Search NASA⌕ Search

SEARCH · Search NASA

Results for “TESTING FACILITY”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

A Proposed Beam-Beam Test Facility COMBINE

The COmpact Machine for Beam-beam Interactions in Non-Equilibrium systems (COMBINE) is a proposed, dedicated, beam-beam test facility. This is currently a joint effort between Jefferson Lab and Old Dominion University to create a small, low energy pair of collider rings that would be used to study beam-beam interactions, as well as act as a teaching tool for students. The base design would make use of a pair of identical rings (2.5 meters per side) one rotated 180 degrees from the other, meeting at their common interaction point. These would be fed by an electron gun producing up to 125 keV electrons. The low energy will allow for beam-beam tune shifts commensurate with existing colliders, and will also allow for an exploration of the predicted effects of gear-changing, which would be performed using a variable pathlength scheme. Finally, this machine can also test linac-ring type systems.

Nissen, Edith↗

High Temperature Test Facility At Scale Testing, Validation, and Demonstration

Theses slides will be used to brief the Tribal DOE and Council Chairman for the project listed below. The High Temperature Test Facility (HTTF) is a demonstration-scale high temperature electrolysis (HTE) system that provides the ability to produce, process, store, and dispense electrolytically produced hydrogen. The system will be designed to accommodate electrolysis systems from various industry partners. The HTTF will be supplied up to 10 MW of power for electrolysis at 5 separate test article locations, each up to 2MW. The system will include post-processing and compression, storage, and capabilities to provide hydrogen for consumption by future end users. The HTTF will also provide the ability to test and demonstrate an HTE system in a configuration that would simulate the use of a nuclear generated steam supply for the high temperature heat source. The HTTF will be located at the Central Facilities Area (CFA) adjacent to CFA-686 on the INL site, 45 miles west of Idaho Falls.

08 HYDROGEN↗

Cryogenic System for the Cryomodule Test Facility at Fermilab

This paper provides an overview of the current progress and near-future plans for the cryogenic system at the new Cryomodule Test Facility (CMTF) at Fermilab, which includes the helium compressors, refrigerators, warm vacuum compressors, gas and liquid storage, and a distribution system. CMTF will house the Project X Injector Experiment (PXIE), which is the front end of the proposed Project X. PXIE includes one 162.5 MHz half wave resonator (HWR) cryomodule and one 325 MHz single spoke resonator (SSR) cryomodule. Both cryomodules contain superconducting radio-frequency (SRF) cavities and superconducting magnets operated at 2.0 K. CMTF will also support the Advanced Superconducting Test Accelerator (ASTA), which is located in the adjacent New Muon Lab (NML) building. A cryomodule test stand (CMTS1) located at CMTF will be used to test 1.3 GHz cryomodules before they are installed in the ASTA cryomodule string. A liquid helium pump and transfer line will be used to provide supplemental liquid helium to ASTA.

White, Michael↗

Status of the ELISE test facility

The test facility ELISE, equipped with a large radio frequency (RF) driven ion source (1×0.9 m2) of half the size of the ion source for the ITER neutral beam injection (NBI) system, is operational since beginning of 2013. The first experimental campaign was dedicated to a thorough qualification of the test facility and its diagnostic tools at low RF power (80 kW in total, i.e. 20 kW per driver) in volume operation, i.e. operation without cesium, where the negative hydrogen ion production is done in the plasma volume only. This paper reports on the main results of the second and third experimental campaigns, where Cs was inserted in the ion source for an enhancement of the negative ion production by the surface process. The second experimental campaign was done still with low RF power, both for hydrogen and deuterium, with pulse lengths of up to 500 s. The results of this campaign are rather encouraging, especially in hydrogen, where large current densities with respect to the low RF power could be achieved at a ratio of co-extracted electrons to extracted ions of 0.5-0.6 at the relevant source pressure of 0.3 Pa. Similar large extracted ion currents could be achieved also in deuterium, but with larger amounts of co-extracted electrons. The required ratio of co-extracted electrons to extracted ions of one could be achieved only in short pulses. The third experimental campaign aimed then for approaching the required ITER NBI parameters with respect to the ion and electron extracted currents, both for hydrogen and deuterium, by increasing the RF power with short pulses, i.e. beam-on times of up to 10 s and RF-on time up to 20 s. Current densities near the ITER NBI requirements could be achieved in hydrogen at a ratio of co-extracted electrons to extracted ions of 0.5-0.6 at the relevant source pressure of 0.3 Pa. As it was the case for the low RF operation, the required filter field was significantly lower than expected from the experience with the small prototype RF source. Similar large extracted ion currents could be achieved also in deuterium, but with larger amounts of co-extracted electrons; the main problem in deuterium operation are the non-stable currents of the co-extracted electrons, most probably caused by the high dynamic of the Cs redistribution in the system. The reasons for this larger instability are still under investigation.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Report on Year-4 of Water NSTF Matrix Testing: Facility Maintenance and Accident Testing

Under support from the Department of Energy (DOE) and the Office of Advanced Reactor Technologies (ART), a large-scale test facility has been constructed at Argonne National Laboratory to generate NQA-1 qualified validation data for passive decay heat removal systems in advanced reactors. The Natural convection Shutdown heat removal Test Facility (NSTF) reflects key features of a ½ scale, water-based, Reactor Cavity Cooling System (RCCS) and is intended to study the behavior, bound performance, and ultimately guide design decisions for passive decay heat removal systems for advanced reactors. In addition to the experimental activities detailed in this report, a supportive computational modeling effort is on-going which has been demonstrated to significantly strengthen the experimental program while also improving accuracy of the computer models. Together these create a mutually beneficial relationship integral to meeting the overall program objective of examining the heat removal performance of the RCCS concept. This report serves as a summary of maintenance and experimental activities during the program’s fourth year of water-based operation. A planned six-month maintenance period began in August 2021, during which major inspections, repairs, cleaning, and installation of new instrumentation and data acquisition hardware were conducted. Most significantly, two heaters that faulted during Year-3 were repaired, allowing the facility to resume use of the full heated section area and full range of available electric power. The remainder of the year consisted of eight months of test operations, during which the facility logged 211 hours of active heating across one bake-out (following the maintenance period) and seven matrix tests; five classifieds as Accepted per NQA-1, one as Trending, and one as Failed. Testing began by performing two repeat cases to confirm expected facility response and behavior during both single- and two-phase flow conditions, ensuring no changes were introduced during the maintenance period that might have altered the thermal-hydraulic characteristics of the facility. In continuation of the power parametric series initiated in previous years, a high-power test case was then performed examining heat removal performance at a decay heat load equivalent to 2.4 MWt, full-scale, a level exceeding maximum design targets. Additional testing then introduced various blockage scenarios along the network piping, examining the effects of partial and complete blockages of the flow paths on the system behavior and heat removal performance. A study of static boiling tests directed at understanding the geysering two-phase instability was also conducted. The loop was filled only to the bottom of the tank outlet, creating an open loop configuration that prevents any natural circulation flow from occurring, and the heaters were powered on until the facility reached saturation conditions. Following, a series of quasi-steady-state conditions were introduced by adjusting the inventory level in the adiabatic chimney piping at decreasingly lower elevations above the heated region. A strong correlation of geysering characteristics and loop level was observed, with flow and temperature excursions decreasing in intensity, but increasing in frequency, as the fill were reduced to lower elevations along the chimney piping. Once the level fell very low in the chimney, at points near the top of the heated section, the system reached a stable state of continuous boiling without any occurrence of geysering eruptions. A final significant testing accomplishment this year was successful completion of an “accident scenario” test, whose operating conditions were based on a prototypic decay heat curve provided by Framatome and scaled for the NSTF. This test began by establishing steady-state, single-phase “normal operation” conditions, before simulating an accident trip where the availability of active cooling systems was lost. Loop temperatures gradually increased until reaching saturation and subsequent two-phase boiling flow. Over the course of an extended operational period along the defined decay heat curve, steam boil-off caused gradual but continued depletion of liquid inventory until reaching a critically low level causing flow stagnation and cessation of natural circulation heat removal. At this point, after nearly 72 hours of continuous operation, a cold refill was performed to replenish the system inventory and allow the facility to re-establish closed loop natural circulation flow and return to a safe operational state.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

The status of the SNS external antenna ion source and spare RFQ test facility

The Oak Ridge National Laboratory operates the Spallation Neutron Source, consisting of a H{sup −} ion source, a 1 GeV linac and an accumulator ring. The accumulated <1 μs-long, ∼35 A beam pulses are extracted from the ring at 60 Hz and directed onto a liquid Hg target. Spalled neutrons are directed to ∼20 world class instruments. Currently, the facility operates routinely with ∼1.2 MW of average beam power, which soon will be raised to 1.4 MW. A future upgrade with a second target station calls for raising the power to 2.8 MW. This paper describes the status of two accelerator components expected to play important roles in achieving these goals: a recently acquired RFQ accelerator and the external antenna ion source. Currently, the RFQ is being conditioned in a newly constructed 2.5 MeV Integrated Test Facility (ITF) and the external antenna source is also being tested on a separate test stand. This paper presents the results of experiments and the testing of these systems.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Design of Modular Test Facility for Particle/sCO2 Heat Exchanger Evaluation

Heliogen has designed a 1.3 MW particle and supercritical carbon dioxide (sCO2) test loop to retire technical and manufacturing risks. The data from this facility will be used to validate near commercial-scale particle heat exchanger modules. The heat exchanger is scaled to capture all features of the full-scale modules. Testing will be conducted with CARBOBEAD HSP 16/30, a larger particle size than other recent testing. The system was designed to ASME codes with the constraint that sCO2 piping and other major components are stainless steels.

14 SOLAR ENERGY↗

Metallography and fuel cladding chemical interaction in fast flux test facility irradiated metallic U-10Zr MFF-3 and MFF-5 fuel pins

Abstract The Mechanistic Fuel Failure (MFF) series of metal fuel irradiations conducted in the Fast Flux Test Facility (FFTF) provides an important potential comparison between data generated in the Experimental Breeder Reactor (EBR-II) and that expected in a larger-scale fast reactor. The irradiations were the beginning tests to qualify U-10wt%Zr as a driver fuel for FFTF. The FFTF core, with a 91.4 cm tall fuel column and a chopped cosine neutron flux profile, operated with a peak cladding temperature at the top of the fuel column, but developed peak burnup at the centerline of the core. This places the peak fuel temperature midway between the core center and the top of fuel, lower in the fuel column than in previous EBR-II experiments that had a 32-cm height core. The MFF-3 and MFF-5 qualification assemblies operated in FFTF to >10 at% burnup, and performed very well with no cladding breaches. The MFF-3 assembly operated to 13.8 at% burnup with a peak inner cladding temperature of 643°C, and the MFF-5 assembly operated to 10.1 at% burnup with a peak inner cladding temperature of 651°C. Because of the very high operating temperatures for both the fuel and the cladding, data from the MFF assemblies are most comparable to the data obtained from the EBR-II X447 experiment, which experienced two pin breaches. The X447 breaches were strongly influenced by a large amount of fuel/cladding chemical interaction (FCCI). The MFF pins benefitted from different axial locations of high burnup and peak cladding temperature, which helped to reduce interdiffusion between rare earth fission products and stainless steel cladding. Post-irradiation examination evidence illustrates this advantage. Comparing other performance data of the long MFF pins to prior EBR-II test data, the MFF fuel inside the cladding grew less axially, and the gas release data did not reveal a definitive difference.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Computation of the Strain Induced Critical Current Reduction in the 16 T Nb 3 Sn Test Facility Dipole

A test facility dipole is being developed at LBNL, targeting a 16 T field in a 144 mm wide aperture. The magnet uses a block design, with two double-pancake coils. In order to minimize motion under the large Lorentz forces, the coils are preloaded against a thick aluminum shell and iron yoke using bladder and key technology. It is then crucial to verify that the performance of the magnet is not degraded due to strain induced on the Nb 3 Sn conductor during assembly, cool-down and powering. The critical current of extracted strands was measured in a varying background magnetic field and as a function of the applied longitudinal strain. Finite element analysis was used to extract the strain state inside the superconducting strands during magnet assembly and operation. This strain was then compared to the measurements to evaluate potential reversible and irreversible effects on the magnet performances. Here the results suggest that the magnet can reach 16 T with sufficient margin, with no irreversible degradation in the high field region.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

Cryogenic Infrastructure Upgrade of the Fermilab Magnet and Vertical Cavity Test Facilities

The Fermilab Magnet Test Facility (MTF) and the Vertical Cavity Test Facility (VCTF), both located in Industrial Building 1 and serviced by a shared cryogenic infrastructure, provide cryogenic testing of superconducting magnets and superconducting radio‐frequency cavities in support of programs such as the Tevatron, US‐LHC, LARP, HINS, Project X, and the ILC. While MTF must continue to support a robust magnet test program, VCTF is expected to increase its cavity test throughput by a factor of five, reaching 250 cavity test cycles per year as cavity production ramps up. A cryogenic infrastructure upgrade program has been undertaken in preparation for meeting the challenge of this additional cavity test throughput. The cryogenic infrastructure improvements include dedicated ambient temperature vacuum pumps, a helium compressor, purification skids, and additional helium gas storage. This paper will elaborate on the goals of the upgrade program, the selected equipment, and foreseen integration and operations plans and issues.

Rabehl, R.↗

Final Report for the Contractor Readiness Assessment of the Transient Reactor Test Facility Resumption of Transient Testing Activity at the Idaho National Laboratory

The purpose of this review was to verify readiness for the TREAT restart of transient testing activity at the INL and inform the startup authorization authority decision-making for startup authorization by providing a deliberate and managed determination of the state of readiness preparation and determination of whether operations can be performed safely. Verification of readiness included assuring that equipment operability, procedure viability, and personnel knowledge, skills, and performance are adequate for operations. Because the TREAT (including restart of transient testing activity) is a hazard category-2 nuclear facility and because reactor operation and transient testing activities were suspended for programmatic and funding reasons in excess of a year, DOE O 425.1D required that both a contractor and DOE RA be satisfactorily completed prior to startup of the TREAT and restart of transient testing activity. To this end, DOE directed that a CRA and federal RA be conducted. The CRA IP defined the depth of the CRA through the objectives and CRADs, delineated in Appendix A of the IP; established roles and responsibilities for CRA team activities; and established processes, practices, and protocols for preparation, conduct, documentation, and reporting of the CRA. The approaches and methodologies identified in the IP were used to verify that the BEA management team has established SSCs, developed personnel capabilities and competencies, and implemented safety features, programs, and procedures in a manner that provides reasonable assurance for adequate protection of workers, the public, and the environment in preparation for and execution of the TREAT restart of transient testing activity. This CRA was intended to confirm that (1) the facility is in a state of readiness to safely conduct operations in accordance with the safety basis; and (2) the management control programs are in place to ensure safe operations can be sustained. This equated to mature implementation of the integrated safety management (ISM) in conjunction with implementation of the individual facility authorization basis. This CRA was structured to verify the readiness to conduct restart of transient testing activity safely, and that facility programs were in place to support the restart of transient testing activity.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗