Monitoring Well Abandonment Completion Report for KARS Park1, Mobil Service Station, and Hypergol Maintenance Material North Solid Waste Management Units: 084, 093, and 090

The intended purpose of the Monitoring Well Abandonment project is to support the Kennedy Space Center (KSC) Environmental Remediation Department’s Resource Conservation and Recovery Act Program by abandoning monitoring wells throughout KSC that have been identified and prioritized as locations that no longer serve usefulness to program. The monitoring wells were abandoned in accordance with the Brevard County Health Departments and St. Johns River Water Management Districts rules and guidelines.

Timothy M Jellett↗

Converter/Compressor Building Solid Waste Management Unit (SWMU) #89 Monitoring Well 21 Area Interim Measure Work Plan

This Work Plan details the approach and design for the Interim Measure (IM) to remediate groundwater within the MW21 Area where VOC concentrations exceed Florida Department of Environmental Protection Natural Attenuation Default Concentrations. The IM includes in-situ bioremediation via injection of emulsified vegetable oil (EVO) and emulsified zero-valent iron (EZVI). The in-situ bioremediation technology consists of injecting an electron donor substrate into the subsurface to promote microbial breakdown of VOCs. The EVO injections for this IM are designed based on the use of Provectus ERD-CH4, which is a vegetable oil/carbon substrate mixture. The EZVI injections for this IM are designed based on the use of Provectus EZVI-CH4. The IM treatment layout consists of nine injection locations of EVO at approximately 10-foot radius of influence (ROI) and three injections locations of EZVI at approximately 6-foot ROI. The injection method will be direct push using a DPT rig. The overall injection depths range from 7 to 17 ft bls. The 7 ft bls top depth is designed to be 2 ft below the water table to prevent substrates from reaching the top of the water table. Injections are planned to be implemented using 2 ft intervals and will take place using a bottom-up approach to 2 ft below the water table. This work plan further describes the IM design, injection calculations, performance monitoring plan, and provides an injection layout. Revision 1 of this Work Plan includes quarterly performance sampling during Year 1 in accordance with F.A.C. 62-780. These changes are reflected in Section 7 and Table 2 of the Work Plan.

Mark J Jonnet↗

Area 3 Support Buildings (A3SB) H5-0992, H5-0996 PRL 218 Confirmatory Sampling Report

The Area 3 Support Buildings site (A3SB) consists of two separate areas located on the north side of Beach Road in the northern portion of Kennedy Space Center, Florida (KSC), outside the secured perimeter of KSC. The A3SB areas are approximately 0.6 miles apart, and were developed as Shiffler's Grocery Store and Service Station (west site) and as a residence (east site) prior to acquisition by the National Aeronautics and Space Administration (NASA) in 1963. Both areas were used by the Bendix Company in support of NASA as chemical laboratories from 1963 through 1969. Both of the buildings were demolished by 1987. The west portion of the site was used by the US Fish & Wildlife Service (F&W) in support of the Merritt Island National Wildlife Refuge (MINWR) for parking at the entrance to the Hammock Trails from 1969 to the present. The east portion of the site was used for intermittent suspect materials staging in the early 1990s and is still used as an apiary location, but is otherwise no longer active. In support of the NASA HSWA permit requirements, this site was identified as Potential Release Location (PRL) 218 and a Solid Waste Management Unit (SWMU) Assessment (SA) was conducted in 2013. Confirmatory Sampling (CS) was recommended and approved by the KSC Remediation Team (KSCRT). Three locations of concern (LOCs) were identified and sampled at the site. The LOCs include two former chemical labs and a former suspect staging area. The CS was conducted in March of 2015 at three locations by means of Direct Push Technology (DPT) groundwater sampling and at one location for soil sampling. The samples were collected and analyzed in accordance with the approved CS Work Plan. There were no exceedances of criteria detected in any of the samples from the three LOCs. The results of this investigation indicate that past and/or present operations have not negatively impacted environmental media at the A3SB. Based upon no confirmed groundwater detections above GCTLs and no soil impacts above applicable screening criteria no further investigation is warranted at the A3SB. A No Further Action (NFA) status for all locations was approved by the KSCRT at the June 2015 meeting.

Confirmatory sampling↗

Mineralogic variations in fluvial sediments contaminated by mine tailings as determined from AVIRIS data, Coeur D'Alene River Valley, Idaho

The success of imaging spectrometry in mineralogic mapping of natural terrains indicates that the technology can also be used to assess the environmental impact of human activities in certain instances. Specifically, this paper describes an investigation into the use of data from the Airborne Visible/Infrared Imaging Spectrometer (AVIRIS) for mapping the spread of, and assessing changes in, the mineralogic character of tailings from a major silver and base metal mining district. The area under investigation is the Coeur d'Alene River Valley in northern Idaho. Mining has been going on in and around the towns of Kellogg and Wallace, Idaho since the 1880's. In the Kellogg-Smelterville Flats area, west of Kellogg, mine tailings were piled alongside the South Fork of the Coeur d'Alene River. Until the construction of tailings ponds in 1968 much of these waste materials were washed directly into the South Fork. The Kellogg-Smelterville area was declared an Environmental Protection Agency (EPA) Superfund site in 1983 and remediation efforts are currently underway. Recent studies have demonstrated that sediments in the Coeur d'Alene River and in the northern part of Lake Coeur d'Alene, into which the river flows, are highly enriched in Ag, Cu, Pb, Zn, Cd, Hg, As, and Sb. These trace metals have become aggregated in iron oxide and oxyhydroxide minerals and/or mineraloids. Reflectance spectra of iron-rich tailing materials are shown. Also shown are spectra of hematite and goethite. The broad bandwidth and long band center (near 1 micron) of the Fe(3+) crystal-field band of the iron-rich sediment samples combined with the lack of features on the Fe(3+) -O(2-) charge transfer absorption edge indicates that the ferric oxide and/or oxyhydroxide in these sediments is poorly crystalline to amorphous in character. Similar features are seen in poorly crystalline basaltic weathering products (e.g., palagonites). The problem of mapping and analyzing the downriver occurrences of iron rich tailings in the Coeur d'Alene (CDA) River Valley using remotely sensed data is complicated by the full vegetation cover present in the area. Because exposures of rock and soil were sparse, the data processing techniques used in this study were sensitive to detecting materials at subpixel scales. The methods used included spectral mixture analysis and a constrained energy minimization technique.

Farrand, W. H.↗

Building M7-0505 Treatment Tank (SWMU 039) Annual Performance Monitoring Report

This Annual Performance Monitoring Report presents a summary of Interim Measure (IM) activities and an evaluation of data collected during the third year (June 2014 to September 2015) of operation, maintenance, and monitoring (OM&M) conducted at the Building M7-505 (M505) Treatment Tank area, Kennedy Space Center (KSC), Florida ("the Site"). Under KSC's Resource Conservation and Recovery Act Corrective Action Program, the M505 Treatment Tank area was designated Solid Waste Management Unit 039. Arcadis U.S., Inc. (Arcadis) began IM activities on January 10, 2012, after completion of construction of an in situ air sparge (IAS) system to remediate volatile organic compounds (VOCs) in groundwater at concentrations exceeding applicable Florida Department of Environmental Protection (FDEP) Chapter 62-777, Florida Administrative Code, Natural Attenuation Default Concentrations (NADCs). This report presents a summary of the third year of OM&M activities conducted between June 2014 and September 2015.

Source record↗

Paint and Oil Locker SWMU 067 Southern Treatment Area Air Sparge System Year 2 Performance Monitoring and Paint and Oil Locker Northern Area (SWMU 067) and Supply Warehouse #3, SWMU 088 Long-Term Monitoring Kennedy Space Center, Florida

This Year 2 Air Sparge (AS) System Performance Monitoring (PM) Report for Paint and Oil Locker (POL) Solid Waste Management Unit (SWMU) 067 Southern Treatment Area and Long- Term Monitoring (LTM) Report for POL Northern Area (SWMU 067) and Supply Warehouse #3 (SW3) SWMU 088 documents ongoing remedial efforts at the POL and SW3 sites at Kennedy Space Center (KSC), Florida. The overall goal for these sites is to reduce concentrations of groundwater contaminants of concern (COCs), specifically trichloroethene (TCE), cis-1,2-dichloroethene (cDCE), trans-1,2-dichloroethene (tDCE) and vinyl chloride (VC), to below the State of Florida Groundwater Cleanup Target Levels (GCTLs). Remediation and reporting of POL and SW3 have been streamlined over the years due to the proximity of the two sites. The scope for these sites currently includes two main components: (1) LTM at SW3 and the POL Northern Area, where an AS system began operation in May 2009 (with expansion in December 2012) and June 2013, respectively, and subsequently turned off for both sites in March 2018 (NASA, 2019a); and (2) Active AS operations and PM in the POL Southern Treatment Area where an AS system was installed and began operation in 2021. The timeframe for activities covered under this report is from September 2022 to July 2023. Based on Year 2 system operation and PM results, the AS system at POL operated as designed and successfully met the performance objective of reducing VOCs to concentrations that support transition of the site from active remediation to long-term monitoring. The results from the samples collected from performance monitoring wells within the AS system ROI showed a significant decrease in COC concentrations since the baseline sampling event conducted in April 2020. Based on the Year 2 OM&M and monitoring results obtained from the POL Southern Treatment Area, the IM objective to reduce concentrations to below the LTM transition target concentrations for TCE, cDCE, tDCE, and VC has been achieved. LTM sampling events at SW3 were conducted in October 2022 and July 2023. LTM sampling was conducted at the POL Northern Area in October 2022, December 2022, March 2023, and July 2023. Analytical results from October 2022 and July 2023 generally indicate that concentrations of COCs have been stable or decreasing compared to the previous year. TCE remains greater than the NADC in one monitoring well (POL-MW0034S) and greater than the GCTL in one monitoring well (POL-MW0009S). Concentrations of cDCE were greater than the GCTL in one monitoring well (POL-MW0026S), and tDCE was non-detect or less than the GCTL in all monitoring wells sampled. VC was greater than the GCTL in four monitoring wells (MW0024, MW0025, MW0027, and MW0028) at SW3 and one monitoring well (MW0026S) at the POL Northern Area.

remediation↗

Area South of K7-516, SWMU 100 Operations, Maintenance, and Monitoring Report Kennedy Space Center, Florida

This Operations, Maintenance, and Monitoring Report documents groundwater interim measure activities from March 30, 2019 through December 31, 2019 at the Area South of K7-516 site located at Kennedy Space Center (KSC), Florida. An air sparge (AS) system consisting of 16 AS wells was installed along the Barge Canal in 2012 to be protective of the Outstanding Florida Waters (OFW). The AS system was expanded in 2015 by installing 40 AS wells to remediate the hot spot (HS) area. Additional expansion activities were performed in 2018 through the installation of eight additional AS wells along the Barge Canal. Currently 24 OFW and 40 HS AS wells are in operation. This report includes performance monitoring events for the OFW and HS areas, along with an annual Interim Groundwater Monitoring (IGWM) event in the Western Area. The 516S site has been designated Solid Waste Management Unit 100 under KSC’s Resource Conservation and Recovery Act Corrective Action program. This document was prepared by Tetra Tech, Inc., for the National Aeronautics and Space Administration under Indefinite Delivery Indefinite Quantity Contract 80KSC019D0011/80KSC019F0068. The OFW and HS AS systems are meeting the performance criteria and IM objectives of preventing contaminant migration and remediating groundwater within the treatment zone. Team consensus was reached to continue operation of the combined OFW and HS AS systems (Meeting Minute 2002-M02, Decisions 2002-D06, D09 and D04). Team consensus was also reached to continue semi-annual OFW performance monitoring and annual monitoring for the IGWM Western Area for the same wells sampled during 2019 events. In the eastern area, MW13, MW14, and MW15 will be reduced from semi-annual to annual frequency. For the HS Area, team consensus was reached to continue the current annual/biennial monitoring program (Meeting Minute 2002-M02, Decisions 2002-D02, D03, D05, D07 and D08).

Patrice L. Lehocky↗

Fluid Servicing Road Area SWMUs 037 and 102 Interim Groundwater Monitoring Report Kennedy Space Center, Florida

This Interim Groundwater Monitoring (IGWM) Report presents the findings of the IGWM activities conducted during the 2021 reporting period at the Fluid Servicing Road Area (FSRA) of Kennedy Space Center (KSC), Florida. The IGWM program was implemented at sites where active remediation was not occurring to monitor and track plume footprints and concentrations. FSRA is located east of the Vehicle Assembly Building and includes Components Cleaning Facility (CCF) also known as Solid Waste Management Unit (SWMU) 030; Converter Compressor Building (CCB) also known as SWMU 089; Area South of K7-516 (516S) also known as SWMU 100; Propellants Support Building Area (PSBA) also known as SWMU 102; and Former Drum Storage Area (FDSA) also known as SWMU 037.

Carol Cady↗

2021 Corrective Measures Implementation and Interim Measures Annual Status Report: Summary of Biosparge System Operation and Maintenance, and Interim Groundwater Monitoring Mobile Launch Platform Rehabilitation Sites / Vehicle Assembly Building Area (SWMU 056) Kennedy Space Center, Florida

This report presents a summary of the Corrective Measures Implementation (CMI) and Interim Measure (IM) implementation activities that occurred from January 2021 through December 2021 at the Mobile Launch Platform Rehabilitation Sites (MLP)/Vehicle Assembly Building (VAB) Area, Solid Waste Management Unit 056 (SWMU 056), located at the John F. Kennedy Space Center, Florida. The following summaries briefly describe areas within SWMU 056 identified by historical site investigation activities where groundwater monitoring and remedial actions have been implemented to date.

Randall K. Sillan↗

2022 Through April 2023 Corrective Measures Implementation and Interim Measures Annual Status Report: Summary of Biosparge System Operation and Maintenance, Interim Measures and Monitoring Mobile Launch Platform Rehabilitation Sites / Vehicle Assembly Building Area (Swmu 056) Kennedy Space Center, Florida

This report presents a summary of the Corrective Measures Implementation (CMI) and Interim Measure (IM) implementation activities that occurred from January 2022 through April 2023 at the Mobile Launch Platform Rehabilitation Sites (MLP)/Vehicle Assembly Building (VAB) Area, Solid Waste Management Unit 056 (SWMU 056), located at the John F. Kennedy Space Center, Florida. The following summaries briefly describe areas within SWMU 056 identified by historical site investigation activities where groundwater monitoring and remedial actions have been implemented to date.

VOCs↗

Implementation of sensor and control designs for bioregenerative systems

The EGM 4000/4001 Engineering Design class is an interdisciplinary design course that allows students to experience the design process. The projects involved the design of sensors and subsystems of a closed-loop life support system (CLLSS) with special emphasis on the Controlled Ecological Life Support System (CELSS) currently being developed at Kennedy Space Center (KSC) by NASA. To understand the work performed by the students, one must understand the purpose and concept of a CLLSS system. In the years to come, NASA will be constructing Moon bases and sending astronauts to other worlds on extended space missions. In order to support the crews, unreasonably large quantities of supplies would have to be sent from Earth. These supplies would be difficult to transport and require large holds. To remedy this problem, NASA plans to incorporate crops into the spacecraft. These crops would supply food for the crews, as well as provide beneficial psychological side effects. In addition, the plants would recycle the air and human waste and provide oxygen and water for the humans. The students in the design class were to work on supporting this project. In order to do this successfully, the course was separated into two phases. The first semester involved studying the various aspects of a CLLSS to determine sensing needs and develop ideas. The second semester involved first determining which of the ideas were most promising. Specific sensors were then designed and tested under laboratory conditions with promising results. Finally, recommendations for further development were proposed. Atmosphere and temperature control, nutrient delivery, plant health and propagation, and resource recycling are discussed.

Source record↗

Components Cleaning Facility, SWMU 030 Eastern High-Concentration Plume Area Implementation Work Plan Kennedy Space Center, Florida

This Implementation Work Plan (IWP) presents detailed design elements and coordination specifics to implement an air sparging (AS) Interim Measure (IM) to remediate groundwater at the Components Cleaning Facility (CCF), Eastern High Concentration Plume (HCP) Area located at Kennedy Space Center (KSC), Florida. The objective of the CCF East IM is to remediate groundwater where trichloroethene, cis-1,2-dichloroethene, and vinyl chloride concentrations exceed Florida Department of Environmental Protection Natural Attenuation Default Criteria (NADC) (identified as the HCP) via AS and to transition to monitored natural attenuation. CCF has been designated Solid Waste Management Unit 030 under KSC’s Resource Conservation and Recovery Act Corrective Action Program.

James Lloyd↗

C-5 Electrical Substation (SWMU 066) Performance Monitoring Report

The C-5 Electrical Substation (C5ES) is a National Aeronautics and Space Administration (NASA) operated electrical power substation located at the John F. Kennedy Space Center (KSC), Florida. This facility has been designated Solid Waste Management Unit (SWMU) 066 under KSC’s Resource Conservation and Recovery Act (RCRA) Corrective Action program. This Performance Monitoring Report (PMR) presents the Interim Measure (IM) activities, including baseline sampling, air sparge system construction and operation, and performance monitoring, that were completed to remediate chlorinated volatile organic compounds (CVOC) in groundwater exceeding the Florida Department of Environmental Protection (FDEP) natural attenuation default concentrations (NADC).

Andrew Scott Starr↗

Launch Complex 39B, SWMU 009 Air Sparging System Expansion Implementation Work Plan Kennedy Space Center, Florida

This Implementation Work Plan (IWP) for expansion of the Air Sparging (AS) system at Launch Complex 39B (LC39B), presents the design and coordination specifics to expand the existing AS Interim Measure (IM) at LC39B located at Kennedy Space Center (KSC), Florida. The existing AS system at LC39B was installed in 2017 and included 279 AS wells. LC39B has been designated as Solid Waste Management Unit (SWMU) 009 under the KSC Resource Conservation and Recovery Act (RCRA) Corrective Action Program. Expansion of the AS IM will include installation of an additional five AS wells to depths of approximately 13 and 17 feet below land surface (bls) to remediate contaminated groundwater identified northwest of the launch pad, near the liquid oxygen (LOX) tank. The expansion will target concentrations of cis-1,2-dichloroethene (cDCE) and vinyl chloride (VC) greater than Florida Department of Environmental Protection (FDEP) Natural Attenuation Default Concentrations (NADCs) that were identified during direct push technology (DPT) sampling events between 2019-2022 in shallow intervals between 8 and 16 feet bls. The objective for this expansion is to remediate contaminated groundwater within the treatment zone to below NADCs to support transition to monitored natural attenuation (MNA) through a long-term monitoring (LTM) program. This expansion will treat approximately 0.07-acres of residual groundwater contamination. The IWP design for this expansion will utilize the existing AS system trailer that is already onsite and operating. The five new AS expansion wells will be integrated into the existing Zone Z4 distribution manifold to deliver compressed air to the new AS wells. To deliver airflow, three existing lateral lines will be split in the field at a lateral split junction point (using 2-way or 3-way splits). Each split lateral will supply air to AS wells at the same depth interval to minimize preferential pathways. The trenching layout for the new AS wells was developed to minimize ground disturbance due to the amount of utilities in the area. One new monitoring well will also be installed and added to LC39B’s performance monitoring program to evaluate the effectiveness of the AS system expansion. This well will be sampled on a semi-annual basis for volatile organic compounds, with results evaluated to determine if system adjustments may be required. The main components of this IWP were presented to the KSC Remediation Team (KSCRT) at the October 2022 Meeting (Meeting 2210-M05). DPT delineation data from the LOX area were also presented, which included some inferred boundaries due to physical restrictions of the LOX tank and associated concrete pad and infrastructure. Planned monitoring well sampling in this area will help determine if back-diffusion may be occurring from beneath the pad. Additionally, based on potential petroleum odors and staining identified at two DPT locations during the January 2022 DPT event in the 10-16 feet bls range, a KSCRT action item was assigned during the October 2022 meeting to collect soil samples for petroleum compounds if similar odors or staining are identified during IM implementation. Construction completion and performance monitoring will be incorporated into LC39B’s groundwater monitoring reports, which are currently submitted on an annual basis to FDEP to document operation and maintenance activities and results from the AS IM.

Deborah M. Wilson↗

Launch Complex 34 SWMU CC054 Hot Spot Area 6 Expansion - Phase Three Implementation Work Plan

This Hot Spot (HS) Area 6 Air Sparge Expansion – Phase Three Implementation Work Plan (IWP) was prepared by Tetra Tech, Inc., for the National Aeronautics and Space Administration (NASA) under the Indefinite Delivery Indefinite Quantity Contract 80KSC019D0011-80KSC019F0067, for the implementation of an Air Sparging (AS) Interim Measure (IM) at Launch Complex 34 (LC34), located at Cape Canaveral Space Force Station (CCSFS), Florida. LC34 has been designated as Solid Waste Management Unit (SWMU) CC054 under the Kennedy Space Center (KSC) Resource Conservation and Recovery Act (RCRA) operating permit. Expansion of the HS 6 IM will include installation of an additional 192 AS wells to depths of approximately 40 feet below land surface (bls) to remediate contaminated groundwater within two areas located west and northeast of the existing HS 6 AS treatment area. These areas were delineated via direct push technology investigations in September and October 2023. The expansion will target “hot spot” concentrations of cis-1,2-dichloroethene (cDCE) and vinyl chloride (VC), which are the contaminants of concern in these areas with concentrations greater than 10-times Florida Department of Environmental Protection Natural Attenuation Default Concentrations. The highest cDCE and VC concentrations detected in the proposed phase three expansion area were 58,000 micrograms per liter (μg/L) (32 to 36 feet bls) and 12,000 μg/L (23 to 27 feet bls), respectively. The objective for this expansion is to remediate contaminated groundwater within the treatment zone to support transition to long-term monitoring. This phase three expansion will add an additional 9.4 acres of treatment area to the HS 6 IM, which currently covers approximately 26.9 acres.

Launch Complex 34↗

Hypergol Maintenance Facility Hazardous Waste South Staging Areas, SWMU 070 Corrective Measures Implementation

This document presents the Corrective Measures Implementation (CMI) Year 10 Annual Report for implementation of corrective measures at the Hypergol Maintenance Facility (HMF) Hazardous Waste South Staging Areas at Kennedy Space Center, Florida. The work is being performed by Tetra Tech, Inc., for the National Aeronautics and Space Administration (NASA) under Indefinite Delivery Indefinite Quantity (IDIQ) NNK12CA15B, Task Order (TO) 07. Mr. Harry Plaza, P.E., of NASA's Environmental Assurance Branch is the Remediation Project Manager for John F. Kennedy Space Center. The Tetra Tech Program Manager is Mr. Mark Speranza, P.E., and the Tetra Tech Project Manager is Robert Simcik, P.E.

CMI↗

An Overview of In-Stu Treatability Studies at Marshall Space Flight Center, Huntsville, Alabama

Marshall Space Flight Center (MSFC) is located in Huntsville, Alabama (north-central Alabama), on approximately 1,840 acres near the center of the U.S. Army's Redstone Arsenal (RSA). MSFC is the National Aeronautics and Space Administration's (NASA's) principal propulsion development center. Its scientists, engineers, and support personnel play a major role in the National Space Transportation System by managing space shuttle mission activities, including the microgravity laboratory. In addition, MSFC will be a significant contributor to several of NASA's future programs, including the Reusable Launch Vehicle (X-33), International Space Station, and Advanced X-ray Astrophysics Facility, as well as research on a variety of space science applications. MSFC has been used to develop, test and manufacture space vehicles and components since 1960, when civilian rocketry and missile activities were transferred from RSA to MSFC. In 1994, MSFC was placed on the National Priority List for the management of hazardous waste sites, under the requirements of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). One requirement of the CERCLA program is to evaluate the nature and extent of environmental contamination resulting from identified CERCLA sites, assess the public health and environmental risks associated with the identified contamination, and identify potential remedial actions. A CERCLA remedial investigation (RI) for the groundwater system has identified at least five major plumes of chlorinated volatile organic compounds (CVOCs) in the groundwater beneath the facility. These plumes are believed to be the result of former management practices at 14 main facility locations (termed "source areas") where CVOCs were released to the subsurface. Trichloroethene (TCE) is the predominant CVOC and is common to all the plumes. Perchloroethene (PCE) also exists in two of the plumes. In addition to TCE and PCE, carbon tetrachloride and 1,1,2,2-tetrachloroethane are contained in one of the plumes. The CVOCs are believed to exist as dense non-aqueous phase liquids (DNAPLs) beneath many of the source areas.

McElroy, Bill↗

Interim Measures Pilot Study Completion Report, South Repeater Building, Solid Waste Management Unit 121, Hydraulic Containment and Groundwater Treatment System for Per- and Polyfluoroalkyl Substances

This Per- and Polyfluoroalkyl Substances (PFAS) Interim Measures Pilot Study Completion Report was prepared for the National Aeronautics and Space Administration by AECOM Technical Services, Inc. under Contract 80KSC019D0010, Task Order 80KSC021F0096. The purpose of this report is to document the pilot study activities at the South Repeater Building, Solid Waste Management Unit (SWMU) 121. This report details the additional assessment activities completed from June 2023 through November 2023 and the subsequent pilot study completed at the South Repeater Building conducted in December 2023 through February 2024. Initial activities were conducted in accordance with the Pilot Study Work Plan (NASA 2023), submitted to the KSC Remediation Team and accepted by the team on October 26, 2023. The objectives of the pilot study were to: • Provide information on aquifer characteristics and to aid in future modeling and remedial design activities to mitigate off-KSC migration of PFAS compounds. • Develop information on characteristics of the surficial aquifer system, specifically transmissivity, storage coefficient, hydraulic conductivity, and vertical hydraulic conductivity. • Obtain data to support construction and calibration of a groundwater flow model. • Acquire design parameters necessary for future remedial design activities, specifically radius of influence, drawdown, flow rates, and pump settings. The following activities were completed to meet the pilot study objectives: • Groundwater and surface water sampling • Geophysical investigation via Hydraulic Profiling Tool (HPT) and soil sampling • Installation of observation and extraction wells via rotosonic techniques • Slug, step, and pump testing activities • Initial modeling efforts for a groundwater hydraulic containment system. Results of the pilot study and modeling activities are being used in the development of a groundwater containment and treatment system for the site.