Search NASA⌕ Search

SEARCH · Search NASA

Results for “acceptability envelope”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Managing the Drivers of Air Flow and Water Vapor Transport in Existing Single Family Homes (Revised)

This document focuses on managing the driving forces which move air and moisture across the building envelope. While other previously published Measure Guidelines focus on elimination of air pathways, the ultimate goal of this Measure Guideline is to manage drivers which cause air flow and water vapor transport across the building envelope (and also within the home), control air infiltration,keep relative humidity (RH) within acceptable limits, avoid combustion safety problems, improve occupant comfort, and reduce house energy use.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Safe operating conditions for NSLS-II Storage Ring Frontends commissioning

The NSLS-II Storage Ring Frontends are designed to safely accept the synchrotron radiation fan produced by respective insertion device when the electron beam orbit through the ID is locked inside the predefined Active Interlock Envelope. The Active Interlock is getting enabled at a particular beam current known as AI safe current limit. Below such current the beam orbit can be anywhere within the limits of the SR beam acceptance. During the FE commissioning the beam orbit is getting intentionally disturbed in the particular ID. In this paper we explore safe operating conditions for the Frontends commissioning.

43 PARTICLE ACCELERATORS↗

Idaho National Laboratory Radioisotope Power Systems Nuclear Operations: Readiness Assessments Supporting a Nuclear-enabled NASA Mission

Idaho National Laboratory Radioisotope Power Systems Nuclear Operations: Preparations, Documentation, Readiness Assessments and Conduct of Operations Supporting a Nuclear-enabled NASA Mission Kelly L. Lively, Eric S. Clarke, Robert P. Gomez Idaho National Laboratory, Idaho Falls, ID 83415 208-533-7388; Kelly.Lively@inl.gov Abstract. The Radioisotope Power Systems (RPS) Program, located at Idaho National Laboratory (INL), is responsible for assembling, testing, and delivering plutonium oxide-fueled RPSs for use in powering missions in remote, harsh environments such as deep space. An informative presentation will be given discussing the preparations, documents, readiness assessments, human capital and conduct of operations involved in performing nuclear operations to support providing these systems to end users for the Department of Energy (DOE). DOE is the start-up authority for performing nuclear operations. Readiness for start-up is determined through independent assessment against established acceptance criteria to ensure activities can be performed safely and within a well defined nuclear safety envelope. There is also an RPS Program approval element requiring additional readiness review before nuclear operations can begin. The programmatic readiness review is performed to ascertain readiness to proceed with nuclear operations from the perspective of product quality. The assessments and reviews are conducted in series in the following order of progression: Management Self Assessment (MSA), Contractor Readiness Assessment (CRA), DOE Readiness Assessment (DOE RA) and lastly, the Programmatic Production Readiness Review (PRR). The CRA, DOE RA, and PRR requires an independent technical review team. Twelve assessment criteria are reviewed and a selection of the criteria is identified for review on a graded approach. Typically, the assessments/review criteria requires, at a minimum, review of operating instructions to ensure technical safety requirements are adequately identified, review of training records to ensure personnel are adequately trained to perform the specified work scope, personnel are interviewed to determine adequacy of level of knowledge for work scope, and a high-fidelity performance of the operation to ensure the operating instructions and conduct of operations are adequate to perform the work scope. As each assessment/review is conducted a formal report delineating any issues in the form of findings, observations, and noteworthy practices will be issued. Before start-up approval is obtained all issues must be resolved to the satisfaction of the individual teams. Start-up notification is formally communicated by memorandum from DOE. Programmatic approval is documented in a Segmented Readiness Review where vested Program representatives in the RPS community (to include DOE NE 75 and DOE ID representatives) ensure personnel, documentation, and materials are in place to perform the activity. The four assessments/reviews can be completed in a 16-week period of time, provided ample resources and a relatively small work scope is identified. RPS assembly and testing operations to support the Mars 2020 Mission, the next planned space mission using a nuclear power system, will require about of year of assessments/reviews before the nuclear operations are performed. Keywords: INL, Operations, Assessments, DOE

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Integration of the full-acceptance detector into the JLEIC

For physics requirements, the JLEIC (Jefferson Lab Electron Ion Collider) has a full-acceptance detector, which brings many new challenges to the beam dynamics integration. For example, asymmetric lattice and beam envelopes at interaction region (IR), forward detection, and large crossing angle with crab dynamics. Also some common problems complicate the picture, like coupling and coherent orbit from detector solenoid, high chromaticity and high multipole sensitivity from low beta-star at interaction point (IP), collision mode with different energy and ion species. Meanwhile, to get a luminosity level of a few 1033 cm-2sec-1, small ?* are necessary at the IP, which also means large ? in the final focus area, chromaticity correction sections, etc. This sets a constraint on the field quality of magnets in large beta areas, in order to ensure a large enough dynamic aperture (DA). In this context, limiting multipole components of magnets are surveyed to get a standard line. And continuously, multipole magnets as dedicated correctors are studied to provide semi-local corrections of specific multipole components beyond the standard line. This report will mention those contents.

Wei, G.H.↗

Techno-Economic Analysis of Dynamic Building Envelopes Comprising Phase Change Materials and Switchable Insulations: Preprint

Integrating phase change materials (PCMs) in building envelopes is a recognized technique to reduce the space heating/cooling loads and provide load shedding and shifting capacity. However, PCM benefits have been found to reduce dramatically with increase in the insulation requirements. Dynamic building envelopes that can alter their thermal resistance based on the indoor and outdoor conditions can effectively harness free ambient heating/cooling, thereby greatly enhancing the benefits of the PCM-integrated envelope in managing thermal loads. In this study, we examine various combinations of PCMs and switchable insulations and compare their combined impact on heat flow through the building envelope. Using numerical analysis, we investigate the PCM- and switchable insulation-integrated building walls, calculate the potential energy saving benefits compared to the conventional static walls, and finally perform technoeconomic analysis to estimate the acceptable cost of the technology under various payback period scenarios.

dynamic building envelopes↗

USING CFD TO ANALYZE NUCLEAR SYSTEMS BEHAVIOR: DEFINING THE VALIDATION REQUIREMENTS

A recommended protocol to formulate numeric tool specifications and validation needs in concert with practices accepted by regulatory agencies for advanced reactors is described. The protocol is based on the plant type and perceived transient and accident envelopes that translates to boundary conditions for a process that gives the: (a) key phenomena and figures-of-merit which must be analyzed to ensure that the advanced plant can be licensed, (b) specification of the numeric tool capabilities necessary to perform the required analyses—including bounding calculational uncertainties, and (c) specification of the validation matrices and experiments--including the desired validation data. The result of applying the process enables a complete program to be defined, including costs, for creating and benchmarking transient and accident analysis methods for advanced reactors. By following a process that is in concert with regulatory agency licensing requirements from the start to finish, based on historical acceptance of past licensing submittals, the methods derived and validated have a high probability of regulatory agency acceptance.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Techno-Economic Analysis of Dynamic Building Envelopes Comprising Phase Change Materials and Switchable Insulations

Integrating phase change materials (PCMs) in building envelopes is a recognized technique to reduce the space heating/cooling loads and provide load shedding and shifting capacity. However, PCM benefits have been found to reduce dramatically with increase in the insulation requirements. Dynamic building envelopes that can alter their thermal resistance based on the indoor and outdoor conditions can effectively harness free ambient heating/cooling, thereby greatly enhancing the benefits of the PCM-integrated envelope in managing thermal loads. In this study, we examine various combinations of PCMs and switchable insulations and compare their combined impact on heat flow through the building envelope. Using numerical analysis, we investigate the PCM- and switchable insulation-integrated building walls, calculate the potential energy saving benefits compared to the conventional static walls, and finally perform techno-economic analysis to estimate the acceptable cost of the technology under various payback period scenarios.

dynamic building envelopes↗

Design of the ECCE detector for the Electron Ion Collider

The EIC Comprehensive Chromodynamics Experiment (ECCE) detector has been designed to address the full scope of the proposed Electron Ion Collider (EIC) physics program as presented by the National Academy of Science and provide a deeper understanding of the quark-gluon structure of matter. To accomplish this, the ECCE detector offers nearly acceptance and energy coverage along with excellent tracking and particle identification. The ECCE detector was designed to be built within the budget envelope set out by the EIC project while simultaneously managing cost and schedule risks. Finally, this detector concept has been selected to be the basis for the EIC project detector.

47 OTHER INSTRUMENTATION↗

Analyses in Support of Risk-Informed Natural Gas Vehicle Maintenance Facility Codes and Standards: Phase I

Safety standards development for maintenance facilities of liquid and compressed gas fueled large-scale vehicles is required to ensure proper facility design and operation envelopes. Standard development organizations are utilizing risk-informed concepts to develop natural gas vehicle (NGV) codes and standards so that maintenance facilities meet acceptable risk levels. The present report summarizes Phase I work for existing NGV repair facility code requirements and highlights inconsistencies that need quantitative analysis into their effectiveness. A Hazardous and Operability study was performed to identify key scenarios of interest. Finally, scenario analyses were performed using detailed simulations and modeling to estimate the overpressure hazards from HAZOP defined scenarios. The results from Phase I will be used to identify significant risk contributors at NGV maintenance facilities, and are expected to form the basis for follow-on quantitative risk analysis work to address specific code requirements and identify effective accident prevention and mitigation strategies.

33 ADVANCED PROPULSION SYSTEMS↗

R Coronae Borealis Star Evolution: Simulating 3D Merger Events to 1D Stellar Evolution Including Large-scale Nucleosynthesis

R Coronae Borealis (RCB) stars are rare hydrogen-deficient carbon-rich variable supergiants thought to be the result of dynamically unstable white dwarf mergers. In this article, we attempt to model RCB stars through all the relevant timescales by simulating a merger event in Octo-tiger, a 3D adaptive mesh refinement (AMR) hydrodynamics code, and mapping the post-merger object into MESA, a 1D stellar evolution code. We then post-process the nucleosynthesis on a much larger nuclear reaction network to study the enhancement of s-process elements. We present models that match observations or previous studies in most surface abundances, isotopic ratios, early evolution, and lifetimes. We also observe similar mixing behavior to previous modeling attempts that result in the partial He-burning products visible on the surface in observations. However, we do note that our subsolar models lack any enhancement in s-process elements, which we attribute to a lack of hydrogen in the envelope. We also find that the 16 O/ 18 O isotopic ratio is very sensitive to initial hydrogen abundance and increases outside of the acceptable range with a hydrogen mass fraction greater than 10 -4 .

79 ASTRONOMY AND ASTROPHYSICS↗

Greenbelt Homes Pilot Program: Summary of Building Envelope Retrofits, Planned HVAC Equipment Upgrades, and Energy Savings

In the fall of 2010, a multiyear pilot energy efficiency retrofit project was undertaken by Greenbelt Homes, Inc, (GHI) a 1,566 home cooperative of circa 1930 and 1940 homes in Greenbelt, Maryland. GHI established this pilot project to serve as a basis for decision making for the rollout of a decade-long community-wide upgrade program that will incorporate energy efficiency improvements to the building envelope and mechanical equipment. It presents a unique opportunity to evaluate and prioritize the wide-range of benefits of high-performance retrofits based on member experience with and acceptance of the retrofit measures implemented during the pilot project. Addressing the complex interactions between benefits, trade-offs, construction methods, project management implications, realistic upfront costs, financing, and other considerations, serves as a case study for energy retrofit projects to include high-performance technologies based on the long-term value to the homeowner. The pilot project focused on identifying the added costs and energy savings benefits of improvements.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Waste Glass Property Database and Data Qualification Plan

The U.S. Department of Energy vitrification facilities currently employ glass property-composition models to ensure processability of waste streams and acceptability of the final glass products. The efficiency (e.g., process flexibility, reduced down time, and reduced cost) of waste vitrification is directly tied to the size of the waste processing envelope. To increase the size of the processing envelope, a larger database was developed. The database will improve the prediction accuracy of glass properties, leading to higher waste loadings, higher waste throughput, broader process flexibility, and reduced mission life. Some of the data in this expanded database has insufficient quality assurance (QA) rigor for use in nuclear facility operation and glass qualification. A plan was developed to qualify high-value data under the appropriate QA rigor for use at the Hanford Waste Treatment and Immobilization Plant’s High-Level Waste (HLW) Facility. This qualification plan first compares the data coverage over the composition region of interest to Hanford HLW by property. Those studies that significantly improve the data coverage in the Hanford HLW glass composition region were prioritized for qualification activities. Qualification methods including QA equivalence, peer review, data corroboration, and confirmatory testing have been assigned to each high-priority study.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Existing Whole-House Solutions Case Study: Greenbelt Homes, Inc. Pilot Retrofit Project

In the fall of 2010, a multiyear pilot energy efficiency retrofit project was undertaken by Greenbelt Homes, Inc., (GHI) a 1,566 home cooperative of circa 1930 and 1940 homes in Greenbelt, Maryland. GHI established this pilot project to serve as a basis for decision making for the rollout of a community-wide upgrade program that will incorporate energy efficiency improvements to the building envelope and mechanical equipment. With the community upgrade fully funded by the cooperative through their membership without outside subsidies, this project presents a unique opportunity to evaluate and prioritize the wide range of benefits of high-performance retrofits based on member experience with and acceptance of the retrofit measures implemented during the pilot project. Addressing the complex interactions between benefits, trade-offs, construction methods, project management implications, realistic upfront costs, financing, and other considerations, serves as a case study for energy retrofit projects that include high-performance technologies based on the long-term value to the homeowner. The pilot project focused on identifying the added costs and energy-savings benefits of improvements. Phase 1—baseline evaluation for a representative set of 28 homes sited in seven buildings; Phase 2—installation of the building envelope improvements and continued monitoring of the energy consumption for the heating season; Phase 3—energy simulations supporting recommendations for HVAC and water heating upgrades.

Attic↗

Building America Case Study: Whole-House Solutions for Existing Homes: Greenbelt Homes, Inc. Pilot Retrofit Program; Whole-House Solutions for Existing Homes, Energy Efficiency & Renewable Energy (EERE)

In the fall of 2010, a multiyear pilot energy efficiency retrofit project was undertaken by Greenbelt Homes, Inc, (GHI) a 1,566 home cooperative of circa 1930 and 1940 homes in Greenbelt, Maryland. GHI established this pilot project to serve as a basis for decision making for the rollout of a decade-long community-wide upgrade program that will incorporate energy efficiency improvements to the building envelope and mechanical equipment. With the community upgrade fully funded by the cooperative through their membership without outside subsidies, this project presents a unique opportunity to evaluate and prioritize the wide-range of benefits of high-performance retrofits based on member experience with and acceptance of the retrofit measures implemented during the pilot project. Addressing the complex interactions between benefits, trade-offs, construction methods, project management implications, realistic upfront costs, financing, and other considerations, serves as a case study for energy retrofit projects to include high-performance technologies based on the long-term value to the homeowner. The pilot project focused on identifying the added costs and energy savings benefits of improvements. Phase 1: baseline evaluation for a representative set of 28 homes sited in seven buildings; Phase 2: installation of the building envelope improvements and continued monitoring of the energy consumption for the heating season and energy simulations supporting recommendations for HVAC and water heating upgrades to be implemented in Phase 3.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Greenbelt Homes Pilot Program: Summary of Building Envelope Retrofits, Planned HVAC Equipment Upgrades, and Energy Savings

In fall 2010, Greenbelt Homes, Inc. (GHI) a 1,566-home cooperative of circa 1930-1940 homes in Greenbelt, Maryland, undertook a multiyear pilot energy efficiency retrofit project. GHI established this pilot project as a basis for decision making for the rollout of a decade-long community-wide upgrade program that will incorporate energy-efficiency improvements to the building envelopes and mechanical equipment. The community upgrade is fully funded by the cooperative through its membership with no outside subsidies. This project thus presents a unique opportunity to evaluate and prioritize the wide range of benefits of high-performance retrofits based on member experience with and acceptance of the retrofit measures implemented during the pilot project. Addressing the complex interactions between benefits, tradeoffs, construction methods, project management implications, realistic upfront costs, financing, and other considerations provides a case study for energy retrofit projects to include high-performance technologies based on the long-term value to the homeowner.

Array↗

DELTA SCUTI, SX PHOENICIS, AND RR LYRAE STARS IN GALAXIES AND GLOBULAR CLUSTERS

The distances to four galaxies and two globular clusters which are derived with the aid of period-luminosity and period-color relations of {delta} Scuti and SX Phe stars are compared to the distances derived by other methods, in particular RR Lyrae stars. We examine the luminosities of horizontal branch or RR Lyrae stars in Oosterhoff I and II globular clusters. Observational data from a variety of sources indicate a discontinuous jump of {approx}0.2 mag in the luminosities of RR Lyrae variables at [Fe/H] {approx} -1.5 as we transition from Oosterhoff I to Oosterhoff II clusters. If Oosterhoff I clusters have RR Lyrae variables with average M{sub V} values of M{sub V} = 0.53 mag at [Fe/H] = -1.5, it implies that RR Lyrae stars in Oosterhoff II clusters average M{sub V} values are {approx}0.34 mag. Unlike the Oosterhoff I clusters which show an increase in the V luminosity of RR Lyrae stars as [Fe/H] becomes smaller, little or no change in the V luminosity of RR Lyrae variables is evident in Oosterhoff II clusters in the interval of [Fe/H] from -1.5 to -2.2. We find distance moduli found with RR Lyrae variables agree to {<=}0.04 mag with those found with the {delta} Scuti and/or SX Phe variables if the M{sub V} values of RR Lyrae stars above are adopted. We find evidence of recent star formation (presence of near solar-metallicity {delta} Scuti stars with ages of 150 Myr to 1 Gyr) in the Large Magellanic Cloud (LMC), Small Magellanic Cloud, and the central region of the Fornax (dSph) galaxies. We also find an older population of metal-poor {delta} Scuti variables (SX Phe stars) in the LMC and Fornax galaxies. The Carina dSph is unique in that only an old population of metal-poor {delta} Scuti variables is evident. No evidence of recent {delta} Scuti star formation is found. The minimum periods observed for the SX Phe variables (blue stragglers) in the globular clusters M55 and {omega} Cen indicate that they could have been formed in a burst of metal-poor single star formation in the last 2.9-6 Gyr. If formed by the more acceptable scenario of stellar mergers, it is likely that the merged remnant resembles a normal star in a relatively advanced stage of main-sequence evolution with an enriched He core and ordinary He envelope. We present equations to calculate intrinsic-color indices for {delta} Scuti, SX Phe, and RR Lyrae stars at mean light. Finally, we show that the fundamental-radial-pulsating stars ({delta} Sct and SX Phe variables) have larger average light amplitudes than the first-overtone pulsating variables. The fundamental metal-poor variables (SX Phe stars) have the largest average and individual amplitudes.

79 ASTRONOMY AND ASTROPHYSICS↗

WIPP Certification of the Retrieval Box Assay System at the Advanced Mixed Waste Treatment Plant, Idaho - 16241

The Retrieval Box Assay System (RBAS) at the Advanced Mixed Waste Treatment Plant (AMWTP) is an Imaging Passive Active Neutron system supplemented with a High Purity Germanium (HPGe) gamma system for the quantification of Pu-239 Fissile Gram Equivalent (FGE) and transuranic (TRU) alpha activity of waste containers of various sizes up to 249 cm x 149 cm x 198 cm (Length x Width x Height). The system was originally calibrated in 2002 (with a range of surrogate matrices and radioactive sources in a 213 cm x 122 cm x 122 cm FRP box) and has been operational for over a decade. As of August 2015, the RBAS has measured approximately 18,000 boxes (50,000 m3 of waste) which has subsequently been fed into the facility's treatment process. Its success, and the wide envelope of waste that it can characterize, has led AMWTP to extend the RBAS mission to include WIPP certification. As part of this new project, the instrument must be capable of meeting WIPP's Waste Acceptance Criteria (WAC) which include reporting activities and masses of the 10 WIPP-tracked radionuclides. The system will be required to assay sludge and debris waste streams, shredded waste and large metal items. The container size includes Standard Waste Box (SWBs), Fiberglass Reinforced Plywood (FRPs) and large Shredder Boxes. Sludge matrices will be loaded into 210-liter (55-gallon) drums and placed inside an SWB. After assay, boxes will be over-packed into SLB-II's for shipment to WIPP. The target waste streams will contain mixtures of Weapons Grade plutonium, Heat Source plutonium (high in Pu-238 content) and Mixed Oxide (MOX). The activity of the waste is expected to encompass a wide dynamic range of activity from low-level waste (LLW) to TRU with up to several hundred grams of plutonium. Some packages will have high gamma activity associated with fission and activation products such as Cs-137 and Co-60. The existing RBAS hardware (detectors, electronics, assay chamber etc.) was retained for this project. Two lead filters were provided and installed on the existing filter wheels to attenuate the gamma ray flux from the highest activity boxes to avoid overload of the HPGe detectors. The new software suite includes PC-FRAM (Version 5), which is used for the isotopic analysis of the gamma spectra. Integration of FRAM and neutron results is performed using a software package known as RBAS WIPP Analysis Reporting Software (RWARS). This package also performs matrix dependent background adjustments. Other upgrades provided include automated tests that identify when assay parameters fall outside a predetermined range and a new Quality Checking (QC) application. Minimum Detectable Activity (MDA) values were determined for the active and passive neutron modes as a function of measured matrix correction indices. The resulting Minimum Detectable Concentration (MDC) has been demonstrated to be less than 3700 Bq/g alpha activity (100 nCi/g). Modifications were performed to update the system TMU parameters to accommodate assay of non-standard size boxes and a wider range of matrix materials. A series of calibration confirmation, measurements were performed on site in 2014 using a representative range of surrogate boxes and radioactive sources including Pu. The WIPP WAC performance criteria were successfully demonstrated up to 157 g Pu and the system passed its first Performance Demonstration Program (PDP) cycle in the Spring of 2015. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

R&D for Safety Codes and Standards: Materials and Components Compatibility

A principal challenge to the widespread adoption of hydrogen infrastructure is the lack of quantifiable data on its safety envelope and concerns about additional risk from hydrogen. To convince regulatory officials, local fire marshals, fuel suppliers, and the public at large that hydrogen refueling is safe for consumer use, the risk to personnel and bystanders must be quantified and minimized to an acceptable level. Such a task requires strong confidence in the safety performance of high pressure hydrogen systems. Developing meaningful materials characterization and qualification methodologies in addition to enhancing understanding of performance of materials is critical to eliminating barriers to the development of safe, low-cost, high-performance high-pressure hydrogen systems for the consumer environment.

36 MATERIALS SCIENCE↗