Search NASA⌕ Search

SEARCH · Search NASA

Results for “Trans Earth Injection”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Mars orbit selection

Parking orbits for a manned Mars mission are examined for ease of access to the Martian moons. Delta V plots for a variety of burns versus elliptical orbit apoapsis are included. A high elliptical orbit (24 hour period, 500 km periapsis, 20 to 30 deg. inclination) minimizes delta V to the Martian moons and Mars orbit insertion (MOI) and trans-Earth injection (TEI) delta Vs.

Gus R Babb↗

Optimal parking orbits for manned Mars missions

This paper summarizes a Mars parking orbit optimization effort. This parking orbit study includes the selection of optimal elliptic Mars parking orbits that meet mission constraints and that include pertinent apsidal misalignment losses. Mars missions examined are for the opportunity years of 2014, 2016, and 2018. For these mission opportunities, it is shown that the optimal parking orbits depend on the year that the mission occurs and are coupled with the outbound, Mars stay, and return phases of the mission. Constraints included in the parking orbit optimization process are periapsis lighting angle (related to a daylight landing requirement), periapsis latitude (related to a landing latitude range requirement) and the vehicle Trans-Earth-Injection stage mass. Also, effects of mission abort requirements on optimal parking orbits are investigated. Off-periapsis maneuvers for Mars orbit capture were found to be cost effective in reducing the mission delta-V for the 2016 abort from Mars capture scenario. The total capture and departure delta-V was `split' between the capture maneuver and the departure maneuver to reduce the 2016 Mars departure delta-V to below the level of the corresponding stage of the 2014 baseline mission. Landing results are provided that show Mars landing site access from the optimal elliptic parking orbits for Mars excursion vehicles with low (0.2) and high (1.3 and 1.6) lift to drag ratio.

Cupples, Michael L.↗

Departure Energies, Trip Times and Entry Speeds for Human Mars Missions

The study examines how the mission design variables departure energy, entry speed, and trip time vary for round-trip conjunction-class Mars missions. These three parameters must be balanced in order to produce a mission that is acceptable in terms of mass, cost, and risk. For the analysis, a simple, massless- planet trajectory program was employed. The premise of this work is that if the trans-Mars and trans-Earth injection stages are designed for the most stringent opportunity in the energy cycle, then there is extra energy capability in the "easier" opportunities which can be used to decrease the planetary entry speed, or shorten the trip time. Both of these effects are desirable for a human exploration program.

Munk, Michelle M.↗

Departure Energies, Trip Times and Entry Speeds for Human Mars Missions

The study examines how the mission design variables departure energy, entry speed, and trip time vary for round-trip conjunction-class Mars missions. These three parameters must be balanced in order to produce a mission that is acceptable in terms of mass, cost, and risk. For the analysis, a simple, massless-planet trajectory program was employed. The premise of this work is that if the trans-Mars and trans-Earth injection stages are designed for the most stringent opportunity in the energy cycle, then there is extra energy capability in the "easier" opportunities which can be used to decrease the planetary entry speed, or shorten the trip time. Both of these effects are desirable for a human exploration program.

Munk, Michelle M.↗

First Cut

Lockheed Martin and a Northrop Grumman/Boeing team expect the Crew Exploration Vehicle proposals they submitted last week to change, given the new top-down push at NASA to close the gap between space shuttle retirement and launch of the new crew carrier. Still, delivery of the proposals gives a first glimpse of at least one of the concepts for a space shuttle replacement. Instead of the ballistic capsule approach put forward in some early CEV concept work, Lockheed Martin proposed a lifting body shape with a two-stage thermal protection system, coupled with a cylindrical mission module to give crews of four to six extra room on trips to the Moon, and a trans-Earth injection module (TEIM) for the return powered-at least in the first cut-by a couple of Pratt & Whitney RL10 rocket engines.

Morring, Frank, Jr.↗

Orion GN and C Overview and Architecture

The Crew Exploration Vehicle, named Orion, is a critical element in the Constellation Program to develop the transportation system needed to send humans back to the moon and then beyond. Lockheed Martin is the prime contractor for the Orion spacecraft, which is managed by the Johnson Space Center. The Orion GN&C sub-system is being jointly developed by NASA and Lockheed Martin through a mode team approach. The GN&C is a critical element of the Orion mission to carry astronauts to low earth orbit to service the International Space Station and then on later flights to transfer and return a crew of four to the moon. The Orion GN&C system must perform monitoring and abort functions during ascent, rendezvous and docking in both low earth and lunar orbits, perform uncrewed lunar loiter operations, perform trans earth injection and atmospheric entry and landing. The Orion also must be integrated with the Ares I Crew Launch Vehicle, the Earth Departure Stage of the Ares V and the Lunar Surface Access Module. This paper provides an overview of the Orion GN&C system. The functional capabilities of the Orion GN&C will be provided in the context of Constellation architecture, the key GN&C requirements will be summarized, the GN&C architecture will be presented, the development schedule and plans will summarized and finally conclusions will be presented.

Hu, Howard↗

CEV Trajectory Design Considerations for Lunar Missions

The Crew Exploration Vehicle (CEV) translational maneuver Delta-V budget must support both the successful completion of a nominal lunar mission and an "anytime" emergency crew return with the potential for much more demanding orbital maneuvers. This translational Delta-V budget accounts for Earth-based LEO rendezvous with the lunar surface access module (LSAM)/Earth departure stage (EDS) stack, orbit maintenance during the lunar surface stay, an on-orbit plane change to align the CEV orbit for an in-plane LSAM ascent, and the Moon-to-Earth trans-Earth injection (TEI) maneuver sequence as well as post-TEI TCMs. Additionally, the CEV will have to execute TEI maneuver sequences while observing Earth atmospheric entry interface objectives for lunar high-latitude to equatorial sortie missions as well as near-polar sortie and long duration missions. The combination of these objectives places a premium on appropriately designed trajectories both to and from the Moon to accurately size the translational V and associated propellant mass in the CEV reference configuration and to demonstrate the feasibility of anytime Earth return for all lunar missions. This report examines the design of the primary CEV translational maneuvers (or maneuver sequences) including associated mission design philosophy, associated assumptions, and methodology for lunar sortie missions with up to a 7-day surface stay and with global lunar landing site access as well as for long duration (outpost) missions with up to a 210-day surface stay at or near the polar regions. The analyses presented in this report supports the Constellation Program and CEV project requirement for nominal and anytime abort (early return) by providing for minimum wedge angles, lunar orbit maintenance maneuvers, phasing orbit inclination changes, and lunar departure maneuvers for a CEV supporting an LSAM launch and subsequent CEV TEI to Earth return, anytime during the lunar surface stay.

Condon, Gerald L.↗

Human/Automation Trade Methodology for the Moon, Mars and Beyond

It is possible to create a consistent trade methodology that can characterize operations model alternatives for crewed exploration missions. For example, a trade-space that is organized around the objective of maximizing Crew Exploration Vehicle (CEV) independence would have the input as a classification of the category of analysis to be conducted or decision to be made, and a commitment to a detailed point in a mission profile during which the analysis or decision is to be made. For example, does the decision have to do with crew activity planning, or life support? Is the mission phase trans-Earth injection, cruise, or lunar descent? Different kinds of decision analysis of the trade-space between human and automated decisions will occurs at different points in a mission's profile. The necessary objectives at a given point in time during a mission will call for different kinds of response with respect to where and how computers and automation are expected to help provide an accurate, safe, and timely response. In this paper, a consistent methodology for assessing the trades between human and automated decisions on-board will be presented and various examples discussed.

Korsmeyer, David J.↗

A High Power Solar Electric Propulsion - Chemical Mission for Human Exploration of Mars

Recently Solar Electric Propulsion (SEP) as a main propulsion system has been investigated as an option to support manned space missions to near-Earth destinations for the NASA Gateway spacecraft. High efficiency SEP systems are able to reduce the amount of propellant long duration chemical missions require, ultimately reducing the required mass delivered to Low Earth Orbit (LEO) by a launch vehicle. However, for long duration interplanetary Mars missions, using SEP as the sole propulsion source alone may not be feasible due to the long trip times to reach and insert into the destination orbit. By combining an SEP propulsion system with a chemical propulsion system the mission is able to utilize the high-efficiency SEP for sustained vehicle acceleration and deceleration in heliocentric space and the chemical system for orbit insertion maneuvers and trans-earth injection, eliminating the need for long duration spirals. By capturing chemically instead of with low-thrust SEP, Mars stay time increases by nearly 200 days. Additionally, the size the of chemical propulsion system can be significantly reduced from that of a standard Mars mission because the SEP system greatly decreases the Mars arrival and departure hyperbolic excess velocities (V(sub infinity)).

Solar Electric Propulsion↗

MOI to TEI : a Mars Sample Return strategy

This paper describes the issues and challenges related to the design of the rendezvous between the Earth Return Vehicle (ERV) and the Orbiting Sample (OS) for the Mars Sample Return (MSR) mission. In particular, attention will be focused on the strategy for 'optimizing' the intermediate segment of the rendezvous process, during which there are a great number of variables that must be considered and well understood.

rendezvous↗

Mars Sample Return - Launch and Detection Strategies for Orbital Rendezvous

This study sets forth conceptual mission design strategies for the ascent and rendezvous phase of the proposed NASA/ESA joint Mars Sample Return Campaign. The current notional mission architecture calls for the launch of an acquisition/cache rover in 2018, an orbiter with an Earth return vehicle in 2022, and a fetch rover and ascent vehicle in 2024. Strategies are presented to launch the sample into a coplanar orbit with the Orbiter which facilitate robust optical detection, orbit determination, and rendezvous. Repeating ground track orbits exist at 457 and 572 km which provide multiple launch opportunities with similar geometries for detection and rendezvous.

Orbiter's trans-Earth injection (TEI):↗

Radiation Environments for Lunar Programs

Developing reliable space systems for lunar exploration and infrastructure for extended duration operations on the lunar surface requires analysis and mitigation of potential system vulnerabilities to radiation effects on materials and systems. This paper reviews the characteristics of space radiation environments relevant to lunar programs including the trans-Earth and trans-lunar injection trajectories through the Earth's radiation belts, solar wind surface dose environments, energetic solar particle events, and galactic cosmic rays and discusses the radiation design environments being developed for lunar program requirements to assure that systems operate successfully in the space environment.

Minow, Joseph I.↗

A Survey of Ballistic Transfers to Low Lunar Orbit

A simple strategy is identified to generate ballistic transfers between the Earth and Moon, i.e., transfers that perform two maneuvers: a trans-lunar injection maneuver to depart the Earth and a Lunar Orbit Insertion maneuver to insert into orbit at the Moon. This strategy is used to survey the performance of numerous transfers between varying Earth parking orbits and varying low lunar target orbits. The transfers surveyed include short 3-6 day direct transfers, longer 3-4 month low energy transfers, and variants that include Earth phasing orbits and/or lunar flybys.

Transfers↗

Closed Loop Guidance Trade Study for Space Launch System Block-1B Vehicle

NASA is currently building the Space Launch System (SLS) Block-1 launch vehicle for the Exploration Mission 1 (EM-1) test flight. The design of the next evolution of SLS, Block-1B, is well underway. The Block-1B vehicle is more capable overall than Block-1; however, the relatively low thrust-to-weight ratio of the Exploration Upper Stage (EUS) presents a challenge to the Powered Explicit Guidance (PEG) algorithm used by Block-1. To handle the long burn durations (on the order of 1000 seconds) of EUS missions, two algorithms were examined. An alternative algorithm, OPGUID, was introduced, while modifications were made to PEG. A trade study was conducted to select the guidance algorithm for future SLS vehicles. The chosen algorithm needs to support a wide variety of mission operations: ascent burns to LEO, apogee raise burns, trans-lunar injection burns, hyperbolic Earth departure burns, and contingency disposal burns using the Reaction Control System (RCS). Additionally, the algorithm must be able to respond to a single engine failure scenario. Each algorithm was scored based on pre-selected criteria, including insertion accuracy, algorithmic complexity and robustness, extensibility for potential future missions, and flight heritage. Monte Carlo analysis was used to select the final algorithm. This paper covers the design criteria, approach, and results of this trade study, showing impacts and considerations when adapting launch vehicle guidance algorithms to a broader breadth of in-space operations.

Von der Porten, Paul↗

In situ propellant production: Alternatives for Mars exploration

Current planning for the Space Exploration Initiative (SEI) recognizes the need for extraterrestrial resources to sustain long-term human presence and to attain some degree of self-sufficiency. As a practical matter, reducing the need to carry large supplies of propellant from Earth will make space exploration more economical. For nearly every round trip planned with conventional propulsion, the actual payload is only a small fraction - perhaps 10-15 percent - of the mass launched from Earth. The objective of this study was to analyze the potential application for SEI missions of propellants made exclusively from lunar or martian resources. Using such propellants could minimize or eliminate the cost of carrying propellant for surface excursion vehicles and return transfers through two high-energy maneuvers: Earth launch and trans-Mars injection. Certain chemical mono- and bipropellants are candidates for this approach; they could be recovered entirely from in situ resources on the Moon and Mars, without requiring a continuing Earth-based resupply of propellant constituents (e.g., fuel to mix with a locally obtained oxidizer) and, perhaps, with minimal need to resupply consumables (e.g., reagents or catalyst for process reactions). A complete assessment of the performance potential of these propellants must include the requirements for installation, operations, maintenance, and resupply of the chemical processing facility.

Stancati, Michael L.↗

NASA Constellation Program (CxP) Key Driving Requirements and Element Descriptions for International Architecture Working Group (IAWG) Functional Teams Human Transportation Cargo Transportation

The NASA Constellation uncrewed cargo mission delivers cargo to any designated location on the lunar surface (or other staging point) in a single mission. This capability is used to deliver surface infrastructure needed for lunar outpost construction, to provide periodic logistics resupply to support a continuous human lunar presence, and potentially deliver other assets to various locations.In the nominal mission mode, the Altair lunar lander is launched on Ares V into Low Earth Orbit (LEO), following a short Low Earth Orbit (LEO) loiter period, the Earth Departure Stage (EDS) performs the Trans Lunar Injection (TLI) burn and is then jettisoned. The Altair performs translunar trajectory correction maneuvers as necessary and performs the Lunar Orbit Insertion (LOI) burn. Altair then descends to the surface to land near a designated target, presumably in proximity to an Outpost location or another site of interest for exploration.Alternatively, the EDS and Altair Descent Stage could deliver assets to various staging points within their propulsive capabilities.

Martinez, Roland M.↗

Launch Order, Launch Separation, and Loiter in the Constellation 1 1/2-Launch Solution

The NASA Constellation Program (CxP) is developing a two-element Earth-to-Orbit launch system to enable human exploration of the Moon. The first element, Ares I, is a human-rated system that consists of a first stage based on the Space Shuttle Program's solid rocket booster (SRB) and an upper stage that consists of a four-crew Orion capsule, a service module, and a Launch Escape System. The second element, Ares V, is a Saturn V-plus category launch system that consists of the core stage with a cluster of six RS-68B engines and augmented with two 5.5-segment SRBs, a Saturn-derived J-2X engine powering an Earth Departure Stage (EDS), and the lunar-lander vehicle payload, Altair. Initial plans called for the Ares V to be launched first, followed the next day by the Ares I. After the EDS performs the final portion of ascent and subsequent orbit circularization, the Orion spacecraft then performs a rendezvous and docks with the EDS and its Altair payload. Following checkout, the integrated stack loiters in low Earth orbit (LEO) until the appropriate Trans-Lunar Injection (TLI) window opportunity opens, at which time the EDS propels the integrated Orion Altair to the Moon. Successful completion of this 1 1/2-launch solution carries risks related to both the orbital lifetime of the assets and the probability of achieving the launch of the second vehicle within the orbital lifetime of the first. These risks, which are significant in terms of overall system design choices and probability of mission success, dictated a thorough reevaluation of the launch strategy, including the order of vehicle launch and the planned time period between launches. The goal of the effort described in this paper was to select a launch strategy that would result in the greatest possible expected system performance, while accounting for launch risks and the cost of increased orbital lifetime. Discrete Event Simulation (DES) model of the launch strategies was created to determine the probability of a second launch not occurring in a timely fashion (i.e., before the assets waiting in LEO expire). An overview of the launch strategy evaluation process is presented, along with results of specific cases that were analyzed. A high-level comparison of options is then presented, along with the conclusion derived from the analysis.

Stromgren, Chel↗

Lunar Base Construction Overview

Previous lunar missions and campaigns have been restricted to using robotic landers and lunar orbiting satellites as well as sortie type of operations using astronaut crews (NASA Apollo program). The next phase of lunar exploration has begun under NASA’s Artemis program and there has been an international response where other nations such as China, Russia, India, Canada, Japan and the European Union of nations, have all expressed interest in either collaborating or competing with NASA on the Moon. This next phase has an over arching goal of achieving a permanent human presence on the Moon via sustainable methods. A lunar base with human occupancy will require infrastructure to provide shelter, utilities, landing/launch pads, roads, communications, power and all the other necessities to sustain human life and protect equipment. Since human biology is not well suited for surviving in the lunar environment, there will be many forms of automated equipment, autonomy and robotic helpers that will minimize the amount of Extra-Vehicular Activity (EVA) required by the crew. This will mean that the radiation dosage received by the crew will stay within acceptable and safe career doses. The required infrastructure must be constructed, but the mass and logistics of bringing all the construction materials from Earth are prohibitive, which makes the necessary construction difficult to achieve. In-Situ Resource Utilization (ISRU) aims to solve this challenge by sourcing construction materials locally or “in-situ”. This means that their transportation can be completely eliminated, resulting in large cost savings by avoiding the launch out of Earth’s deep gravity well and subsequent trans lunar injection, lunar orbit capture and landing. This paper will give an overview of the required construction tasks and related equipment that will be required to robotically build a lunar base using in-situ resources. It will also organize these tasks into logical groupings so that technology development and implementation can be pursued within a framework that can be referenced by all involved.

Construction↗