Capacity Expansion for Utility Scale Single Axis Tracked PV Systems with Sub-Optimal Performance
Explore the source record for details and available documents.
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
The Transportation-Security, Tracking, and Reporting System (T-STAR) was developed by the National Nuclear Security Administration, NA-21, Office of Radiological Security (ORS) to provide a transportation security system for detection and tracking during transport of Category 1 and Category 2 radiological material. Few off-the-shelf systems for conveyance tracking offer detection of a cargo compartment breach or a removal of the cargo. Systems that do offer this capability often require permanent installation through modifying of the conveyance itself. This is not sustainable in many countries where ORS is building use, storage, and transport security capacity. The development of T-STAR has moved from fielding robust prototypes deployed in countries ranging from North America, Latin America and Central Asia to a commercially produced product that can now be deployed to provide enhanced security during transit. Each prototype deployment resulted in important lessons learned, which informed the requirements for the final commercial product. T-STAR uses both cellular and Iridium satellite modems to provide redundant communications to provide the configuration, status, and alerts to a server monitoring the shipment, which is accessible using a multilanguage browser-based user interface. A wireless security system employing using Z-wave sensors for intrusion detection located in the conveyance provide low cost but effective solution for a wide range of conveyance types. Additional capabilities include the ability to monitor a vehicles’ CANBUS (Controller Area Network) system, an ethernet port for high throughput sensor information such as video cameras, and the ability to power and use advanced external sensor payloads. These features make the T-STAR a capable and expandable security gateway that can be deployed on a variety of conveyances from box trucks to open trailers. The ability to provide tracking, monitoring, and detection provide a key component in overall best practices designed to protect shipments of radioactive material.
The purpose of this protocol is to define procedures and practices to be used by the PACT center for field testing of metal halide perovskite (MHP) photovoltaic (PV) modules. The protocol defines the physical, electrical, and analytical configuration of the tests and applies equally to mounting systems at a fixed orientation or sun tracking systems. While standards exist for outdoor testing of conventional PV modules, these do not anticipate the unique electrical behavior of perovskite cells. Further, the existing standards are oriented toward mature, relatively stable products with lifetimes that can be measured on the scale of years to decades. The state of the art for MHP modules is still immature with considerable sample to sample variation among nominally identical modules. Version 0.0 of this protocol does not define a minimum test duration, although the intent is for modules to be fielded for periods ranging for weeks to months. This protocol draws from relevant parts of existing standards, and where necessary includes modifications specific to the behavior of perovskites.
The project goal is to develop a floating solar photovoltaics (FPV) tracking & position system that: (1) increases annual energy production of FPV projects by >10%, (2) lowers levelized cost of energy (LCOE) for FPV by >10%, and (3) leverages U.S. contract supply chain & manufacturing. The outcome of the project will be a certified tracking product that has undergone extensive field testing and is ready for commercial sales. The primary objectives for each budget period are: • BP1: Define product requirements, develop initial controls architecture and design other sub-components, complete small-scale pilot testing, install a larger-scale pilot, secure sites for commercial pilots, and develop the beta-version of a user portal. • BP2: complete control system and sub-component design, successful demonstration and testing at a commercial pilot, certification & bankability, finalize user portal, and complete various commercialization activities related to supply chain, customer acquisition, and sales. PNNL will provide support during both project phases for prototype development and testing of the controls architecture, software, and hardware components of the tracking and positioning system. PNNL will provide support during both project phases for prototype development and testing of the controls architecture, software, and hardware components of the tracking and positioning system. This effort represents PNNL’s first opportunity to support the floating solar photovoltaics (FPV) industry with capabilities, facilities, and personnel developed to contribute to the marine energy (e.g., wave and tidal energy) sector. This portfolio expansion leverages internal and DOE EERE investments and the growing visibility of PNNL-Sequim’s Marine and Coastal Research Laboratory (MCRL) and our marine research capabilities, in general. The development of effective and low-cost FPV platforms is a potential way to increase the nation’s set of tools for providing emission-free electricity without utilizing valuable terrestrial resources. Successful commercialization of such a project may lead to economic benefits through job creation, supply chain creation, and access to a cheaper source of electricity.
This study presents wind and solar power generation estimates derived from the US Department of Energy’s Simple Cloud-Resolving E3SM Atmosphere Model (SCREAM) Regionally Refined Models (RRM) over California at 3.25 km and 800 m horizontal resolutions, using the Python wrapper for the System Advisor Model (PySAM). The resulting wind and solar generation estimates are compared to monthly capacity factors reported to the Energy Information Administration (EIA), High-Resolution Rapid Refresh (HRRR, 3 km resolution) forecast model, and E3SM North American regionally refined model (NARRM, 25 km resolution). We systematically assess the impacts of generation modeling assumptions, meteorological models, and horizontal resolution. Results show that resolution plays a dominant role for wind energy: increasing from 25 to 3.25 km brings qualitative and quantitative improvements, most notably by resolving the phase error in the seasonal cycle found in coarser simulations. However, further refinement to 800 m offers minimal gains. SCREAM performs better than HRRR for solar power generation in single- and dual-axis tracking systems, likely due to more accurate surface radiation. The sensitivity of PySAM to system configuration, particularly for axis-tracking modeling in photovoltaics, is also highlighted. Overall, SCREAM-RRM shows strong potential for high-resolution energy assessments, with future progress depending on more in situ observations and clearer quantification of uncertainties in generation modeling.
The Intermediate Silicon Tracker (INTT), a two-layer barrel silicon strip tracker, is a key component of the tracking system for sPHENIX at the Relativistic Heavy Ion Collider (RHIC) at Brookhaven National Laboratory. The INTT is designed to enable the association of reconstructed tracks with individual RHIC bunch crossings. To evaluate the performance of preproduction INTT ladders and the readout chain, a beam test was conducted at the Research Center for Accelerator and Radioisotope Science, Tohoku University, Japan. This paper presents the performance of the INTT evaluated through studies of the signal-to-noise ratio, residual distribution, spatial resolution, hit-detection efficiency, and multiple track reconstruction.
Stanford University (Subcontractor) shall provide the services of qualified multiscale modelers to perform tasks that contribute to reaching the objectives of the LDRD project entitled Automated and Accelerated Continuum Model Development for Electrochemical Systems (Tracking number 24-ERD-051). These tasks relate to the development, deployment, and validation of multiscale models relevant to flow and transport in electrochemical systems.
The Spallation Neutron Source (SNS) at Oak Ridge National Laboratory accelerates proton beams, which are directed toward a mercury target to generate the world’s most intense neutron beams via spallation. The target system consists of several interconnected subsystems and accounts for a major share of the facility’s overall downtime. Early detection of anomalies in the target system response can thus provide the possibility of taking corrective actions to reduce downtime. Accelerator facilities have largely focused on the beam side for data-driven fault prognostics. On the target side, SNS relies on operational shift technicians (OSTs), who respond to alarms and manually flag anomalies onto the System Tracking and Reliability (STAR) platform. This paper presents one of the first studies of using machine learning (ML) to automate anomaly detection in the target system. The study focused on the mercury process system as the first use case and employed reconstruction-based anomaly detection on minutely sampled time series signals. The pipeline was integrated into the STAR platform to autonomously rank and flag anomalies every week. The STAR platform provides a user interface for the OSTs to evaluate the flagged anomalies, thereby incorporating human feedback.
One of the future plans at Jefferson Lab is running electron scattering experiments with large acceptance detectors at luminosities > 10^37 cm^−2 s^−1. These experiments allow the measurements of the Double Deeply Virtual Compton Scattering (DDVCS) reaction, an important physics process in the formalism of Generalized Parton Distributions, which has never been measured because of its small cross-section. The luminosity upgrade of CLAS12 or the SOLID detector makes Jefferson Lab a unique place to measure DDVCS. One of the important components of these high luminosity detectors is a tracking system that can withstand high rates of ≈ 1MHz/cm2. The recently developed Micro-Resistive Well (𝜇RWELL) detector technology is a promising option for such a tracking detector by combining good position resolutions, low material budget with simple mechanical construction, and low production costs. In this proceeding, we will discuss recent developments and studies with 𝜇RWELL detectors at Jefferson Lab for future upgrades of the CLAS12 detector to study the DDVCS reaction.
The inner structure of the nucleon (proton and neutron) remains a topic of great interest in nuclear and particle physics, after many decades of study. For example, understanding the quark-gluon dynamics inside the nucleon would shed light on how 99% of the nucleon mass is created. The neutron electromagnetic form factors, Gn E and Gn M , give important insights into the neutron structure. The Super BigBite Spectrometer (SBS) program at Jefferson Lab (JLab) seeks to extend the form factor measurements for both the proton and the neutron. The neutron electric form actor, Gn E , has been historically difficult to measure due to the short lifetime of the free neutron and the small value of Gn E . The GEn-II experiment is part of the SBS program and seeks to measure Gn E , significantly increasing the high momentum transfer coverage. A newly designed polarized 3He target increased the figure of merit by three times compared to previous measurements. The analysis of this data is especially challenging due to the unprecedented high-rate environment caused by the open nature of the spectrometer with a direct line of sight to the target. This required developing new Gas Electron Multiplier (GEM) particle trackers which can cover large areas demanded by this setup and handle particle rates up to 500 kHz/cm2. Rates this high over a large area is unprecedented in particle tracking systems and came with a number of challenges. Data taken in the SBS program was critical to understanding hardware and software solutions that improved the track reconstruction efficiency to be >97% with a position resolution of 70 ?m. In previous experiments the proton electromagnetic form factors, Gp E and Gp M were measured up to Q2 = 8.5 GeV2 and Q2 = 30 GeV2, respectively, while Gn E has only been measured up to Q2 = 3.4 GeV2. The GEn-II experiment has measured the neutron form factor ratio, Gn E/Gn M, at Q2 values of 2.90, 6.50, and 9.47 GeV2 by scattering a polarized electron beam with a polarized 3He target, used here as an effective polarized neutron target, and measuring the double spin asymmetry of the cross section. Previous Gn E measurements do not extend above Q2 = 3.4 GeV2, and therefore this analysis has extended the world data by almost three times. The background correction is especially difficult at the higher Q2 settings leading to large systematic errors. As very exploratory results from this early analysis of the data, we find for Q2 = 2.90 GeV2, Gn E = 0.0157 ±stat 0.0016 ±sys 0.0011, for Q2 = 6.50 GeV2, Gn E = 0.0067 ±stat 0.0019 ±sys 0.0005, and for Q2 = 9.46 GeV2, Gn E = 0.0046 ±stat 0.0023 ±sys 0.0005. These results are compared to predictions from the Dyson-Schwinger Equations (DSE) model and a Relativistic Constituent Quark Model (RCQM).
In order to guarantee that a system meets adequate levels of reliability and availability, system performances are continuously monitored and analyzed thanks to the technological advancements driving the Industry 4.0 revolution. An Industry 4.0 approach is typically based on advanced statistical, big data mining, machine learning, and internet-of-things methods designed to detect anomalies in the behavior of system, detect the most likely failure modes, and provide indications to system engineers on when maintenance activities should be performed before system performance are deemed unacceptable (which can be generated by diagnostic and prognostic methods). However, these analyses, which are designed to automatize and increase the efficacy of the system maintenance program, require large amount of data which can come in various forms: numeric, textual, images, sounds etc. Such data constitutes the historic knowledge benchmark to track system performances and support system engineer decisions. Here we claim that data is not sufficient to support this kind of analyses when applied to systems characterized by complex architectures and behaviors. Robust system engineer decisions require the ability to understand the system operational context that lies behind the observed data elements. In this respect, system models are in fact necessary to “put data in context” and capture relationships between data elements. Industry 4.0 methods require in fact contextual knowledge as a basis upon which hypotheses can be generated and assumptions tested. In our view, for complex systems, model-based system engineering (MBSE) models can afford this contextual knowledge, as they are typically used to describe systems architecture and dynamic behaviors. System knowledge is here intended as the blending of collected data and system architecture which takes the form of a “knowledge graph”. A knowledge graph is a database which consists of a large set of nodes (in our case an entity can be either a data or an MBSE element) which are linked to each other. The types of nodes and links follow a pre-defined topology, sometimes also refers as an ontology, that is designed to fit the actual decisions that needs to be performed. We show here how a knowledge graph can be defined to support system engineer maintenance decisions and how the same graph can be built based on system MBSE models and pre-processed data from numeric (through anomaly detections and diagnostic methods) and textual elements (through technical language processing TLP).
This paper provides a comprehensive assessment of the up-to-date life-cycle sustainability status of cadmium-telluride based photovoltaic (PV) systems. Current production modules (Series 6 and Series 7) are analyzed in terms of their energy performance and environmental footprint and compared with the older series 4 module production and current single-crystalline Silicon (sc-Si) module production. For fixed-tilt systems with Series 6 modules operating under average US irradiation of 1800 kWh/m 2 /year, the global warming potential (GWP) is reduced from 16 g CO 2eq /kWh in Series 4 systems to 10 CO 2 eq /kWh in Series 6 systems. For operation in US-SW irradiation of 2300 kWh/m 2 /year, the GWP is reduced from 11 to 8 CO 2eq /kWh and for 1-axis tracking systems operating in Phoenix, Arizona, with point-of array irradiation of 3051 kWh/m 2 /year the GWP is reduced to 6.5 CO 2eq /kWh. Similar reductions have happened in all environmental indicators. Energy payback times (EPBT) of currently installed systems range from 0.6 years for fixed–tilt ground–mounted installations at average US irradiation at latitude tilt installations to 0.3 years for one-axis trackers at high US-SW irradiation, considering average fossil-fuel dominated electricity grids with fuel to electricity conversion efficiency of 0.3. The resulting energy return on energy investment (EROI) also depends on the conversion efficiency of the electricity grid and on the operation life expectance. For a 30-year operational life and grid conversion efficiency of 0.3, EROI ranges from 50 (at US average irradiation) to 70 for US-SW irradiation. The EROI declines with increased grid conversion efficiency; for CdTe PV operating in south California with grid conversion efficiency of 49%, the EROI is about 50 and is projected to fall to 30 when the state's 2030 target of 80% renewable energy penetration materializes. Material alternatives that show a potential of further reductions in degradation rates and materials for enhanced encapsulation that would enable longer operation lives have also been investigated. A degradation rate of 0.3%/year, which has been verified by accelerated testing, is assumed in 30-year scenarios; this is projected to be reduced to 0.2%/year in the near-term and potentially to 0.1%/year in the longer term. With such low degradation rates and enhanced edge-sealing, modules can last 40- to 50-years. Consequently, all impact indicators will be proportionally reduced while EROI will increase. This detailed LCA was conducted according to ISO standards and IEA PVPS Task 12 guidelines. Furthermore, the study revealed that the choices of system models, methods and temporal system boundaries can significantly impact the results and points out to the need to include assumptions regarding these choices in the “transparency in reporting” requirements listed in the IEA PVPS Task 12 Guidelines.
The future Electron-Ion Collider (EIC) at Brookhaven National Laboratory will collide polarized electrons with polarized proton/ions. The electron ? Proton / Ion Collider (ePIC) Experiment is the EIC general-purpose detector aiming at delivering the full physics program of the EIC. This unique environment imposes stringent requirements on the tracking system needed for the measurement of the scattered electron and charged particles produced in the collisions at the EIC. The central tracker of the ePIC detector has silicon layers for tracking and vertexing based on MAPS technology, which are complemented by large Micro-Pattern Gaseous Detector (MPGD) trackers in the barrel and in both the electron and hadron end cap regions. The MPGD layers provide fast timing (10-20 ns) and additional hit points (150 µm) for pattern recognition during track finding. Two MPGD technologies are used in ePIC central trackers: cylindrical Micromegas for the barrel inner tracker and planar thin-gap GEM-µRWELL hybrid detector for the barrel outer tracker and the end cap disks. In this talk, we will introduce these two technologies in the context of ePIC and we will discuss the ongoing R&D efforts to address the requirements. Finally, we will discuss the plans and timeline for the production and testing and commissioning of the MPGD trackers for the installation in the ePIC detector.
This presentation provides a comprehensive overview of technical debt in the context of control systems for large-scale physics facilities. We will explore its various forms, common causes, and potential consequences on system reliability, maintainability, and upgradability. Drawing on experiences from multiple projects, we will present a range of strategies for proactively managing technical debt, including best practices in design, development, testing, and documentation, as well as reactive approaches for identifying and mitigating existing issues. The presentation will also emphasize the importance of a collaborative approach and the use of modern tools, like fault tracking systems, to ensure the long-term health and success of control systems in our field.
The ALICE-USA Barrel Tracking Upgrade (BTU) project began in 2015 to participate in a major upgrade of the Time Projection Chamber (TPC) and the Inner Tracking System (ITS) of the ALICE Experiment at CERN in Geneva, Switzerland. This upgrade increased the maximum readout rate of the ALICE detector to accommodate the increased heavy ion interaction rates following Long Shutdown 2 of the Large Hadron Collider, and greatly improved the vertexing performance of the detector. The original scope was completed and reviewed in November 2019. The BTU project document BTU.19.v1 "ALICE Barrel Tracking Upgrade Project Closeout / Transition to Operations (2019)" from November 2019 describes the status in detail and is attached as Appendix 1 below. At that point, all delivery milestones had been met on time, all Key Performance Parameters (KPPs) of the project had been satisfied, and the project was under budget. Several subsequent No Cost Extensions (NCEs) supported integration and pre-commissioning of the BTU project deliverables at CERN, as well as study and assessment of performance with Pb-Pb collisions at 50 kHz. The BTU project was successfully completed on 30 September 2024.
The objective of this project was to design and implement a comprehensive educational and applied research program in Concentrated Solar Thermal Power (CSTP) and heliostat technologies at Northeastern University. In alignment with the U.S. Department of Energy's Heliostat Consortium (HelioCon) goals, the project aimed to expand student and public understanding of CSTP systems while simultaneously contributing to workforce development and the broader decarbonization strategy. A particular emphasis was placed on integrating hands-on student design projects and publicly disseminating educational content relevant to CSTP systems. The project addressed a critical gap in renewable energy education: CSTP and heliostats, despite their importance in utility-scale solar energy, are rarely included in standard mechanical engineering programs. This project established new pathways for students to engage with the topic through the creation of a 4-credit graduate/senior elective course, development of five industry-facing short courses, and the inclusion of CSTP-based capstone design projects. Over two academic years, 36 students across six senior design teams developed and tested technologies such as deformable heliostats, beacon-based tracking systems, and solar-powered pyrolizers for biomass-to-biochar conversion. Concurrently, 30 undergraduate and graduate students were enrolled in the new academic course centered around CSTP principles. To ensure the relevance and accessibility of the short course content, the project team engaged with industry professionals, technical policy stakeholders, and potential course participants through structured surveys and informal consultations. Feedback from 28 respondents guided the structure, length, and delivery format of the courses - resulting in a modular design broken into five workshops. The feedback emphasized the need for flexible, asynchronous delivery and practical case studies, particularly in areas such as heliostat control, thermal storage, and solar fuel production. This engagement helped align the courses with the evolving knowledge demands of the renewable energy workforce and ensured that participants from both technical and policy backgrounds could meaningfully benefit from the material. The research and educational activities advanced the understanding of heliostat control systems, optical performance under misalignment, and thermal system integration in solar-driven pyrolysis applications. Methods and designs explored in this project proved to be both technically effective and economically feasible at the lab scale. Prototypes were constructed using commercially available components and custom-fabricated elements, demonstrating that meaningful performance improvements can be achieved with modest material and fabrication costs, supporting the feasibility of student-led research in this field. The public benefit of this project is twofold. First, it cultivates a pipeline of engineers trained to be familiar with CSTP principles, an essential workforce need identified by the Department of Energy for achieving its 2030 cost and deployment targets. Second, it contributes openly accessible educational materials, course content, and experimental frameworks to the broader community, enabling other institutions to adopt or adapt similar programming. Through outreach activities, curriculum integration, and technical exposure, this project contributes to a more informed and capable renewable energy workforce while supporting innovation in heliostat and CSTP system design. A new technical report is being prepared to document the development of the course and its outcomes, with plans to publish it in the ASME Open Access Journal of Engineering to ensure global accessibility, free of cost.
The Python-based program is a laboratory automation tool designed to control and monitor electrochemical systems. The tool was developed for capacitive deionization (CDI) experiments, but it can be used for any system that requires controlled voltage or current segments and multi-parameter monitoring. The program integrates hardware components to run user-defined experimental parameters, providing operational control of a programmable power supply, peristaltic pump, and data acquisition devices. Currently, the program is structured with a workflow that includes an initialization (or pre-run) phase, a main loop, and a post-experiment stabilization (or post-run) phase. The initialization phase prepares and stabilizes the cell, ensuring that the electrodes and solution reach a baseline state before the experiment begins. The main loop consists of multiple voltage segments that repeat, controlling the experiment while recording key parameters such as time, voltage, current, pH, and conductivity. Finally, the post-experiment stabilization phase allows the system to stabilize after the experiment, returning the cell and solution to equilibrium conditions before ending the sequence. The program is designed with four variations, each tailored to different experimental needs. All variations include both the initialization and post-experiment stabilization stages, which run for a set amount of time, voltage, current, and flow rate before and after the main experiment block. The main loop runs for a set number of cycles, as defined by the user input, and each cycle is composed of 2 or 4 segments. The 4 program variations are described as follows: Program 1: The main program includes 2 segments. Each segment is defined to have a set duration, flow rate, voltage, and current. This program measures conductivity, flow rate, voltage, and current. Program 2: The main program expands Program 1 to include 4 segments. Each segment has a specified duration, flow rate, voltage, and current. Like Program 1, it measures conductivity, flow rate, voltage, and current. Program 3: The main program consists of 2 segments, each defined by time, flow rate, voltage, and current. In addition to conductivity, flow rate, voltage, and current, Program 3 collects pH and temperature data through a 4-channel data acquisition device. Program 4: This program independently controls two channels of a multi-channel power supply simultaneously. While conductivity can only be measured for one cell at a time, the dual-channel control makes it possible to operate two cells simultaneously under different voltage/current conditions. The main program includes 2 segments.For each program, all measurements are automatically logged and integrated into a single Excel output file. Data are displayed in numerical format and plotted, both in real time, to track system performance. A key feature of the program is its ability to synchronize all outputs so that every measurement shares a single timestamp, ensuring accurate alignment of voltage, current, pH, conductivity, and pH data.By combining hardware control, real-time monitoring, and unified data collection, this program significantly reduces manual workload and minimizes errors, making it a reliable platform for researchers, engineers, and laboratory technicians conducting CDI experiments, among other electrochemical tests.