An Introduction to the Federated Architecture for Secure and Transactive Distributed Energy Management Solutions (FAST-DERMS): Preprint

Deployment and capability of distributed energy resources (DER) in power systems is growing rapidly. These resources present an opportunity for low-cost provision of energy and grid services. The Federal Energy Regulatory Commission recently provided rulings to enable market participation of these distribution-connected resources, but the prevailing strategies for their management may not scale well to meet future needs. This paper introduces the Federated Architecture for Secure and Transactive Distributed Energy Management Solutions (FASTDERMS) which was designed to address this need. In it we describe the architectural features of the approach, and a reference controls implementation employing a hierarchical coordination that includes stochastic optimization, model predictive control, and a simple real-time management scheme. Sample results from simulation show firm transmission-level service provision measured at the distribution substation.

DERMS↗

Optimized V1G and V2G Electric Vehicle Fleet Management and Grid Transaction at Marine Corps Air Station Miramar in San Diego, CA

The overall technical goal of the project was to demonstrate an all-electric bi-directional non-tactical fleet at Marine Corps Air Station (MCAS) Miramar that was integrated and controlled with other distributed energy resources (DERs) (i.e., PV, stationary battery, and building loads) to provide resilience to critical electric loads in the event of grid outages, to minimize charging costs, and to provide economic energy resources to electricity markets. In this project, the specific, technical objectives were: 1. Demonstrate that bi-directional electric vehicles can provide critical complementary services to fixed storage batteries in microgrid applications while performing function as non-tactical vehicles. 2. Demonstrate participation of bi-directional (V2G) and unidirectional (V1G) PEVs for demand management and minimization of charging costs. 3. Demonstrate integration of multiple DERs for grid service participation. US Marine Corps Air Station (MCAS) Miramar in San Diego was the site of this electric vehicle-to-microgrid-utility grid test and demonstration project. Existing microgrid assets in this study included (1) a public works building; (2) a 30-kW rooftop photovoltaic (PV) system and (3) a separate 250 kW carport PV system. In this project, six bi-directional V2G vans were located at the MCAS Miramar’s showcase building-scale microgrid to develop and test technical capabilities that V2G can provide in microgrid applications (e.g., cost reduction and resiliency). These resources provided aggregated demand management and simulated participation in current retail DR programs. The vehicles used in this demonstration were selected because they provided functionality that MCAS Miramar needed, 15 passenger transport and facilities work cargo carrying capacity, and bi-directional charging capability that the research project required. All vehicles in this study were manufactured and distributed by VIA Motors, Inc. There were six vehicles total and each was VIA’s VTRUX eREV V2G model, a modified General Motors Chevrolet 2500 2WD van. Three of the vans were configured as passenger vans and the other three were configured as cargo vans. Each van had an on-board bi-direcrtional inverter/charger, Bel Power Solutions model 350INVCHGT150-120-240-8G nominally rated at +/-15 kW. The VIA van’s charging connector follows the J1772 charging protocol. The bi-directional EVSEs demonstrated in this study were manufactured by Coritech, Inc. Each VGI-80-AC charging station enabled enhanced V2G charging capability to a Clipper Creek CS-100 charging module. The enhanced capabilities included ethernet communication following the SEP2.0 protocol with a distributed energy resource function set and an operator screen displaying real-time SOC, voltage, and current. The VGI-80-AC charging stations are classified as level 2 with a maximum current output of 80 A or effectively 19 kW. The VIA van’s onboard charger limited the charging and discharging power to 15 kW in each direction. A control computer was installed in the EWOC and connected to an existing monitor. The V2G control communication network was a completely stand-alone closed system that did not have any connection to any other networks on the base. A cybersecure remote communication connection was created with a cellular modem, firewall hardware, and a virtual private network configuration.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Federated Architecture for Secure and Transactive Distributed Energy Resource Management Solutions (FAST-DERMS)

This document provides system-level specifications for a federated architecture for secure and transactive distributed energy resource management solutions (FAST-DERMS), presents a solution, and describes operational concepts for the proposed solution. FAST-DERMS enables the provision of reliable, resilient, and secure transmission and distribution (T&D) grid services through the scalable aggregation and near-real-time management of utility-scale and small-scale distributed energy resources (DERs). We first present the principles and objectives of FAST-DERMS. Then, after discussing important system concepts, we present the specifications for FAST-DERMS and a solution that employs a distributed and federated control methodology in which the DERs connected to a single point of common coupling with the rest of the system, such as individual substations, are optimized coordinately to provide system-level grid services. FAST-DERMS aims to aggregate and coordinate the operations of DERs to support T&D grid operations. The key optimization and control component of this FAST-DERMS reference implementation is a flexible resource scheduler (FRS) that aggregates the DERs within a substation service area. These FRSs operate at the substation level and perform constrained economic dispatch of DERs, either directly or through a transactive market or aggregator, as shown in Figure ES-1. An FRS Coordinator at the distribution system operator (DSO) level aggregates distribution substations operated by FRSs and interfaces with the transmission system operator (TSO) to provide transmission services. FAST-DERMS also allows for the integration of the FRS Coordinator with an existing distribution utility management system that could be employed by the DSO to enhance distribution grid operations.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Twin-page storage management for rapid transaction-undo recovery

This paper presents and evaluates a new twin-page disk-storage management scheme for rapid database transaction-undo recovery. In contrast to previous twin-page schemes, the present approach uses static page mapping and allows dirty pages in the main memory to be written, at any instant, onto disk without the requirement of undo logging. No explicit undo is required when a transaction is aborted. Transaction undo is implicitly performed by not subsequently fetching from disk the invalid pages updated by the aborted transaction. Performance in terms of disk I/O and CPU overhead for transaction-undo recovery is analyzed and compared with a previous approach TWIST. It is shown that the scheme achieves rapid transaction-undo recovery without degrading average system performance for various workloads, and that the scheme is well suited for applications with a large number of updates and frequent transaction aborts.

Wu, Kun-Lung↗

Evaluating the Feasibility of Transactive Approach for Voltage Management Using Inverters of a PV Plant

This article evaluates the feasibility of a double-auction-based Transactive Energy System (TES) for engaging the reactive power (Var) capability of inverters in a utility-scale pho¬tovoltaic (PV) plant for voltage management in distribution feed¬ers. In this approach, a PV plant owner (seller) provides Var supply curves in terms of price-quantity pairs consider¬ing the inverters’ P-Q capability, efficiency, opportunity cost for real power curtail¬ment, losses, etc. At the same time, the utility (buyer) proposes Var demand curves in price-quantity pairs exhibiting the marginal price of Var. Then, market clearing points are obtained from the intersection points of supply and demand curves which are then used to create Var dispatch sig-nals from the PV plant. To conduct a fea¬sibility study of this approach, an Australian distribution network with a utility-scale PV plant (capacity 3.275 MWP) is modeled in RSCAD and simu¬lated in real-time on MATLAB, RSCAD-RTDS co-simulation platform using real historical data. Consid¬ering a use case, namely, conservation voltage reduction (CVR), the operational feasibility along with cost-benefit analysis is demonstrated in software-in-the-loop (SIL) and hardware-in-the-loop (HIL) platform. Another use case, exploring the benefit from tap-change reduction of step-voltage-regulator, is investigated. These studies explore further use cases, e.g., PV hosting capacity, network reconfiguration, etc., to be incorporated in TES for experiencing substantial economic benefits.

Alam, Mollah Rezaul↗

Providing the Persistent Data Storage in a Software Engineering Environment Using Java/COBRA and a DBMS

An investigation was undertaken to build the software foundation for the WHERE (Web-based Hyper-text Environment for Requirements Engineering) project. The TCM (Toolkit for Conceptual Modeling) was chosen as the foundation software for the WHERE project which aims to provide an environment for facilitating collaboration among geographically distributed people involved in the Requirements Engineering process. The TCM is a collection of diagram and table editors and has been implemented in the C++ programming language. The C++ implementation of the TCM was translated into Java in order to allow the editors to be used for building various functionality of the WHERE project; the WHERE project intends to use the Web as its communication back- bone. One of the limitations of the translated software (TcmJava), which militated against its use in the WHERE project, was persistent data management mechanisms which it inherited from the original TCM; it was designed to be used in standalone applications. Before TcmJava editors could be used as a part of the multi-user, geographically distributed applications of the WHERE project, a persistent storage mechanism must be built which would allow data communication over the Internet, using the capabilities of the Web. An approach involving features of Java, CORBA (Common Object Request Broker), the Web, a middle-ware (Java Relational Binding (JRB)), and a database server was used to build the persistent data management infrastructure for the WHERE project. The developed infrastructure allows a TcmJava editor to be downloaded and run from a network host by using a JDK 1.1 (Java Developer's Kit) compatible Web-browser. The aforementioned editor establishes connection with a server by using the ORB (Object Request Broker) software and stores/retrieves data in/from the server. The server consists of a CORBA object or objects depending upon whether the data is to be made persistent on a single server or multiple servers. The CORBA object providing the persistent data server is implemented using the Java progranu-ning language. It uses the JRB to store/retrieve data in/from a relational database server. The persistent data management system provides transaction and user management facilities which allow multi-user, distributed access to the stored data in a secure manner.

Dhaliwal, Swarn S.↗

Federated Architecture for Secure and Transactive Distributed Energy Resource Management Solutions

There are fewer conventional, dispatchable generation resources and more variable renewable energy (VRE) and distributed energy resources (DERs). There is more uncertainty from bulk-level VRE and net demand from distribution systems with high DER levels. FAST-DERMS aims to develop and demonstrate a scalable solution for managing uncertainties in supply and demand at the grid edge. We propose that distribution system operators (DSOs) provide firm net load forecasts to the bulk system operator's energy management system (EMS).

distributed energy resources↗

Blockchain Research and Development Activities Sponsored by the U.S. Department of Energy and Utility Sector

This article provides an in-depth analysis of blockchain research in the energy sector, focusing on projects funded by the U.S. Department of Energy (DOE) and comparing them with industry-funded initiatives. A total of 110 funded activities within the U.S. power industry were successfully tracked and mapped into a newly developed categorization framework. This framework is designed to help research agencies to systematically understand their funded portfolio. Such characterization is expected to help them make effective investments, identify research gaps, measure impact, and advance technological progress to meet national goals. In line with this need, the proposed framework proposes a 2-D categorization matrix to systematically classify blockchain efforts within the energy sector.Under the proposed framework, the Energy System Domain serves as the primary classification dimension, categorizing use cases into 30 distinct applications. The second dimension, Blockchain Properties, captures the specific needs and functionalities provided by Blockchain technology. The aim was to capture blockchain’s applicability and functionality: where and why blockchain? Principles behind the selection of the viewpoint dimensions were carefully defined based on consensus obtained through the Blockchain for Optimized Security and Energy Management (BLOSEM) project. The mapped results show that activities within the Grid Automation, Coordination, and Control (31.8%), Marketplaces and Trading (25.5%), Foundational Blockchain Research (19.1%), and Supply Chain Management (17.3%) domains have been actively pursued to date. The three leading specific use case applications were identified as Transactive Energy Management for Marketplaces and Trading, Asset Management for Supply Chain Management, and Fundamental Blockchain for Foundational Blockchain Research. The Marketplaces and Trading and Retail Services Enablement domains stood out as being favored by industry by a factor greater than 2 (2.3 and 2.6, respectively), yet there seemed to be little to zero investment from DOE. Approximately 76% of the total projects prioritized Immutability, Identity Management, and Decentralization and/or Disintermediation compared to Asset Digitization and/or Tokenization, Automation, and Privacy and/or Anonymity. The greatest discrepancies between DOE and industry were in Asset Digitization and/or Tokenization and Automation. The industry efforts (36% in Asset Digitization/Tokenization and 22% in Automation) was 14 times and 2.4 times, respectively, more intensive than the DOE-sponsored efforts, indicating a significant discrepancy in industry versus government priorities. Overall, quantifying DOE-sponsored projects and industry activities through mapping provides clarity on portfolio investments and opportunities for future research.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Mars Express Forward Link Capabilities for the Mars Relay Operations Service (MaROS)

This software provides a new capability for landed Mars assets to perform forward link relay through the Mars Express (MEX) European Union orbital spacecraft. It solves the problem of standardizing the relay interface between lander missions and MEX. The Mars Operations Relay Service (MaROS) is intended as a central point for relay planning and post-pass analysis for all Mars landed and orbital assets. Through the first two phases of implementation, MaROS supports relay coordination through the Odyssey orbiter and the Mars Reconnaissance Orbiter (MRO). With this new software, MaROS now fully integrates the Mars Express spacecraft into the relay picture. This new software generates and manages a new set of file formats that allows for relay request to MEX for forward and return link relay, including the parameters specific to MEX. Existing MEX relay planning interactions were performed via email exchanges and point-to-point file transfers. By integrating MEX into MaROS, all transactions are managed by a centralized service for tracking and analysis. Additionally, all lander missions have a single, shared interface with MEX and do not have to integrate on a mission-by mission basis. Relay is a critical element of Mars lander data management. Landed assets depend largely upon orbital relay for data delivery, which can be impacted by the availability and health of each orbiter in the network. At any time, an issue may occur to prevent relay. For this reason, it is imperative that all possible orbital assets be integrated into the overall relay picture.

Allard, Daniel A.↗

Platform Management System (PMS) evolution

In fiscal year 1988 a study was begun to define the platform management system (PMS) functions required for the mature platform operations era. The objectives of the task include: (1) defining how to increase the operational productivity of the platform by providing enhanced capability for responding to changing events, (2) influencing the initial PMS design by identifying required 'hooks and scars', and (3) evaluation potential automation techniques that are appropriate given predicted onboard computing resources. Initial platform operations scenarios were defined. The focus was on PMS-related functions where operations enhancements are likely to occur. Operations productivity was defined in terms of scientific productivity of the platform as well as the level of automation of the ground system. The Platform Operations Productivity Enhancement Report was completed earlier this year documenting system enhancements to increase science productivity and ground system automation. Using the baseline PMS defined in the PMS Definition Document as a starting point, the resulting PMS-specific enhancements were molded into a sequence of progressively more sophisticated operations management capabilities. This sequence of upgrades to the PMS has been documented in a PMS Evolution Plan. The plan includes enhancements in the areas of resources scheduling, resource modeling, system and payload anomaly management, and transaction sequence interpretation. A plan for migration of functions from the ground portion of the PMS to the flight portion is also included. The impacts of this plan on the platform are now being documented to ensure that the required 'hooks and scars' are included in the baseline system. Future plans include a prototype of some of the PMS enhancements to address the feasibility of and techniques for implementing these enhancements in the onboard computing environment.

Tilley, Mike↗

Interregional Transmission Operational Coordination

This presentation will discuss challenges and opportunities on interregional coordination in the areas of interchange transaction, congestion management, reserve sharing and deliverability across multi-stage operational processes. It will then provide an overview of the interregional transmission operational coordination (IRTOC) project that currently focuses on congestion management, including Inter-regional transmission coordination in real time operations and operational planning, HVDC optimization (intra- and interregional), ancillary service deliverability (intra- and interregional). In addition, it will discuss the Sienna-Decomposition tool development to systematically study interregional coordination methods.

congestion management↗

Rapid transaction-undo recovery using twin-page storage management

This paper presents a twin-page storage method, which is an alternative to the TWIST (twin slot) approach by Reuter, for rapid transaction-undo recovery. In contrast to TWIST, our twin-page approach allows dirty pages in the buffer to be written at any instant onto disk without the requirement of undo logging, and, when a transaction is aborted, no explicit undo is required. As a result, all locks accumulated by the aborted transaction can be released earlier, allowing other transactions waiting for the locks to proceed. Through maintenance of aborted transaction identifiers, invalid pages written by the aborted transaction coexist with other valid pages and are guaranteed not be accessed by subsequent transactions. Instead of an explicit undo, most of the invalid pages are overwritten by subsequent normal updates. Performance in terms of disk I/O and CPU overhead for transaction-undo recovery is analyzed and compared with TWIST. It is shown that our scheme is particularly suited for applications where there are a large number of updates written onto disk when transactions are aborted, and there are frequent aborts. The approach, however, is not as applicable to environments where transactions are typically short or rarely aborted, or most updates are not written onto disk before a commitment.

Wu, Kun-Lung↗

Scheduling spacecraft operations

A prototype scheduling system named MAESTRO currently under development is being used to explore possible approaches to the spacecraft operations scheduling problem. Results indicate that the appropriate combination of heuristic and other techniques can provide an acceptable solution to the scheduling problem over a wide range of operational scenarios and management approaches. These can include centralized or distributed instrument or systems control, batch or incremental scheduling, scheduling loose resource envelopes or exact profiles, and scheduling with varying degrees of user intervention. Techniques used within MAESTRO to provide this flexibility and power include constraint propagation mechanisms, multiple asynchronous processes, prioritized transaction-based command management, resource opportunity calculation, user-alterable selection and placement mechanisms, and maintenance of multiple schedules and resource profiles. These techniques and scheduling complexities requiring them are discussed.

Britt, Daniel L.↗

Space station Ada runtime support for nested atomic transactions

The Space Station Data Management System (DMS), associated computing subsystems, and applications have varying degrees of reliability associated with their operation. A model has been developed (McKay '86) which allows the DMS runtime environment to appear as an Ada virtual machine to applications executing within it. This model is modular, flexible, and dynamically configurable to allow for evolution and growth over time. Support for Fault-tolerant computing is included within this model. The basic primitive involved in this support is based on atomic actions (Grey '78). An atomic action possesses two fundamental properties: (1) it is indivisible with respect to concurrent actions, and (2) it is indivisible with respect to failure. A transaction is a collection of atomic actions which collectively appear to be one action. Transactions may be nested, providing even more powerful support for reliability. A proposed approach is described for providing support for nested atomic transactions within the Ada runtime model developed for the Space Station environment. The level of support is modular, flexible and dynamically configurable just like the overall runtime support environment.

Monteiro, Edward J.↗