Search NASA⌕ Search

SEARCH · Search NASA

Results for “Test Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

HotSpot Software Test Plan

This Software Test Plan (STP) describes the procedures used to verify and validate that the HotSpot Health Physics Codes meet the requirements of its user base, which includes: (1) Users of the PC version of HotSpot conducting consequence assessment, hazard assessment and safety analysis calculations; and (2) Users of the NARAC Web and iClient software tools, which allow users to run HotSpot for consequence assessment modeling. This plan is intended to meet Critical Recommendation 2 from the Software Evaluation of HotSpot and DOE Safety Software Toolbox Recommendation for inclusion of HotSpot in the Department of Energy (DOE) Safety Software Toolbox. These users and sponsors of the HotSpot software and the organizations they represent constitute the intended audience for this document. HotSpot software is maintained for the Department of Energy Office of Emergency Operations by the National Atmospheric Release Advisory Center (NARAC) at Lawrence Livermore National Laboratory (LLNL). An overview of HotSpot and NARAC are provided.

99 GENERAL AND MISCELLANEOUS↗

Aluminum Clad Spent Nuclear Fuel Task 1: Oxyhydroxide Layer Behavior and Chemistry Experimental Test Plan

This document presents the test plan for Task 1 of the Aluminum Clad Spent Nuclear Fuel Long Term Dry Storage Technical Issues Action Plan, which covers aluminum clad spent nuclear fuel (ASNF) fuel that is currently or may in the future be held in dry storage for an extended period. The objectives of the Task 1 test plan are to: 1. Understand how ASNF performs over extended dry storage periods. 2. Understand mechanisms that could alter aluminum hydroxide/oxyhydroxide layers during extended storage. 3. Characterize thickness and growth rates of oxyhydroxide layers based on fuel history and provide anticipated H2 gas generation rates based on chemical corrosion. 4. Characterize materials properties for oxides present on ASNF. 5. Interface with canister modeling activity to deliver degradation rates for package performance for both sealed and vented configurations. 6. Understand implications of higher temperature drying (250°C) on stability in dry storage. This test plan lays out the technical activities that will be performed to achieve the test objectives described above. Experiments will be performed at Idaho National Laboratory in-town facilities. Specimens for testing will include those supplied by Savannah River National Laboratory. Activities will include both experiments and modeling and will coordinate with other tasks within the project.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

LCLS Undulator Test Plan

This note presents the test plan for the LCLS undulators. The undulators will be measured and tuned in the Magnetic Measurement Facility at SLAC. The requirements for tuning are well established and are summarized. A brief discussion of the measurement equipment is presented. This is followed by the detailed test plan in which each step is enumerated. Finally, the measurement results and storage format are presented. The LCLS consists of 33 undulator segments, hereafter referred to as undulators, plus 6 spares and one reference undulator. The undulators must be tuned to meet strict requirements. They must also be fiducialized to allow alignment with other components. This note details the plan for tuning and fiducializing the LCLS undulators. The note begins with the list of tuning and fiducialization requirements. The laboratory in which the work will be performed and the relevant equipment is then briefly described. This is followed by a detailed test plan in which all the steps of tuning and fiducialization are enumerated.

43 PARTICLE ACCELERATORS↗

Test Plan for the Third Reirradiation Heating Test of Fuel Particles from AGR 2 Compact 5-4-2

Post irradiation examination (PIE) and high-temperature heating tests of tristructural isotropic (TRISO)-coated fuel particles and compacts from the second Advanced Gas Reactor (AGR) irradiation experiment, AGR 2, are in progress. This test plan describes the reirradiation and subsequent high-temperature testing of loose fuel particles obtained from AGR 2 Compact 5-4-2. To simulate exposed kernels, four of these particles have been cracked at Oak Ridge National Laboratory (ORNL) to produce localized defects that extend through the TRISO layers (outer pyrolytic carbon, silicon carbide [SiC], and inner pyrolytic carbon) while keeping these layers in place and maintaining the shape and integrity of the kernel. To generate short-lived fission products, these particles will be reirradiated in the Neutron Radiography Reactor (NRAD) at the Hot Fuel Examination Facility (HFEF) at the Idaho National Laboratory (INL) Materials and Fuels Complex prior to heating testing in the Fuel Accident Condition Simulator (FACS) furnace at HFEF. FACS testing will be at 1200°C, and fission products released from the reirradiated particles will be measured. The intention of the test is to assess the retention of short-lived fission products I-131 (t1/2 = 8.02 days) and Xe-133 (t1/2 = 5.2 days) in the fuel kernels at high temperatures.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Test Plan for the Second Reirradiation Heating Test of Fuel Particles from AGR 2 Compact 6-4-1

Post irradiation examination (PIE) and high-temperature heating tests of tristructural isotropic (TRISO)-coated fuel particles and compacts from the second Advanced Gas Reactor (AGR) irradiation experiment, AGR 2, are in progress. This test plan describes the reirradiation and subsequent high-temperature testing of loose fuel particles obtained from AGR 2 compact 6-4-1. Four of these particles will have been cracked, gamma counted, and re-irradiated in the Neutron Radiography (NRAD) reactor prior to the heating test. The heating test will involve heating the particles in the Fuel Accident Condition Simulator (FACS) furnace to a peak temperature of approximately 1600°C while collecting fission products released from the particles for post-heating test analysis. The intention of the test is to assess the retention of fission products in the fuel kernel. Reirradiation of the particles will allow a determination of the retention of short-lived fission products I-131 (t1/2 = 8.02 days) and Xe-133 (t1/2 = 5.2 days) in the kernel.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Robustness of Asymptotic Optimal Accelerated Test Plans to Small-Sample Settings

Accelerated testing is a form of testing commonly employed in industry, especially at Sandia National Laboratories, in order to extract information about product lifetime behavior that cannot be acquired under normal operating conditions due to the extensive durations of the intended life- times. As of the writing of this report, there is no known guideline for the design of accelerated tests at the laboratories and yet there is an entire field in the statistical literature on the optimal design of accelerated tests covering a wide range of limitations and constraints available for reference. A potential roadblock to incorporating this knowledge is the common difficulty at Sandia of having severely limited data available for such testing. Nearly all of the methodology presented in the statistical literature is based on asymptotic or large-sample theory and so may not be appropriate for the testing conditions present at Sandia. This report investigates optimal accelerated test plans derived based on small-sample or exact methodology for both a basic test setting as well as a more realistic setting and compares the resulting test plans to those derived based on the large- sample methodology from the literature. It is shown that the large-sample test plans are actually quite robust to the presence of limited data and are generally more flexible than the small-sample test plans.

36 MATERIALS SCIENCE↗

Radiation Hardened Foam Cold Test Plan - Phase II: Foam Characterization Testing and Environmental Chamber Testing of FoamBag Fixative Foam

This document outlines the Phase II test objectives and implementation plan for a down-select foam fixative technology intended to facilitate activities in support of the Savannah River Site (SRS) F/H labs deactivation and decommissioning (D&D) efforts. It is a collaborative effort between Savannah River National Laboratory (SRNL), Florida International University (FIU), and the SRS F/H labs team intended to test and evaluate the potential of a polyurethane resin foam in mitigating the release of contamination during dismantling operations on radioactively contaminated piping in legacy facilities. The cold test plan addresses specific requirements highlighted by site and safety personnel and will be executed at FIU and SRNL test and lab facilities. Results from the cold tests will inform the hot test at F/H labs, which will use the foam fixative to confine and/or isolate residual contamination within a 3-dimensional void space of Hastelloy C-22 piping designated for removal from the area and transported to a designated disposal facility. Phase I testing was previously conducted using Hilti CP620 fixative foam. Results from Phase I testing indicate Hilti CP-620 fixative foam is incompatible with SRS site hot taps as an effective foam delivery method into Hastelloy C-22 piping. Phase II testing will be conducted using FoamBag TM fixative foam as an alternative fixative foam option. Phase II testing will address eight test objectives: (1) evaluation of the adhesion and bonding properties of FoamBag TM in Hastelloy C-22 piping, (2) evaluation of the adhesion of FoamBag TM in piping under various moisture conditions, (3) determination of the heat profile of FoamBag TM during curing, (4) determination of the internal pipe pressure after FoamBag TM deployment and curing, (5) conduct a leak test to determine if FoamBag TM is effective at creating a full seal within piping, (6) headspace testing of FoamBag TM to determine if there are any associated off-gas hazards during FoamBag TM curing, (7) conduct environmental chamber testing of FoamBag TM to understand how environmental parameters impacts FoamBag TM curing, and (8) conduct fire testing to evaluate FoamBag TM fire retardant characteristics.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Test Plan for Reirradiation and 1600°C Heating Test of AGR-3/4 Compact 3-1

Post irradiation examination (PIE) and heating tests of tristructural isotropic (TRISO)-coated fuel particles, fuel compacts, and graphite from Advanced Gas Reactor (AGR) irradiation experiment AGR 3/4 are in progress. The AGR-3/4 test train consisted of twelve separate capsules irradiated in the northeast flux trap of the Advanced Test Reactor (ATR) at Idaho National Laboratory (INL) from December 14, 2011, to April 12, 2014 (Collin 2015b). This test plan describes the reirradiation and subsequent heating test of AGR-3/4 Compact 3-1. One of the main goals of this test is to assess the retention of short-lived fission products I-131 (t1/2 = 8.02 d) and Xe-133 (t1/2 = 5.2 d) in fuel kernels. To generate short-lived fission products, the compact will first be reirradiated in the Neutron Radiography Reactor (NRAD). Following reirradiation, the compact will be removed from NRAD, gamma scanned on the Precision Gamma Scanner (PGS), and then loaded into the Fuel Accident Condition Simulator (FACS) furnace for heating at 1600°C. Fission gases and condensable fission products released from the compact will be collected in the Fission Gas Monitoring System (FGMS) and the FACS condensation plates, respectively. The planned uses of AGR-3/4 compacts (including heating testing and destructive analysis) are discussed in the AGR-3/4 PIE plan (Demkowicz 2017).

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Test Plan for Reirradiation and 1200°C Heating Test of AGR-3/4 Compact 8-1

Post irradiation examination (PIE) and heating tests of tristructural isotropic (TRISO)-coated fuel particles, fuel compacts, and graphite from Advanced Gas Reactor (AGR) irradiation experiment AGR 3/4 are in progress. The AGR-3/4 test train consisted of twelve separate capsules irradiated in the northeast flux trap of the Advanced Test Reactor (ATR) at Idaho National Laboratory (INL) from December 14, 2011, to April 12, 2014 (Collin 2015b). This test plan describes the reirradiation and subsequent heating test of AGR-3/4 Compact 8-1. One of the main goals of this test is to assess the retention of short-lived fission products I-131 (t1/2 = 8.02 d) and Xe-133 (t1/2 = 5.2 d) in fuel kernels. To generate short-lived fission products, the compact will first be reirradiated in the Neutron Radiography Reactor (NRAD). Following reirradiation, the compact will be removed from NRAD, gamma scanned on the Precision Gamma Scanner (PGS), and then loaded into the Fuel Accident Condition Simulator (FACS) furnace for heating at 1200°C. Fission gases and condensable fission products released from the compact will be collected in the Fission Gas Monitoring System (FGMS) and the FACS condensation plates, respectively. The planned uses of AGR-3/4 compacts (including heating testing and destructive analysis) are discussed in the AGR-3/4 PIE plan (Demkowicz 2017). Significant portions of this plan have been completed and additional samples are being used for purposes not captured in that plan.

42 ENGINEERING↗

Hanford Waste End Effector Prototype Test Plan – Phase II

This test plan describes the Phase II testing program of the Hanford Waste End Effector (HWEE) at the Washington River Protection Solutions (WRPS) Cold Test Facility (CTF) using a Pacific Northwest National Laboratory (PNNL)-designed testing setup. This task builds on Phase I development testing completed in August 2017 and reported in PNNL-26856 to address some key actual tank waste challenges. The task includes demonstrating retrieval of a mixed layered simulant and retrieval of uneven simulant profiles like that found near tank walls. A separate demonstration using only the HWEE conveyance jet pump will start to assess the lifting capabilities of this device for transporting waste out of an underground tank. The PNNL-designed robotic gantry system and associated systems (e.g., tanks, high-pressure water delivery and valves, instruments, etc.) used at CTF during Phase I have been modified and upgraded to implement the Phase II test program and measure various process parameters. The tests will involve retrieval of water and kaolin (sludge) simulant to determine pumping rate, dilution factors, and screen fouling rate.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Aluminum Clad Spent Nuclear Fuel Task 2: Oxide Layer Radiolytic Gas Generation Resolution Experiment Test Plan

This document presents the test plan for Task 2 of the Aluminum Clad Spent Nuclear Fuel Long Term Dry Storage Technical Issues Action Plan. This task’s overarching goal is the resolution of gas generation resulting from the radiolytic degradation of the oxide layers on aluminum. The uncertainty associated with the build-up of gaseous radiolytic products inside the ASNF storage canisters is one of the dominant technical challenges associated with long term dry storage of aluminum clad fuel. The objectives of the Task 2 test plan are to: 1. Understand how radiation chemistry inside the ASNF dry storage canister impacts extended dry storage performance. 2. Understand the radiation induced mechanisms governing the production of radiolytic gases and alteration of gas composition within a canister. 3. Correlate the observed changes in material properties of ASNF with the radiolytic degradation of aluminum oxide in fill environments of variable moisture and gas composition. 4. Compile a predictive kinetic modeling tool, to provide quantitative mechanistic insight into the in-cask radiation chemistry of ASNF. 5. Interface with the canister modeling activity of Task 3 to deliver degradation rates for package performance of both sealed and vented scenarios.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

High Burnup Dry Storage Cask Research and Development Project, Final Test Plan

EPRI is leading a project team to develop and implement the first five years of a Test Plan to collect data from a SNF dry storage system containing high burnup fuel.12 The Test Plan defined in this document outlines the data to be collected, and the storage system design, procedures, and licensing necessary to implement the Test Plan.13 The main goals of the proposed test are to provide confirmatory data14 for models, future SNF dry storage cask design, and to support license renewals and new licenses for ISFSIs. To provide data that is most relevant to high burnup fuel in dry storage, the design of the test storage system must mimic real conditions that high burnup SNF experiences during all stages of dry storage: loading, cask drying, inert gas backfilling, and transfer to the ISFSI for multi-year storage.15 Along with other optional modeling, SETs, and SSTs, the data collected in this Test Plan can be used to evaluate the integrity of dry storage systems and the high burnup fuel contained therein over many decades. It should be noted that the Test Plan described in this document discusses essential activities that go beyond the first five years of Test Plan implementation.16 The first five years of the Test Plan include activities up through loading the cask, initiating the data collection, and beginning the long-term storage period at the ISFSI. The Test Plan encompasses the overall project that includes activities that may not be completed until 15 or more years from now, including continued data collection, shipment of the Research Project Cask to a Fuel Examination Facility, opening the cask at the Fuel Examination Facility, and examining the high burnup fuel after the initial storage period.

high burnup, dry storage cask, final test plan, fu↗

Seismic Shake Table Test Plan

This report is a preliminary test plan of the seismic shake table test. The final report will be developed when all decisions regarding the test hardware, instrumentation, and shake table inputs are made. A new revision of this report will be issued in spring of 2022. The preliminary test plan documents the free-field ground motions that will be used as inputs to the shake table, the test hardware, and instrumentation. It also describes the facility at which the test will take place in late summer of 2022.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Washington Clean Energy Fund: Energy Storage System Performance Test Plans and Data Requirements

This report documents the test plans, including detailed duty cycles, used in evaluating the technical performance of five energy storage systems (ESSs) sponsored by the Washington State Clean Energy Fund (CEF). These ESSs were installed at three participating utilities’ (Avista, Snohomish Public Utility District or SnoPUD, and Puget Sound Energy or PSE) designated sites. Under each test plan, a number of baseline and use case tests are defined. This report documents the test plan for each utility, including duty cycles, data and performance reporting requirements. Baseline tests defined in this report mainly focus on determining an initial or reference performance for each ESS, which may be compared with the performance at any later time to assess the state of health of the ESS. Parameter values of a given ESS obtained from baseline tests are applied for different modeling purposes and use case tests. The stored energy capacity test is the first test conducted in the baseline test program, which generates data to calculate round trip efficiency (RTE). The response time and ramp rate tests provide the time required for an ESS to change from zero to full charging/discharging rate and hence the ramp rate, which is important in understanding ESS performance for applications calling for fast response. Internal resistance testing of ESS cells is also conducted in conjunction with the response time and ramp rate tests. Finally, the baseline tests include frequency regulation (FR) and peak shaving (PS) tests based on real-world duty cycles. Upon completion of the baseline tests, use case tests are conducted at each of the storage sites with duty cycles developed to meet the site-specific criteria and conditions. The use cases are grouped according to their intended target benefits within the electric infrastructure topology (e.g., transmission versus distribution). Although an ESS may be located on the low-voltage side of a substation that provides power to a distribution feeder, a use case that addresses bulk power services could still be provided and would be grouped under the transmission or bulk-power benefits. Use cases for ESS applications deep into the distribution circuit would be categorized under the distribution system cases.

25 ENERGY STORAGE↗

Test Plan for Reirradiation and 1400°C Heating Test of AGR-3/4 Compact 10-1

Post irradiation examination (PIE) and heating tests of tristructural isotropic (TRISO)-coated fuel particles, fuel compacts, and graphite from Advanced Gas Reactor (AGR) irradiation experiment AGR 3/4 are in progress. The AGR-3/4 test train consisted of twelve separate capsules irradiated in the northeast flux trap of the Advanced Test Reactor (ATR) at Idaho National Laboratory (INL) from December 14, 2011, to April 12, 2014 (Collin 2015b). This test plan describes the reirradiation and subsequent heating test of AGR-3/4 Compact 10-1. One of the main goals of this test is to assess the retention of short-lived fission products I-131 (t1/2 = 8.02 d) and Xe-133 (t1/2 = 5.2 d) in fuel kernels. To generate short-lived fission products, the compact will first be reirradiated in the Neutron Radiography Reactor (NRAD). Following reirradiation, the compact will be removed from NRAD, gamma scanned on the Precision Gamma Scanner (PGS), and then loaded into the Fuel Accident Condition Simulator (FACS) furnace for heating at 1400°C. Fission gases and condensable fission products released from the compact will be collected in the Fission Gas Monitoring System (FGMS) and the FACS condensation plates, respectively.

42 ENGINEERING↗

Test Plan for DOE-GENIORS Dyanamic Irradiation Tests

Dynamic irradiation tests will be performed within the DOE-GENIORS collaboration, to be finished by the end of March 2021. These tests will be performed using three different setups, one at INL, one at CEA, and one at CIEMAT. The cis-mTDDGA/PTD chemical system will be used, applying both "extraction" (cis-mTDDGA - n-dodecane/HNO3) and "stripping" (cis-mTDDGA - n-dodecane/PTD - HNO3) conditions. This test plan provides the details and parameters to be used to perform irradiation at the INL using the INL Radiolysis Test Loop.

38 RADIATION CHEMISTRY, RADIOCHEMISTRY, AND NUCLEA↗

DEEP VADOSE ZONE TREATABILITY TEST PLAN

{sm_bullet} Treatability test plan published in 2008 {sm_bullet} Outlines technology treatability activities for evaluating application of in situ technologies and surface barriers to deep vadose zone contamination (technetium and uranium) {sm_bullet} Key elements - Desiccation testing - Testing of gas-delivered reactants for in situ treatment of uranium - Evaluating surface barrier application to deep vadose zone - Evaluating in situ grouting and soil flushing

54 ENVIRONMENTAL SCIENCES↗