Instrumentation for measurement of cosmic noise at 750, 1225, and 2000 kHz from a rocket Final technical report
Design and performance characteristics of rocketborne instrumentation system to measure radio frequency noise energy
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Design and performance characteristics of rocketborne instrumentation system to measure radio frequency noise energy
Optical communication equipment design and integration - propulsion subsystem - guidance, navigation, and environmental control
Design calculations and materials test data for planetary entry ringsail parachute
Design and operational performance of solid state ultrahigh frequency prototype telemetry transmitter
Design parameters for developing phased array acquisition and tracking radar for onboard experiment in Apollo spacecraft
Design and fabrication of electronic pressure switches
Design and tests of MHD induction generator operating on liquid flow
Design characteristics of universal position switches for Launch Complex 39 service arm
Design and development of electrical system and power conditioning equipment for thermoelectric outer planet spacecraft program
Design and construction of system for measuring frequency of S band, FM TV transmitter
These documents are referenced in the public version of the H3 StingRAY Final Design and Technical Report (Linked Dataset can be found in Resources section, below), and are submitted separately to allow for public release of head document. The display names have the corresponding section number for easy reference.
The goal of this Project was to develop a standards-compliant, fabrication-ready design of Columbia Power Technologies’ (C·Power) next-generation wave energy converter (WEC), the StingRAY H3p. The H3p is a design iteration of C·Power’s StingRAY WEC and is intended for electrical power generation suitable for micro-grids or remote loads. The H3p was designed for grid-connection and at least two years of continuous testing and operation at the proposed PacWave-South (PWS) test site.
We developed and used quantum simulation techniques to predict structural, electronic, optical and thermal properties affecting the scientific design of semiconductor nanostructures. We focused on the study of surfaces and interfaces at the nanoscale, in particular embedding and solvation of semiconductor nanoparticles, and provided a microscopic description of nanostructured materials in realistic environments, directly comparable with experimental conditions. We addressed three major problems: (i) the design of realistic structural models of integrated nanostructures, e.g. quantum dots embedded in solid matrices and nanostructures immersed in fluids; (ii) the development of efficient and accurate calculations to describe the excited state properties of nanostructures, beyond standard Density Functional Theory, so as to understand and predict electronic properties involved in renewable energy applications, for example solar conversion devices. In particular we developed and used methods based on a many body perturbation theory. (iii) the development of calculations of heat transport properties of nanostructured materials, for thermoelectric applications, including predictive calculations of thermal and electrical conductivity and of Seebeck coefficients. Specifically, we developed and used methods based on the Boltzmann transport equation and molecular dynamics.
Various studies and analyses that were performed in support of the V/STOL research transport design effort are discussed. The propulsion system specified for these studies was the LF460/YJ97-GE-100 turbotip lift fan. Strong emphasis was placed on achieving low fan noise while maintaining the high thrust/weight capability of the high pressure ratio lift fan system. The work was divided into cycle analysis and performance studies, installation and systems support, acoustic analysis and preliminary or conceptual design studies.
NREL is developing an advanced aerobic bubble column model using Aspen Custom Modeler (ACM). The objective of this work is to integrate the new fermentor model with existing techno-economic models in Aspen Plus and Excel to establish a new methodology for guiding process design. To assist this effort, NREL has contracted Genomatica to critique and make recommendations for improving NREL's bioreactor model and large scale aerobic bioreactor design for biologically producing lipids at commercial scale. Genomatica has highlighted a few areas for improving the functionality and effectiveness of the model. Genomatica recommends using a compartment model approach with an integrated black-box kinetic model of the production microbe. We also suggest including calculations for stirred tank reactors to extend the models functionality and adaptability for future process designs. Genomatica also suggests making several modifications to NREL's large-scale lipid production process design. The recommended process modifications are based on Genomatica's internal techno-economic assessment experience and are focused primarily on minimizing capital and operating costs. These recommendations include selecting/engineering a thermotolerant yeast strain with lipid excretion; using bubble column fermentors; increasing the size of production fermentors; reducing the number of vessels; employing semi-continuous operation; and recycling cell mass.
This report serves as the final technical report for the US Department of Energy (DOE) award DE-EE0006713 (Award 6713). The project is titled “New England Aqua Ventus I Offshore Wind Advanced Technology Demonstration Project 100% Front-End Engineering and Design (FEED)”. The New England Aqua Ventus I (NEAV) project demonstrates a unique prestressed concrete semi-submersible floating hull technology, called VolturnUS. The technology is applicable to harness nearly 60% of the US offshore wind resource within 50 miles of the coast. The hull will be demonstrated at full-scale with a commercial scale wind turbine connected to the grid in the Northeast US off Monhegan Island, Maine for 20 years.
The Alaska Gasline Development Corporation (AGDC) is Alaska’s natural gas infrastructure development corporation established in 2013. AGDC’s mission is to maximize the benefit of Alaska’s vast North Slope natural gas resources for Alaskans through the development of infrastructure necessary to move the gas into local and international markets. AGDC was identified for a Congressionally Directed Spending (CDS) project for funding in the Energy and Water Development and Related Agencies Appropriations Act, 2023 under the heading: “Congressionally Directed Energy Efficiency and Renewable Energy Projects.” The CDS included $\$$4,000,000 of direct funding, with required match funds, to move the project forward. Alaska’s North Slope holds America’s largest proven and conventional natural gas supply. The integrated Alaska LNG Project will deliver 3.5 billion cubic feet of natural gas per day from Alaska’s North Slope gas fields to Alaskans as well as to a marine terminal located at tidewater in Cook Inlet. Alaska LNG is an integrated gas infrastructure project with three major components: a gas treatment plant (GTP) located at Prudhoe Bay, an 807-mile (1,287 km) gas pipeline (Mainline Pipeline) to Southcentral Alaska with interconnections for in-state gas use, and a natural gas liquefaction facility (LNG Facility) in Nikiski, Alaska. The integrated Alaska LNG Project has several strategic advantages including proven gas resources, existing upstream infrastructure, an advantageous arctic climate for LNG production, proximity to LNG markets, a track record of reliability from a state that first began exporting LNG to Japan in 1969, and broad support from Alaskans. North Slope natural gas is a conventional resource and can be produced with minimal drilling at a fraction of the carbon dioxide emissions of shale gas from the Lower 48 states. Through the development of the Alaska LNG Project, Alaska can provide energy security to Alaskans and a stable source of LNG to the Asia-Pacific region for generations. The Alaska LNG Project has been progressed through Pre-Front-End Engineering Design (Pre-FEED) and has obtained all major federal and State of Alaska permits and authorizations to construct the project, including the Federal Energy Regulatory Commission (FERC) Order Granting Authorization Under Section 3 of the Natural Gas Act. On September 5, 2024, the U.S. Department of Energy (DOE), National Energy Technology Laboratory (NETL) awarded Project No. DE-FE0032307 to AGDC with the objective to progress the project to Front-End Engineering Design (FEED) entry for the Alaska LNG Project Phase 1 Pipeline. The award Start Date was made effective July 1, 2023, with a Period of Performance through June 30, 2025. On March 27, 2025, AGDC announced the execution of definitive commercial agreements with Glenfarne Alaska LNG, LLC, an affiliate of Glenfarne Group, LLC, (together as “Glenfarne”), to lead the development of the Alaska LNG Project and enter FEED for the Phase 1 Pipeline. Project activities are now funded and directed by this private sector partner who holds a 75% interest in 8 Star Alaska, LLC (8 Star). 8 Star holds the assets of the Alaska LNG Project. As planned, AGDC continues to hold 25% minority interest in 8 Star and will play a governance role moving forward with Alaska LNG. This definitive commercial agreement milestone led to the successful completion of AGDC’s Statement of Project Objectives (SOPO) for FEED entry and led to the completion of DOE Project No. DE-FE0032307. At conclusion of the SOPO, AGDC also reached the award’s maximum federal cost share of $\$$4,000,000. AGDC is, therefore, providing Final Technical Report to close out DOE Project No. DE-FE0032307.
The International Committee for Future Accelerators (ICFA) set up the Global Design Effort (GDE) for the design of the International Linear Collider (ILC) in 2005. Drawing on the resources of over 300 national laboratories, universities and institutes worldwide, the GDE produced a Reference Design Report in 2007, followed by a more detailed Technical Design Report (TDR) in 2013. Following this report, the GDE was disbanded. A compact core team, the Linear Collider Collaboration (LCC), replaced it. This is still under the auspices of ICFA and is directly overseen by the Linear Collider Board, which reports to ICFA. The LCC is charged with continuing the design effort on a much-reduced scale until the Project is approved for construction. An additional mandate of the LCC was to bring together all linear collider work, including the CERN-based Compact Linear Collider (CLIC) under one structure in order to exploit synergies between the two studies.