spacecraft power; and fission power systems for electric propulsion or direct thermal propulsion. Each of these areas has been investigated in the United States since the 1950s, achieving various stages of development. While some nuclear systems have achieved flight deployment, others continue to be researched today. This paper will provide a brief overview of historical space nuclear programs in the U.S. and will provide a summary of the ongoing space nuclear systems research, development, and deployment in the United States.

07 ISOTOPE AND RADIATION SOURCES↗

Resonant Kicker System Development at SLAC

The design and installation of the Linear Coherent Light Source [1] at SLAC National Accelerator Laboratory has included the development of a kicker system for selective beam bunch dumping. The kicker is based on an LC resonant topology formed by the 50 uF energy storage capacitor and the 64 uH air core magnet load which has a sinusoidal pulse period of 400us. The maximum magnet current is 500 A. The circuit is weakly damped, allowing most of the magnet energy to be recovered in the energy storage capacitor. The kicker runs at a repetition rate of 120Hz. A PLC-based control system provides remote control and monitoring of the kicker via EPICS protocol. Fast timing and interlock signals are converted by discrete peak-detect and sample-hold circuits into DC signals that can be processed by the PLC. The design and experimental characterization of the system are presented.

43 PARTICLE ACCELERATORS↗