Search NASA⌕ Search

SEARCH · Search NASA

Results for “Waste Isolation Pilot Plant”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Computer vision-based rock bolt detection in orthomosaic imagery obtained in the Waste Isolation Pilot Plant underground facility

Assessing structural integrity of large underground tunnel facilities is often a time consuming and human-labor intensive task. Thus, research using various modes of sensing and automated detection of key structural components in mines is posed to aid in safety assessments and establishing overall structural health. We propose an approach utilizing off-the-shelf camera and lidar technology fixed to a custom sensing platform, image stitching techniques, fine-tuned object detection models, and specialized model-inference methods to automatically detect, count, and map roof bolts for assessment of structural safety in man-made underground tunnels. Results show a novel workflow for effective object counting in orthomosaic tunnel ceiling images generated from collections in GPS-denied mining environments. Additionally, we demonstrate effective fine-tuning of EfficientDet object detectors utilizing state-of-the-art image augmentation techniques known as the mosaic and mixup transformations. Our work is demonstrated on sensed data and imagery collected from the Department of Energy (DOE) Waste Isolation Pilot Plant (WIPP) where miles of tunnel ceiling must be assessed for structural integrity.

42 ENGINEERING↗

Brine Availability Test in Salt, a Heated Borehole Experiment at the Waste Isolation Pilot Plant, New Mexico, USA - 20233

The Brine Availability Tests in Salt is a US Department of Energy Office of Nuclear Energy supported activity as part of the Spent Fuel and Waste Disposition Campaign where we are performing simultaneous heated and control experiments in adjacent horizontal boreholes in the WIPP Salt Disposal Investigation drifts as part of experimental Phase 1. Phase 1a of BATS, a low-cost, small spatial-scale experiment performed in order to design instrumentation and methods for further experimentation in the URL, has been completed (June 2018 - May 2019) and is described elsewhere. In coincidence with multiple physical parameters that will be measured over the duration of the experiment, we will be measuring the liquid and vapor phases of H{sub 2}O as well as its isotopic content (not measured in Phase 1a). Three different forms of water occur in natural salts: as fluid in macro scale (mm size) inclusions, as intergranular free H{sub 2}O and as H{sub 2}O incorporated in hydrous minerals. Each of these forms has potentially different stable isotope signatures and will be influenced differentially by heat induced transport and by interaction with introduced tracers. Continuous measurement of vapor phase H{sub 2}O isotopes during borehole heating will be impacted by several effects: 1) evaporation as liquid brine flows into the borehole and evaporates completely or partially into the dry N{sub 2} stream; 2) steam from dehydration of hydrous minerals, that may enter the borehole; and 3) hydrous minerals that may form in the borehole (preferentially incorporating heavier isotopes). The continuous time series collected over the course of the heating test will be combined with analyses of pre-test and post-test collected samples of test site salt to investigate the contributions of each of the three water types as H{sub 2}O is mobilized due to the effects of heating. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Summary of the Brine Availability Test in Salt (BATS), Including Extended Plan for Experiments at the Waste Isolation Pilot Plant (WIPP)

This document lays out a set of near-future investigations in salt, the third phase of BATS (BATS 3). This phase is planned to answer the few remaining issues from the first two phases of BATS (BATS 1 and BATS 2), and to prepare for a subsequent large-scale demonstration phase. The BATS experiments are the first part of a larger plan to conduct field experiments to answer specific technical questions, improve the technical basis for disposal of heat-generating radioactive waste in salt (Stauffer et al., 2015; SNL et al., 2020), and demonstrate readiness for disposal of radioactive waste in salt, including large, hot waste packages.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Standard Analysis Report INV-SAR-81, Revision 0 Chemical and Cement Components 2023 Inventory Estimates for the Interim State Performance Assessment of the Waste Isolation Pilot Plant

This standard analysis report provides the estimates for the chemical (oxyanions and complexing agents) and cement components with a data collection cut-off date of December 31, 2023. These estimates will be included in a Performance Assessment Inventory Report developed for the U.S. Department of Energy (DOE) interim state repository configuration performance assessment (PA) for the 2026 Compliance Recertification Application (CRA).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Panel Session 25: DOE Waste Isolation Pilot Plant (WIPP) Update 2020

This panel focused on the WIPP operational efficiencies and capital improvement progress in the year 2020. Because WIPP is a key component of the US DOE EM cleanup strategy, the progress on returning WIPP to full design capacity and throughput by 2021 is of importance. Panelists with presentations: Status of WIPP Capital Asset Projects (Stephen Smith); WIPP Update (Sean Dunagan); CBFO Update (Greg Sosson)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗