Search NASA⌕ Search

SEARCH · Search NASA

Results for “Trip chain”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

23 records · Page 2

Planetary Protection Technology for Mars Sample Return

The NASA Mars Exploration Program has recently adopted a plan that includes a first Mars sample return (MSR) mission proposed for launch in 2013. Such a mission would deal with two new categories of planetary protection requirements: (1) assuring a very low probability of inadvertent release of the sample in order to provide extra protection against the extremely unlikely possibility of biological hazards in the returned material and (2) keeping the samples free of round-trip Earth organisms to facilitate confirmation of safety after return to Earth. This paper describes the planetary-protection-related technical challenges awaiting any MSR mission and describes work in progress on technology needed to meet these challenges. New technology is needed for several functions. Containment assurance requires breaking the chain of contact with Mars: the exterior of the sample container must not be contaminated with Mars material either during the loading process or during launch from the Mars surface.

planetary protection↗

Statistical analysis of flight times for space shuttle ferry flights

Markov chain and Monte Carlo analysis techniques are applied to the simulated Space Shuttle Orbiter Ferry flights to obtain statistical distributions of flight time duration between Edwards Air Force Base and Kennedy Space Center. The two methods are compared, and are found to be in excellent agreement. The flights are subjected to certain operational and meteorological requirements, or constraints, which cause eastbound and westbound trips to yield different results. Persistence of events theory is applied to the occurrence of inclement conditions to find their effect upon the statistical flight time distribution. In a sensitivity test, some of the constraints are varied to observe the corresponding changes in the results.

Graves, M. E.↗

Economically Viable Intermediate to Long Duration Hydrogen Energy Storage Solutions for Fossil Fueled Assets

This report was prepared as an account of work sponsored by the Office of Fossil Energy and Carbon Management of U.S. Department of Energy under Funding Opportunity Announcement Number DE-FOA-0002332 “Energy Storage for Fossil Power Generation”. The work aimed to explore and advance an innovative hydrogen energy storage system – the synergistically integrated hydrogen energy storage system (SIHES) – that has the following characteristics: • Compatible with existing or new coal and gas fuel electricity generation units, • best suited for intermediate to long duration energy storage, from 12 hours to weeks even months, and • capable of storing energy at the utility scale – hundreds of MWh to GWh energy storage with power output level in tens to hundreds of MW. Preliminary front-end engineering design (Pre-FEED) studies was carried out to develop and refine a site-specific SIHES as peaking power generation units (so named as HyPeaker) as the first market entry point, to demonstrate both the technical feasibility and the economic viability to integrate the HyPeaker “within the fence” of a fossil power plant. This specific site was TVA’s Johnsonville Combustion Turbine Plant. The HyPeaker was designed and engineered to integrate with a 60MW aeroderivative gas turbine unit already available at TVA’s Johnsonville site. This site-specific HyPeaker consists of an alkaline electrolyzer to produce hydrogen from CO 2 free electricity sources, an innovative low-cost high-pressure hydrogen storage system (Big-Ton) and the aero gas turbine to generate electricity using blend of hydrogen and natural gas. A holistic system level technoeconomic analysis tool specific to HyPeaker was developed to optimize the engineering design of the Johnsonville site-specific HyPeaker for cost and performance. The optimal design and specification of the Johnsonville site-specific HyPeaker are the following: • Alkaline electrolyzer: 3MW • Big-Ton storage vessel: 11,000kg H 2 at 3000psi. • 4-stage diaphragm hydrogen compressor: 55kg-H 2 /hr from 150psi to 3000psi. The HyPeaker is designed to provide sufficient hydrogen for 90% continuous operation of the HyPeaker. All major components have design life of 30 years. The capex of HyPeaker is estimated at $\$$7.1M. This included $\$$1.5M for the electrolyzer, $\$$5.6M for the storage vessel and compressor. The cost of aero gas turbine was included as it is already available at the site. Key findings are: • HyPeaker can be designed, manufactured, installed and integrated with the fossil power plants, with sub-systems and components commercially available on the market today, even when it is scaled up to an order of magnitude larger than the one at the Johnsonville site. HyPeaker is a technologically viable solution to cover a wide range of energy storage duration needs, from daily peaking operation to seasonal shifting for fossil fueled assets. • The cost advantage of SCCV based Big-Ton H 2 storage vessel made it possible to “oversize” the H 2 storage subsystem to achieve overall system level cost optimization. The benefits are two-fold. First, it allows to significantly reduce the capacity and cost of electrolyzer by spreading H 2 production over a much longer period of time when the fuel cost for electricity production is low. Second, it allows to balance the hydrogen production and usage shift over weeks to months to meet the peak demands. As such, the capital cost of HyPeaker system using the Big-Ton was less than half of the cost of a system with today’s steel tube based H 2 storage system. The HyPeaker has even better cost advantage Li-ion battery based energy storage system. The estimated capital cost of Li-Ion battery system would be at $\$$38M, under the same projected 20-year electricity generation profile of the Johnsonville site. This is over 5 times more expensive than the HyPeaker system. • Since industry scale energy storage systems do not have 100% energy conversion and storage efficiency, energy storage systems using fossil fuel generated electricity would increase the CO 2 emission. This is particularly the case for HyPeaker due to its low round trip efficiency. Therefore, a more sensible solution would be to the excessive or curtailed electricity from CO 2 emission free sources such as solar farms, wind farms or nuclear power plants, to produce hydrogen, and integrate them with the HyPeaker. Electricity from TVA’s nuclear power plants was used for the Johnsonville HyPeaker. • The economic viability of HyPeaker is expected to be further improved when global supply chains are taken into consideration. For the same Johnsonville site specific HyPeaker, the capex would be reduced to ~$\$$3.6M from ~$\$$7.1M, and the added LCOE is reduced to ~$\$$85/MWh. With the bipartisan Infrastructure Investment and Jobs Act, the cost of domestically produced HyPeaker sub-systems would be at the level of today’s global suppliers. Since the peaking units generally operate at peak usage period, thereby demanding higher price, the projected $\$$85/MWh LCOE would be within the realm of financial viability for utility operators.

08 HYDROGEN↗

Application of Machine Learning Techniques to Delay Tolerant Network Routing

This dissertation discusses several machine learning techniques to improve routing in delay tolerant networks (DTNs). These are networks in which there may be long one-way trip times, asymmetric links, high error rates, and deterministic as well as non-deterministic loss of contact between network nodes, such as interplanetary satellite networks, mobile ad hoc networks and wireless sensor networks. This work uses historical network statistics to train a multi-label classifier to predict reliable paths through the network. In addition, a clustering technique is used to predict future mobile node locations. Both of these techniques are used to reduce the consumption of resources such as network bandwidth, memory and data storage that is required by replication routing methods often used in opportunistic DTN environments. Thesis contributions include: an emulation tool chain developed to create a DTN test bed for machine learning, the network and software architecture for a machine learning based routing method, the development and implementation of classification and clustering techniques and performance evaluation in terms of machine learning and routing metrics.

Dudukovich, Rachel M.↗

Probabilistic Round Trip Contamination Analysis of a Mars Sample Acquisition and Handling Process Using Markovian Decompositions

A method for evaluating the probability of a Viable Earth Microorganism (VEM) contaminating a sample during the sample acquisition and handling (SAH) process of a potential future Mars Sample Return mission is developed. A scenario where multiple core samples would be acquired using a rotary percussive coring tool, deployed from an arm on a MER class rover is analyzed. The analysis is conducted in a structured way by decomposing sample acquisition and handling process into a series of discrete time steps, and breaking the physical system into a set of relevant components. At each discrete time step, two key functions are defined: The probability of a VEM being released from each component, and the transport matrix, which represents the probability of VEM transport from one component to another. By defining the expected the number of VEMs on each component at the start of the sampling process, these decompositions allow the expected number of VEMs on each component at each sampling step to be represented as a Markov chain. This formalism provides a rigorous mathematical framework in which to analyze the probability of a VEM entering the sample chain, as well as making the analysis tractable by breaking the process down into small analyzable steps.

Hudson, Nicolas↗