Search NASA⌕ Search

SEARCH · Search NASA

Results for “Transmission Expansion Planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Joint Planning of Electricity Transmission and Hydrogen Transportation Networks

The abundance and uneven distribution of renewable energy might cause congestion and curtailment in electric power systems. Transmission expansions can potentially alleviate transmission congestion and reduce renewable energy curtailment. On the other hand, with the substantial cost reduction of electrolyzer technology and the continuing rise of hydrogen demand, converting surplus renewable energy to hydrogen provides synergistic benefits to power and hydrogen systems, but consequently requires joint planning of the two systems. To this end, we propose a joint planning approach for power transmission and hydrogen transportation networks to coordinately optimize the investment and operation of power and hydrogen infrastructure. In our proposed model, detailed truck routing, pipeline, and hydrogen storage are formulated to quantify the flexibility of hydrogen transportation system. A robust joint planning approach is also proposed to address various uncertainties from renewable energy, electric load, and hydrogen demand. Furthermore, our numerical simulations show that the proposed joint planning model can save the total system cost, reduce renewable energy curtailment, and increase the utilization level of transmission lines.

08 HYDROGEN↗

The impact of development priorities on power system expansion planning in sub-Saharan Africa

Sub-Saharan Africa faces unique barriers to electricity development due to the large proportion of the population that is un-electrified and the prevalence of rural populations. Typically, power system expansion planning models assume all potential consumers can be immediately electrified. This assumption is unrealistic in sub-Saharan Africa, where electrification will likely be a gradual process over a number of years. Furthermore, since a large proportion of the population in sub-Saharan Africa is located in rural regions, the prioritization of these regions may impact how the grid develops. In this research, we develop a multi-period optimization model for power generation and transmission system expansion planning in sub-Saharan Africa. In contrast to existing models, which assume full electrification, we consider a variety of electrification policies and analyze the impact of varying the electrification rate and policy on the cost and resources selected for power system expansion. We test our model on a case study of Rwanda. We find that varying the year in which full electrification is reached has a larger impact on cost and generation capacity than varying the electrification policy does, although, when urban and rural regions are considered equitably, more rooftop solar is built. Varying the electrification policies has a larger impact on transmission expansion than on generation expansion and this impact is amplified when starting from zero initial system capacity rather than the original Rwanda system. Additionally, a sensitivity analysis shows that tightening the bounds on CO 2eq emissions has a large impact on the generation portfolio and cost.

97 MATHEMATICS AND COMPUTING↗

IM3 Projected U.S. Western Interconnection Grid Stress Dataset

This dataset provides projected grid stress and reliability results (including all model inputs and outputs from GO WEST and TEP) for Integrated Multisector, Multiscale Modeling (IM3) Phase 2 simulations across eight different scenarios for the U.S. Western Interconnection through 2055. The scenarios include combinations of two Shared Socioeconomic Pathways (SSP3 and SSP5) with four high-resolution climate projections specific to the United States from a set of Thermodynamic Global Warming (TGW) simulations. These climate projections include "hotter" and "cooler" variants for two Representative Concentration Pathways (RCP4.5 and RCP8.5). The resulting eight simulations are: rcp45cooler_ssp3 rcp45cooler_ssp5 rcp45hotter_ssp3 rcp45hotter_ssp5 rcp85cooler_ssp3 rcp85cooler_ssp5 rcp85hotter_ssp3 rcp85hotter_ssp5 GO WEST is an open-source power grid modeling framework for the U.S. Western Interconnection, which allows users to tailor the model depending on their research study and science questions. It covers 28 balancing authorities (BAs) and 12 states in U.S. Western Interconnection. GO WEST allows users to select different number of nodes and come up with a simplified network by utilizing 10,000 nodal topology of the U.S. Western Interconnection (ACTIVSg10k). Users can select different number of nodes, mathematical formulations (linear programming vs. mixed-integer linear programming), transmission line limit scaling factors, and hurdle rate scaling factors. GO WEST offers a unit commitment and economic dispatch (UC/ED) module to simulate grid operations on an hourly scale. In this sense, users can calibrate and validate their model versions by comparing model outputs to historical datasets. TEP is an open-source transmission capacity expansion model, built on the GO WEST framework. It utilizes linear programming to optimize transmission capacity addition investment on existing lines within the GO WEST framework. The TEP model only increases the thermal capacity of existing transmission lines and does not add new lines to the system, which leaves the topology preserved. In order to use TEP model, users need to create scenarios with the GO WEST framework. Please refer to README file for a detailed description of the dataset including individual files and references.

Capacity Expansion Model↗

Assessing the Reliability Benefits of Energy Storage as a Transmission Asset

Utilizing energy storage solutions to reduce the need for traditional transmission investments has been recognized by system planners and supported by federal policies in recent years. This work demonstrates the need for detailed reliability assessment for quantitative comparison of the reliability benefits of energy storage and traditional transmission investments. First, a mixed-integer linear programming expansion planning model considering candidate transmission lines and storage technologies is solved to find the least-cost investment decisions. Next, operations under the resulting system configuration are simulated in a probabilistic reliability assessment which accounts for weather-dependent forced outages. The outcome of this work, when applied to TPPs, is to further equalize the consideration of energy storage compared to traditional transmission assets by capturing the value of storage for system reliability.

co-optimization↗

Informing Transmission Supply Chain Needs from National Transmission Studies

Recent national studies indicate significant transmission expansion can provide the lowest-cost option to maintain grid reliability while meeting growing demand. However, constraints in domestic supply chains may limit grid expansion across the U.S., with higher costs and longer delays for required transmission equipment. Despite growing evidence of supply chain constraints for transmission components, transmission planning studies often assume transmission equipment is readily available for deployment or analyze future demand using historical trade and manufacturing data that may not capture evolving grid needs. This report aims to address this gap by demonstrating methods to quantify future demand for critical transmission components and input materials from national-scale planning models. These components include power transformers, generator step-up transformers, converter transformers, conductors, circuit breakers, and transmission towers and the materials include aluminum, steel, grain-oriented electrical steel (GOES), and copper. The analytical approach is applied to two nodal transmission expansion scenarios from the National Transmission Planning Study (NTP) to illustrate the methods. These scenarios represent different transmission expansion strategies for the contiguous U.S. to the year 2035: the Alternating Current (AC) scenario includes AC transmission expansion within each interconnection and the Multiterminal (MT) scenario includes interregional transmission expansion across the country using both AC and multiterminal HVDC options between neighboring zones. We also explore potential heuristics to derive transmission component demand from zonal capacity expansion models (CEMs) with coarse representation of the transmission grid.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Informing Transmission Supply Chain Needs from National Transmission Studies

Recent national studies indicate significant transmission expansion can provide the lowest-cost option to maintain grid reliability while meeting growing demand. However, constraints in domestic supply chains may limit grid expansion across the U.S., with higher costs and longer delays for required transmission equipment. Despite growing evidence of supply chain constraints for transmission components, transmission planning studies often assume transmission equipment is readily available for deployment or analyze future demand using historical trade and manufacturing data that may not capture evolving grid needs. This report aims to address this gap by demonstrating methods to quantify future demand for critical transmission components and input materials from national-scale planning models. These components include power transformers, generator step-up transformers, converter transformers, conductors, circuit breakers, and transmission towers and the materials include aluminum, steel, grain-oriented electrical steel (GOES), and copper. The analytical approach is applied to two nodal transmission expansion scenarios from the National Transmission Planning Study (NTP) to illustrate the methods. These scenarios represent different transmission expansion strategies for the contiguous U.S. to the year 2035: the Alternating Current (AC) scenario includes AC transmission expansion within each interconnection and the Multiterminal (MT) scenario includes interregional transmission expansion across the country using both AC and multiterminal HVDC options between neighboring zones. We also explore potential heuristics to derive transmission component demand from zonal capacity expansion models (CEMs) with coarse representation of the transmission grid.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A Multistage Stochastic Transmission Expansion Algorithm for Wide-Area Planning under Uncertainty

The overall objective for this project was to develop and demonstrate a set of methods for solving the transmission investment problem for a large network considering many possible scenarios of future conditions and multiple decision points when investments can be made. Project sub-objectives achieved this goal through a succession of extending the methods to apply to problems with increasing complexity or additional features, including the number of decision points, whether generation and transmission are co-optimized, and whether AC or DC power flow is used. A transmission model was developed for the Western Electric Coordinating Council (WECC) region, the high-voltage transmission system that serves the western third of the continental U.S. Using a dataset provided by WECC and by researchers from John Hopkins University, we have validated and demonstrated the model and used it to compare the new method for solving multi-stage stochastic transmission planning to several state-of-the-art techniques. The project has resulted in several key outcomes and achievements: The covariance-based method for choosing a small set of hours to represent short-term variability has superior performance in terms of accuracy to existing methods, including K-means clustering and Importance Sampling; The combined partitioning method for long-term uncertainty with the nested clustering approach for choosing representative hours for each long-term group has superior accuracy for equivalent computational effort compared with existing methods; Using the partitioning/clustering method combined with Sample Average Approximation provides both statistical bounds on the quality of the solution and at the same time, a complete investment plan for all contingencies in the full uncertainty set; no existing methods can provide both at the same time; The method is demonstrated to work well for choosing both transmission and generation investments; A variant on the method allows for both scenario selection and simultaneous correction for the error from the DC power flow approximation to provide a tractable method for AC power flow-based transmission planning under uncertainty; The method applied to the WECC case study demonstrates the additional value to the system operator and the consumer of identifying flexible investment options in the near-term decisions. In particular, the case study exhibits significant option value in postponing some transmission additions that appear useful but in some long-term system states create new congestion problems.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Climate Influences on Capacity Expansion Planning with Application to the Western U.S

Electric power system planners utilize a variety of planning tools to inform decisions concerning generation and transmission additions to the electric grid, the need for operational changes, and to evaluate potential stressors on the system. Numerous factors contribute to the planning process including projected fuel and technology costs, policy and load profiles. There is also a growing recognition of the interdependency of the electric grid with other natural and engineered systems. Here we explore how future climate change and hydropower operability might influence decisions related to electricity capacity expansion planning and operations. To do so we assemble a multi-model framework. Specifically, water resource modeling is used to simulate climate impacts on future water supply for thermoelectric and hydropower generation. Separately, temperature impacts on electricity load are evaluated. Together, these climate factors spatially constrain a capacity expansion model that projects generation and transmission additions to the grid. The projected new capacity-builds are then evaluated on their operations, reliability, and cost under average and extreme climate conditions using production cost modeling. This coupled framework is demonstrated on the electric grid in the Western U.S., supporting capacity expansion planning by WECC, the North American Electric Reliability Corporation (NERC) regional entity responsible for reliability assurance of the Western Interconnection. This region was selected in part because the West is unique in that it has high potential for renewable penetrations and is experiencing large retirements/displacements of baseload resources, primarily coal, leading to possible operational challenges in terms of changing resource mix and the need for resource flexibility. Toward this challenge, planning scenarios encompass a range of alternative energy, climate and drought futures. In this context we explore answers to two strategic questions: 1) How does changing climate influence electricity expansion planning (generation and transmission) and future operations, including type and capacity of new builds, system reliability, cost and environmental impacts? 2) How does the representation of hydropower in the modeling framework influence the evaluation of bulk power system operations? Results indicate that climate has a measurable influence on recommendations concerning the capacity, type and location of new generation and transmission additions, with up to 17 GW additional capacity needed by 2038 to meet peak loads (~6.6% increase over capacity-builds based on historical climate). The extent of additional infrastructure needs is strongly influenced by future water availability for hydropower and the potential deployment of demand response technologies. Systems designed for future climate conditions were found to maintain high system reliability under a range of electricity and water availability scenarios (including significant drought), with minimal system curtailments. Additional capacity needs due to higher load tend to increase cumulative 20-year investment and operating costs by $\$$5-$\$$17 billion and generation costs increase by 9 to 19%. Finally, changing the representation of hydropower flexibility has a relatively small influence on capacity expansion in the Western Interconnection through 2038, but hydropower flexibility impacts generation costs to a similar extent as climate.

13 HYDRO ENERGY↗

Adaptive Protection and Validated Models to Enable Deployment of High Penetrations of Solar PV (PV-MOD)

The availability and validation of various PV models in commercial tools differ, with some models not yet thoroughly validated for advanced inverter functionalities and reliable performance under weak system conditions. Many existing models do not fully incorporate new inverter control functions, which can affect system stability. The increasing deployment of solar PV and other inverter-based resources (IBRs), including distributed energy resources (DERs), is influencing the reliable operation of protection schemes in distribution systems and microgrids. Emerging adaptive protection schemes (APS) offer new opportunities for protecting these systems during varying configurations and DER operating conditions, though their demonstration and validation remain limited. Adaptive protection schemes face similar challenges, as they are typically designed for specific configurations. There is a growing need for tools and methodologies to streamline the deployment of adaptive protection for safe and reliable DER integration. The project main objective was to develop and validate high-fidelity generic models of solar PV facilities for stability, protection, EMT, and QSTS analyses. This objective was achieved, and these models can now be integrated into commercial software tools, enabling utilities, vendors, and developers to study high-penetration PV systems more confidently. The project also demonstrated advanced applications of these models, including the design and deployment of adaptive protection schemes in high-penetration field applications and microgrids, supporting grid safety and reliability. Several milestones were reached by the end of the project. A sophisticated inverter test plan was developed, and inverters representative of the North American marketplace were selected. EPRI and NREL tested various inverters, conforming to IEEE standards. Improvements were made to existing generic models of IBR units, IBR plants, and aggregated feeders for various analyses. The first generic electromagnetic transient (EMT) model for a solar PV plant was developed, conforming to IEEE Std 2800™-2022 and validated against laboratory measurements of a 2.2 MVA large-scale battery energy storage system (BESS) inverter. That model was then used to produce reference responses illustrating examples of validated and verified IBR plant models that pass or fail tests for technical minimum capability and performance as specified in the IEEE standard. The developed, tested, and validated generic models can be used for transmission planning, stability assessments, expansion planning, and evaluating potential future IBR interconnection requirements. They can also support interconnection screens and conformity assessments of IBR plants, including solar PV. The project significantly contributed to the ongoing standardization and model-based representation and verification of IBR responses. The project further addressed challenges of common distribution protection schemes with increasing deployment of DER by developing, validating, and demonstrating adaptive protection schemes (APS) that can improve the reliable and safe integration of DER into distribution systems. New APS were designed using improved DER models for three common distribution systems: a radial feeder, a meshed network, and a microgrid. Modeling and hardware-in-the-loop (HIL) testing of the APS were conducted, successfully showing their effectiveness and selectivity. Proof-of-concept field demonstration was achieved for two APS, i.e., one on a radial feeder and another one in a microgrid. Field demonstration could not be achieved for the APS on a meshed network, primarily due apprehension of one utility partner and also due to limited access to the protective algorithms in the network protectors. Guidelines developed from the lessons learned in the project lay out the general process followed in the design, installation, and commissioning of APS for various distribution systems. Distribution utility partners’ apprehension about field demonstration of the new APS were addressed—with varying success—by taking a stepped risk-management approach of modeling of a wide range of sensitivities first, performing in-depth proof-of-concept testing in the laboratory including HIL next, and finally deliberately implementing and commissioning the actual protection equipment and algorithms into parts of—or in parallel operation to—the three real distribution systems. Future work should include pilot projects that further show the acceptable performance of the developed APS before these schemes be rolled out more widely. Inclusion of both utility and original equipment manufacturers (OEMs) in future projects could increase chances of successful field demonstration. Despite challenges in achieving the field demonstration goal of the project for all three APS, the research significantly contributed to the innovation of adaptive protection solutions for scalable and reliable DER integration into distribution systems. This project significantly enhances the understanding of the impact of using appropriate inverter models on distribution and transmission (T&D) systems. By addressing the limitations of existing generic models, the project introduces high-fidelity models for stability, protection, electromagnetic transient (EMT), and quasi-static time series (QSTS) analyses. These models, integrated into commercial software tools, enable utilities, vendors, and developers to confidently study high-penetration PV systems. The project also demonstrates advanced applications, including adaptive protection schemes (APS) for distribution systems and microgrids, ensuring grid safety and reliability. The technical effectiveness and economic feasibility of the methods are evident through the development and validation of sophisticated inverter test plans and the selection of representative inverters. Testing by EPRI and NREL on retail, commercial, and utility-scale inverters, conforming to IEEE standards, underscores the robustness of the models. Improvements to existing generic models for various analyses further enhance their validity and applicability. The project also identifies gaps in common distribution protection schemes and designed new APS using improved DER models, demonstrating their effectiveness through modeling and hardware-in-the-loop (HIL) testing. The project’s benefits to the public are manifold. By advancing the standardization and model-based representation of IBR response, it supports transmission planning, stability assessments, and future IBR interconnection requirements. The generic models can facilitate better communication between transmission planners and developers, supporting expected IBR plant capability and performance. Additionally, the development of APS for radial feeders, meshed networks, and microgrids supports the integration of distributed energy resources (DERs) into distribution systems, enhancing grid reliability and safety. The project’s emphasis on thorough testing and simplicity in design ensures practical and scalable solutions for DER integration.

14 SOLAR ENERGY↗

GODEEEP-hydro: Historical and projected power system ready hydropower data for the United States

Hydropower is a critical electricity resource in the United States which, in addition to low-cost electricity generation, provides valuable ancillary grid services, and supports the integration of nondispatchable weather-dependent resources (e.g., wind and solar). Despite its value to the grid, there are very few comprehensive datasets available from which to study both historical and future impacts of climate, weather driven energy droughts, and integration of other weather driven generation. In this paper, we present a hydropower generation dataset covering 1,452 hydroelectric plants in the contiguous U.S. The dataset contains monthly and weekly hydropower generation estimates for both historical (1982–2019) and future (2020–2099) periods which includes 4 future climate scenarios. In addition, this dataset provides weekly and monthly constraints such as minimum and maximum power which are particularly useful in power system models which are used to study grid reliability, transmission planning and capacity expansion.

13 HYDRO ENERGY↗

Assessing the Key Requirements for 450 GW of Renewable Capacity in India by 2030

In this policy brief, we assess the prerequisites for India to achieve 450 GW of solar and wind cumulative installed capacity by 2030. We examine requirements such as availability of land, new transmission buildout, financing and pace of deployment, as well as the impact on grid reliability and cost of generation. We also examine the impact of policies promoting domestic manufacturing. Deploying 307 GW of solar and 142 GW of wind capacity would use only about 1.25% of land that is categorized as barren or waste, which is equivalent to about 0.22% of the total land area in India. Because of the good solar resource across large swaths of India, the solar energy buildout—and thus the land use—potentially can be spread out. India would need about 280 GW of new interstate transmission capacity by 2030, a little over double the transmission expansion that has already been planned through 2025. However, most of the new transmission buildout is driven by the near doubling of electricity demand between 2020 and 2030. The total investment needed (in generation and storage resources) to realize this target is around USD 26.5 billion annually, which is 20% lower than the annual investment in India’s power sector across all generation resources between 2015 and 2019. We estimate that using domestically manufactured panels instead of imported panels may increase solar PPA prices by about 10%–15% in the medium term, but solar power would still be a cost-effective way to meet growing demand instead of building new fossil fuel-based power plants, because the price of electricity from solar plants has fallen below the variable cost of most existing coal units. To reach this target, India would need to build about 35–40 GW of solar and wind capacity every year in this decade. India’s power sector achieved a pace of capacity addition of 22 GW per year in the previous decade (including thermal and renewable). Policy and regulatory measures would be needed to increase the pace of deployment.

14 SOLAR ENERGY↗

Nodal capacity expansion planning with flexible large-scale load siting

We propose explicitly incorporating large-scale load siting into a stochastic nodal power system capacity expansion planning model that concurrently co-optimizes generation, transmission, and storage expansion. The potential operational flexibility of some of these large loads is also taken into account by considering them as consisting of a set of tranches with different reliability requirements, which are modeled as a constraint on expected served energy across operational scenarios. We implement our model as a two-stage stochastic mixed-integer optimization problem with cross-scenario expectation constraints. To overcome the challenge of scalability, we build upon existing work to implement this model on a high performance computing platform and exploit scenario parallelization using an augmented Progressive Hedging Algorithm. The algorithm is implemented using the bounding features of mpisppy, which have shown to provide satisfactory provable optimality gaps despite the absence of theoretical guarantees of convergence. We test our approach and assess the value of this proactive planning framework on total system cost and reliability metrics using realistic testcases geographically assigned to San Diego and South Carolina, with datacenter and direct air capture facilities as large loads.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Integrated Assessment Modeling of Grid Resilience: GCAM-to-PCM Scoping

Deep decarbonization towards a net-zero emissions future and the associated growth in power demand, renewables, and changes in water availability will require significant evolution in grid planning. Many obstacles threaten the viability of near-term generation capacity build out, including the need for large-scale transmission expansion. Current very-long term planning tools do not adequately model physical representations of economic dispatch and system topology down to inter- and intra-regional transmission and distribution infrastructure. This project attempts to fill that gap.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Energy storage planning for enhanced resilience of power systems against wildfires and heatwaves

Extreme weather events pose significant risks to power grid stability due to their severe consequences and potential for widespread failures. Energy storage systems hold great potential for enhancing grid resilience against such events by providing reliable power during peak demand periods. However, accurately quantifying the size, location, and investment costs of new energy storage assets is a complex task, as energy storage planning decisions depend on the investment choices of other generation technologies and the integration of new transmission projects. Here, this paper presents a novel capacity expansion planning framework that simultaneously optimizes investments in energy storage, generation, and transmission, determining their optimal size, location, and type, while incorporating extreme weather events into long-term planning. More specifically, our stress-event-informed planning framework integrates the impact of heatwaves and wildfires into the planning process, identifying least-cost investment solutions that comply with policy goals and enhance grid resilience. The proposed framework employs machine-learning-based modeling to project heatwave-induced loads and performance-based risk assessment to evaluate wildfire-driven transmission line derates. Using industry-standard datasets to accurately represent the transmission topology of the Western Interconnection (WI) system, the proposed framework is applied to the WI 40-zone system, with investment decisions reported for the years 2030, 2035, and 2040. Simulation results reveal that with just a 10% increase in investment costs, resilience against extreme events can be significantly improved, with investment decisions heavily favoring energy storage, particularly 4-hour energy storage systems.

25 ENERGY STORAGE↗