Search NASASearch

SEARCH · Search NASA

Results for “Timeline”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Integrating Mission Timelines and Procedures to Enhance Situational Awareness in Human Spaceflight Operations

Future human spaceflight missions to the Moon, Mars, and beyond will have significant transmission delays and reduced communications bandwidth compared to operations in Low Earth Orbit, requiring increased crew autonomy due to the limited availability of real-time support from Mission Control Center (MCC). In this paper, we argue for the development of technology to enhance situational awareness (SA) for a remote MCC and astronauts onboard the vehicle, describe a usability study conducted towards this aim, and identify key usability features for the design of future integrated timeline tools. By tightly integrating timelines and procedures, future crew systems can predict future constraint violations, suggest resolutions to these violations, and ultimately support more successful missions.

User experience

Human Factors Operability Timeline Analysis to Improve the Processing Flow of the Orion Spacecraft

The Constellation Program (CxP) Orion vehicle goes through several areas and stages of processing before its launched at the Kennedy Space Center. In order to have efficient and effective processing, all of the activities need to be analyzed. This was accomplished by first developing a timeline of events that included each activity, and then each activity was analyzed by operability experts and human factors experts with spacecraft processing experience. This papers focus is to explain the results and the process for developing this human factors operability timeline analysis to improve the processing flow of Orion.

Schlierf, Roland

Timeline-Based Mission Operations Architecture: An Overview

Some of the challenges in developing a mission operations system and operating a mission can be traced back to the challenge of integrating a mission operations system from its many components and to the challenge of maintaining consistent and accountable information throughout the operations processes. An important contributing factor to both of these challenges is the file-centric nature of today's systems. In this paper, we provide an overview of these challenges and argue the need to move toward an information-centric mission operations system. We propose an information representation called Timeline as an approach to enable such a move, and we provide an overview of a Timeline-based Mission Operations System architecture.

Chung, Seung H.

Innovative Development of a Cross-Center Timeline Planning Tool

The Payload Operations Integration Center (POIC) at Marshall Space Flight Center (MSFC) is the United States focal point to support operations controllers and payload developers conducting payload science operations for the National Aeronautics and Space Administration (NASA) aboard the International Space Station (ISS). Some of the key functions are planning, coordination and scheduling of science activities. This effort occurs in coordination with other NASA centers, international partners, and payload developers. The ability to efficiently plan and re-plan in response to change is critical to the flight planning teams. Additionally, in Fall 2017, NASA will increase its ability to perform payload science operations aboard the ISS with a fourth crew member. In order to support this, there will be an increasing need to quickly plan and schedule more activities. In the past, it was cumbersome and time-consuming to consolidate copious amounts of planning and change request data from various sources. Planners would summarize information from the Johnson Space Center (JSC) Operations Planning Timeline Integration System (OPTIMIS) and manually integrate it with other data in order to produce a Timeline Planning Summary (TPS). This lengthy process of updating static documents while planning and re-planning was cumbersome, introduced human error, and was inflexible to last minute changes. There was a need for a dynamic, more efficient, less erroneous, and more concise way of building a report that could be readily updated as fast as payload science plans change.

Pedoto, Ramon W.

Detect and Avoid Timeline

This brief presentation provides a timeline for the steps taken by an unmanned aerial system (UAS) pilot when maneuvering to avoid a conflicting aircraft. This talk also provides time estimates for each step in the timeline utilizing 'measured response' data from previous Human Systems Integration Division simulation research.

Fern, Lisa

Human Performance of Novice Schedulers for Complex Spaceflight Operations Timelines

Objective: Investigate the effects on human performance as a function of scheduling task complexity for novice schedulers creating spaceflight timelines. Background: Future astronauts will be expected to self-schedule, yet will not be experts in creating timelines that meet complex constraints inherent to spaceflight operations. Method: Conducted a within-subject experiment to measure scheduling efficiency, effectiveness, workload and situation awareness while varying scheduling task complexity factors, namely number of constraints and types of constraints. Results: Fifteen participants completed various scheduling problems. Performance differences were identified between the independent variables. There was a main effect due to the number of constraints and type of constraint for efficiency, effectiveness, and workload. Significant interactions were observed in situation awareness and workload for certain types of constraints. Results also suggest that a lower number of constraints may be manageable by novice schedulers when compared to scheduling activities without constraints. Conclusion: Results suggest that novice schedulers performance decreases with high number of constraints and future scheduling aids may have to be targeted to type of constraint. Application: Knowledge on the effect of scheduling task complexity will help design scheduling systems that will enable self-scheduling for future astronauts. It will also inform other domains that conduct complex scheduling, such as nursing and manufacturing.

scheduling

Integrating Mission Timelines and Procedures to Enhance Situational Awareness in Human Spaceflight Operations

Future human spaceflight missions to the Moon, Mars, and beyond will have significant transmission delays and reduced communications bandwidth compared to operations in Low Earth Orbit, requiring increased crew autonomy due to the limited availability of real-time support from Mission Control Center (MCC). In this paper, we argue for the development of technology to enhance situational awareness (SA) for a remote MCC and astronauts onboard the vehicle, describe a usability study conducted towards this aim, and identify key usability features for the design of future integrated timeline tools. By tightly integrating timelines and procedures, future crew systems can predict future constraint violations, suggest resolutions to these violations, and ultimately support more successful missions.

user experience

A timeline algorithm for astronomy missions

An algorithm is presented for generating viewing timelines for orbital astronomy missions of the pointing (nonsurvey/scan) type. The algorithm establishes a target sequence from a list of candidate targets in a way which maximizes total viewing time. Two special cases are treated. One concerns dim targets which, due to lighting constraints, are scheduled only during the antipolar portion of each orbit. They normally require long observation times extending over several revolutions. A minimum slew heuristic is employed to select the sequence of dim targets. The other case deals with bright, or short duration, targets, which have less restrictive lighting constraints and are scheduled during the portion of each orbit when dim targets cannot be viewed. Since this process moves much more rapidly than the dim path, an enumeration algorithm is used to select the sequence that maximizes total viewing time.

Moore, J. E.

Timeline Analysis Program (TLA-1)

The Timeline Analysis Program (TLA-1) was described. This program is a crew workload analysis computer program that was developed and expanded from previous workload analysis programs, and is designed to be used on the NASA terminal controlled vehicle program. The following information is described: derivation of the input data, processing of the data, and form of the output data. Eight scenarios that were created, programmed, and analyzed as verification of this model were also described.

Miller, K. H.

Timeline analysis program (TLA-1), appendices

Appendices for the Timeline Analysis Program (TLA-1) were given. The appendices contain the Atlanta terminal area scenarios, the task catalog and the control and display configurations for the forward and aft flight decks of the NASA 515 aircraft, and the event/procedure, phase, mission, and subsystem catalogs.

Miller, K. H.

Simulation of mission timelines for the Spacelab program

The paper describes the structure of the Special Purpose Simulation Language (SPSL) designed to overcome certain problems encountered in the use of the General Purpose Simulation Language (GPSL) when applied to simulation and validation of Spacelab mission timelines. The current analysis system is GROPE (Ground Resource Operations Planning Executive), the main data base models of which are the ground operations model, the mission model, the resource model, and the traffic model. Some of the simulation problem areas are mentioned, and unique features of the SPSL are highlighted.

Roberts, J. S.

Development of the Spartan 101 navigation and pointing timeline

This paper presents the techniques and analyses that were used to construct the Spartan 101 mission pointing timeline for the Space Shuttle Orbiter-detached portion of its flight. This covers the design process that had to transform requirements and constraints originating from the experimenter, the Space Transportation System, and the payload hardware design into a workable set of pointing instructions sequenced to mission events. The paper will discuss the technical approach used for initial attitude acquisition, determining target visibility, observation scheduling, and calculation of vehicle maneuvers.

Lambros, S. D.

Graphical timeline editing

NASA's Experiment Scheduling Program (ESP), which has been used for approximately 12 Spacelab missions, is being enhanced with the addition of a Graphical Timeline Editor. The GTE Clipboard, as it is called, was developed to demonstrate new technology which will lead the development of International Space Station Alpha's Payload Planning System and support the remaining Spacelab missions. ESP's GTE Clipboard is developed in C using MIT's X Windows System X11R5 and follows OSF/Motif Style Guide Revision 1.2.

Meyer, Patrick E.

Load-Following Power Timeline Analyses for the International Space Station

Spacecraft are typically complex assemblies of interconnected systems and components that have highly time-varying thermal communications, and power requirements. It is essential that systems designers be able to assess the capability of the spacecraft to meet these requirements which should represent a realistic projection of demand for these resources once the vehicle is on-orbit. To accomplish the assessment from the power standpoint, a computer code called ECAPS has been developed at NASA Lewis Research Center that performs a load-driven analysis of a spacecraft power system given time-varying distributed loading and other mission data. This program is uniquely capable of synthesizing all of the changing spacecraft conditions into a single, seamless analysis for a complete mission. This paper presents example power load timelines with which numerous data are integrated to provide a realistic assessment of the load-following capabilities of the power system. Results of analyses show how well the power system can meet the time-varying power resource demand.

Fincannon, James

Timeline-Based Space Operations Scheduling with External Constraints

We describe a timeline-based scheduling algorithm developed for mission operations of the EO-1 earth observing satellite. We first describe the range of operational constraints for operations focusing on maneuver and thermal constraints that cannot be modeled in typical planner/schedulers. We then describe a greedy heuristic scheduling algorithm and compare its performance to both the prior scheduling algorithm - documenting an over 50% increase in scenes scheduled with estimated value of millions of dollars US. We also compare to a relaxed optimal scheduler showing that the greedy scheduler produces schedules with scene count within 15% of an upper bound on optimal schedules.

Chien, Steve

Innovative Development of a Cross-Center Timeline Planning Tool

The Payload Operations Integration Center (POIC) at Marshall Space Flight Center (MSFC) supports planning, coordination and scheduling of science activities for the International Space Station (ISS) in coordination with other NASA centers, international partners, and payload developers. The ability to efficiently plan and re-plan in response to change is critical to the flight planning teams. With the achievement of supporting a fourth crew member aboard the ISS and an increasing amount of payload science activities, came the need for a dynamic, more efficient way of building timeline planning reports that could be readily updated as fast as payload science plans could change. This paper addresses software architecture considerations in the successful cross-center development of an automated planning tool with multiple data sources. It also discusses the practical implementation of a time-boxed, hybrid Agile Software Development (ASD) approach to deliver customer-driven value despite changing requirements with respect to low-Earth orbit operational planning activities. The goal of this paper is to open discussion with members of the international community and trade effective strategies for cross-center architectural and customer-developer driven collaborations, to support increasing utilization of planning and conducting science activities in space.

Pedoto, Ramon W.