Search NASASearch

SEARCH · Search NASA

Results for “audits”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

NM 502 Road Safety Audit Report

The Texas A&M Transportation Institute (TTI) and the Los Alamos National Laboratory - Parking and Transportation Services (LANL) have been working in close collaboration to seek solutions for parking, traffic operations, traffic safety, and transit issues facing LANL. NM 502 is a main route for employee traffic entering the lab as well as traffic in and out of the Los Alamos Townsite. The section of roadway in the vicinity of Camino Entrada is of particular interest as it was the site of two very serious crashes involving the extended LANL family, and it is also the entry point onto NM 502 for Los Alamos County Operations to include the school district and transit vehicles.

29 ENERGY PLANNING, POLICY, AND ECONOMY

Feature Engineering and Ensemble Methods for Imbalanced ICS Intrusion Detection: Pipeline Audit and Constrained Evaluation

Industries are becoming increasingly connected and are more vulnerable to cyberattacks due to the widened attack surface. Industrial Control Systems (ICS) are among the most critical sectors that malicious actors can target, as such attacks can cause significant operational disruption and physical damage. It is imperative to detect such attacks as early as possible. This paper evaluates constraint-conditioned optimistic performance estimates for traditional ML models in ICS intrusion detection (i.e., estimates obtained under contiguous, non-shuffled temporal evaluation without test-set alteration, but with pre-split feature engineering that may introduce temporal leakage, due to dataset constraints). Our findings are threefold. First, we quantify how iterative feature engineering affects tree-based ensemble performance and examine how pipeline decisions (split strategy, sampling scope, and cleaning policy) can inflate or reduce reported IDS results under constraint-bound evaluation. Second, we compare intrinsic class-imbalance handling across ensemble models. Third, under our current pipeline constraints (including pre-split feature engineering), CatBoost achieves the best performance on Water Storage Tank (accuracy: 0.9831, class-1 F1: 0.9682), while Light- GBM achieves the best performance on Gas Pipeline (accuracy: 0.9618, class-1 F1: 0.9086).

97 MATHEMATICS AND COMPUTING

Radio Frequency Spectrum Audit to Inventory Private Cellular Base Station Infrastructure

The ever-changing cellular communication landscape makes it difficult to identify, map, and localize cellular base stations. Localizing cellular base stations provides various advantages, including information security, cybersecurity, spectrum management, and interference detection. For example, the MITRE ATT&CK® (Adversarial Tactics, Techniques, and Common Knowledge architecture) [1] and Common Attack Pattern Enumeration and Classification [2] emphasize the importance of being able to minimize the cyber security threat presented by unregulated private cellular base stations (PCBS). The majority of published research looks at the malicious use of PCBSs and focuses on using data retrieved from user equipment (UE), data obtained from an application on the UE, or data shared between the UE and a mobile network to locate it. This innovative strategy, however, focuses on the passively discovered uniqueness of radio frequency (RF) transmissions from commercial cellular infrastructure received in a designated monitoring position (DMP).

42 ENGINEERING

Program audit, A management tool

Program gives in-depth view of organizational performance at all levels of the management structure, and provides means by which managers can effectively and efficiently evaluate adequacy of management direction, policies, and procedures.

Miller, T. J.

Space Shuttle critical function audit

A large fault-tolerance model of the main propulsion system of the US space shuttle has been developed. This model is being used to identify single components and pairs of components that will cause loss of shuttle critical functions. In addition, this model is the basis for risk quantification of the shuttle. The process used to develop and analyze the model is digraph matrix analysis (DMA). The DMA modeling and analysis process is accessed via a graphics-based computer user interface. This interface provides coupled display of the integrated system schematics, the digraph models, the component database, and the results of the fault tolerance and risk analyses.

Sacks, Ivan J.

System Critical Design Audit (CDA)

Small Satellite Technology Initiative (SSTI) Lewis Spacecraft Program is evaluated. Spacecraft integration, test, launch, and spacecraft bus are discussed. Payloads and technology demonstrations are presented. Mission data management system and ground segment are also addressed.

Source record

Two-stage formation-energy correction (NbZr, TaZr, VZr)

This bundle contains the scripts, the raw and corrected per-structure data, and the manuscript plots for the NbZr / TaZr / VZr BCC binary formation energies and the associated RMSDs. Why a two-stage correction is necessary: The "raw" formation energy of every relaxed VASP configuration is computed in the usual way, FE_raw(c) = E_alloy(c) - sum_i x_i * E_pure_i , where E_pure_i are the per-atom total energies of the pure-element reference structures (Nb, Ta, V, Zr in the same BCC supercell, with identical INCAR / KPOINTS / PAW choices). With perfectly consistent reference runs the raw FE should vanish at the two pure-element endpoints (x = 0 and x = 1) by construction. In practice this does not hold for two reasons that are present in our dataset: 1. Reference-energy inconsistency (composition-dependent bias). Even with identical input parameters, the pure-element runs (stored in `corrected_DFT_pure_element_runs/`) differ slightly from the values that would be implied by the alloy runs at near-pure compositions (a few meV/atom). This bias is approximately linear in concentration, because the residual error in E_pure_Nb (or E_pure_Ta / E_pure_V) propagates into FE_raw(c) as (1 - x) * dE_pure_1, and the corresponding error in E_pure_Zr propagates as x * dE_pure_2. Left uncorrected, this produces a non-physical "tilt" of FE_raw(x) and shifts the entire FE-vs-x cloud away from zero at the endpoints. 2. Endpoint anchoring against the audited true endpoints. The strict endpoint values (FE_x0_meVatom, FE_x1_meVatom in `corrected_fe_strict_endpoints_20260518/strict_endpoint_check_20260518.csv`) were re-derived from an independent cross-check of the pure-element runs. After stage 1 removes the linear bias, the near-pure compositions in the alloy dataset still extrapolate to values that differ slightly from these audited endpoints — because stage 1 is fit from a few near-end alloy bins, not from the audited pure-element references themselves. The README.txt file discusses how these issues are addressed by the two-stage correction, and describes folder layout, pipeline summary, and how to re-run.

36 MATERIALS SCIENCE

Reported Energy and Cost Savings from the DOE ESPC IDIQ Program: FY 2024

Energy Savings Performance Contracts (ESPCs)are a contractual mechanism that allow a federal agency to procure energy savings and facility improvements without upfront capital costs to reduce costs and resiliency. ESPCs are covered under FAR Part 23.2, and 42 USC § 8287. Section 8287(a)(2)(A) of Title 42 of the U.S. Code requires that each energy savings performance contract (ESPC) undergo an annual energy audit, resulting in a separate audit report for every project. The objective of the present report is to compile and analyze all annual ESPC audit reports issued between October 1, 2023, and September 30, 2024, for projects awarded under Generations 1, 2, and 3 of DOE’s ESPC IDIQ contracts. During this period, 205 measurement and verification (M&V) reports were produced for 200 projects; the total number of reports exceeds the number of projects because some projects generated more than one report(for example, a few projects measure savings twice per year and produce two audit reports annually, each covering a different six-month period). By aggregating the results from these individual audits, the report determines the portfolio-wide realization rate of energy and cost savings for all active ESPC projects awarded under DOE’s IDIQ program. For all 205audit reports, sufficient information was available to compare project-level estimated, reported, and guaranteed cost savings. Reported cost savings accounted for ESCO verified savings per each project’s M&V plan. The total reported cost savings for the period addressed were $\$$647.8million,compared with the total guaranteed cost savings of $\$$601.6million. On average across the reported projects: •ESPC contractors guaranteed 92.8% of the estimated cost savings• projects reported achieving 100.0% of the estimated cost savings• projects reported achieving 107.7% of the guaranteed cost savings. The M&V performed for the period indicated adjustments for government operations and maintenance impacts to savings amount to$\$$43.9millionandcould be restored with the original operational parameters for impacted projects. Accounting for this potential cost savings impact, these projects still realized 100.4% of the guaranteed cost savings. The information on estimated and reported energy savings was collected and compared for all 205of the reports examined. Based on site energy, estimated savings totaled 14.88million MMBtu, and reported savings were 15.33million MMBtu; 3.1% greater than the estimated energy savings. All of the reports examined contained sufficient information to calculate source energy savings. Based on site-adjusted source energy, total estimated energy savings were 20.90 million MMBtu, and reported savings were 21.22million MMBtu, 101.5% of the estimated energy savings. For water savings, the estimated savings were 11,539,055 kGal and the reported savings were 13,315,930 kGal. This means 1,776,875 kGal more water was saved than estimated, which is about 15% higher than the estimate. These results indicate that, overall, the reported energy savings slightly exceeded the estimated values, while estimated water savings significantly exceeded estimated values, suggesting that the projects achieved greater cost savings than originally projected. The total annual expense for the ESCOs to perform annual M&V audits and reporting was $\$$10.02million. Through this effort, $\$$647.8 million in annual cost savings was verified. The M&V results indicated that $\$$43.9 million of these verified savings reflected adjustments due to government operations A-6and maintenance impacts, which could be restored under the original operational parameters for the affected projects. These findings show the value of M&V that only costs 1.7%of the guaranteed cost savings to ensure guarantees are met.

29 ENERGY PLANNING, POLICY, AND ECONOMY

BuildingSync® v.2.7.0 (released 9.11.2025) [SWR-18-28]

BuildingSync® is a building data exchange schema to better enable integration between software tools and building data workflows. The schema's original use case was focused on commercial building energy audits; however, several additional use cases have been realized including building energy modeling and more high-level generic building data exchange. Version 2.7.0 adds new elements for file attachment feature and FederalBuilding, and generalizes usage of Optional Elements (e.g. EquipmentCondition, EquipmentID) to all assets/systems. BuildingSync helps streamline the data exchange process, improving the value of the data, minimizing duplication of effort for subsequent building data collection efforts (including audits), and facilitating the achievement of greater energy efficiency. This in done in part by standardizing on (a) reporting audits in an electronic format, (b) tracking proposed, implemented, and discarded energy conservation measures, and (c) storing building characteristics (at multiple levels) for audits, benchmarking, and building energy analysis. BuildingSync has several documents and tools available to help users understand how to best leverage BuildingSync. The list below are only a subset of the resources available. If new resources are discovered, then feel free to create a new pull request with the additions. Generic BuildingSync information is available on the DOE website and the project website. BuildingSync Examples - These examples are kept up to date and show a wide range of implementations. Any new update to BuildingSync is required to pass validation on these example files. BuildingSync Use Case Validator allows for users to determine if their instance complies with a specific use case for BuildingSync by checking if the required elements are implemented in an uploaded instance. An API is also provided for automated integration into other tools. Also, the website contains an easy way to view the entirety of the schema and how elements relate to the Building Exchange Data Exchange Specification. The Validator is open sourced here Use Case TestSuite provides a Python package for easier generation of BuildingSync use cases. BuildingSync use cases depend on the generation of schematron documents, which is time-consuming and difficult to implement well. The TestSuite allows users to define a use case using a more palatable CSV template, which it then turns into a Schematron document. The source code is available here. BuildingSync to OpenStudio/EnergyPlus. The translator is open sourced here. This project will translate a Level 1 (and partial Level 2) ASHRAE Energy Audit to a fully defined OpenStudio and EnergyPlus model. This project is in early Beta testing and any feedback is welcome!

Long, Nicholas [National Renewable Energy Lab. (NR

Reported Energy and Cost Savings from the DOE ESPC IDIQ Program: FY 2024

Energy Savings Performance Contracts (ESPCs) are a contractual mechanism that allow a federal agency to procure energy savings and facility improvements without upfront capital costs to reduce costs and enhance mission resiliency. ESPCs are covered under FAR Part 23.2, and 42 USC § 8287. Section 8287(a)(2)(A) of Title 42 of the U.S. Code requires that each energy savings performance contract (ESPC) undergo an annual energy audit, resulting in a separate audit report for every project. The objective of the present report is to compile and analyze all annual ESPC audit reports issued between October 1, 2023, and September 30, 2024, for projects awarded under Generations 1, 2, and 3 of DOE’s ESPC IDIQ contracts. During this period, 205 measurement and verification (M&V) reports were produced for 200 projects; the total number of reports exceeds the number of projects because some projects generated more than one report (for example, a few projects measure savings twice per year and produce two audit reports annually, each covering a different six-month period). By aggregating the results from these individual audits, the report determines the portfolio-wide realization rate of energy and cost savings for all active ESPC projects awarded under DOE’s IDIQ program.

29 ENERGY PLANNING, POLICY, AND ECONOMY

The Office of Inspector General (OIG)

The NASA Office of Inspector General is the Federal Law Enforcement Agency at NASA which conducts criminal and regulatory investigations in which NASA is a victim. The OIG prevents and detects crime, fiaud, waste and abuse and assists NASA management in promoting economy, efficiency, and effectiveness in its programs and operations. Investigations (OI) and the Office of Audits (OA). The investigations side deals with criminal Investigations, administrative investigations, and civil investigations. The Audits side deals with inspections and assessments as well as the Auditing of NASA Programs and Activities. Our mission at the OIG is to conduct and supervise independent and objective audits and investigations relating to agency programs and operations; to promote economy, effectiveness and efficiency within the agency; to prevent and detect crime, fraud, waste and abuse in agency programs and operations; to review and make recommendations regarding existing and proposed legislation and regulations relating to agency programs and operations. We are also responsible for keeping the agency head and the Congress fully and currently informed of problems in agency programs and operations. deal with False Claims, False Statements, Conspiracy, Theft, Computer Crime, Mail Fraud, the Procurement Integrity Act, the Anti-Kickback Act, as well as noncompliance with NASA Management Instructions, the Federal Acquisition Regulations (FAR), and the Code of Federal Regulations (CFR). Most of the casework that is dealt with in our office is generated through gum shoe work or cases that we generate on our own. These cases can come from Law Enforcement Referrals, GIDEP Reports, EPlMS (NASA Quality System), Defense Contract Audit Agency, Newspaper Articles, and Confidential Information. In many cases, confidentiality is the biggest factor to informants coming forward. We are able to maintain confidentiality because the 01 is independent of NASA Management and doesn t report to the Center Directors, therefore the informant s mangers and supervisors are unaware of the informants actions. The only time when an informant s confidentiality may be compromised is when it is needed in a Court of Law and is released through a Judicial Court Order. During my tenure here at the NASA OIG/OI at Glenn Research Center, I have been involved in many different tasks. They have ranged from updating Suspected Unapproved Parts case files to independently interviewing NASA employees to turn up general background information. The 01 has the duty of informing NASA aeronautical safety managers of potential Nonconforming products. My mission is to compile a database of Nonconformance reports for distribution. The background information that I turn up from my interviews is then used to determine NASA s susceptibility to acceptance of unapproved parts. The IG organization is divided up into two separate disciplines, the Office of 01 investigations primarily focus on violations of Federal laws. Some of these violations

Macisco, Christopher A.