Search NASA⌕ Search

SEARCH · Search NASA

Results for “Tank 4”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Integrity Monitoring and Assessment, Prediction, Repair, and Corrosion Control of the Hanford Storage Tanks — 25213

BACKGROUND AND PROJECT TASKS Proposed work addresses focus area 1: Waste Retrieval, Transport and Closure, with particular focus on increasing volume available for tank storage 1) Refurbish/fortify existing double shell storage tanks (Tank Refurbish – Polymer Grout) 2) Robust monitoring tools for internal corrosion (Integrity Monitoring -Reference Electrodes) 3) Mitigate external corrosion (Degradation Prevention - Cathodic Protection) 4) Determine viability of constructing new tanks, and storage room creation by way of evaporation (Cost Benefit Analysis)

Shukla, Pavan K. [Savannah River National Laborato↗

FY24 Task 4: Studies of Phosphate and Fluoride Solubility for Dissolution of High Phosphate Tank Waste

Knowledge gaps have been identified in phosphate solubility in almost every single- and multi-component system, and particularly for aluminate in phosphate/hydroxide, where uncertainties in predicted values of aluminum solubility are greater than 50%. Solubility data of multicomponent, aqueous electrolytes containing sodium hydroxide, sodium fluoride, sodium phosphate, sodium nitrite, sodium nitrate, and dissolved gibbsite are also sparse. For example, for solutions of (i) sodium nitrate and sodium phosphate, data are only available at 30 and 50 °C, and for (ii) dissolved gibbsite in sodium hydroxide and sodium phosphate, only two data points are available at 20 and 40 °C. There is no data available on mixtures of sodium hydroxide, sodium phosphate, sodium fluoride, and dissolved gibbsite. These knowledge gaps were identified in a technical review of waste solubility data and the impact of dilution on solution stabilities and will be addressed in this work to predict aluminum hydroxide and sodium phosphate solubility in multicomponent electrolytes upon dilution, and upon variation of temperature. Results will provide the technical basis to develop accurate models for (i) gibbsite solubility and mass transfer of aluminum between solid and liquid forms following the sluicing of sludge and saltcake with water; and (ii) further blending of these suspensions with bismuth from bismuth phosphate waste, and zirconium and uranium left from the fuel decladding. This work will be essential to developing a disposition path for retrieval solutions from bismuth phosphate wastes. This effort would also support sludge washing to further reduce phosphate concentration if that process were to be added back to the flowsheet in the future.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Analysis of Tank 38H (HTF-38-25-36, -32) and Tank 43H (HTF-43-25-33, -35) Samples for Support of the Enrichment Control and Corrosion Control Programs

Savannah River National Laboratory (SRNL) analyzed samples from Tank 38H and Tank 43H to support the Enrichment Control Program (ECP) and Corrosion Control Program (CCP). The results indicate the concentrations of most soluble species in the Tank 38H surface sample are similar to the previous Tank 38H surface sample. The current Tank 38H subsurface sample shows similar Na, free hydroxide, and anions in comparison to the previous subsurface sample. The current Tank 38H subsurface sample appears brown in color. Measurement of the wt.% insoluble solids in the Tank 38H subsurface sample and associated uncertainty analysis indicates that the calculated average wt.% insoluble solids is 5.5 ± 3.6 wt.%. Significant differences in the concentrations of major components between the Tank 38H surface and subsurface samples indicate stratification of solution species between these two locations within the Tank 38H. The current Tank 43H surface sample is ~ 10% diluted versus the previous Tank 43H surface sample and the Tank 43H subsurface sample is similar in composition to the previous Tank 43H subsurface sample. Information provided by SRMC on tank additions since the last ECP sampling indicates that a total of about 4,062 gallons of water was added to Tank 43H. This addition could account for the observed relatively small dilution of ~ 10% in the Tank 43H surface sample. Similar solution compositions measured in the current Tank 43H surface and subsurface samples indicate a minimal stratification within the tank.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

RM3 Wave Tank Validation Model

An approximately 1/75th scale point absorber wave energy absorber was built to validate the testing systems of a 16k gallon single paddle wave tank. The model was build based on the RM3 design and incorporated a linear position sensor, a force transducer, and wetness detection sensors. The data set also includes motion tracking data of the device's two bodies acquired from 4x Qualisys cameras. The tank wave spectrum is measured by 4 ultrasonic water height sensors.

16 TIDAL AND WAVE POWER↗

Characterization of Tank 11H Samples from Tank Closure Cesium Removal (TCCR) Batch 3 - Intermediate and Final Samples

Savannah River Remediation (SRR) is currently operating the Tank Closure Cesium Removal (TCCR) process to remove 137 Cs from tank waste supernate using an ion exchange process. The TCCR unit processes dissolved salt from Tank 10H through a series of ion exchange columns containing crystalline silicotitanate (CST) and the effluent is then discharged to Tank 11H. Four interim samples pulled from Tank 11H during and just after the completion of processing of Batch 3 through the TCCR process have been analyzed for 137 Cs activity and density. The 137 Cs activity was found to decrease with each subsequent sample, which is consistent with the addition of decontaminated solution to Tank 11H. When compared to the expected composition from mixing the Tank 10H Batch 3 feed with the material already present in Tank 11H, the bulk chemical composition was as expected. A corrosion control sample collected from Tank 11H in June 2020 showed changes in the chemical composition and 137 Cs activity when compared to the composition measured at the end of Batch 2 processing. As there were no additions made to the tank during this period, these changes were attributed to leaching of the solids present in Tank 11H. Additional analyses of the 4 th interim sample are pending and will be documented in a revision to this report.

11H↗

Calculating Methane Emissions from Offshore Facilities Using Bottom-Up Methods

With changing demands in regulation, understanding methane emissions from offshore oil and gas production infrastructure has become increasingly important. Reported emissions from facilities in the Gulf of Mexico range from zero to thousands of tons of methane per hour, but these is currently no clear understanding of how this range compares to expected emissions from normally operating facilities. To generate realistic emission estimates, we create two bottom-up models that simulate emissions from facilities operating in the Gulf of Mexico. We estimate type 1 prototypical facilities (typically unmanned, older, lower-producing platforms in shallow water with little processing equipment, compressors, or storage tanks) to emit an average of 13 kg CH 4 h −1 , which corresponds to a loss of 2.7% of the average facility production. Type 2 prototypical facilities (continuously manned, higher production and operate in deeper water with processing equipment, oil storage tanks, compressors and power generation) emit an average of 88 kg CH 4 h −1 , which corresponds to a loss of 2.5% of production. The average measured emission from type 1 facilities was 18 kg CH 4 h −1 with a median production loss estimated at 8%. The average measured emission from type 2 facilities was 36 kg CH 4 h −1 with a median production loss estimated at 2.4%. Using emission factors that consider the long-tail emission distribution partly reconciles the difference between modelled and measured emission estimates, but we suggest the current the fugitive emission estimate may be an underestimate and more data on the number and size of fugitive emissions could explain differences between the modelled and measured emission estimate. We suggest the bottom-up approach described here that uses production data coupled with facility equipment could be used to identify facilities that have abnormally large measured emissions, caused by methodological failure or larger than expected fugitive emissions, which should be targeted for further evaluation resulting in remeasurement or identification of source type so that a more accurate estimates can be made on the absolute emission.

bottom-up↗

Tank 14H Preliminary Cease Waste Removal Sample Analyses

Savannah River Mission Completion Waste Removal and Tank Closure requested that Savannah River National Laboratory perform characterization analyses of Tank 14H in support of closure activities, specifically preliminary cease waste removal. This report provides important characterization of the prepared filtrate and air-dried solids in the January 2026 Tank 14H sample, HTF-14-26-1,2,3,4,5,6, for I-129, Tc-99, Cs-137, and Sr-90. The results reported here were utilized by SRMC to declare preliminary cease waste removal for Tank 14H.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Selection of Glasses to Confirm the 0.65 Weight Percent Sulfate Solubility Limit for Sludge Batch 10

In preparation for Sludge Batch 10 (SB10) processing, projections of sulfate (SO 4 2- ) in glass at 36% waste loading (WL) were calculated in May 2020 for Tank 40 blend projections representing 0.7M and 0.85M Na wash endpoints. The projected SO 4 2- ) concentrations for either sludge-only (SO) or coupled processing with the Salt Waste Processing Facility (SWPF) were either near or exceeded the current Sludge Batch 9 (SB9) limit of 0.65 weight percent (wt.%). Four nominal glass compositions were selected based on SO and coupled processing for the 0.85M Na wash endpoint Tank 40 blend projection to conduct an initial evaluation of the SB10 sulfate solubility behavior. A sulfate salt phase was absent from each of the prepared glasses, which provided preliminary results that supported the 0.65 wt.% SO 4 2- ) limit for SB10.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Antifoam Development for Eliminating Flammability Hazards and Decreasing Cycle Time in the Defense Waste Processing Facility

The Savannah River National Laboratory (SRNL) was requested to develop a new antifoam control method for the Defense Waste Processing Facility’s (DWPF) Chemical Process Cell (CPC). SRNL completed testing of both chemical and nonchemical foam controls. The nonchemical foam controls were either ineffective (or worse, created more foam) or impractical (a water spray can control foam, but excessive water is needed). As a result, the focus of this study was on finding a superwetter or commercial antifoam for controlling foam. Thirty potential antifoams were tested as part of this study. A series of tests were developed to help screen out ineffective alternatives including: 1. Spreading testing of superspreaders, 2. Foam column testing with physical simulants, 3. Boiling testing with physical and chemical simulants, 4. Days-only Sludge Receipt and Adjustment Tank (SRAT) process simulations with sludge (containing noble metals and mercury), Precipitate Reactor Feed Tank (PRFT), and Slurry Mix Evaporator Feed Tank (SEFT) simulants in the RC1 Reaction Calorimeter (purchased for antifoam testing), and 5. Around-the-clock SRAT and Slurry Mix Evaporator (SME) process simulations with sludge(containing noble metals and mercury), PRFT, and SEFT simulants in the RC1 Reaction Calorimeter. Evonik Surfynol® MD20, a commercially available defoamer, was relatively effective in controlling foam, while remaining chemically stable in SRAT and SME processing across the pH range of 4 to 13. No degradation products were detected in the offgas, in the condensate or in the SRAT and SME products. In nitric-glycolic acid flowsheet testing, 250 mg/kg Evonik Surfynol® MD20 was needed for foam control compared to 1,625 mg/kg for Antifoam 747, DWPF’s current antifoam. In nitric-formic acid flowsheet testing, 1,125 mg/kg of Evonik Surfynol® MD20 was needed to control foam throughout the SRAT and SME cycles. The commercially available superspreader Momentive™ Y-17112 was even more effective than Evonik Surfynol® MD20 as both a defoamer and an antifoam. Not only was the foam destroyed upon addition but also was less persistent between additions. It was the most effective antifoam in testing using both the nitric-glycolic acid flowsheet and the nitric-formic acid flowsheet. In nitric-glycolic acid flowsheet testing, only 100 mg/kg Momentive™ Y-17112 was needed to control foam throughout the SRAT and SME cycles. In nitric-formic acid flowsheet testing, 300 mg/kg Momentive™ Y-17112 was needed to control foam throughout the SRAT and SME cycles. Momentive™ Y-17112 is also resistant to hydrolysis as demonstrated by its chemical stability in SRAT and SME processing across the pH range of 4 to 13 and lack of degradation products in offgas or condensate. Both candidates were effective as potential replacements for Antifoam 747, with Y-17112 demonstrating superior foam control. During nitric-glycolic flowsheet testing 50% less antifoam was needed when using Momentive™ Y-17112 compared to MD20. During nitric-formic flowsheet testing 75% less antifoam was needed when using Momentive™ Y-17112 compared to MD20. Foam remediated with Momentive™ Y-17112 was less persistent throughout testing. In addition, no degradation products were detected in the offgas, in the condensate or in the SRAT and SME products. Based on this testing, Momentive™ Y-17112 is clearly superior to Evonik Surfynol® MD20 and Antifoam 747, especially for the nitric-formic acid flowsheet processing; it is recommended that Momentive™ Y-17112 replace Antifoam 747 in DWPF. An antifoam addition strategy is recommended for both the nitric-glycolic acid flowsheet and the nitric-formic acid flowsheet. Implementation of Momentive™ Y-17112 is expected to decrease SRAT and SME boiling times by up to 50%, eliminate the issues resulting from Antifoam 747 degradation products, and minimize foamovers. To validate the effectiveness of these defoaming agents, SRNL recommends irradiation of a SRAT or SME product simulant containing fresh antifoam. The goal of this testing is to determine whether the irradiation causes decomposition of the antifoam that would make it less effective or produce new species in the offgas or slurry. This testing began in April 2020. An evaluation should be completed to determine the thermolytic hydrogen and methane generation rate in downstream equipment, including the High-Level Waste evaporators.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Prioritizing Uncertainties in Hydrogen Contribution to Risk in Post-Crash Outcomes for Rail

This report presents analysis from Sandia National Laboratories predicting contributions to risk associated with the use of hydrogen technology for rail. Event sequence diagrams are used to describe possible accident scenarios and progressions. Initiating event frequencies and branch event probabilities for each scenario are quantified with uncertainty using distributions fit to Federal Railroad Administration and U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration data on applicable accidents from 2000 to 2020. Uncertainty is propagated through the event sequence diagram to estimate the frequency and conditional probability of accident end states. The analysis identifies four scenarios with significant contributions to risk from hydrogen that are predicted to occur relatively frequently, which may inform priorities for reducing uncertainty. These scenarios are 1) overpressure events resulting from collisions with hydrogen release due to mechanical damage and delayed ignition, 2) jet fire events resulting from collisions with hydrogen release due to mechanical damage and immediate ignition, 3) jet fires resulting from fire or explosion initiating events involving the hydrogen tank and correct operation of the thermally-activated pressure relief device (TPRD) subsequent to the thermal insult, and 4) pressure burst resulting from fire or explosion initiating events involving the hydrogen tank and failure of the TPRD. Delayed and immediate hydrogen ignition probabilities are identified as being highly uncertain and potential candidates for reducing conservatism in the predicted frequencies for these two scenarios.

08 HYDROGEN↗

Evaluation of the Impact of Additional Manganese from the Recycle Collection Tank (RCT) Glycolate Destruction Process on Glass Properties

The Defense Waste Processing Facility (DWPF) is planning to implement glycolic acid as a reductant within the waste processing flowsheet. An assessment of the glycolic acid flowsheet has revealed the potential for thermolytic production of hydrogen in the Concentration, Storage and Transfer Facilities (CSTF) from glycolate entrained in the DWPF recycle stream. To mitigate this potential scenario, a glycolate destruction process utilizing sodium permanganate (NaMnO 4 ) is being developed for use in the DWPF Recycle Collection Tank (RCT). The RCT is fed by the Slurry Mix Evaporator Condensate Tank (SMECT) and the Off-Gas Condensate Tank (OGCT). The SMECT could receive glycolate via a foamover from the Sludge Receipt and Adjustment Tank (SRAT) or the Slurry Mix Evaporator (SME), and the OGCT could receive glycolate via carryover of sludge particles in the purge from the melter during surge conditions. The use of NaMnO 4 additions in the RCT will result in additional manganese (Mn) in the waste stream and needs to be evaluated.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

FY24 Report on Water NSTF Testing: Lower Tank Inlet Piping Configuration

The following report serves as a summary of the accomplishments and testing results by the Natural convection Shutdown heat removal Test Facility (NSTF) experimental program over the past 12-month period. A major activity included reconfiguration of the chimney piping geometry which altered the discharge position into the tank from the original 50% tank height to a new lower position at a 10.9% tank height. This modification increases the volume of available coolant thus extending long-term operating capacity, however also results in a decreased liquid driving head which has the potential to reduce the natural circulation efficiency and decrease overall performance. Examination of the tradeoffs for these two configurations is an area of interest for RCCS designers and drove planned test activities this year. Ten matrix tests were performed in FY24, totaling 195 hours of heated operations and 12.9 MWh of electrical heating throughout the year, with eight classified as Accepted per NQA-1 and two classified as Trending. Testing prior to the facility reconfiguration examined the facility response to throttling at the tank inlet, demonstrating increased sensitivity of flow instabilities to throttling within the two-phase region when compared to throttling at the lower sensitivity single-phase inlet region. Testing after the chimney reconfiguration began with a baseline test at conditions of 80% inventory fill and prototypic thermal power input of 2.1 MW t . In addition to establishing a reference for nominal system behavior and performance, repeat testing with multiple subsequent runs demonstrated strong repeatability between tests performed at the same conditions in this new configuration. These tests also examined if influences would occur to system behavior with installation of new higher-resolution instrumentation within the upper chimney. In this critical region where boiling and flashing phenomena dominate, the test results provided confidence that the new instrumentation does not uncharacteristically influence the observed behaviors. An inventory parametric series was then initiated to examine system behavior with the new chimney configuration at six varying initial inventory levels, ranging from high 80% to low 20% fill. Two-phase oscillations with similar peak and mean flow rates were observed when comparing to the previous mid tank configuration. Generally, similar system response trends with inventory were also observed, such as two phase oscillations suppressing as inventories were lowered. However, in one absolute inventory comparison at the highest fill of 80%, flow oscillations saw a gradual growth over the 4 hours of two-phase operation in the new lower tank inlet configuration, opposite of the gradual dampening observed in the mid tank inlet configuration. This can be attributed to, in part, a greater hydrostatic head pressure above the two-phase discharge region where the boiling front is developed. Furthermore, the change resulted in greater sensitivity to liquid degassing phenomena during single-phase heating, causing loop instabilities to form which trigged moderate flow degradation during the period approaching saturation and boiling conditions. This behavior had been observed previously under some conditions but was a common occurrence in recent testing with the newer lower tank inlet configuration. Initial observations from these first data sets suggest an overall larger window of stability for the mid tank inlet configuration compared to the lower tank inlet. Lastly, the lowest inventory fill test was repeated over an extended testing window to examine depletion behavior. Natural circulation flow and effective heat removal performance were observed during most of the testing period; only after the tank became fully drained (0% fill) did flow stagnate and violent geysering events occur. This early observation confirms one relative advantage over the mid tank inlet configuration, which stagnated under comparable conditions at ~20% inventory remaining in the tank.

42 ENGINEERING↗

Design new epoxy nanocomposite coatings based on metal vanadium oxy-phosphate M 0.5 VOPO 4 for anti-corrosion applications

Epoxy nanocomposite coatings are an essential way to protect petroleum storage tanks from corrosion. For this purpose, the new nanocomposite epoxy coatings (P-M/epoxy composites) have been successfully designed. The P-M/epoxy composites are based on the metal vanadium oxy-phosphate M 0.5 VOPO 4 (where M = Mg, Ni, and Zn). The function of P-M/epoxy composites as anti-corrosion coatings was explored using electrochemical and mechanical tests. Using electrochemical impedance spectroscopy (EIS), it has been noticed that the pore resistance and polarization resistance of the P-M/epoxy composites remain higher as compared to the neat epoxy. The P-M/epoxy composites have the greatest impact on the cathodic dis-bonded area and water absorption. Besides, P-M/epoxy composites exhibit a very high order of mechanical properties. Further, Mg 0.5 VOPO 4 has the greatest effect on the anti-corrosion properties of epoxy coating followed by Zn 0.5 VOPO 4 and Ni 0.5 VOPO 4 . All these properties lead to developing effective anti-corrosion coatings. Thus, the net result from this research work is highly promising and provides a potential for future works on the anti-corrosion coating.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Refinement of Pitting Factor Basis to Evaluate Minimum Nitrite Requirement in Dilute Waste Chemistries

Considering that chloride concentrations are an order of magnitude lower at SRS than the maximum chloride previously tested to evaluate pitting susceptibility of carbon steel, it has been proposed that the Pitting Factor methodology be refined to determine if a reduction in the minimum nitrite requirement is warranted in more dilute solutions and those with chloride concentrations more indicative of waste tank chemistries at SRS. Through the use of cyclic potentiodynamic polarization, the susceptibility of A537 carbon steel to pitting corrosion was evaluated. The Pitting Factor was shown to accurately predict pitting susceptibility throughout the chemistry envelope evaluated. In addition, it was shown that nitrite is not required for inhibition of pitting corrosion in tank conditions with chloride concentrations observed at SRS and up to 4 M nitrate. Based upon these findings, new control limits were proposed that removed the minimum nitrite requirement within the chemistry envelope evaluated up to 50 °C.

36 MATERIALS SCIENCE↗

Numerical modeling and parametric study of a dual purpose underground thermal battery

We report integrating thermal energy storage with building energy systems can enable flexible building electric demands at buildings to help mitigate the mismatch between electricity supply and demand. A novel building heating and cooling system that integrates a dual-source heat pump with hybrid thermal storage named dual-purpose underground thermal battery (DPUTB) has been developed for reshaping building electric demands. The proposed DPUTB integrated geothermal heat pump system is an original innovation that enables Grid-interactive Energy Efficient buildings. This paper focuses on the study of the novel DPUTB. The DPUTB works as both a thermal storage tank (an inner tank) and a ground heat exchanger (an outer tank separated from the inner tank by the insulation material). High fidelity and computationally effective models are needed to predict the performance of the novel DPUTB. This study has developed a simplified dynamic model for the DPUTB according to heat transfer and energy conservation principles and validated it by using experimental data obtained from testing a small-scale DPUTB apparatus. A parametric study was conducted to identify a design that can achieve the target thermal storage performance of load shift and energy efficiency. The parametric study results show that the inner tank shell thermal conductivity and the phase change material's melting point are the two most influencing factors on the performance of the DPUTB. One single full-size DPUTB with the identified design could provide 1-ton cooling (3.51 kW) with the supply temperature lower than 11 °C for 4 hours in summer after being fully charged in 8 hours. The inner tank filled with phase change material is for cooling thermal storage as a latent tank in the design. However, its capacity can be as high as 60 MJ as a sensible water tank for heating storage in winter. In the future study, the DPUTB model will be incorporated into the dual-source heat pump system for evaluating the overall system performance of demand side management in the long term.

25 ENERGY STORAGE↗

Time Dependence of Methane Generation Rates from Saltstone

This report documents the tests performed to address the requirements listed in the Technical Request, which resulted in a Task Technical & Quality Assurance Plan (TTQAP) and a Run Plan to obtain the required information. The research expands previous scoping work to better understand methane generation in the Saltstone Disposal Facility (SDF). That scoping work demonstrated that methane is produced when sulfide-containing material is added to methylmercury (MeHg), which is found in the SDF Tank 50 feed waste. When Tank 50 waste is combined with grout premix solids dry feed ingredients of cement, slag cement, and fly ash, sulfides are released from the slag cement component of the premix. The prior testing results showed that while the concentration of total mercury was not affected in the pH 14 waste, the MeHg likely reacted with the sulfide contained in the slag. The scoping tests were performed in sealed reactors and thus, methane generation was not measured continuously; rather, it was measured after one hour and after 24 hours. After 24 hours, a large percentage of the MeHg was converted to methane, but after 1 hour only a small percentage of methane was released. It is noteworthy that the methane generation rate (MGR) was greater at the one-hour measurement. The data compiled from the scoping work needed to be expanded to better understand the generation of methane released from grout mixed with Tank 50 waste. This expanded study developed a more extensive knowledge of how and when methane is generated to inform the Documented Safety Analysis (DSA) of the SDF. As such, employing 8 sealed reactors, the methane generation time periods were extended to 2, 4, 6, 18, 30, 48, 72, and 96 hours (4 days). Results are documented herein to determine the capacity for MeHg, contained within Tank 50 salt solution (T50SS) simulant, to produce methane when mixed with saltstone dry feed ingredients, i.e., individual components (cement, slag, and fly ash) or a combination of those components.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Product Consistency Test Results for the LAW HPVR Glasses

This report summarizes the chemical analysis of Product Consistency Test (PCT) leachates received from Pacific Northwest National Laboratory (PNNL). The leachates are from a series of simulated nuclear waste glasses designated Low-Activity Waste High PCT and VHT Response (LAW HPVR) glasses that were designed and fabricated at PNNL. The glasses included both quenched and canister centerline cooled glasses. The reported data will be used in the development, validation, and implementation of enhanced property/composition models for waste glass vitrification at Hanford. The elemental release for the study glasses is reported as normalized concentration (NC i ). NC i of several elements was computed for both the target and measured glass compositions, which were similar, resulting in no significant differences when computing the NC i values. The majority of the glasses exhibited NC B , NC Na , and NC Si values that were greater than the Hanford Tank Waste Treatment Plant (WTP) low-activity waste constraint of 4 g/L. Several blank solutions included with the study glasses had K, Na, and Si concentrations above the analytical detection limit. Additionally, several of the reference glasses that were included with the study glasses had Na concentrations that were higher than expected. The unexpected analyte concentrations in the reference glass and blank solutions were insignificant with respect to the reported NC i values, and are noted for completeness and their experimental relevance.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Technical Gaps in Hanford High-Level Waste Solids Settling Behavior and Settling Time Evaluation for Direct Feed High-Level Waste (DFHLW) Operations

Settling of high-level waste (HLW) solids in process vessels is a key conceptual process step in providing HLW feed directly to the Hanford Waste Treatment and Immobilization Plant (WTP) HLW Vitrification Facility. Direct Feed High-Level Waste (DFHLW) is a potential approach to initiating HLW vitrification prior to completing of the WTP Pretreatment Facility. Settling would be used with subsequent supernatant decant to concentrate HLW feed. To support planning for DFHLW, Washington River Protection Solutions (WRPS) requested support from the Pacific Northwest National Laboratory to evaluate the current data set available to predict the time needed for HLW solids to settle, to identify gaps in the understanding and predictive capability of HLW solids waste settling times, and to provide scoping estimates of the potential settling time. Eight technical gaps were identified for predicting settling times and characteristics of the formed sediment layers including: Gap 1: In-Tank Settling Rates Faster than Settling of Laboratory Samples, Gap 2: Effect of Sludge Leaching/Washing on Predicted Settling Times, Gap 3: Predicting Waste Settling from Waste Chemistry (Waste Type), Gap 4: Predicting Waste Settling from Particle Size and Density Distributions (PSDDs), Gap 5: Insufficient Laboratory and In-Tank Settling Data to Represent Hanford Waste, Gap 6: Methods for Real-Time, In-Tank Tracking of Settling, Gap 7: Prediction of Sediment Erosion Resistance as a Function of Settling Time, and Gap 8: Prediction of Sediment Solids Content as a Function of Settling Time. In addition to the data gaps, an overarching observation of the settling rate and settled layer data is the significant variation in behavior. At similar solids concentrations, settling rates can vary by as much as 3 orders of magnitude depending on the source waste tank, and significantly different settling rates are noted between laboratory and in situ tests for the same waste tank. The range of average solids concentration in existing HLW sediment, which may have been quiescent for decades, can vary from less than 7 wt% to greater than 74 wt% solids. The shear strengths (or yield stresses) measured on laboratory samples range from less than 27 Pa to greater than 6400 Pa. These variations can challenge process planning for the application of a settle/decant process for DFHLW. This report describes the significance of the gaps to the settle/decant process and presents uncertainties by way of examples. Potential technical approaches for resolving these gaps are described and the estimated difficulty in resolving these gaps is evaluated. Based on the significance of the gap and the difficulty of resolution, recommendations are made to address specific gaps. Scoping estimates of the potential settling times for DFHLW solids have been made based on the existing data set with its associated gaps. Depending on the process vessel depth and final sediment concentration, substantial fractions of the scoping estimate results for settling times for characterized HLW exceed the 2-week period that has been previously assumed for process planning. There is also significant disparity, potentially greater than a factor of 5000 difference, in the estimated settling times depending on process vessel depth and final sediment solid concentration. This variation in results underscores the significance of the identified gaps and uncertainties with respect to process planning for utilizing settle/decant operations for DFHLW.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗